Production of Dicalcium Phosphate by Digestion

of Phosphate Rock with HCl

DCP Manufacturing Co., Inc.

Financial Analysis
A Detailed Calculation of the Cost Estimation

DCP Manufacturing Co., Inc.


295

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

FINANCIAL ANALYSIS
This is an outline of the economic considerations, which are necessary when preparing an estimate
of the capital investment or total product cost for a new venture or project. Methods for obtaining
predesign cost estimates has purposely been emphasized because the latter are extremely
important for determining the feasibility of proposed investment and to compare alternative
designs. The predesign estimates are based partially on approximate percentages or factor that
are applicable to a particular plant or process under consideration.
USE OF COST INDEXES
A cost index is merely an index value for a given period point in time showing the cost at that time
relative to a certain base time. If the cost at some time in the past is known, the equivale nt co st at
the present time can be determined by multiplying the orig inal cost by the ratio of the present index
value to the index value applicable when the original cost was obtained.
For the Production of Dicalcium Phosphate by Digestion of Phosphate Rock with HCl, we used the
Marshall and Swift Equipment Cost Indexes projected to 2013. We used the projections cost index
,
( ) ( )
=
[
]
( )
( )

Marshall and Swift Installed Equipment Indexes (Reference: Chemical Engineering Plant Cost
Index)
YEAR

ALL INDUSTRY

2005

468.2

2006

499.6

2007

525.4

2008

575.4

2009

521.9

2010

550.8

2011

585.7

2012

584.6

DCP Manufacturing Co., Inc.


296

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

By plotting the data above, we could get the cost index for the year 2015,

COST INDEX 2015


700

600

CEPCI

500
400
y = -0.1211x6 + 2.051x5 - 11.509x4 + 22.461x3 - 6.5617x2 + 20.605x + 468.76
R = 0.9159

300
200
100

0
0

No. of Years since 2005

For the cost index of 2015 let x = 3;


y = -0.1211x 6 + 2.051x 5 - 11.509x 4 + 22.461x 3 - 6.5617x 2 + 20.605x + 468.76
y = -0.1211(3)6 + 2.051(3)5 - 11.509(3)4 + 22.461(3)3 - 6.5617(3)2 + 20.605(3) + 468.76
y = 555.85 (Cost index for year 2015)
Cost index at 2002 = 395.6

Exchange Rate (Source: www.bsp.gov.ph)


Unite States Dollar (USD)

Philippine Peso (Php)

$1

Php 46.831
As of October 1, 2015

DCP Manufacturing Co., Inc.


297

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

Cost Estimation
Estimation of Capital Investment
Plant Capacity: 3467.5 MT/year
Plant Operation: 8322 hours/year
Table 1 Total Purchased Equipment Cost

Equipment
Jaw Crusher
Ball Mill1
Denver 24 Flotation Cell
Vibrating screen
Mixing tank
Digester
Cooler (S&T)
Clarifier
Precipitator
Decanter Centrifuge
Vacuum Filter
Rotary Dryer
Plate Cooler
Ball Mill 2
Vibrating Screen 2
Total Purchase Equipment Cost w/
Delivery Cost

No.of Equipment
1
1
3
1
1
1
1
1
1
1
1
1
1
1
1

Total Cost
70340
11854
113025
64940
5778
42393
44504
466382
139336
186335
12871
71325
2341
8375
17945
1,257,744

Unit
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

58,901,409.26

Php

DCP Manufacturing Co., Inc.


298

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

Cost of Equipment:
1. Jaw Crusher
Using the McGraw Hill Online Cost Estimator, cost of crushe rs (jaw crusher) is calculated.
Capacity: 10 kg/s
Materials of Construction:PE-250x400 Blake Type Jaw Crusher
Cost2002: $70340
Solving for Cost2015 ,
2015

(2015 = 2002 ( 2002 )


555.85
2015 = $70340(
)
395.6
= $98,833.39
2. Ball Mill 1
Using the McGraw Hill Online Cost Estimator, cost of ball mill is calculated.
Capacity:0.30kg/s
Materials of Construction: BM-2115
Cost2002:$ 11854
Solving for Cost2015 ,
2015

(2015 = 2002 (
)
2002
555.85
2015 = $11854(
)
395.6
= $16655.83
3. Vibrating Screen 1
Using the McGraw Hill Online Cost Estimator, cost of vibrating screen is calculated.
Screen area: 4.85 m2
Materials of Construction: Stainless Steel
Cost2002: $64940
Solving for Cost2015 ,
2015

(2015 = 2002 (
)
2002
555.85
2015 = $64940(
)
395.6
= $91,245.95

DCP Manufacturing Co., Inc.


299

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

4. Denver 24 Froth Flotation Cell


Using the McGraw Hill Online Cost Estimator, cost for the 3- is cell flotation system is
calculated.
Capacity:9.14 m3
Materials of Construction: Stainless Steel
Cost2002:$ 113025
Solving for Cost2015 ,
2015

(2015 = 2002 ( 2002 )


555.85
2015 = $113025(
)
395.6
= $158,809.27
5. Mixing Tank
Using the McGraw Hill Online Cost Estimator, cost of the mixing tank is calculated.
Capacity: 0.78 m3
Materials of Construction: Carbon Steel
Cost2002: $5778
Solving for Cost2015 ,
2015

(2015 = 2002 ( 2002 )


555.85
2015 = $5778(
)
395.6
= $8,118.56
6. Digester
Using the McGraw Hill Online Cost Estimator, cost of the digester is calculated.
Capacity: 3. 70 m3
Materials of Construction: Molybdenum Stainless steel
Cost2002:$ 42393
Solving for Cost2015 ,
2015

(2015 = 2002 ( 2002 )


555.85
2015 = $42393(
)
395.6
= $, .

DCP Manufacturing Co., Inc.


300

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

7. Cooler (Shell and Tube)


Using the McGraw Hill Online Cost Estimator, cost of the cooler is calculated.
Heat Transfer area: 268.27 m 2
Materials of Construction: Molybdenum Stainless steel 18/8
Cost2002: $44504
Solving for Cost2015 ,
2015

(2015 = 2002 ( 2002 )


555.85
2015 = $44504(
)
395.6
= $62531.72
8. Clarifier
Using the McGraw Hill Online Cost Estimator, cost of the clarifier is calculated.
Total solids capacity:10 kg/s
Materials of Construction: Carbon Steel (SA 516, Grade 60)
Cost2002: $ 466382
Solving for Cost2015 ,
2015

(2015 = 2002 ( 2002 )


555.85
2015 = $466382(
)
395.6
= $655,304.44
9. Precipitator
Using the McGraw Hill Online Cost Estimator, cost of the precipitator is calculated.
Capacity: 1.9 m3
Materials of Construction: Carbon Steel Grade C
Cost2002: $139336
Solving for Cost2015 ,
2015

(2015 = 2002 (
)
2002
555.85
2015 = $139336(
)
395.6
= $, .

DCP Manufacturing Co., Inc.


301

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

10. Decanter Centrifuge


Using the McGraw Hill Online Cost Estimator, cost of the decanter centrifuge is calculated.
Solids Product Capacity: 1.26 kg/s
Materials of Construction: Carbon Steel
Cost2002: $ 186335.00
Solving for Cost2015 ,
2015

(2015 = 2002 ( 2002 )


555.85
2015 = $186335(
)
395.6
= $, .
11. Vacuum Filter
Using the McGraw Hill Online Cost Estimator, cost of the vacuum filter is calculated.
Filter area: 9.3 m2
Materials of Construction: Carbon Steel
Cost2002: $12871
Solving for Cost2015 ,
2015

(2015 = 2002 ( 2002 )


555.85
2015 = $12871(
)
395.6
= $. .
12. Rotary Dryer
Using the McGraw Hill Online Cost Estimator, cost of the rotary dryer is calculated.
Peripheral surface area:33.42 m 2
Materials of Construction: Carbon Steel (Sa 285, Grade C)
Cost2002: $ 71325
Solving for Cost2015 ,
2015

(2015 = 2002 ( 2002 )


555.85
2015 = $71325(
)
395.6
= $, .

DCP Manufacturing Co., Inc.


302

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

13. Indirect Plate Cooler


Using the McGraw Hill Online Cost Estimator, cost of the plate cooler is calculated.
Heat transfer area: 14.87 m 2
Materials of Construction: Carbon Steel
Cost2002:$ 2341
Solving for Cost2015
2015
2015 = 2002 (
)
2002
555.85
2015 = $2341(
)
395.6
= $.
14. Ball Mill 2
Using the McGraw Hill Online Cost Estimator, cost of the plate cooler is calculated.
Capacity: 0.16 kg/s
Materials of Construction: Carbon Steel
Cost2002:$ 8375
Solving for Cost2015
2015
2015 = 2002 (
)
2002
555.85
2015 = $8375(
)
395.6
= $, .
15. Vibrating Screen 2
Using the McGraw Hill Online Cost Estimator, cost of the plate cooler is calculated.
Screen area: 1.11 m2
Materials of Construction: Carbon Steel
Cost2002:$ 17945
Solving for Cost2015
2015
2015 = 2002 (
)
2002
555.85
2015 = $17945(
)
395.6

DCP Manufacturing Co., Inc.


303

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

= $, .
It is assumed that delivery charges are 5% of the purchased price.
Total Purchased Cost = $1767232.06
Total Purchased Cost with delivery Cost = $1767232.06+ (0.05 x $1767232.06)
Total Purchased Cost with Delivery Cost (PROCESSING EQUIPMENT) = $1,855,593.66
Php. 86899306.69

PUMPS AND CONVEYORS


Equipment
Pump 1
Pump 2
Screw Conveyor
Belt Conveyor
Pneumatic Conveyor
Bucket Elevator
Total Purchase Equipment Cost
Delivery Cost (25% Purchase Cost)
Total Purchase Equipment Cost with
Delivery Cost

No.of
Equipment
1
1
6
2
8
1

Total Cost
(2002)
1087
1308
31,818
18,908
90,248
11,594
154963
38740.75

Total Cost
(2015)
1527.32
1837.85
44706.86
26567.27
126805.74
16290.51
217735.55
54433.89

193,703.75
9,071,340.32

272169.44
12,745,966.93

Unit
$
$
$
$
$
$
$
$
$
Php

Pump 1
Using the McGraw Hill Online Cost Estimator, cost of the pump 1 is calculated.
Volumetric flowrate: 0.00022 m3/s
Type: Centrifugal single-stage pump
Materials of Construction: Carbon Steel
Cost2002:$ 1087
Solving for Cost2015 ,
2015
2015 = 2002 (
)
2002
555.85
2015 = $1087(
)
395.6
= $.

DCP Manufacturing Co., Inc.


304

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

Pump 2
Using the McGraw Hill Online Cost Estimator, cost of the pump 2 is calculated.
Volumetric flowrate: 0.00094 m 3/s
Type: Centrifugal single-stage pump
Materials of Construction: Carbon Steel
Cost2002:$ 1308
Solving for Cost2015 ,
2015
2015 = 2002 (
)
2002
555.85
2015 = $1308(
)
395.6
= $.
Screw Conveyor
Using the McGraw Hill Online Cost Estimator, cost of the screw conveyor is calculated.
Cost2002:$ 31,818
Solving for Cost2015 ,
2015
2015 = 2002 (
)
2002
555.85
2015 = $31,818(
)
395.6
= $.
Belt Conveyor
Using the McGraw Hill Online Cost Estimator, cost of the belt conveyor is calculated.
Cost2002:$ 18,908
Solving for Cost2015 ,
2015
2015 = 2002 (
)
2002
555.85
2015 = $18,908(
)
395.6
= $.

DCP Manufacturing Co., Inc.


305

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

Pneumatic Conveyor
Using the McGraw Hill Online Cost Estimator, cost of the pneumatic conveyor is
calculated.
Cost2002:$ 90,248
Solving for Cost2015 ,
2015
2015 = 2002 (
)
2002
555.85
2015 = $90,248(
)
395.6
= $.
Bucket Elevator
Using the McGraw Hill Online Cost Estimator, cost of the bucket elevator is calculated.
Cost2002:$ 11,594
Solving for Cost2015 ,
2015
2015 = 2002 (
)
2002
555.85
2015 = $11,594(
)
395.6
= $.
Total Purchase Cost of Equipment Delivered = Processing Equipments + Pumps and Comp.
= 86899306.69+ 12,745,966.93= Php
99,645,273.62

DCP Manufacturing Co., Inc.


306

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

I.DIRECT COSTS
Installation Cost
The cost of installation of process equipment includes cost of labor, cost of foundation support
platforms, constructions related expenses, and other costs related to the installation of the
purchased equipment.
Basis: Cost of installation is estimated as 39% of Purchased Equipment Delivered
Installation Cost = 0.39 (PhP 99,645,273.62)
= PhP 38861656.71
Instrumentation and Control Cost
The instrumentation and control cost includes the installation labor cost and cost of auxiliary
machines used for the control of each equipment. Auxiliary equipment involves pressure,
temperature, and flow controllers of the plant.
Basis: Instrumentation and Control Cost is estimated as 26% of Purchase Equipment Delivered
Instrumentation and Control Cost = 0.26 (PhP 99,645,273.62)
= Php 10104030.75
Piping & Conveyor Installation
The piping & conveyor cost includes the labor cost of installation, cost of pipes, valves, fitting s and
all other piping and conveyor requirements.
Basis: The piping and conveyor installation cost is estimated as 31% of the cost of Purchased
Equipment Delivered
Piping, Installed = 0.31 (PhP 99,645,273.62)
= PhP 30890034.82
Buildings
The buildings cost includes the cost of installation for the construction of administrative offices, the
cost of plumbing, heating, lighting ventilation, and other similar services, and land cost.
Basis: Buidlings Cost is estimated as 29% of the Purchase Equipment Delivered
Chemical Engineers: Solid-Fluid Processing Plant. (Table 6-9, p. 251).
Buildings and Services = 0.29 (PhP 99,645,273.62)
= PhP 28897129.35
Land Cost = (50,000 sqm) (PHP 3700 /sqm)
= PhP 185,000,000

DCP Manufacturing Co., Inc.


307

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

Electrical Systems
The cost of electrical system consists of four major components namely, power wiring, lighting,
transformation, service and instrument & control wiring.
Basis: Electrical Systems Cost is estimated as 10% of Purchase Equipment Delivered
Electrical Systems (Installed) = 0.10 (PhP 99,645,273.62)
= PhP 9964527.36
Yard Improvement
The yard improvement includes the costs for fencing, grading, roads, sidewalks, railro ad sid ing s,
landscaping and any other similar items related to yard improvements.
Basis: Cost of yard improvement is estimated as 12% of Purchase Equipment Delivered
Yard Improvement = 0.12 (PhP 99,645,273.62)
= PhP 11957432.83
Service Facilities
The cost of service facilities includes the utilities for supplying steam, water, power, and fuel for the
chemical processes and operations. Waste disposal, fire protection and miscellaneous service
items such as shops, clinics or first aid quarters and cafeterias require capital investment that are
included under general heading of service facilities.
Basis: Cost of service facilities is estimated as 55% of Purchase Equipment Delivered
Service Facilities = 0.55 (PhP 99,645,273.62)
= PhP 54804900.49
Total Direct Capital Cost = Php 335,504,212.3

DCP Manufacturing Co., Inc.


308

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

II.INDIRECT COSTS
Engineering and Supervision
The cost for construction design and engineering including internal or licensed software, computeraided drafts, purchasing, accounting, travel, and the plant supervisory services must be considered
as part of the capital investment.
Basis: Engineering and supervision cost is estimated as 32% (Purchase Equipment Delivered)
Engineering and Supervision = 0.32 (PhP 99,645,273.62)
= PhP 31886487.56
Construction Expenses
Construction expenses include construction labor and other construction related expenses,
construction tools and rentals, construction payroll, construction tariffs, insurance and permits,
miscellaneous equipment installation and other fees related to the construction process.
Basis: Construction expenses are estimated as 34% of the Purchase Equipment Delivered
Construction Expenses = 0.34 (PhP 99,645,273.62)
= PhP 33879393.03
Legal Expenses
Legal costs cover the processing of land purchase, equipment purchase and construction
contracts. Understanding and proving compliance with the government, environmental and safety
requirements constitute major sources of legal cost.
Basis: Legal Expenses are estimated as 4 % (Purchase Equipment Delivered)
Legal Expenses = 0.04 (PhP 99,645,273.62)
= PhP 3985810.95
Contractors Fee
The contractors fee is the payment involved in the construction contract and other related charges.
Basis: Contractors Fee is estimated as 19% (Purchase Equipment Delivered)
Contractors Fee = 0.19 (PhP 99,645,273.62)
= PhP 18932601.99
Contingency
A contingency amount is incorporated in the estimation of the project cost which takes account the
occurrences in the unexpected events and charges which inevitably increase the cos t of the
project. Inevitable events such as storms, flood, transportation accidents, strikes, price changes,
errors of the estimation and unforeseen expenses may occur; hence each should have its own
appropriation.
Basis: Contingency is estimated as 37% (Purchase Equipment Delivered)
Contingency = 0.37 (PhP 99,645,273.62)
= PhP 36868751.24
Total Indirect Cost = Php 125,553,044

DCP Manufacturing Co., Inc.


309

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

Raw Materials
The raw materials used in the process is one of the major costs in a production operation. Raw
materials, in general, refer to the materials that are consumed in making the final product.
A. Phosphate Rock
= (21772.59

kg
hr

4448 .95 PhP

) (8322 )(

)(1000 )

Cost of Phosphate Rock = 806,111,897.1

PhP
year

B. HCl (37% Purity)


= (2208.73

liters
hr

) (8322 )(

2926.94 PhP
3.8

Cost of HCl = 14,157,956,210

PhP
year

Total Raw Material Cost: PhP 14,964,068,110/year


Working Capital Costs = Php 14,964,068,110
Fixed Capital Costs = Direct Cost + Indirect Cost
= 335,504,212.3 + 125,553,044.8 = Php 461,057,257.1

Total Capital Cost = Fixed Capital + Working Capital


= 461,057,257.1+ 14,964,068,110 = Php 15,425,125,370.00

DCP Manufacturing Co., Inc.


310

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

DEPRECIATION
Depreciation is the decrease in value of most property with use and time. Law permits a deductio n
of a reasonable allowance for the exhaustion and wear and tear of property used in trade or
business or of property held for the production of income. This amount depends on several factors,
such as: cost basis or investment in the property, property class or estimated useful life, method o f
depreciation used. Depreciable property meets the following requirements: It must be used in
business or held for production of income, it must have a useful life that can be determined and its
useful life must be longer than 1 year, And It must be something that wears out, decays, gets use d
up, becomes obsolete, or loses value from natural causes.
Using Straight Line method:
=


()

For all Equipments that used:


= 11
= 10%
(Source: Plant Design and Economics for ChE By: Peters and Timmerhaus)

Equipment:

Jaw Crusher
=

Ball Mill 1
=

$16655.83 $1665.58
= $1362.75/
11

Vibrating Screen 1
=

$98,833.39 $9883.34
= $8086.37/
11

$91,245.95 $9124.59
= $7465.58/
11

Denver 24 Froth Flotation System


$158,809.27 $15880.93
=
= $12993.49/
11

DCP Manufacturing Co., Inc.


311

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

Mixing Tank
=

Digester
=

$59,565.59 $5956.56
= $458,505.90/
11

Cooler (Shell and Tube)


=

$195,778.35 $19577.84
= $16018.23/
11

Decanter Centrifuge
=

$655304.44 $65530.44
= $53615.82/
11

Precipitator
=

$ 62531.72 $ 6253.17
= $5116.23/
11

Clarifier
=

$261,815.75 $26181.58
= $21421.29/
11

Vacuum Filter
=

$18,084.80 $1808.48
= $1479.67/
11

Rotary Dryer
=

$100,217.39 $10021.74
= $8199.60/
11

Plate Cooler
=

$8,118.56 $811.86
= $664.25/
11

$3289.29 $328.93
= $269.12/
11

Ball Mill 2
=

$11,767.55 $1176.76
= $962.80/
11

DCP Manufacturing Co., Inc.


312

Production of Dicalcium Phosphate by Digestion


of Phosphate rock with HCl

Vibrating screen 2
=

$25,214.18 $2521.42
= $2062.98/
11

$598224.08

= 28015431.89/

WORLD MARKET PRICE


(http://www.researchandmarkets.com/)
1. Dicalcium Phosphate = $1000/Ton
= 3467.5 (

$1000

)(

46.831
$1

) = , , .

Total sales = , , .

DCP Manufacturing Co., Inc.


313