Professional Documents
Culture Documents
Brock Horsley
Jack Judson
Roger Viticoski
Roadmap
Inspections
1. Site Description
2. Erosion Control
3. Sediment Control
4. Failures & Problem Areas
Design
1. Perimeter Controls
2. Entrance/Exit Pads
3. Stockpile Management & Washout
4. Diversions
5. Slope Protection
6. Channel Design & Protection
7. Soil Stabilization
8. Sediment Barriers
9. Site Maps/Planning
Inspections
1. Site Description
2. Erosion Control
3. Sediment Control
4. Failures & Problem Areas
1. Site Description
Stockpile
Northwest corner of site
Wetland area
East & Southeast of site
2. Erosion Controls
Permanent Vegetation
Seeded on eastern and southern side of site
Mulching
Placed on eastern and southern side of site while waiting for growth of vegetation
3. Sediment Controls
Silt Fences
Improper tie in installation
Perimeter control running along entirety of eastern and southern side of site
Double layered
Sediment Barriers
Installed in channel on eastern side of site
Design
1. Perimeter Controls
2. Entrance/Exit Pads
3. Stockpile Management & Washout
4. Diversions
5. Slope Protection
6. Channel Design & Protection
7. Soil Stabilization
8. Sediment Barriers
9. Site Maps/Planning
1. Perimeter Controls
TOTAL:
970ft of Type B Silt Fence
162 wooden posts
810 staples
2. Entrance/Exit Pads
3 Pads, 6 deep and 50ft long
Located at north, southwest, &
southeast entrances & exits
2. Entrance/Exit Pads
CEP
Location
Fabric Underlay
(ft2)
#1 AL Hwy Dept.
Coarse Aggregate
(ft3)
North
3300
1650
Southwest
2400
1200
Southeast
1600
800
TOTAL
7300
3650
Stockpile
Washout Area
Located in northwest
corner
Flattest pre-construction
contours
Should be covered with
tarp
40ft x 80ft
West side of northern
CEP
most trafficked CEP based
on inspections
4. Diversions
4. Diversions
5. Slope Protection
The site area was divided into 10 sub-areas based on site topography.
5. Slope Protection
Assumptions:
the site has a surface covered with short grass (n= 0.15)
25-yr Storm Event assumed in Peak Discharge (cfs) calculations
5. Slope Protection
Facilities
Post Construction
Section
Slope
Soil Type
Min Mat N
1a
0.300
0.045742942
SC150
1b
0.300
0.045742942
SC150
1c
0.018
0.200
0.05142747
SC150
0.140
0.053689689
SC150
0.050
0.021608349
SC150
0.125
0.038094719
SC150
0.010
0.014339589
SC150
0.007
0.01227767
SC150
0.020
0.017729323
SC150
0.040
0.027152656
SC150
10
0.125
0.048260474
SC150
Channel Dimensions:
Bottom
Width (b)
AR^(2/3)
y/b
/ B^(8/3)
0.00254 0.025
Maximum Shear
Stress
Safety
Factor
0.2
0.209
0.177
The P300 phase 3 was suggested as the NAG material. With this material, the SF will be higher
than 1
y
SF
0.2
0.0049
7.61
7. Soil Stabilization
7. Soil Stabilization
TOTALS
Phase
6.50
0.69
0.84
8
7. Soil Stabilization
Recommendations:
No seeding After Rough Grading (due to weather)
Phase
Initial Grubbing
(Nov 15 - Jan15)
Rough Grading
(Jan 16 - Feb 15)
Final Grading
(Feb 16 - April 15)
Cover Recommendation
(none)
Hay mulch
Bermuda Grass Hybrid
8. Sediment Barriers
8. Sediment Barriers
8. Sediment Barriers
Specifications
For each barrier, stack three
pyramid-style
Total needed: 12 Erosion
Eels
9. Site Maps/Planning
Pre-construction//Initial Grubbing
Nov 15 Jan 15
9. Site Maps/Planning
Pre-construction//Initial Grubbing
Nov 15 Jan 15
Active construction
Jan 16 Feb 15
9. Site Maps/Planning
Pre-construction//Initial Grubbing
Nov 15 Jan 15
Active construction
Jan 16 Feb 15
Feb 15 Apr 15
Post-construction
April 16+