Professional Documents
Culture Documents
Contact information
Company*:
Country:
Contact person:
Phone/Fax:
E-mail:
Field*:
Cluster:
Well name*:
Reservoir*:
Date of completion:
Parameters
Start up date
Pump
Gas separator
Motor
Power cable
Motor-Lead Extention
Tubing OD, Category (EUE, NUE, BTC, IJ),
Thread
Pump setting depth
Producing fluid level
Total fluid production
Oil production
Water production
Reservoir pressure at upper perforations
Static fluid level
Manifold pressure
Water cut
Actual PI
Annulus pressure
Wellhead pressure
Voltage and frequency of power supply
system
VSD
VSD operating frequency
Step down transformer
Step up transformer
Shutdown date
Unit
Date
Series, flow rate, stg. Rated Hz.
Yes/No, Type
Series, power and voltage. Rated
Hz. temperature
Round/flat, AWG,
rating
AWG, temperature rating
Inch / Threads per inch
ft
ft
bpd
bpd
bpd
psi
ft
psi
%
bpd/psi
psi
psi
V, Hz
Model, kVA, voltage
Hz
Model, kVA, Prim./Sec. Voltage
Model, kVA, Prim./Sec. Voltage
Date
Value
26
Pullout
Yes/No/Reason
Reservoir data
No
1*
2*
3
3.1
3.2
3.3
3.4*
3.5
3.6
3.7*
3.8
3.9
3.10
3.11
4
4.1
4.2
5
5.1
5.2
5.3
5.4
6
6.1
6.1.1
Parameters
Unit
Bubble-point pressure
Reservoir GOR
Value
psi
scf/bbl
Crude physical properties
F
psi/ft
F/ft
o
API
o
API
cP
cP
cP
Physical properties of reservoir water
o
cP
Associated gas properties
cP
% of TSS
CO2
%
%
%
Asphaltenes
Paraffin
Well construction*
Depth interval,
ft
Zenith angle,
degrees
Azimuth angle,
degrees
Casing OD,
inch
Please note: Deviation survey is required from the wellhead to the bottom hole
Parameters
Desired total daily fluid production
Oil production
Water production
Desired pump setting depth
Pump intake pressure
Wellhead pressure
Sizing based on
Unit
bpd
bpd
bpd
ft
psi
psi
Value
Table No.1
ata
Table No.2
Value
Table No.3
Temperature of
measurement
Table No.4
Well construction*
eet.
vomet:
Casing wall
thickness/weight, (inch/ppf)
Table No.5
Value