Professional Documents
Culture Documents
No.
Item
General Requirement
Flow Requirements
Type of Development
Occupancy Figure
Area of Development (ha)
Plan and Sectional Drawings of Screening Mechanism and Grit Chamber provided
Calculations for Design of Screening Mechanism and Grit Chamber provided
Calculations shall include the following:
a.
b.
c.
d.
e.
f.
Primary Treatment
Secondary Treatment
Secondary Clarifier
Sludge Handling
Disinfection
Other
l.
m.
n.
o.
p.
q.
r.
s.