BILL OF QUANTITIES

Item

Description

Qty.

Unit

Rate

Amount
Inr.

Sub Structure
Dewatering (Contactor
Investigation Report)

to

check

Soil
Item

Excavation from existing natural ground


level to a required depth for Footing, Strap
beams, Tie beams and service lines
including necessary compaction.

m3

Backfill with selected material in layers


including watering and compaction as per
the specs & engineers approval.

m3

Cart away surplus excavated material off


the site.

m3

Filling in plinth with selected material


including watering and compction as per
the specs & engineers approval.
Not include
Damp proof course/DPC for block work .
Applying 44mm thick water proofing
membrane and two coats of hot bitumen
115/15 over it . Above Tie beam all around
Villa+ above tie beam of Compound Wall.
m3
Anti - termite treatment
Pre Costruction Anti termite treatment
Dursban 4TCincluding 20 years
guarantee.(Supplier shoud be approved by
the Engineer)

Applied horizontally
Applied Vertically

m2
m2

Blinding including shuttering


50 mm thick PCC grade M 20, using
SRC 250 kg/m3.

m3

Concrete grade 25 using SRC 370 Kg/M3


RCC footings
Column necks
Tie/strap/plinth Beam

m3
m3
m3

To Collection

age 42 of 96

Fs.

Item

Description

Qty.

Unit

Walls 200mm thick

M3

Walls 300mm thick

M3

Reinforcement steel :

Ton

Rate

Reinforcement steel of all dia.


SOLID BLOCK WORK:
200mm thk solid block work using SR
Cement Below tie beams :

M2

Septic Tank and Soak away/ contractor to

Include here all related concrete works or


Steel, etc..
Shuttering works
Sides of footing

M2

Sides of walls

M2

Sides and soffits of floor beams

M2

Soffits of slab

M2

Sides of columns necks

M2

Sides of slabs

M2

Soffits of staircase and landings

M2

Sides of tie beams/plinth beams, sides of


strap beam.

M2

Entrance steps sides & riser.

M2

Sundries
Laying 1000 g polythene sheet

M2

Apply two coats of butimen emulsion to


concrete surface in touch with soil as per
specs and engineers approval.

M2

Under ground water tank (1,500 gallons)

To Collection
age 43 of 96

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

Super structure:
Walls 20mm thick

M3

Columns

M3

Floor beams

M3

Solid slabs

M3

Rib Slabs

M2

Projections/ upstand / cills .

M3

Staircases, steps and landings

M3

Parapet and moulds


Foundation for A / C machines, pumps,
water tanks etc.,

M3
Item

Grade slab 100mm thick

M2

Foam concrete

M3

REINFORCEMENT
Reinforcement steel of all dia.

Ton

A 142 Mesh

M2

Shuttering work:
Sides of walls

M2

Sides of columns

M2

Sides and soffits of floor beams

M2

Soffits of solid slab

M2

Sides of slabs

M2

Soffits of staircase and landings


M2
M

Edge of risers
To Collection

age 44 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

Amount
Inr.

Rate

Shuttering work: [Contd]


Sides of parapet and moulds
Sides and soffit of lintels / arches

M3

Sides of Projections/ upstand / cills / lintels


/ Arches

Generally :
The contractor will list here and price items
shown on the drgs., mentioned in the
specification or required for the satisfactory
completion of this section, but not mentioned
here. Any such items not listed below shall be
deemed to be included

two coats of hot bitumen


115/15 over it . Above Tie beam all around
Villa+ above tie beam of Compound Wall
Grond floor slab 4 thick

To Collection

M2
M3

age 45 of 96

Fs.

Item

Description

Qty.

Unit

Block work & plaster works


A

250mm thick insulated block work


Autoclaved Aerated Concrete (AAC)
Thermalite blocks .

200mm thick hollow block

C
D

200mm thick solid block

100mm thick hollow block work

200mm wide damp proof course

100mm wide damp proof course

Internal plaster
External plaster
Ceiling plaster
Duct plaster
Angle Beds
Expanded metal
Other balance and miscellaneous wprks

M2
M2
M2
M2
M2
M

E
F
G
H
I
J
K
L
M

Lintels including reinforcement and


shuttering:
A

200 x 150mm

LM

100 x 150mm

LM

200 x 200mm

LM

BOUNDARY WALL GATES:


A
Gate Automatic Door ( cars Gate)
B

Front Pedestrain Gate

D
Builders Work to install the two gates:
(A+B).

E
O.H. & Profits ( for A+B)
(Cotractor to fill in the percetage bracket.)

To Collection
age 46 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

FLOOR FINISHES:
Granite flooring cut to size with design and
pattern, polished smooth finish, fixed in
accordance with Specifications and
approval of owner and consultant. (F1)
P C Rate:
Granite steps with 2 strips (2cm each ) of
flamed granite to avoid slipping as per
specs and approval of owner and
consultant .(F1a)
m2.
m2.

P.c Rate :
Marble flooring cut to size with design and
pattern, polished smooth finish, fixed in
accordance with Specifications and
approval of owner and consultant. (F2)

m2.

P C rate : .
Marble steps in accordance with
Specification and approval of owner and
consultant. (F2a)
P C rate : ..

M2.

Granite Ceramic flooring , color pattern &


size as per the approval of owner and
consultant. (F3)
P C rate :
Ceramic floor tiles color , pattern and size
as per the approval of owner and
consultant..( F4) N.A

M2.
m2.

To Collection

age 47 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

Rate

FLOOR FINISHES: [Contd]


Ceramic flooring tiles (non-slippery) colour
pattern & size as per the approval of owner
and consultant for toilets & washrooms for
toilets & wash rooms. (F5)
M2
P C rate :
Ceramic flooring tiles, colour pattern & size
as per the approval of owner and
consultant. (F6)
P C Rate :

M2.

Interlock 60mm thick as per the approval of


owner and consultant.(F7)

l.s

Interlock 80mm thick as per the approval of


owner and consultant.(F8)

l.s

Mosaic tiles as per the approval of owner and


consultant.(F9)

Precast kerbston for the approval of


owner and consultant . (F11)
P C Rate :

( N.A )
l.s

To Collection

Inr.

age 48 of 96

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

WALL FINISHES
Fenomastic emulsion paint (Highly
Washable) from JOTUN over smooth
plaster. (W1)

M2

Polyrthene Epoxy from Jotun system over


smooth plaster. ( for the external wall of
villa ) (W3)
Jotun semi epoxy ( Acrylic ) system over
smooth plaster ( for compound wall) ( W3a)

M2

Glazed ceramic tiles cladding, colour as


per specs ,approval of owner &engineer.
(W4) PC-rate AED15/m2

M2

CEILING FINISHES:
Gypsum board ceiling with access panel as
per specs, approval of owner and engineer
(C1).

M2

Gypsum false ceiling tiles water proof type


(600x600 mm) as per specs, approval of
owner and engineer . (C2)
P.C : Rate :

M2.

Aluminium strip/tiles ceiling 10cm wide


colour and patter as per approval of owner
and engineer. (C3)
P.C : Rate :

M2.

To Collection

age 49 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

Fenomastic emulsion paint (Highly


Washable) from JUTON over smooth
plaster.(C4)

M2

Enamel oil paint (Highly Washable) from


Jotun over smooth plaster. (C5) N.A

M2

Glass Dome skylight design, as / the


approval of of owner and engineer.(C7)
M2
Wood works for the sitting area in Roof to
be quoted seperately here.
Skirting:

l.s

Granite skirting (S1)

Angled granite skirting parallel to steps.


(S1a)

Marble skirting (S2)

Angled Marble skirting parallel to steps


slope (S2a).

Granite Ceramic skirting (S3)

Granite Ceramic skirting (S3a) ( N.A )


Granite Ceramic skirting (S4) (N.A)

Ceramic skirting (non - slippery) (S5) (N.A)


Ceramic skirting (S6) ( N.A )

Sloping Mosaic tiles skirting as per the


approval of owner and consultant.(S9a)
Generally :

The contractor will list here and price items


shown on the drgs., mentioned in the
specification or required for the satisfactory
completion of this section, but not
mentioned here. Any such items not listed
below shall be deemed to be included.
To Collection

age 50 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

Rate

Amount
Inr.

EXTERNAL WORKS
Excavation and earth work for
pavement works
A

Excavate to reduce levels

Remove surplus excavated material form


site

Not include

Filling levelling with suitable soil and


compacting to 95% dry density CBR
15%, generally over the site to levels as
shown on Drawings

Not include
M
Not include

Paving and kerbs (outside plot limit):


D

Not include

Removal of existing (if any) interlocks,


cement tiles kerb stones, etc(Width
required by the D M shall be borne by
main contractor ). and cart away the
debris

Item
Not include

Precast concrete upstand kerbs


(Outside plot limit)
E

Not include

Kerb stones on concrete beds, painting


with road marking reflective black and
white paint, all necessary excavation,
back-filling, concrete haunching and
expansion joints including flexcell boards,
sealants, etc., complete

- do - for inside the building

Not include

Concrete interlocking blocks (Outside


plot limit)
G

Not include

80mm thick, on minimum 2" thick sand,


8" thick subkha fill as per specifications
and dwgs.(F8)

- do - but 60mm thick interlock tiles(F7)

To Collection

Not include

Inr

age 51 of 96

Fs.

Item

Description

Qty.

Unit

Rate

INTERLOCK WORKS INSIDE THE


PLOT :
A

60mm thk . as per the approval of the


owner and the consultant . ( F7)

Generally :
The contractor will list here and price items
shown on the drgs., mentioned in the
specification or required for the satisfactory
completion of this section, but not mentioned
here. Any such items not listed below shall be
deemed to be included.

To Collection

Inr

age 52 of 96

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

Roofing & Waterproofing


A

Minimum 50 mm thick light weight foam


concrete screed density 700 kg/m3 laid to
slope, Smoothly Finish to receive water
proofing membrane.

M2

One coat of cold Bituminous primer coat


As per Specification.

M2

4 mm thick one layer waterproofing APP


membrane as per specification.

M2

50 mm thick Extruded polystyrene heat


insulation board / Roofmate OR
Equivalent Approved.

M2

One layer of Filter membrane (min.100 g


/m2.

M2

Mosaic tiles (25x25x2cm) over mortar

M2

Mosaic skirting 250mm above 30mm


Layer of 10 15 mm dia round
aggregates as per Finishing schedule

M2

Roofing upstand including grooved fillet


with mastic sealant ,1mm thick aluminium
flashing shot fired to walls as shown in
drawings.

Extra over for water proofing details


around rain water roof outlets
No

To Collection

age 53 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Roofing & Waterproofing [Contd]


WET AREAS
i

Apply water proofing as specified

ii

Horizontally

iii

Vertically

iv

90cm height of water proofing treatment


to wall in contact with bath tub for toilets.
Generally :
The contractor will list here and price items
shown on the drgs., mentioned in the
specification or required for the satisfactory
completion of this section, but not mentioned
here. Any such items not listed below shall be
deemed to be included

To Collection

age 54 of 96

Unit

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

PLUMBING (WATER SUPPLY)


Note:- Contractor to submit the
detailed shop drawings for water
supply to the engineer before
execution of work on site.
EQUIPMENT:
A

Transfer water supply pump set complete


with one pump run the other standby and
with necessary fitting for operations to be
as per specs. and engineers approval
No.

Supply, install and connect ground floor


Under ground tank with over head water
tanks to be Fiber Glass 1000 Gallons
POLYCON type as per specs, dwgs and
engineers approval.
No.

Supply, install, fix and test booster pump


sets with 2 pumps pressure vessels. The
set shall be complete with steel base,
strainers, non return valves, Gate valves
,Anble Valve,cut (on-off), pressure switch,
pressure gauge, all softy devices, copper
connections, pipes and control panels,
float switch, etc. as per specs, dwgs and
engineers approval.
No.
Supply and Installation of Aluminum
water Proof Cat Ladder for over head
water tank as per specs. and engineers
approval.

No
To Collection

age 55 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

PLUMBING INSTALLATIONS [Cont'd]


DOMESTIC WATER SERVICES : PIPE
WORK
Supply & Install PVC Coated Copper
pipes with fittings (over false ceiling) hot
& cold water supply, including all short
lengths, fittings, accessories, supports
and sleeves, testing, etc., complete as
per specs. and approved shop dwgs.

16mm diameter

25mm diameter

Supply & Install Cross linked


polyethylene pipes-PEX with fittings
(from false ceiling to water outlets
sanitary ware) hot & cold water supply,
including all short lengths, fittings,
accessories, supports and sleeves,
testing, etc., complete as per specs. and
approved shop dwgs.

16mm diameter

25mm diameter

Domestic hot water piping from water


heaters to pex manifold including fittings,
accessories, etc, complete

Supply and install of UPVC Class Pipes


(for roof & Exposed areas) Insulated with
Rock wool & coated by canvas , foaster
and aluminium foil 2mm thk. with fittings,
accessories, supports and sleeves,
testing, etc., complete as per specs. and
approved shop dwgs.
To Collection

age 56 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

Polypropylene pipe (PPR pipes) work


with solvent welded fittings, testing, etc.,
complete
20mm diameter

No.

25mm diameter
Supply & Install all connector pipes
between water supply line & sanitary
fitting as per specs.

No.
No.

Installation of all pipes exposed on walls


and or below ceiling by using special
galvanized steel with rubber lined.

No.

Supply & Installation of all internally


exposed valves, mixers, angle, valves,
and water taps to be as per the specs.
and engineers approval.

No.

Supply & Installation of W/C in bathroom


to be as per specs. and engineers
approval.

No.
No.
No.

Supply & Installation of Water Pipe line


for future swimming pool to be as per
specs. and engineers approval.

To Collection

age 57 of 96

Rate

Amount
Inr.

Fs.

Amount
Item

Description

Qty.

Unit

Rate

Supply and install glass lined water


heaters, power connections, testing,
warranty, etc as per specs.
Water heater; 60 liters; horizontal
P .C : Rate
Builders Work:
O.H. & Profits
Contactor to fill in the percentage bracket

%)

Installation.
Supply and install glass lined water
heaters, power connections, testing,
warranty, etc as per specs
Water heater; 80 liters; horizontal
P .C : Rate
Builders Work:
O.H. & Profits
Contactor to fill in the percentage bracket
Installation.

To Collection

age 58 of 96

(%)

Inr.

Fs.

DRAINAGR & STROM WATER:


Supply , install, connect and test the
following UPVC under ground drains,
complete with all accessories, solvent
welded fittings, supports, sleeves, etc.
& as per BS 4660/67 & as per specs.

40mm diameter

50mm diameter

80mm diameter

100mm diameter

150mm diameter

200mm diameter

Supply , install, connect and test the


following UPVC pipe work for above
ground soil, waste, rainwater and vent
installations with all accessories,
solvent welded fittings, supports,
sleeves, etc. & as per specs.
G

32mm diameter

40mm diameter

50mm diameter

80mm diameter

100mm diameter

150mm diameter
M

200mm diameter
M

To Collection

age 59 of 96

Amount
Item

Description

Qty.

Unit

MANHOLE & INSPECTION ROOMS:


FLOOR TRAPS, FLOOR DRAINS &
ROOF DRAINS
Supply and install Connect and test
the following floor drains
A

UPVC (Class E) floor traps, for


External use as per specs. &
dwgs. and Engineer's approval

No.

Stainless steel floor traps, for Internal


use as per specs. & dwgs. and
Engineer's approval

No.

UPVC (Class E) gully trap; as per


specs. & dwgs. and Engineer's
approval.

No.

UPVC (Class E) roof drain outlets as


per specs. & dwgs. and
Engineer's approval

No.

UPVC (Class E) floor drain outlets


as per specs. & dwgs. and
Engineer's approval

No.

MANHOLES AND GT CHAMBER


A

Construct waterproof manholes 200mm


reinforced concrete or solid block-work
walls; 150mm thick reinforced concrete
base and cover slab with opening to suit
the cover and frame; benching and
rendering internally; complete including
all necessary excavation, back-filling,
bitumen coating disposal, etc. as per
specs. & dwgs. and Engineer's
approval
No.

Construct waterproof gully trap chambers


200mm solid block-work walls; 100mm
thick reinforced concrete base and over
slab with opening to suit cover and frame;
complete including all necessary
excavation, back-filling, disposal, etc.
No.

To Collection

age 60 of 96

Rate

Inr.

Fs.

Item

Description

Qty.

Unit

Supply and install the following covers


and frames as shown on the Drawings

600 x 600mm, recessed pattern, heavyduty, double seal, with epoxy painting; for
manholes

No.

600 x 600mm, cast iron, solid top, heavy


-duty, double seal, with epoxy painting;
for manholes

No.

300 x 300mm, recessed pattern, heavyduty, double seal, with epoxy painting; for
gully traps

No.

300 x 300mm, cast iron, heavy duty,


single seal; to all valve chambers

No.

SANITARY WARE:
Sanitary ware and Others

Builders Work:
O.H. & Profits
Contactor to fill in the percentage bracket
Installation.
Generally :
The contractor will list here and price items
shown on the drgs., mentioned in the
specification or required for the satisfactory
completion of this section, but not mentioned
here. Any such items not listed below shall be
deemed to be included

To Collection

age 61 of 96

Rate

Amount
Inr.

Fs.

Amount
Item

Description

Qty.

Unit

ELECTRICAL WORKS
A

All Conduits & junction boxes should be


of Ducab, Including necessary
accessories as per dwgs and approval of
the Engineer.
No.
No.
Supply, Installation, Testing &
Commissioning of lighting fittings as per
specs & dwgs approval of engineer for
the following which includes:
No.

Complete villa (Internal & External)


No.
P.S :
Builders Work:
O.H. & Profits
Contactor to fill in the percentage bracket

(10 %)

Installation.
Supply, Installation, Testing &
Commissioning of lighting fixtures for the
complete villa as per specs & dwgs
approval of engineer for the following
A

All boxes

Sockets (Internal)

No.
No.

C
Lighting switches(Internal)
D

Sockets(External Weather proof)

Lighting switches(External Weather


proof)

No.
No.
No.

To Collection

age 62 of 96

Rate

Inr.

Fs.

Amount
Item

Description

Qty.

Unit

ELECTRICAL WORKS [contd]


A

Power points outlets

No.

Switches cover

No.

TV points

No.

Telephones points

No.

E
F

Copper earth term.

No.

Pull Box/ Junction Boxes

No.

Dimmers

No.

Switch
(To control the external lighting)

No.

Earthling system

No.

Electrical outlet cocker in kitchen(45


Amps)

No.

LVC (low voltage current):


A

Telephone & TV connection

No.

Telephone sockets

No.

Telephone wires

No.

Sockets (CATV System)

No.

POWER SOCKETS
A

Supply, Installation, Testing &


Commissioning of power socket outlets
220 V-13Amps MK for the complete villa
as per specs and approval
No.

Supply, Installation, Testing &


Commissioning of shaver socket outlets
220 V-13Amps MK for the complete villa
as per specs and approval
No.

To Collection

age 63 of 96

Rate

Inr.

Fs.

Amount
Item

Description

Qty.

Unit

ELECTRICAL WORKS [contd]


C

Supply, Installation, Testing &


Commissioning of twin power socket
outlets 220 V-13Amps MK for the
complete villa as per specs and
approval.

No.

Supply, Installation, Testing &


Commissioning of power socket outlets
220 V-13Amps MK weather proof type for
site & roof as per specs and approval

No.

Supply, Installation, Testing &


Commissioning of power socket
outlets 220 V-45Amps MK as per
dwgs, specs and approval .

No.

Supply, Installation, Testing &


Commissioning of power socket outlets
220 V-20Amps MK for water heater &
washing machine as per dwgs, specs
and approval .
Supply, installation, testing and
commissioning of EXHAUST FANS
as/spec,s dwgs. And the approval of the
engineer.

Supply, installation, testing and


commissioning of ELECTRIC BELL
as/spec,s dwgs. And the approval of the
engineer

No.

No.

No.

DISTRIBUTION PANEL BOARDS &


METERS
Supply, Installation, Testing &
Commissioning Of DISTRIBUTION
PANEL BOARD 220V- 3PH 50Hz as per
Schedule, specs and approval
To Collection

age 64 of 96

No.

Rate

Inr.

Fs.

Amount
Item

A
B
C
D
E
F
G
H

Description

Qty.

ELECTRICAL WORKS [contd]


DB-BAS.F-20KW
DB-GF-55KW
DB-AC-90KW
DB-FF-45KW
DB-EXT-25KW
DB-WP-10KW
Isolators
Circuit Breaker

Unit

Rate

No.
No.
No.
No.
No.
No.
No.

POWER CABLES:
A

Supply, Installation, Testing &


Commissioning Of POWER CABLE 4C
70mm2 XLPE/SWA/PVC CU+1C 35MM2
Y/G AS ECC from electric meter to
internal panels as per Schedule, specs
and approval.
Supply, Installation, Testing &
Commissioning Of POWER CABLE 4C
25mm2 XLPE/SWA/PVC CU+1C 16
MM2 Y/G AS ECC as per Schedule,
specs and approval

No.

No.

Supply and Installation of 3- Phase


Electric Meter
INTERCOM & INTERPHONE SYSTEM
Supply, Installation, Testing,
Commissioning, of intercom &
interphone system-Low Voltage with all
necessary conduits, pull boxes, junction
boxes, cables and other accessories
required as /specs dwgs. and approval of
the engineer.

No.

Builders Work:
O.H. & Profits
Contactor to fill in the percentage bracket
Installation.
To Collection

age 65 of 96

( 10 %)

Inr.

Fs.

Amount
Item

Description

Qty.

Unit

ELECTRICAL WORKS [contd]

CENTRAL ANTENA&DISH ANTENA


SYSTEM:
Supply, Installation, Testing,
Commissioning, of the complete system
with all necessary conduits, pull boxes,
junction boxes, cables and other
accessories required as /specs dwgs.and
approval of the engineer.

No.

Builders Work:
(10 %)

O.H. & Profits


Contactor to fill in the percentage bracket
Installation.

TV dishes:
Conduits
Wires
Sockets (without covers)

Collection

age 66 of 96

Rate

Inr.

Fs.

Item

Description

Qty.

Unit

Rate

A/C & VENTILATION INSTALLATIONS


Rates within this element are to include for
complying with each and every clause of the
preliminaries, specification and method of
measurement.
Include for the complete installation as
described in the specification and as
shown on the Drawings to give a
complete system as well as the remote
remote
controlled
thermostats,
pipeing, ducting and insulation related
to ducts and pipes and the control is
separate for each room and space is
acceptable to the Engineer and all
local authorities and under the
following sections
A

Ducted split units including all supports,


anti-vibration, mountings refrigerant pipes
charge, accessories and integral controls
as per schedules & specs,
No.

Builders Work:
( 15 %)

O.H. & Profits


Contactor to fill in the percentage bracket
Installation.
Contractor to quote seperately :
A
B
C
D
E

Civil & electrical works related to A/C,


All plumbing works
Sleeves (PVC) for GAS route for
protection
shops drawing for all A/c works
R.C.C. pads

To Collection

age 67 of 96

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

ALUMINUM DOORS & WINDOWS


All Aluminum sections to be heavy duty
powder coated 80 micron with the desired
color and section 10.5 cm for windows,
12.5cm for doors, and box sections for all
sliding panels and doors to be provided
with fly mesh from inside , with necessary
accessories.
Doors:
No
No.
Glazed Windows:
W1

No.

KW1

No.

W2
W3
EW1

No.

EW2
EW3
CW1
CW2(curtain wall)
CW5
DW1

To Collection

age 68 of 96

Rate

Amount
Inr.

Fs.

Amount
Item

Description

Qty.

Unit

Rate

CAT & SPIRAL LADDERS:


A

Supply & Installation of CAT & SPIRAL


LADDERS from ground floor to terrace &
then to roof as per Shop dwgs and
Approval of Engineer

No.

RAILS:
Internal Railing : (staircase)
A

Supply & Installation of Aluminum


powder coated railing as per details and
Approval of Engineer.
P.C. Rate :

rm

External Railing :
Supply & Installation of Decorative Cast
Aluminum coated railing as per details
and Approval of Engineer.
P.C. Rate :
Powder coated aluminum
canopy/wooden Pergola
On first floor terrace contractor to
consider as provisional sum of total
value . N.A
Builders work :
O.H &profits

rm

%(10 )

Generally :
The contractor will list here and price
items shown on the drgs., mentioned in
the specification or required for the
satisfactory completion of this section, but
not mentioned here. Any such items not
listed below shall be deemed to be
included.

To Collection

age 69 of 96

Inr.

Fs.

Amount
Item

Description

Qty.

Unit

JOINARY WORKS: (Wooden)


All the external Doors to be Burma teak
Wood with bronze bolts and other
ironmongery as per specs, dwgs and
approval of the engineer.
A

P.C Rate :

no

Supply :
Installation:
D

Supply and installation of All Internal


Doors as per specs, dwgs and approval
of the engineer.
P.S Rate :
Supply :

No.

Installation
E

Supply and installation of Sub-Frames for


all doors as per specs, dwgs and
approval of the engineer.

To Collection

age 70 of 96

No.

Rate

Inr.

Fs.

Item

Description

Qty.

Unit

Amount
Inr.

Rate

WARDROBES:
Supply & Installation of wardrobes for all
Bed / Dressing room as per specs and
Approval of Engineer.
P.S :
Builders Work
O.H. & Profits

( 10 %)

Contractor to fill in the percentage


Bracket
CAR SHED:
Car Shed roof G R P panel as per the
approved shop dwgs and Engineers
Approval/ C6

M2

P.S :
Builders Work
O.H. & Profits
Contractor to fill in the percentage
Bracket
( 10 %)
STONE CLADDING IN CORNERS OF
VILLA:
As shown in drawings.

M2

GRC DECORATION PYRAMIDS ON


ELEVATIONS:
As shown in elevations.

No.

To Collection

age 71 of 96

N.A.

N .A

Fs.

Item

Description

Qty.

Unit

Rate

Inr.

KITCHEN CABINETS
Supply & Installation of Kitchen cabinets
In Ground as per specs and Approval of
Engineer.

M2

P.S : Rate :
Builders Work :
(10 %)

O.H. & Profits

VANITY COUNTERS
Supply & Install Vanity Counters in
Ground floor(as per drawings)for wash &
toilets etc., as per specs and approval of
the engineer.

RM

P.C : Rate :
Genarally:
The contractor will list here and price
items shown on the drgs., mentioned in
the specification or required for the
satisfactory completion of this section, but
not mentioned here. Any such items not
listed below shall be deemed to be
included
To Collection

Inr

age 72 of 96

Fs.

Item

Description

Qty.

Unit

COMPOUND WALL :
Sub - structure:
Excavation from existing natural ground
level to a required depth for Footing
including necessary compaction.
M3
Backfill with selected material in layers
including watering and compaction
Cart away surplus excavated material off
the site.

M3

Damp proof course/ DPC for block


work .Applaying 4mm thick water proofing
membrane and two coats of hot birumen
115/15 over it / Above tie beam.
M3
Blinding including shuttering
50 mm thick PCC grade M 20, using
SRC 250 kg/m3.
M3
Concrete grade 30 using SRC 370
Kg/M3
RCC footings

M3

Reinforcement steel of all dia.


tons
M2

200mm thk solid block work using SR


Shuttering works
Sides of footing
Sundries
Laying 1000 g polythene sheet

M2
M2

Apply two coats of butimen emulsion to


concrete surface in touch with soil as per
specs and engineers approval.

M2

Super structure:
Concrete grade 30/20 using OPC 370
kg/m3
Columns
Coping Beams

m3
M3

To Collection

age 73 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

COMPOUND WALL: [Contd]


Block Work:
200mm wide damp proof course

200mm thick hollw block work

WALL FINISHES:

Jotun Semi epoxy system over smooth


plaster. (W------)
M2

Electrical Works:
Supply,
Installation,
Testing
&
Commissioning of All Electrical works for
the compound wall as per specs & dwgs
approval of engineer for the following
Genarally:
The contractor will list here and price
items shown on the drgs., mentioned in
the specification or required for the
satisfactory completion of this section, but
not mentioned here. Any such items not
listed below shall be deemed to be
included

To Collection

age 74 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

EXTERNAL SERVICE BLOCK:


Sub Structure
Dewatering (Contactor
Investigation Report)

to

check

Soil
Item

Excavation from existing natural ground


level to a required depth for Footing, Strap
beams, Tie beams and service lines
including necessary compaction.

m3

Backfill with selected material in layers


including watering and compaction as per
the specs & engineers approval.

m3

Cart away surplus excavated material off


the site.

m3

Filling in plinth with selected material


including watering and compction as per
the specs & engineers approval.

m3

Damp proof course/DPC for block work


.Applaying 4mm thick water proofing
membrane and two coats of hot birumen
115/15 over it / Above tie beam.
Anti - termite treatment
Pre Costruction Anti termite treatment
Dursban 4TCincluding 20 years
guarantee.(Supplier shoud be approved by
the Engineer)
Applied horizontally

m2

Blinding including shuttering


50 mm thick PCC grade M 20, using
SRC 250 kg/m3.

m3

Concrete grade 30 using SRC 370 Kg/M3


RCC footings

m3

Column necks

m3

Tie/strap/plinth Beam

m3

To Collection

age 75 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

EXTERNAL BLOCK [cond]


Reinforcement steel :

Ton

Reinforcement steel of all dia.


SOLID BLOCK WORK:
200mm thk solid block work using SR
cement :
Below tie beams

M2

Shuttering works
Sides of footing

M2

Sides of columns necks

M2

Sides of tie beams/plinth beams, sides of


strap beam.

M2

Entrance steps sides & riser.

M2

Sundries
Laying 1000 g polythene sheet

M2

Apply two coats of butimen emulsion to


concrete surface in touch with soil as per
specs and engineers approval.

M2

Generally :
The contractor will list here and price items
shown on the drgs., mentioned in the
specification or required for the satisfactory
completion of this section, but not mentioned
here. Any such items not listed below shall be
deemed to be included.

To Collection

age 76 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

EXTERNAL BLOCK : [Contd]


Super structure:
Walls 20mm thick

M3

Columns

M3

Floor beams

M3

Solid slabs

M3

Hourdy Rib slabs

M2

Projections/ upstand / cills .

M3

Staircases, steps and landings

M3

Parapet and moulds


Foundation for A / C machines, pumps,
water tanks etc.,
Grade slab 100mm thick

M3
Item
M2

REINFORCEMENT
Reinforcement steel of all dia.

Ton

A 142 Mesh

M2

Shuttering work:
Sides of walls

M2

Sides of columns

M2

Sides and soffits of floor beams

M2

Soffits of solid slab

M2

Sides of slabs

M2

Soffits of staircase and landings


M2
M

Edge of risers
To Collection

age 77 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

EXTERNAL BLOCK : [cond]


Shuttering work: [Contd]
Sides of parapet and moulds
Sides and soffit of lintels / arches
Sides of Projections/ upstand / cills / lintels
/ Arches
Block work & plaster Works
250mm thick insulated block work
Autoclaved Aerated Concrete (AAC)
Thermalite blocks .

M2

200mm thick hollow block

M2

200mm thick solid block

M2

100mm thick hollow block work

M2

200mm wide damp proof course

M2

100mm wide damp proof course

M2

Internal plaster
External plaster
Ceiling plaster
Duct plaster
Angle Beds
Expanded metal
Other balance and miscellaneous wprks

M2
M2
M2
M2
M2
M

Lintels including reinforcement and


shuttering:
200 x 150mm
100 x 150mm
200 x 200mm
To Collection

age 78 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

EXTERNAL BLOCK [cond]


FLOOR FINISHES:
Ceramic flooring tiles (non-slippery) colour
pattern & size as per the approval of owner
and consultant for toilets & washrooms for
toilets & wash rooms. (F5)
P C rate :

M2

Ceramic flooring tiles colour pattern & size


as per the approval of owner and
consultant. (F6)
P C Rate :
Mosaic tiles as per the approval of owner and
consultant .( F9)

M2

WALL FINISHES
Fenomastic emulsion paint (Highly
Washable) from JOTUN over smooth
plaster. (W1)
M2
Jotun polytheren system over smooth
plaster .( External walls only ) . (W3)
M2
Glazed ceramic tiles cladding, colour as
per specs ,approval of owner &engineer.
(W4)

M2

CEILING FINISHES
Fenomastic emulsion paint (Highly
Washable) from JUTUN over smooth
plaster.(C4)
Enamel oil paint ( Highly washable ) over
smooth plaster ( C5)

M2

To Collection

age 79 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

EXTERNAL BLOCK: [cond]


Skirting:
Ceramic skirting (S6)
M2

Slopping mosaic tiles skirting (S9)


EXTERNAL WORKS

M2
Excavation and earth work for pavement
works
Excavate to reduce levels
Remove surplus excavated material form
site

M2

Filling levelling with suitable soil and


compacting to 95% dry density CBR 15%,
generally over the site to levels as shown
on Drawings

M2

Precast concrete upstand kerbs

M2

Kerb stones on concrete beds, painting


with road marking reflective black and
white paint, all necessary excavation, backfilling, concrete haunching and expansion
joints including flexcell boards, sealants,
etc., complete

M2

Concrete interlocking blocks


60mm thick, on minimum 2" thick sand, 8"
thick subkha fill as per specifications and
dwgs.

To Collection

age 80 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

EXTERNAL BLOCK [cond]


Roofing & Waterproofing
A

Minimum 50 mm thick light weight foam


concrete screed density 700 kg/m3 laid to
slope, Smoothly Finish to receive water
proofing membrane.

M2
M2

One coat of cold Bituminous primer coat


As per Specification.

4 mm thick one layer waterproofing APP


membrane as per specification.

M2

50 mm thick Extruded polystyrene heat


insulation board / Roofmate OR
Equivalent Approved.

M2

One layer of Filter membrane (min.100 g


/m2.

M2

Mosaic tiles (25x25x2cm) over mortar

M2

Mosaic skirting 250mm above 30mm


Layer of 10 15 mm dia round
aggregates as per Finishing schedule

M2

Roofing upstand including grooved fillet


with mastic sealant ,1mm thick aluminium
flashing shot fired to walls as shown in
drawings.

Extra over for water proofing details


around rain water roof outlets
No

To Collection

age 81 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

EXTERNAL BLOCK [cond]


PLUMBING INSTALLATIONS [Cont'd]
DOMESTIC WATER SERVICES : PIPE
WORK
Supply & Install PVC Coated Copper
pipes with fittings (over false ceiling) hot
& cold water supply, including all short
lengths, fittings, accessories, supports
and sleeves, testing, etc., complete as
per specs. and approved shop dwgs.

16mm diameter

25mm diameter

Supply & Install Cross linked


polyethylene pipes-PEX with fittings
(from false ceiling to water outlets
sanitary ware) hot & cold water supply,
including all short lengths, fittings,
accessories, supports and sleeves,
testing, etc., complete as per specs. and
approved shop dwgs.

16mm diameter

25mm diameter

Domestic hot water piping from water


heaters to pex manifold including fittings,
accessories, etc, complete

Supply and install of UPVC Class Pipes


(for roof & Exposed areas) Insulated with
Rock wool & coated by canvas , foaster
and aluminium foil 2mm thk. with fittings,
accessories, supports and sleeves,
testing, etc., complete as per specs. and
approved shop dwgs.
To Collection

age 82 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

EXTERNAL BLOCK [cond]


Polypropylene pipe (PPR pipes) work
with solvent welded fittings, testing, etc.,
complete
20mm diameter

No.

25mm diameter
Supply & Install all connector pipes
between water supply line & sanitary
fitting as per specs.

No.
No.

Installation of all pipes exposed on walls


and or below ceiling by using special
galvanized steel with rubber lined.

No.

Supply & Installation of all internally


exposed valves, mixers, angle, valves,
and water taps to be as per the specs.
and engineers approval.

No.

Supply & Installation of W/C in bathroom


to be as per specs. and engineers
approval.

No.
No.
No.

Supply and install glass lined water


heaters, power connections, testing,
warranty, etc as per specs.

No.

Water heater; 60 liters; horizontal


P .C : Rate AED 350
Builders Work:
O.H. & Profits
Contactor to fill in the percentage bracket
Installation.
No.
No.
To Collection

age 83 of 96

Rate

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

EXTERNAL BLOCK [cond]


DRAINAGR & STROM WATER:
Supply , install, connect and test the
following UPVC under ground drains,
complete with all accessories, solvent
welded fittings, supports, sleeves, etc. &
as per BS 4660/67 & as per specs.
40mm diameter
B
C

50mm diameter

80mm diameter

100mm diamete
150mm diameter
200mm diameter

Supply , install, connect and test the


following UPVC pipe work for above
ground soil, waste, rainwater and vent
installations with all accessories,
solvent welded fittings, supports,
sleeves, etc. & as per specs.
32mm diameter
40mm diameter
50mm diameter
80mm diameter
100mm diameter
150mm diameter
No.
To Collection

age 84 of 96

Rate

Amount
Inr.

Fs.

Amount
Item

Description

Qty.

Unit

EXTERNAL BLOCK [cond]


MANHOLE & INSPECTION ROOMS:
FLOOR TRAPS, FLOOR DRAINS &
ROOF DRAINS
Supply and install Connect and test
the following floor drains
A

UPVC (Class E) floor traps, for


External use as per specs. &
dwgs. and Engineer's approval

No.

Stainless steel floor traps, for Internal


use as per specs. & dwgs. and
Engineer's approval

No.

UPVC (Class E) gully trap; as per


specs. & dwgs. and Engineer's
approval.

No.

UPVC (Class E) roof drain outlets as


per specs. & dwgs. and
Engineer's approval

No.

UPVC (Class E) floor drain outlets


as per specs. & dwgs. and
Engineer's approval

No.

MANHOLES AND GT CHAMBER


A

Construct waterproof manholes 200mm


reinforced concrete or solid block-work
walls; 150mm thick reinforced concrete
base and cover slab with opening to suit
the cover and frame; benching and
rendering internally; complete including
all necessary excavation, back-filling,
bitumen coating disposal, etc. as per
specs. & dwgs. and Engineer's
approval

Construct waterproof gully trap chambers


200mm solid block-work walls; 100mm
thick reinforced concrete base and over
slab with opening to suit cover and frame;
complete including all necessary
excavation, back-filling, disposal, etc.

No.

No.
To Collection

age 85 of 96

Rate

Inr.

Fs.

Item

Description

Qty.

Unit

Rate

EXTERNAL BLOCK [cond]


Supply and install the following covers
and frames as shown on the Drawings

600 x 600mm, recessed pattern, heavyduty, double seal, with epoxy painting; for
manholes

No.

600 x 600mm, cast iron, solid top, heavy


-duty, double seal, with epoxy painting;
for manholes

No.

300 x 300mm, recessed pattern, heavyduty, double seal, with epoxy painting; for
gully traps

No.

300 x 300mm, cast iron, heavy duty,


single seal; to all valve chambers

No.

Generally :
The contractor will list here and price items
shown on the drgs., mentioned in the
specification or required for the satisfactory
completion of this section, but not mentioned
here. Any such items not listed below shall be
deemed to be included

SANITARY WARE :
Sanitary ware and Others
Builders Work:
O.H. & Profits
Contactor to fill in the percentage bracket
Installation.

To Collection

age 86 of 96

(10 %)

Amount
Inr.

Fs.

Amount
Item

Description

Qty.

Unit

EXTERNAL BLOCK [cond]


ELECTRICAL WORKS
A

All Conduits & junction boxes should be


of Ducab, Including necessary
accessories as per dwgs and approval of
the Engineer.
No.
No.
Supply, Installation, Testing &
Commissioning of lighting fittings as per
specs & dwgs approval of engineer for
the following which includes:
No.
External Block

Builders Work:
O.H. & Profits
Contactor to fill in the percentage bracket

( 10 %)

Installation.
Supply, Installation, Testing &
Commissioning of lighting fixtures for
external block as per specs & dwgs
approval of engineer for the following
A

All boxes

Sockets (Internal)

No.
No.

C
Lighting switches(Internal)
D

Sockets(External Weather proof)

Lighting switches(External Weather


proof)

No.
No.
No.

To Collection

age 87 of 96

Rate

Inr.

Fs.

Amount
Item

Description

Qty.

Unit

EXTERNAL BLOCK [cond]


ELECTRICAL WORKS [contd]
A

Power points outlets

No.

Switches cover

No.

TV points

No.

Telephones points

No.

E
F

Copper earth term.

No.

Pull Box/ Junction Boxes

No.

Dimmers

No.

Switch
(To control the external lighting)

No.

Earthling system

No.

Electrical outlet cocker in kitchen(45


Amps)

No.

LVC (low voltage current):


A

Telephone & TV connection

No.

Telephone sockets

No.

Telephone wires

No.

Sockets (CATV System)

No.

POWER SOCKETS
A

Supply, Installation, Testing &


Commissioning of power socket outlets
220 V-13Amps MK as per specs and
approval

Supply, Installation, Testing &


Commissioning of shaver socket outlets
220 V-13Amps MK as per specs and
approval

No.

No.
To Collection

age 88 of 96

Rate

Inr.

Fs.

Amount
Item

Description

Qty.

Unit

EXTERNAL BLOCK [cond]


ELECTRICAL WORKS [contd]
C

Supply, Installation, Testing &


Commissioning of twin power socket
outlets 220 V-13Amps MK as per specs
and approval.

No.

Supply, Installation, Testing &


Commissioning of power socket outlets
220 V-13Amps MK weather proof type for
site & roof as per specs and approval

No.

Supply, Installation, Testing &


Commissioning of power socket
outlets 220 V-45Amps MK as per
dwgs, specs and approval .

No.

Supply, Installation, Testing &


Commissioning of power socket outlets
220 V-20Amps MK for water heater &
washing machine as per dwgs, specs
and approval .
Supply, installation, testing and
commissioning of EXHAUST FANS
as/spec,s dwgs. And the approval of the
engineer.

To Collection

age 89 of 96

No.

No.

Rate

Inr.

Fs.

Item

Description

Qty.

Unit

Rate

EXTERNAL BLOCK [cond]


A/C & VENTILATION INSTALLATIONS
Rates within this element are to include for
complying with each and every clause of the
preliminaries, specification and method of
measurement.
Include for the complete installation as
described in the specification and as
shown on the Drawings to give a
complete system as well as the remote
remote
controlled
thermostats,
pipeing, ducting and insulation related
to ducts and pipes and the control is
separate for each room and space is
acceptable to the Engineer and all
local authorities and under the
following sections
A

Split units Decorative type mountings


charge, accessories as per schedules &
specs,

No.
Builders Work:
O.H. & Profits

( 10 %)

Contactor to fill in the percentage bracket


Installation.
Contractor to quote seperately :
A
B
C
D
E

Civil & electrical works related to A/C,


All plumbing works
Sleeves (PVC) for GAS route for
protection
shops drawing for all A/c works
R.C.C. pads

To Collection

age 90 of 96

Amount
Inr.

Fs.

Item

Description

Qty.

Unit

Rate

EXTERNAL BLOCK [cond]


ALUMINUM DOORS & WINDOWS
All Aluminum sections to be heavy duty
powder coated 80 micron with the desired
color and section 10.5 cm for windows,
12.5cm for doors, and box sections for all
sliding panels and doors to be provided
with fly mesh from inside , with necessary
accessories.
Doors:
A
B

ED1:
ED2

No

Glazed Windows:
A

EW1:

No.

EW2

No.

EW0
JOINARY WORKS: (Wooden)
Supply and installation of All Internal
Doors as per specs, dwgs and approval
of the engineer.
D2,D3,D5 : Supply and installation of Sub-Frames for
all doors as per specs, dwgs and
approval of the engine
Kitchen cabinet :
P.S rate
Builders work :
O.H & profits

( 10 )%

Shelves at store :
P.S Rate
Builders Work :
O.H & Profits

( 10 ) %

To Collection

age 91 of 96

Amount
Inr.

Fs.

You might also like