Sl
No
Details of work
Tender
Spec No
Qty
Cost of Total
Pack age
(Rs in Lacs)
Physical progress
made.
During
the
month.
M/s secure
meters . Ltd
Solan.
1HT+1LT
2.46
APDRP/0
3-04/42
40.78+0.78
APDRP/0
3-04/19
3.30
APDRP/0
3-04/52
M/s Awadh
113No.DTs. 559.37+56.00=
Transformers upgradation
616.00
P.Ltd.Sultanpur +metering of
1088 DTs.
7Nos.1x5
MVA new
S/S &
connected
33KV &11
KV lines
2362.48+25.96
=2388.44
APDRP/0
M/s
17Nos.33/11 614.96+13.61=
3-04/34 Instrumentation kv S/S of
628.57
Ltd Lko
Varanasi
Town
Replacement of LT
Conductors by ABC.
10Kms.
87.92
1job
409.63
Civil wing
UPPPCL.
7 Nos.New
S/Ss.
224.00
Civil wing
UPPPCL.
M/s Elymer
10Nos.
36.00
60850
486.90
Local Firms
54Ckt Km
102.00+30
EAV07/05-06
M/S genus
Electricals Ltd.
Jaipur
416
-do-
-do-
-do-
-do-
30cktkm
-do-
-do-
80+105=185
-do-do-do-
-do-do-do-
30cktkm
300 nos.
45+20
353.45
20 Reconductoring 33 Kv lines
-do-
-do-
32 Ckt Km.
58.82
-do-
-do-
40 Ckt Km
86.40
9
construction of control
room building and allied
Civil Works including cost of
land for new 33/11 KV s/ss.
10 R & M of building old
33/11KV S/s.
11 lnstallation of single Phase
Electronic meters
12 LT reconductoring
13 TVMs.
1184.03
-do-
-do-
190 Ckt Km
446.20
23 Replacement of
DamagedSTP
24 Constructionl of new 33KV
linesO/H 15 Kms.U/G 2
Kms.
-do-
-do-
300
30.05+25.00
-do-
-do-
17 Ckt km
222.73
25 Conversion of 33 KV lines
from Dog to Panther from
Manduadih to Bhadani S/S.
-do-
-do-
6Ckt Km
O/H+1Ckt
Km U/G
89.75
-do-
-do-
3.5 Ckt Km
75.03
-do-
-do-
10
9.00
-do-
-do-
36
162.00
12Nos
306.01
80.00
29 HVDS
30 Jyoti Breaker for
Kashividyapeeth& Beniya
33/11 KV S/S
Total
8385.25
8478.00
Balance
93.00
( 30/04/2006)
Physical progress
Expenditure
outstanding
made.
incured.(Rs. In liability at the
cumulative Duringlacs)
cumulati end of the
up to the
the
ve up to month (Rs. In
lacs)
month.
month.
the
month.
8
9
10
11
1HT+1LT
2.46
Present Status
12
Material received and 100% payment made.
40.78+0
.78
do
3.31
560.17
+25.77+
7.70=59
3.64
+2.78
1078.75
+138.85
+312.78
+85.00+
29.67+2
18.35
=1863.4
0
+146.29
611.31
69.78+3
.43+4.6
9
+7.96
The firm has so far supplied 33 KV. C.Ts. And P.Ts. And Fire
Fighting Equipments against this contract. 1 Nos. 10 MVA
Transformer Installed at Bhadaini & energised on 7.9.05 work
of installation of C.Ts. LAS etc. completed. Installation of 8
MVA T/F at Shankuldhara completed on 16/11/05.
Installation of 10 MVA T/F in place of 8 MVA
completed on 28/12/05 at PannaLal Park. 33/11 kV s/s.
Machhodari 8 MVA T/F installed in place of 5 MVA on 31-1-06
At Pandaypur installation of 10 MVA T/F in place of 8 MVA
completed and energised on 12-4-06.
32.97
+4.14
+4.895
23.04+4
.77=27.
81+4.50
+8.39
=40.70
76.00
76.00
4.80+7 4.80+7.
.89 89+104.
97+14.0
0
+8.00+1
0.19
=149.85
+13.42+
1.17
_
135.00
-do-
135
+402.83
+173.69
Agreement executed
Agreement executed
_
_
Agreement executed
Agreement executed work to be started shortly.
Agreement executed.work to be started shortly
GTP of T/F approved Inspection call given.
_
_
_
16.12
14.00
_
_
_
_
4737.00