You are on page 1of 10

NO.

ITEM
GENERATOR
ENGINES (YANMAR
4TNE 106T)

CHECK POINTS

ENGINE CARGO
PORTSIDE
( MITSUBISHI 6D16 )

Yes

No

Safety devices function properly.

Yes

No

Water level at Expansion Tank

Yes

No

Condition of the V - Belt

Yes

No

Measure deflection of the V - Belt ( 10 mm )

Yes

No

Yes

No

Condition The Oil and Level Oil ( Full mark )

Yes

No

Lubricating Oil Filter

Yes

No

Color of exhaust smoke

Yes

No

Sea water discharging volume

Yes

No

Air Filter

Yes

No

400

The Valve tip Clearance ( inlet 0.2 mm and


exhaust 0.45 mm )

2000

Yes

No

Condition of the Viscous Damper

2000

Yes

No

Lubricating Oil Pressure ( 280 kN/m2 / 2.5


kgf/cm2 )

Yes

No

Fuel injection nozzle opening pressure ( Mpa /


kgf/cm2 )

Yes

No

Operate satisfactorily.

Yes

No

Abnormal vibration

Yes

No

Synchronasation system

Yes

No

Output voltage

Yes

No

Operate satisfactorily.

Yes

No

Check condition and level the Engine Oil

Yes

No

Water level at expansion tank

Yes

No

Condition of the V- Belt and tension of the Vbelt ( 10 -15 mm )

Yes

No

Oil filter element

Yes

No

Fuel filter element

Yes

No

Yes

No

The Nozzle pressure and Spray ( 22 Mpa / 224


Kg/cm2 )

Yes

No

Remote control function properly.

Yes

No

Sea water discharging volume

Yes

No

Abnormal noise and vibrate

Yes

No

Exhaust color of smoke

Yes

No

Cargo Pump operate satisfactorily.

Yes

No

Clearance Valve ( inlet 0.2 mm and exhaust 0.3


mm )

CARGO SYSTEM

SATISFACTORY

Operate satisfactorily.

Condition of the Impeller water pump

ALTERNATOR
( STAMFORD
UCM274E1 )

Running
hours

1000

NO. CARGO ITEM


SYSTEM

ENGINE CARGO
PORTSIDE
( MITSUBISHI 6D16 )

CHECK POINTS

FIRE FIGHTING
ENGINE DRIVEN
( electromotor )
FIRE PUMP

BILGE & GS
SYSTEM

SATISFACTORY

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Emergency stop ECP operating satisfactorily

Yes

No

Piping in good order.

Yes

No

Operate satisfactorily.

Yes

No

Check condition and level the Engine Oil

Yes

No

Water level at expansion tank

Yes

No

Condition of the V- Belt and tension of the Vbelt ( 10 -15 mm )

Yes

No

Oil filter element

Yes

No

Fuel filter element

Yes

No

Yes

No

The Nozzle pressure and Spray ( 22 Mpa / 224


Kg/cm2 )

Yes

No

Remote control function properly.

Yes

No

Sea water discharging volume

Yes

No

Abnormal noise and vibrate

Yes

No

Exhaust color of smoke

Yes

No

Cargo Pump operate satisfactorily.

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Emergency stop ECP operating satisfactorily

Yes

No

Piping in good order.

Yes

No

Operate satisfactorily.

Yes

No

Sea water discharging volume

Yes

No

Abnormal noise and vibrate

Yes

No

Operate satisfactorily.

Yes

No

Abnormal noise and vibrate

Yes

No

leakage from the pump casing

Yes

No

Greasing

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Bilge & GS Pump operate satisfactorily.

Yes

No

No heavy corrosion and leakage.

Yes

No

Clearance Valve ( inlet 0.2 mm and exhaust 0.3


mm )

CARGO SYSTEM

Running
hours

1000

6
NO.

10

11

12

BILGE & GS
SYSTEM

ITEM

Running
hours

SATISFACTORY

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

SEA WATER
Sea water cooling Pump operate satisfactorily.
COOLING SYSTEM

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Emergency stop operating satisfactorily

Yes

No

Stripping Pump operate satisfactorily.

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Operate satisfactorily.

Yes

No

Remote and control function properly.

Yes

No

Meters and gauges in good order.

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Operate satisfactorily.

Yes

No

Emergency stop operating satisfactorily

Yes

No

Operate satisfactorily.

Yes

No

Must be clean without rubbish or waste oil.

Yes

No

Protection covers and/or guards in good order.

Yes

No

FUEL OIL SYSTEM Fuel oil Pump operate satisfactorily.

STRIPPING
SYSTEM

DIRTY OIL SYSTEM Dirty oil Pump operate satisfactorily.

OILY WATER
SEPARATOR

PIPING

13

BLOWER P/R

14

BLOWER E/R

15

CLEANLINESS of E/R

16

CHECK POINTS

GUARDS AND
FENCING

NO.

ITEM
Chief Engineers
Date :

CHECK POINTS

Running
hours

SATISFACTORY

REMAKS

REMAKS

REMAKS

REMAKS
Technical Superintendent
Date :

NO

ITEM

Lighting in E/R

Lighting in Acc. Spaces

Lighting in working room,


steering room and other
spaces

Emergency cables

Emergency lights
Anti-explosion lights in
dangerous spaces, pump
room, battery room, paint
locker etc.
Insulating mats around
MSB
Main Switch Board

6
7

Alarms operate
satisfactorily

Level high / low alarm


operate satisfactorily
10

Chief Engineers
Date :

CHECK POINTS

SATISFACTORY

All lights in good order.

Yes

No

Protection covers or guards in good order

Yes

No

All lights in good order.

Yes

No

Protection covers or guards in good order

Yes

No

All lights in good order.

Yes

No

Protection covers or guards in good order

Yes

No

Condition in good order, no exposed wire,


heavy corrosion, especially on weather
deck.

Yes

No

All lights in good order, no broken lights.

Yes

No

Yes

No

Yes

No

All gauges and indicating light are


functioning

Yes

No

The surface of panel for excessive


warmness

Yes

No

Unusual smell

Yes

No

All cable conncetion and bus

Yes

No

Gas detector at P.R

Yes

No

Fire detector

Yes

No

Sensor CO2

Yes

No

Bilges at Engine Room

Yes

No

Bilges at Pump Room

Yes

No

Bilges at Steering Room

Yes

No

Daily Oil Tank

Yes

No

Fuel Oil Tank

Yes

No

Sewage tank

Yes

No

All lights in good order, no broken covers


and guards, tightening handles available
on board.
Available on board or insulation cement
permanently laid up on the floor.

REMAKS

Technical Superintendent
Date :