You are on page 1of 75

Profil PT.

Trakindo Utama
& Aplikasi Caterpillar Paving Product
Di Dunia Konstruksi

Presented by
Tri Handoko
Caterpillar Paving Product
Caterpillar Asia Pte Ltd

PT. Trakindo Utama Company Profile

For the past 45 years, Trakindo has


experienced a rewarding journey to grow
and become The Customer Services
Company which provides customers
with world-class Caterpillar solutions and
services.

1970

2015

Vision

To be the world-class provider of


Caterpillar equipment solutions

Mission

To set up an entity that creates worthwhile and challenging job


opportunities to as many Indonesians as possible, while
incorporating the following values:
Continuous development of employees
Consistent capital growth (financial, intellectual, brand
identity) and
reinvestment of capital into the business, and
Maintaining highly ethical business practices.

Milestone

PT Trakindo Utama
was established by
AHK (Met) Hamami
on December 23rd.

1970

Trakindo established
a subsidiary, PT
Sanggar Sarana Baja,

Trakindo took part


in the construction
of Soekarno-Hatta
International Airport.

1977

1980

PT Natra Raya was


established as a joint
venture between
Caterpillar Inc. and
Trakindo as a
manufacturing and
assembling
company for
Caterpillar heavy
equipment.
Trakindo took part
Trakindo
in the construction
inaugurated
of PadalarangEmployee Pension Cileunyi Toll Road.
Fund on July 1st.

1982

Trakindo
established the first
Schedule Oil
Sampling (SOS)
Laboratory in
Jakarta.

1986

1991

1971

1978

1981

1984

1988

Trakindo became the


official sole distributor
for Caterpillar for
Indonesia on April
13th.
Jatiluhur Training
Center was
established.

Trakindo took part


in the construction
of Jagorawi Toll
Road, the first toll
road project in
Indonesia

Trakindo took part


in the construction
of Saguling Dam.

Trakindo took part


in the construction
of Cirata Dam.

The 1st heavy


equipment company
using on-line system
that is supported by
CDIS (Caterpillar
Dealer Information
System).

Milestone
Trakindo moved to its
own building at Jl.
Cilandak KKO, from the
previous office at Cilandak
Commercial Estate.
Trakindo established PT
Sumberdaya Sewatama,
genset rental company,

1992

Trakindo acquired
PT Chandra Sakti
Utama Leasing from
Standard Chartered
Bank

Trakindo
established PT Cipta
Kridatama,
Trakindo
established PT Cipta
Krida Bahari,

1995

1993
The first MARC
(Maintenance And
Repair Contract) for
Large Mining
Equipment was signed.

Trakindo
established the first
Component Rebuild
Center (CRC) in
Samarinda.

1997

Trakindo received
OHSAS 18001 : 2007,
certifying the
Company's
commitment towards
Safety Health and
Environment
management. Today,
11 Trakindo
branches have
received such
certification.

2000

1996

1999

AHK (Met) Hamami


established
Nayakatama
Foundation to
provide scholarship
and financial
support for
employees children
who excel
academically and
require additional
financial support to
continue their
education.

Trakindo
established PT Mitra
Solusi Telematika,
Nayakatama
Foundation changed
its name to
Mitratama
Foundation.

SOS Trakindo
received KAN (Komite
Akreditasi Nasional)
Accreditation.
Trakindo Utama Head Office moved to
its new building at TMT
Building.

2007

2002
The first CAT
Rental Store was
opened.
Trakindo started
deploying 6Sigma
business methodology.

2009

2008
Trakindo
Training
Center
Cileungsi
received a
five-star
Caterpillar
Learning
Accreditatio
n System
(CLAS)

Its all about commitment in


providing extensive services and
improving competitiveness, yet
positioning ourselves for longterm growth.

A.H.K Hamami
Founder

Trakindos Branch Offices

Products
Machines
Engines
CAT Rental
Store
Parts
Used Equipment
&
Used Parts
Non CAT
Products

Machines

Engines

and everything in between

Industries

Caterpillar Paving Product Facilities

5
MANUFACTURING
FACILITIES
WORLDWIDE
MINNEAPOLIS, U.S.A.

PIRACICABA, BRAZIL
RANTIGNY, FRANCE
MINERBIO, ITALY
XUZHOU, CHINA

Common use of Paving Products

Road Construction and Maintenance


Concept
1) New Road Construction
2) Road Maintenance
3) Road Stabilization

New Road Construction Streamlined Process


Hot Mix Asphalt
Compact
Land Clear

Grade

Compact

Pave

Compact

Roll

A road has a life

Starts when freshly built

After rain
After snow

Maybe some overloading

Then damage will start ...

Till the day


Hmmm
where is the
fish ?

Road Life Cycle

Good

Pavement
Condition

Poor
Time (Years)

Reference: National Highway Institute

Milling Solution
1
5

Road Maintenance
Milling Solution

2
2

Typical Damage
Surface cracks and deformation
Underlying structure undamaged

Cracks
Deformation
Asphalt Wearing Course
Asphalt Binder Course
Asphalt Base Course
Sub-base

Road maintenance Streamlined process

Compact

Milling

Sweep

Pave
Compact

Roll

Caterpillar Cold Planers

PM200

PM102

C18 ACERT engine


429 kW / 30,900 kg

C7 ACERT engine
168 kW / 17,600 kg

Applications: highways, national


roads, airports

Applications: city streets, urban


and secondary roads

Milling Solution
Process suitable when base is in
good condition and will support axle
loads
Cracks and deformation do not
extend through all asphalt courses
Asphalt mix materials are loaded to
a truck and then are recycled.

Asphalt Layers

Sub base

After milling...

Milled surface material


removed to a depth where
damage is no longer present

Mill & Pave


Damaged material removed
Paved with a new wear course

Rehabilitated surface extends the life of the road bed

Before

After ready to pave new


wear course

Road Stabilization / Rehabilitation


Streamlined Process

Rehabilitate /
Stabilize

Compact
Grade

Compact

Pave

Compact

Roll

ROTARY MIXERS
RM300

RM500

Model

Gross
Power

Weight

Cutting
Width

Cutting
Depth

RM500

540 hp
403 kW

62,060 lb
28 145 kg

96 in
2438
mm

20 in
508 mm

RM300

350 hp
261 kW

53,911 lb
24 454 kg

96 in
2438
mm

16 in
406 mm

Rehabilitation / Stabilization Process


Regulated addition of
fluids under pressure
Direction

Addition of aggregates
and / or cement on
existing road surface

Thick layer of
uniformly
mixed material

Undisturbed
subgrade support

Rehabilitation / Stabilization Process


First step is to pulverize
existing asphalt layer with
portion of the base
Additives applied after
pulverization or after rough
grading

Pulverization & mixing


passes are usually
separate for better
consistency

Recycled Road
Re-use of existing material economic / environmental benefits
Shorter project duration / less disruption to traffic
Addition of stabilizing agents improve underlying structure

Before

After ready to pave asphalt


layers

Caterpillar Paving
Product Line Overview

NPI & Product Updates B Series SCOM ( LRC )

36

VIBRATORY SOIL COMPACTORS


SMOOTH DRUM

10 20 ton Range

Model

Gross
Power

Compaction
Width

Weight
Class

CS78B

173.7 hp
129.5 kW

84 in
2134 mm

41,214 lb
20 T

CS76B

173.7 hp
129.5 kW

84 in
2134 mm

38,450 lb
17 T

CS74B

173.7 hp
129.5 kW

84 in
2134 mm

35,264 lb
16 T

CS68B

157 hp
117 kW

84 in
2134 mm

31,572 lb
14 T

CS66B

157 hp
117 kW

84 in
2134 mm

27,245 lb
12 T

CS64B

131 hp
98 kW

84 in
2134 mm

26,569 lb
12 T

CS56B

157 hp
117 kW

84 in
2134 mm

24,887 lb
11 T

CS54B

131 hp
98 kW

84 in
2134 mm

22,822 lb
10 T

CS533E XT

130 hp
97 kW

84 in
2134 mm

27,249 lb
12 T

CS533E

130 hp
97 kW

84 in
2134 mm

23,898 lb
10 T

VIBRATORY SOIL COMPACTORS


PADFOOT DRUM

10 16 ton Range

Model

Gross
Power

Compaction
Width

Weight
Class

CP74B

173.7 hp
129.5 kW

84 in
2134 mm

36,048 lb
16 T

CP68B

157 hp
117 kW

84 in
2134 mm

32,370 lb
15 T

CP56B

157 hp
117 kW

84 in
2134 mm

25,264 lb
11 T

CP54B

131 hp
98 kW

84 in
2134 mm

24,096 lb
11 T

CP533E

130 hp
97 kW

84 in
2134 mm

25,750 lb
10 T

NPI & Product Updates UCOM B Series

39

TANDEM VIBRATORY ROLLERS ( Utility )


Model

Gross
Power

Compaction
Width

Weight
Class

CB34B XW

49.1 hp
36.6 kW

55 in
1400 mm

9,267 lb
4.2 T

CB34B

49.1 hp
36.6 kW

51 in
1300 mm

9,267 lb
4.2 T

CC34B

49.1 hp
36.6 kW

51 in
1300 mm

8,091 lb
3.7 T

CB24B XT

33 hp
24.4 kW

47 in
1200 mm

6,885 lb
3.1 T

CB24B

33 hp
24.4 kW

47 in
1200 mm

6,003 lb
2.7 T

CC24B

33 hp
24.4 kW

47 in
1200 mm

5,380 lb
2.4 T

CB14B

22.5 hp
16.8 kW

39 in
1000 mm

3,351 lb
1.5 T

22.5 hp
16.8 kW

35 in
900 mm

3,274 lb
1.5 T

1000 mm (39)

1.5 4.2 ton Range

CB14B
900 mm (35)

NPI & Product Updates B Series ACOM ( LRC )

41

TANDEM VIBRATORY ROLLERS

8 10 ton Range

Model

Gross
Power

Compaction
Width

Weight
Class

CB54B

131 hp
98 kW

67 in
1700 mm

23,171 lb
10 T

CB44B

100 hp
75 kW

59 in
1500 mm

18,056 lb
8T

PNEUMATIC ROLLERS

Gross
Power

Compaction
Width

Weight
Class

Tier 3, Stage IIIA


Equiv.
129 hp (96.5 kW)

82 in
2080 mm

59,525 lb
10 - 27 T

PS150C HW

100 hp
78 kW

69 in
1743 mm

38,000 lb
17 T

PS150C

100 hp
78 kW

69 in
1743 mm

28,535 lb
12 T

Model
CW34

10 27 ton Range

NPI & Product Updates SAP AP300D plus combi screed

44

Asphalt Pavers ( Wheeled Type )


Wheeled Pavers
MODEL

Gross Power

Paving
Range

Tractor Wt

AP300D

71 hp (52 kW)

1.70 - 3.20 m

5.8 ton

AP500E

144 hp (106 kW)

1.83 7.00 m

12.9 ton

AP600D

174 hp (129 kW)

1.83 8.00 m

14.0 ton

AP1000E

225 hp (168 kW)

3.00 8.00 m

15.5 ton

Asphalt Pavers ( Tracked Type )


Track Pavers
MODEL

Gross Power

Paving
Range

Tractor Wt

AP255E

35.4 hp (26.4 kW)

1.40 2.60 m

4.5 ton *

AP555E

144 hp (106 kW)

1.83 8.00 m

14.1 ton

AP655D

174 hp (129 kW)

1.83 8.00 m

15.1 ton

AP1055E

225 hp (168 kW)

3.00 8.00 m

17.0 ton

Operating Wt with Screed *

CAT Paving Products


Success Stories

Thimarafushi Domestic
Airport

Paving in Paradise Thimarafushi Domestic Airport

Anhui Highway

Inner Mongolia

Beijing Town

Henan

Shanghai

Tianjin

Italy Padua

Beijing

Tiananmen

Indonesia

Singapore Changi Airport

South Korea

Italy

India

Saudi Arabia

South Korea

Hunan

Jiangsu

Liaoning

RM500 - China

RM500 - Indonesia

Lime Stabilisation of
Subgrades for Subdivision
Construction Existing clay
material

Timber Mill, Sumatra,


Indonesia

Paving All Day. Everyday.

Thank you

You might also like