Professional Documents
Culture Documents
Attachment-1
OWNER REFERENCE
Project
Package
Originator
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
1 / 13
TPX
FE1
RAPID
CONTRACTOR REFERENCE
FEED PHASE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
PROJECT SPECIFICATION
OWNER Approval:
PETRONAS
Name:
Date
(DD-MMM-YY) :
Signature:
Document Class:
All
60987R-0001-FOR-0004_E
Adrien Rafin
2013.03.04 17:44:33
+01'00'
Jerome Chanavat
2013.03.04 17:41:36
+01'00'
Jean-Marc Maurice
2013.03.05
11:01:48 +01'00'
04-Mar-13
J.Chanavat
A.Rafin
J.M. Maurice
25-Oct-12
J.Chanavat
A.Rafin
J.M. Maurice
30-Mar-12
J. Martin
J.M. Maurice
REV.
DATE
DD-MMM-YY
A. Rafin
WRITTEN BY
CHECKED BY
APPROVED BY
Sections changed in last revision are identified by a vertical line in the margin.
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Package
Project
RAPID
FEED PHASE
Originator
TPX
FE1
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
2 / 13
CONTRACTOR REFERENCE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
CONTENTS
1.
PURPOSE ............................................................................................................................................................................ 3
2.
REFERENCE DOCUMENTS ........................................................................................................................................... 3
3.
ACRONYMS AND DEFINITIONS .................................................................................................................................. 3
4.
CODES AND STANDARDS .............................................................................................................................................. 4
4.1
4.2
5.
GENERAL PROCESS AND ENGINEERING REQUIREMENTS .............................................................................. 5
5.1
5.3
5.2
5.4
5.5
5.6
D ESIGN PRINCIPLE......................................................................................................................................................... 6
6.
INSTRUMENTS ............................................................................................................................................................... 10
7.
DETAIL ENGINEERING AND DESIGN REQUIREMENTS .................................................................................... 10
7.1
PURPOSE ..................................................................................................................................................................... 10
7.3
7.2
7.4
7.5
7.6
INSTRUMENTS ............................................................................................................................................................. 11
SUPPORTING ................................................................................................................................................................ 11
8.
STEAM TRACING DOSSIERS ...................................................................................................................................... 12
8.1
9.
MATERIALS .................................................................................................................................................................... 13
10.
FABRICATION ............................................................................................................................................................ 13
11.
11.1
CLEANING ................................................................................................................................................................... 13
11.2
INSPECTION ................................................................................................................................................................. 13
11.3
TESTING ...................................................................................................................................................................... 13
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Package
Project
FE1
RAPID
FEED PHASE
Originator
TPX
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
3 / 13
CONTRACTOR REFERENCE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
1.
PURPOSE
This Project Specification covers the minimum requirements for Piping Steam Tracing to be used
for the PETRONAS RAPID (Refinery And Petrochemical Integrated Development) Project.
These requirements shall be used throughout all steps of the Project and by all parties:
2.
REFERENCE DOCUMENTS
RAPID-FE1-TPX-PIP-DES-0001-9009
Piping System
RAPID-FE1-TPX-PIP-STD-0001-0001
RAPID-FE1-TPX-PIP-STD-0001-0002
RAPID-FE1-TPX-PIP-DES-0001-0021
RAPID-FE1-TPX-MEC-DES-0001-0401
RAPID-FE1-TPX-INC-DES-0001-9018
Project
Specification
Installation
of
on-line
instruments
3.
The following terms used in this document have the meaning defined below:
CONTRACT
priority,
including
the
exhibits,
drawings,
specifications
and
Form of Agreement.
CONTRACTOR
Petroliam
OWNER
Nasional
Berhad
(PETRONAS)
which
includes
its
where the context so admits and requires, also include its employees,
PROJECT
Refinery
And
Petrochemicals
Integrated
Development
(RAPID)
SCOPE OF WORK
of the PROJECT.
WORK
CHANGE ORDER.
SUBCONTRACTOR
in
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Package
Project
FE1
RAPID
FEED PHASE
Originator
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
4 / 13
TPX
CONTRACTOR REFERENCE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
LICENSOR
EPCC CONTRACTORS
proposal
has
been
accepted
by
OWNER
for
Engineering,
permitted assignee.
A carbon steel header running from the battery limit in the unit.
A carbon steel pipe line running from the main steam header in the
the tracer.
TRACER
A line m ade of stainless steel pipe running from a tracer feed line
A carbon steel pipe line running from the tracer to the condensate
return manifold.
CONDENSATE RETURN LINE A carbon steel pipe line running from the condensate return
CONDENSATE HEADER A carbon steel header running in the unit, collecting all condensate to
The acronyms used in this document have the meaning defined below:
FEED
PTS
RAPID
LP
MP
P&ID
DM
CM
4.
4.1
Unless otherwise specified, the latest applicable revision of codes and standards shall be
considered.
4.2
Order of precedence
In case of conflict between Laws, Project Specifications and Codes & Standards, the following
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Project
RAPID
Package
FE1
Originator
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
5 / 13
TPX
CONTRACTOR REFERENCE
FEED PHASE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
- 1.
- 2.
- 3.
- 4.
If a Low er Level requirem ent is m ore stringent than an upper one in the above docum ents, a
request shall be raised to OWNER for written decision before proceeding with the Design,
Manufacture or Construction.
5.
5.1
Type of Heating
Type
of steam
5.2
Pressure Barg
Temperature C
Design
Operating
Design
Operating
LP
295
185
25.0
22.0
MP
350
290
9.0
7.0
Steam Supply
LP and M P steam supply in Process and Offsite areas will be from the main LP and M P steam
headers.
5.3
Condensate Return
The condensate discharge from condensate return manifolds shall be connected to the main
condensate headers in Process Areas. In Offsite and Interconnecting areas, the condensate
5.4
Lines to be traced
Traced lines and instruments are indicated on P&IDs with proper symbol.
5.5
Tracers shall be fastened to piping with stainless steel fastening bands. Bands shall be
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Package
Project
FE1
RAPID
Originator
TPX
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
6 / 13
CONTRACTOR REFERENCE
FEED PHASE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
5.6
Design principle
5.6.1
Table 2: Maintenance temperature between 55C and 130C with LP Steam , tracing code
: SL
5.6.2
FE1-TPX-PIP-DES-0001-9009.
Heat tracers used are steel piping 1/2 (OD = 21.3mm) and 3/4 (OD = 26.7mm)
TRACER
NOMINAL
SIZE
PROCESS UNIT
Efficient
(pipe)
Table 1 :SL
Max
Total Max
Length
Length (m)
(m)
ON RACK AND
INTERCONNECTING
Efficient
Max Length
(m)
(m)
1/2
30
+ 2 x 15 = 60
45
+ 2 x 15 = 75
1/2
35
+ 2 x 15 = 65
50
+ 2 x 15 = 80
3/4
60
+ 2 x 15 = 90
80
+ 2 x 15 = 110
1/2
65
+ 2 x 15 = 95
90
+ 2 x 15 = 120
3/4
95
+ 2 x 15 = 125
130
+ 2 x 15 = 160
Table 2 :SL
Table 3 :ML
5.6.3
Insulation thickness
Insulation thicknesses indicated in the hereafter Tables are in accordance with the Project
5.6.4
Insulating wedges shall be provided between tracer and pipe in accordance with tables from
5.6.5
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Package
Project
RAPID
Originator
TPX
FE1
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
7 / 13
CONTRACTOR REFERENCE
FEED PHASE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
TABLE - 1
TRACING CODE: SL
: 20 C
: 36.5 C
traced) DIAMETER
Nominal
(inch)
External
(mm)
INSULATION
TRACING
Int.
Nominal
External
Thickness
Fixation
Diameter
Diameter
Diameter
Nbr
(mm)
System
(mm)
(inch)
(mm)
3/4
26.7
1/2
21.30
Spacer
48.0
30
Maximum
Real Fluid
Temperature
Inside the
Line (C)
85.4
Steam
Flowrate
kg/h.100m
5.3
33.4
1/2
21.30
Spacer
54.7
30
82.9
5.5
3/2
48.3
1/2
21.30
Spacer
69.6
30
78.3
5.9
60.3
1/2
21.30
Spacer
81.6
30
75.3
6.1
88.9
1/2
21.30
Spacer
110.2
40
74.8
6.1
114.3
1/2
21.30
Spacer
135.6
40
70.9
6.4
168.3
1/2
21.30
Spacer
200.3
40
80.7
11.4
219.1
1/2
21.30
Spacer
251.1
40
75.6
12.2
10
273.1
1/2
21.30
Spacer
305.1
40
71.5
12.8
12
323.9
1/2
21.30
Spacer
355.9
40
68.3
13.2
14
355.6
1/2
21.30
Spacer
398.2
40
75.7
18.3
16
406.4
1/2
21.30
Clamp
427.7
40
97.2
31.3
18
457.2
1/2
21.30
Clamp
478.5
40
94.2
32.8
20
508.0
1/2
21.30
Clamp
529.3
40
91.5
34.2
22
558.2
1/2
21.30
Clamp
579.5
40
89.1
35.3
24
609.6
1/2
21.30
Clamp
630.9
40
86.9
36.5
26
660.4
1/2
21.30
Clamp
681.7
40
84.8
37.5
28
711.2
1/2
21.30
Clamp
732.5
40
83.0
38.5
30
762.0
1/2
21.30
Clamp
783.3
40
81.2
39.3
32
821.8
1/2
21.30
Clamp
843.1
40
79.4
40.3
34
863.6
1/2
21.30
Clamp
884.9
40
78.1
40.9
36
914.4
1/2
21.30
Clamp
935.7
40
76.8
41.6
42
1066.8
1/2
21.30
Clamp
1088.1
40
73.1
43.4
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Package
Project
RAPID
FEED PHASE
Originator
TPX
FE1
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
8 / 13
CONTRACTOR REFERENCE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
TABLE - 2
TRACING CODE: SL
: 20 C
: 36.5 C
be traced)
DIAMETER
TRACING
Nominal
Nominal
External
Diameter
(inch)
(mm)
(inch)
External
Diameter
Nbr
(mm)
Maximum Real
Steam
Fluid
Flowrate
Temperature
Int.
Thickness
Diameter
kg/h.100m
(C)
(mm)
(mm)
INSULATION
Fixation
System
3/4
26.7
3/4
26.70
Clamp
53.4
30
138.5
13.0
33.4
3/4
26.70
Clamp
60.1
30
137.1
13.9
3/2
48.3
1/2
21.30
Clamp
80.3
30
141.3
18.1
60.3
1/2
21.30
Clamp
92.3
30
139.6
19.7
88.9
1/2
21.30
Clamp
120.9
40
139.7
19.6
114.3
1/2
21.30
Clamp
146.3
40
137.2
22.1
168.3
1/2
21.30
Clamp
210.9
40
139.0
30.6
219.1
3/4
26.70
Clamp
272.5
40
139.1
38.2
10
273.1
1/2
21.30
Clamp
315.7
40
138.0
42.8
12
323.9
3/4
26.70
Clamp
377.3
40
139.2
50.9
14
355.6
3/4
26.70
Clamp
409.0
40
137.9
54.1
16
406.4
1/2
21.30
Cement
438.4
40
139.9
58.9
18
457.2
1/2
21.30
Cement
489.2
40
138.2
63.9
20
508.0
3/4
26.70
Cement
548.1
40
140.2
72.5
22
558.2
3/4
26.70
Cement
598.3
40
138.9
77.7
24
609.6
3/4
26.70
Cement
649.7
40
137.6
82.5
26
660.4
1/2
21.30
Cement
703.0
40
139.4
90.9
28
711.2
1/2
21.30
Cement
753.8
40
138.3
95.9
30
762.0
1/2
21.30
Cement
804.6
40
137.3
100.8
32
821.8
3/4
26.70
Cement
875.2
40
139.7
112.4
34
863.6
3/4
26.70
Cement
917.0
40
139.0
116.5
36
914.4
3/4
26.70
Cement
967.8
40
138.2
121.2
42
1066.8
1/2
21.30
Cement
1109.4
40
136.9
136.6
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Package
Project
RAPID
FEED PHASE
Originator
TPX
FE1
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
9 / 13
CONTRACTOR REFERENCE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
TABLE - 3
TRACING CODE: ML
: 20 C
: 36.5 C
be traced)
DIAMETER
TRACING
Nominal
Nominal
External
Diameter
(inch)
(mm)
(inch)
External
Diameter
Nbr
(mm)
Maximum Real
Steam
Fluid
Flowrate
Temperature
Int.
Thickness
Diameter
kg/h.100m
(C)
(mm)
(mm)
INSULATION
Fixation
System
3/4
26.7
3/4
26.70
Clamp
53.4
30
138.5
13.0
33.4
3/4
26.70
Clamp
60.1
30
137.1
13.9
3/2
48.3
1/2
21.30
Clamp
80.3
30
141.3
18.1
60.3
1/2
21.30
Clamp
92.3
30
139.6
19.7
88.9
1/2
21.30
Clamp
120.9
40
139.7
19.6
114.3
1/2
21.30
Clamp
146.3
40
137.2
22.1
168.3
1/2
21.30
Clamp
210.9
40
139.0
30.6
219.1
3/4
26.70
Clamp
272.5
40
139.1
38.2
10
273.1
1/2
21.30
Clamp
315.7
40
138.0
42.8
12
323.9
3/4
26.70
Clamp
377.3
40
139.2
50.9
14
355.6
3/4
26.70
Clamp
409.0
40
137.9
54.1
16
406.4
1/2
21.30
Cement
438.4
40
139.9
58.9
18
457.2
1/2
21.30
Cement
489.2
40
138.2
63.9
20
508.0
3/4
26.70
Cement
548.1
40
140.2
72.5
22
558.2
3/4
26.70
Cement
598.3
40
138.9
77.7
24
609.6
3/4
26.70
Cement
649.7
40
137.6
82.5
26
660.4
1/2
21.30
Cement
703.0
40
139.4
90.9
28
711.2
1/2
21.30
Cement
753.8
40
138.3
95.9
30
762.0
1/2
21.30
Cement
804.6
40
137.3
100.8
32
821.8
3/4
26.70
Cement
875.2
40
139.7
112.4
34
863.6
3/4
26.70
Cement
917.0
40
139.0
116.5
36
914.4
3/4
26.70
Cement
967.8
40
138.2
121.2
42
1066.8
1/2
21.30
Cement
1109.4
40
136.9
136.6
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Project
RAPID
FEED PHASE
Package
Originator
TPX
FE1
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
10 / 13
CONTRACTOR REFERENCE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
6.
INSTRUMENTS
Instrument requiring tracing are defined in instrument list in accordance with piping and
instrumentation diagrams.
- Flanged-mounted instruments, such as control valves, ON-OFF valves, flow elements, rotameters,
- Tapped-mounted and remote instruments, such as pressure transmitters, level transmitters, flow
7.
7.1
Purpose
The purpose of detail engineering and design is to develop, from the documents prepare all
necessary documents and/or calculations which are required to purchase materials, fabricate, install
7.2
General design
Caution shall be taken that tracer feed lines, tracers and tracer return lines do not interfere with
valves, equipment, instruments, etc. in hindering of access, operation, maintenance and removal.
Each tracer feed line shall have a separate valved connection on the steam distribution
manifold. Each tracer return line shall be provided with its own steam trap.
Installation of manifold is preferred in vertical position rather than horizontal position for
Vertical and horizontal steam supply manifolds shall have a maximum of 12 tracer
Vertical and horizontal condensate return manifolds shall have a maximum of 12 tracer
Tracer isometric drawings shall show the tracer route in dotted line, the tracer feed
sequence number from steam manifold and the tracer return sequence number to
condensate return manifold, as well as tracer feed and tracer return pipe length.
Each tracer supply shall be routed, to the object to be traced, as short as possible, in
accordance with Construction Standards. The tracer shall start at the highest point and be
Tracer feed and tracer return lines shall be insulated in accordance with the Project
If a line needs more than one tracer, a tracer may run back and forward along the line as
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Project
RAPID
FEED PHASE
Package
FE1
Originator
TPX
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
11 / 13
CONTRACTOR REFERENCE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
Tracing of two different objects with the same tracer is not permitted. Suction and
discharge piping on two or more parallel pumps shall also be treated separately to enable
7.3
Tracers that follow the contour of equipment shall start at the highest point to be traced.
Single tracers shall run along the bottom half of the horizontal pipe line to be traced.
M ultiple tracers shall run at an angle to the vertical axis of the horizontal pipe line and
Flange connections shall be used for tracer dismantling but their use shall be limited as
much as possible.
Flange connections shall be installed at pumps, equipment, control valves, relief valves,
special break-out flanges, spectacle blinds and orifice flanges. They shall be installed
connections, and all other dead ends at a traced object shall be traced to its extremity or up
7.4
Thermal expansion
The thermal expansion for tracing will be define by EPCC CONTRACTORS following
Type of steam
Material
Thermal Expansion
LP Steam at 185 C
stage
MP Steam at 290 C
stage
On long runs, tracers shall be provided with expansion loops. The loops shall be extended
7.5
Instruments
Tracing of instruments shall be as per the Project Specification - Installation of on-line instruments
7.6
Supporting
Tracer feed and return lines (lines running from manifold to tracer or from tracer to
manifold) shall be adequately supported with an acceptable method, preferably from, but
not attached to, adjacent structural steel and not from process lines.
The distance between support points shall not exceed 3 m. Supply and return lines, coming
from or going to the same manifold, shall be grouped together as much as possible for
common supports.
Tracer supply and return lines shall not be pocketed except where absolutely necessary for
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Project
RAPID
FEED PHASE
Package
Originator
TPX
FE1
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
12 / 13
CONTRACTOR REFERENCE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
Tracers shall be supported from the traced object by means of Stainless Steel bands. No
deformation of tracing, due to bending shall be allowed. In all cases the tracer shall be held
provided.
Fastening bands shall be installed allowing tracer thermal expansion expect for anchor
Tracer bands shall be located as close as possible to the back face of each flange.
8.
8.1
Drawing requirements
8.1.1
Location of steam distribution manifolds (DM) and condensate return manifolds (CM)
The location of steam distribution manifolds (DM) and condensate return manifolds (CM) shall be
specified on drawings called Location plan for Steam Supply (DM) and Condensate Return (DM)
If manifolds are located on platform, elevation shall be indicated. Plot Plans shall be used as
8.1.2
Steam supply and condensate Return Manifolds P&IDs shall be prepared by Piping group.
It includes:
8.1.3
Isometrics
8.1.4
List of traced lines (including line number, piping class, diameter, insulation code and design area
number).
8.1.5
Traced isometrics
Tracer feed line number from steam manifold and tracer return line number to condensate
return manifold.
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OWNER REFERENCE
Project
RAPID
FEED PHASE
Package
FE1
Originator
TPX
Discipline
Doc. Type
Unit n
Serial n
PIP
DES
0001
0003
Rev.
Page
13 / 13
CONTRACTOR REFERENCE
Project
60987R
Unit n
Doc. Type
Doc. Code
Sequent. n
0001
JSD
1300
0003
8.1.6
Table which sums up all above information in order to trace stream traced line and ensure proper
9.
MATERIALS
Materials for the tracing systems shall be in accordance with the applicable piping classes .
Substitutions, including thicker wall materials, are not permitted without written approval
of Purchaser.
For all threaded pipe to tube connections, shall be in accordance with ASME/ANSI
B1.20.1 and shall be seal welded with a full strength fillet weld
For attachment of tracing, fully softened 18-8 Stainless Steel bands, 10 x 0.4 mm, shall be
used. Seal or buckles for use with bands shall be from 18-8 fully softened Stainless Steel
10.
FABRICATION
Welding shall be in accordance with Project Specification for Shop and field fabrication of
piping system.
All carbon steel exterior surfaces, except machined flange faces, shall receive surface
11.
11.1
Cleaning
Tracing systems shall be cleaned of weld spatter, pipe scale, rust and other debris prior to testing
11.2
Inspection
The following visual inspections shall be made prior to testing and insulating:
Tracing shall be visually inspected for kinked or flattened sections. All such sections shall
loops.
other changes of direction where movement of tracer could damage the insulation.
11.3
Testing
Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval
system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
B
MIN
SPARE
SPARE
INSTRUMENTS TRACING
(WITH TUBING)
STEAM TRAP
STEAM TRAP
TO GRADE
TO GRADE
BYPASS
SPARE
SPARE
STEAM TRAP
TO GRADE
BYPASS
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-3
TABLE-1
TRACING CODE: SL
PIPE MAINTENANCE TEMPERATURE: T < 55 C
Type of heating medium: Low Pressure Steam, 5 barg / 165 C, Saturated temperature 158.8 C
General air condition Design Minimum temperature: 20 C
Main Line
Tracer
Insulation
Nominal
Diameter
(DN)
External
Diameter
(mm)
Nominal
Diameter
(DN)
Numbers
of Tracer
Tracer Fixation
Thickness
(mm)
20
26.7
15
Fastening Band
30
25
33.4
15
Fastening Band
30
40
48.3
15
Fastening Band
30
50
60.3
15
Fastening Band
30
80
88.9
15
Fastening Band
30
100
114.3
15
Fastening Band
30
150
168.3
15
Fastening Band
30
200
219.1
15
Fastening Band
30
250
273.1
15
Fastening Band
30
300
323.9
15
Fastening Band
30
350
355.6
15
Fastening Band
30
400
406.4
15
Fastening Band
30
450
457.2
15
Fastening Band
30
500
508.0
15
Fastening Band
30
550
558.2
15
Fastening Band
30
600
609.6
15
Fastening Band
30
650
660.4
15
Fastening Band
30
700
711.2
15
Fastening Band
30
750
762.0
15
Fastening Band
30
800
821.8
15
Fastening Band
30
850
863.6
15
Fastening Band
30
900
914.4
15
Fastening Band
30
1050
1066.8
15
Fastening Band
30
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-4
TABLE-2
TRACING CODE: SL
PIPE MAINTENANCE TEMPERATURE: 55 C < T < 100 C
Type of heating medium: Low Pressure Steam, 5 barg / 165 C, Saturated temperature 158.8 C
General air condition Design Minimum temperature: 20 C
Main Line
Tracer
Insulation
Nominal
Diameter
(DN)
External
Diameter
(mm)
Nominal
Diameter
(DN)
Numbers
of Tracer
Tracer Fixation
Thickness
(mm)
20
26.7
15
20
25
33.4
15
30
40
48.3
15
30
50
60.3
15
30
80
88.9
15
30
100
114.3
15
30
150
168.3
15
30
200
219.1
15
30
250
273.1
15
30
300
323.9
15
30
350
355.6
15
30
400
406.4
15
30
450
457.2
15
30
500
508.0
15
30
550
558.2
15
30
600
609.6
15
30
650
660.4
15
30
700
711.2
15
30
750
762.0
15
30
800
821.8
15
30
850
863.6
15
30
900
914.4
15
30
1050
1066.8
15
30
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-5
TABLE-3
TRACING CODE: SM
PIPE MAINTENANCE TEMPERATURE: 100 C < T < 130 C
Type of heating medium: Medium Pressure Steam, 19 barg / 275 C, Saturated temperature
212.4 C
General air condition Design Minimum temperature: 20 C
Main Line
Tracer
Insulation
Nominal
Diameter
(DN)
External
Diameter
(mm)
Nominal
Diameter
(DN)
Numbers
of Tracer
Tracer Fixation
Thickness
(mm)
20
26.7
15
30
25
33.4
15
30
40
48.3
15
30
50
60.3
15
30
80
88.9
15
40
100
114.3
15
40
150
168.3
15
40
200
219.1
15
40
250
273.1
15
40
300
323.9
15
40
350
355.6
15
40
400
406.4
15
40
450
457.2
15
40
500
508.0
15
40
550
558.2
15
40
600
609.6
15
40
650
660.4
15
40
700
711.2
15
40
750
762.0
15
40
800
821.8
15
40
850
863.6
15
40
900
914.4
15
40
1050
1066.8
15
40
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-6
Q = Qi + Qo
Qi =
Qo =
Ta Ti
= d i1a a (Ta Ti )
d i1
1
1
ln( ) +
2li
di2
d i1a a
Ta To
d
1
1
1
n( o1 ) +
+
d o2
d o1a o d o 2a a
2i
Q = nd t1a a (Tt Ta )
(1)
(2)
(3)
(4)
Ta =
1
To
R
1
d i1 a a + n d t1 a a +
R
d i1 a a Ti + n d t1 a a Tt +
(5)
where
R=
1
2 o
n(
d o1
1
1
)+
+
d o2
d o1 a o d o 2 a a
Q = Qi + Qo
In this case Qi need not be considered, hence:
Qi = 0
Q = Qo
Ta =
(6)
1
To
R
1
n d t1 a a +
R
n d t1 a a Tt +
(7)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-6
where
Q:
Qi :
Qo :
To :
Ti :
Ta :
To
Qo
Ti
Qi
QT
Case 3 : Heat Transfer Compound is provided between tracer pipe and process pipe
Qo = Qa + Qb
(8)
Qi = Qb
(9)
Qi = n qi S1 (Tt Ti )
(10)
Qb = ( d i1 n S1 ) a a (Ti Ta )
(11)
Qa = n S 2 a a (Tt Ta )
(12)
Qo =
Ta To
d
1
1
1
+
n( o1 ) +
2o
d o1a o d o 2a a
d o2
Ta = Ti
nqi S1 (Tt Ti )
(d i1 nS1 )a a
(13)
(14)
Ti =
where
K
To
)+
R'
R'
1 K
+
A + AK + BK +
R' R'
Tt ( A + AK + BK +
A = nS 2a a
B = (d i1 nS1 )a a
(15)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-6
nqi S1
nq S
= i 1
(d i1 nS1 )a a
B
d
1
1
1
R
n( o1 ) +
+
=
R' =
2o
d o2
d o1 o d o 2
K=
S1 :
S2 :
qi :
Qa :
Qb :
Qi :
Qo :
qi = 105
qi = 89
qi = 71
qi = 59
qi = 47
To
Qo
Ta
Tt
(DN 200)
(DN 250)
(DN 300)
(DN 350)
(DN 400 and larger)
Qi
Ti
Qb
Qa
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-7 (1/3)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-7 (2/3)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-7 (3/3)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-8 (1/4)
DELETED
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-8 (2/4)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-8 (3/4)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-8 (4/4)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
Fig-1 For Piping (2/2)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
Fig-2: For Control Valves (1/2)
DELETED
DELETED B
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
Fig-2: For Control Valves (2/2)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
Fig-3: For Vessel Nozzles (1/1)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
Fig-4: For In-Line Instruments and Equipment (1/3)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
Fig-4: For In-Line Instruments and Equipment (2/3)
Flange connection
on tracer for
dismantling
Flange connection on
tracer for dismantling
B
B
Flange connection on
tracer for dismantling
Flange
connection on
tracer for
dismantling
B
Flange
connection
on tracer for
dismantling
B
B
Flange connection on
tracer for dismantling
Flange
connection on
tracer for
dismantling
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
Fig-4: For In-Line Instruments and Equipment (3/3)
Flange connection on
tracer for dismantling B
Flange connection on
tracer for dismantling
Flange connection on
tracer for dismantling
B
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
Fig-6: For Pump Piping and Pump (2/3)
RAPID-P0005-TYO-PIP-DES-2000-0003
Attachment-9
Typical Installation Detail
Fig-6: For Pump Piping and Pump (3/3)