You are on page 1of 8

Progress Report of APDRP works of VARANASI

Sl
No

Details of work

Tender
Spec No

Name of the firm


to whom work
order
placed/Date of
contract

Qty

Cost of Total
Pack age
(Rs in Lacs)

Physical progress
made.
During
the
month.

1 LT & HT Accu check meters APDRP/0


3-04/10

M/s secure
meters . Ltd
Solan.

1HT+1LT

2.46

2 Cable Fault locating


system.

APDRP/0
3-04/42

M/s PCI New


Delhi.

40.78+0.78

3 Oil Certrifuging machines.

APDRP/0
3-04/19

M/s CEE DEE


Vacuum Eqpt
pvt ltd, Pune.

3.30

4 Increasing Capacity of DTs


& metering of all DTs.

APDRP/0
3-04/52

M/s Awadh
113No.DTs. 559.37+56.00=
Transformers upgradation
616.00
P.Ltd.Sultanpur +metering of
1088 DTs.

5 New 33/11 KV - S/Ss&


APDRP/0
M/s
associated 33KV and 11KV 3-04/40 Instrumentation
Lines.
Ltd Lko

7Nos.1x5
MVA new
S/S &
connected
33KV &11
KV lines

2362.48+25.96
=2388.44

R&M of 33/11kv S/S

APDRP/0
M/s
17Nos.33/11 614.96+13.61=
3-04/34 Instrumentation kv S/S of
628.57
Ltd Lko
Varanasi
Town

Replacement of LT
Conductors by ABC.

APDRP/0 M/s Fabricator


3-04/48 (India)Varanasi

10Kms.

87.92

8 GIS mapping, indexing


billing etc.

APDRP/0 M/s KLG Systel


3-04/37
Gurgaon

1job

409.63

Civil wing
UPPPCL.

7 Nos.New
S/Ss.

224.00

Civil wing
UPPPCL.
M/s Elymer

10Nos.

36.00

60850

486.90

Local Firms

54Ckt Km

102.00+30

EAV07/05-06

M/S genus
Electricals Ltd.
Jaipur

416

14 Electronic Meter Testing


Bench
15 Constructionl of 33KV lines
Weasel/ Rabbit

-do-

-do-

-do-

-do-

30cktkm

16 New 11/0 4 Kv s/ss 400


+225006 KVA
17 New LT line
18 Solid Earthing
19 Increasing capacity of DTS
from 45 x(400-630 KVA)+20
x (250-40KVA) with solid
earthing of 800 N0s.
Transformer

-do-

-do-

80+105=185

-do-do-do-

-do-do-do-

30cktkm
300 nos.
45+20

353.45

20 Reconductoring 33 Kv lines

-do-

-do-

32 Ckt Km.

58.82

21 Reconductoring 311Kv lines

-do-

-do-

40 Ckt Km

86.40

9
construction of control
room building and allied
Civil Works including cost of
land for new 33/11 KV s/ss.
10 R & M of building old
33/11KV S/s.
11 lnstallation of single Phase
Electronic meters
12 LT reconductoring

13 TVMs.

1184.03

22 L.T line Reconductoring

-do-

-do-

190 Ckt Km

446.20

23 Replacement of
DamagedSTP
24 Constructionl of new 33KV
linesO/H 15 Kms.U/G 2
Kms.

-do-

-do-

300

30.05+25.00

-do-

-do-

17 Ckt km

222.73

25 Conversion of 33 KV lines
from Dog to Panther from
Manduadih to Bhadani S/S.

-do-

-do-

6Ckt Km
O/H+1Ckt
Km U/G

89.75

26 33 KV U/GH cable 3x300


SQ MM XLPE from Konio to
M achhodary

-do-

-do-

3.5 Ckt Km

75.03

27 Renobatin of old 33 /11 Kv


Switchyard
28 36 N0s. Outsourced
Computerised bill collection
centres

-do-

-do-

10

9.00

-do-

-do-

36

162.00

12Nos

306.01
80.00

29 HVDS
30 Jyoti Breaker for
Kashividyapeeth& Beniya
33/11 KV S/S
Total

8385.25

Sacntioned under the


Scheme

8478.00

Balance

93.00

P works of VARANASI TOWN

( 30/04/2006)

Physical progress
Expenditure
outstanding
made.
incured.(Rs. In liability at the
cumulative Duringlacs)
cumulati end of the
up to the
the
ve up to month (Rs. In
lacs)
month.
month.
the
month.
8
9
10
11

1HT+1LT

2.46

Present Status

12
Material received and 100% payment made.

40.78+0
.78

do

3.31

Material received and 90% payment made.

560.17
+25.77+
7.70=59
3.64
+2.78

The firm has supplied 70 Nos 400 KVA transformers out of


which 70 Nos have since allredy been installed at site.33 No
250 KVA Transformer has also been installed.Out of 113 DTs
boring for earthing on 113Nos Transformer has since been
completed earthing of 70Nos 400 KVA and 32 Nos,250KVA
Transformer has since been completed. The firm has
supplied TVm Cts and L.T. XLPE cable for 1088 Dts 1088
NO. Metering cubicals has since been received sofar and
balance are still awaited. The work of installation 1085 Nos of
TVM on DTs has since been completed.so far balance is
under progress.

1078.75
+138.85
+312.78
+85.00+
29.67+2
18.35
=1863.4
0
+146.29

The work of construction of 33Kv lines on Panther conductor


from 132 KV Cantt. S/S to Kashi
Vidyaapeeth all 90 poles has already been errected,
stringing work complete. 75% cable work complete,Railway
permission awaited and in 33 KV. Sarnath- Konia line out of
120 poles, all have already been errected. Fitting and stay
wire 100% complete +stringing complete.
Out of 2.9 Km cable laying 1.8 Km work complete. PWD &
Railway permission awated expected
to be cleared by 31.5.06 for balance cable work. All 105
poles of 11 KV Dafi-Bhagwanpur line has
since been errected, stringing complete. cable laying
complete conected to S/S. energised
on 30/09/05 Construction of 33KV Sahupuri- Ram Nagar line
all 189 poles errected, strigning complete. Charged on 23-206 Lenghth of line 7.5 Km, 11 KV Lohata-Kurauta line all 31
poles erected lenght 2 Kms-fiting +stay rod & stringing
complete. For Sigra S/S. 33 KV line on Dog complete. DPHLohata 33 Kv line - 1.5 Kms- all 21 Poles erected. 604 Mtr. cabling
work complete, stringing complete. M/s I.L., Lucknow have supplied
11 KV XLPE cable, 33 KV CTs & PTs & Isolators etc.
Supply of 7 Nos. 33/11 Kv. 5 MVA T/F has been received.

33 KV VCBs supply complete and 11 KV VCBs are


received. The work of laying of earth mats at new 33/11 KV.
S/Ss at Ram Nagar,Lohta and Ordaly Bazar & Sigra has
already been completed. 33/11 KV S/S Ramnagar & Ardaly
Bazar energised on 23-2-06 & Sigra & Lohta have been
energisedon 27-2-06 & 5-3-06. respectively The payment
of Rs. 69.90 Lacs has been made to EE (Transmission),
Varanasi towards Bay charges for New 33 KV lines.

611.31

69.78+3
.43+4.6
9
+7.96

The firm has so far supplied 33 KV. C.Ts. And P.Ts. And Fire
Fighting Equipments against this contract. 1 Nos. 10 MVA
Transformer Installed at Bhadaini & energised on 7.9.05 work
of installation of C.Ts. LAS etc. completed. Installation of 8
MVA T/F at Shankuldhara completed on 16/11/05.
Installation of 10 MVA T/F in place of 8 MVA
completed on 28/12/05 at PannaLal Park. 33/11 kV s/s.
Machhodari 8 MVA T/F installed in place of 5 MVA on 31-1-06
At Pandaypur installation of 10 MVA T/F in place of 8 MVA
completed and energised on 12-4-06.

The firm has already supplied ABC cables and 70 sqmm.


Dropper cables & Junction boxes in our store. The work of
erection of 100 km ABC completed.

32.97
+4.14
+4.895

GIS mapping, Sequencing Linking work has since been


comleted. Survey work of consumers has also been
completed. The work for billing of consumers of UEDD-III,
Machhodari has been started from 8/12/05. Work of UEDDIV Chetmani has start from 18-1-06.

23.04+4
.77=27.
81+4.50
+8.39
=40.70

The construction of control Room buildings at Ram Nagar


and Ordaly Bazar & Lohata and Sigra are 100% complete.
The land for Alaipur is expected to be available in 5/06.

Work under progress Tender of remaining job under


finalisation.

76.00

76.00

12500 Meters already received, balance expected shortly.


Work of installation under progress.
Reconductoring Work about 40 Km complete.

4.80+7 4.80+7.
.89 89+104.
97+14.0
0
+8.00+1
0.19
=149.85
+13.42+
1.17

Agreement executed work of erection to be started shortly.

_
135.00

-do-

135
+402.83
+173.69

Agreement executed

Agreement executed

_
_

Agreement executed
Agreement executed work to be started shortly.
Agreement executed.work to be started shortly
GTP of T/F approved Inspection call given.

Agreement executed. Line chart prepared, BOQ finalised.


GTP of conductor poles and insulator approved.

Agreement executed.GTP of 11 KV insulators. & Poles


approved.

_
_

_
16.12

14.00

Agreement executed.GTP of Conductor & Poles approved.


To EE (Store) GTP of Poles approved
Agreement executed. Line chart prepared, BOQ finalised.
GTP of pols,conductor poles and insulator approved. Raja Ka
Talab- DPH Line Construction started on 27-2-06

Agreement executed. Line chart prepared, BOQ finalised.


GTP of Pols conductor poles and insulator approved

Agreement executed. Line chart prepared, BOQ finalised.


GTP of 33 KV cable approved .

Agreement executed work of erection to be started shortly.

Tendering under process. At G.M. (MM) level.

_
_

_
_

Tendering under process.


Tendering under process.

4737.00