You are on page 1of 25

DAILY PROGRESS REPORT

CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/24/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 5
1

1 1

Cleaner

1 2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


Bruce
called
to
inform
he
cut
the
conduit
at 17th and intersection lights are conflicting
9:30 AM
Called James and asked him to send a crew to repull wire
Rod/Joe onsite - cleaning out box, set out stop sign and ordering materials
Concrete bands poured earlier
Hunt on schedule for tomorrow night Broadway entrance of Cath building - continue to lay bricks today
Guillermo on-site forming nose
1 laborer compacting at nose with jmping jack
3/7 interlocking conc paver sub expects to be onsite - 3 weeks to complete work by hand
2 workers cleaning/mortaring MHs at 16th - winch/air onsite for confined space
2:30 PM Guillermo had question about ramps - informed him to cut the ramps

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone

Foremen

CONTRACTOR & SUB


M&H
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/23/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 5
1
1

1 1

Cleaner

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)

10:00 AM M*H setting castings at 16th


M&H breaking overpoured AC at 15th to prepare concrete band
Hunt continue t olay bricks on wesst side of Cath building
Columbia onsite mortaring boxes - leaving drain hole
Columbia installed conduit and cut slab
2:00pm

Hunt continues to lay brick on west side of Cath building

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Elec

Foremen

CONTRACTOR & SUB


M&H
Hunt
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/22/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1
1

1 1

Cleaner

1
1

1
1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


Hunt
onsite
setting
bricks
on
both
sides
of Cath building
10:00 AM
Barry installing on west side towards trapezoidal planter
Armando standing pedestrian plaza poles today with crane
Columbia did not install conduit from box to box - will have to demo out
Median nose plaza - spoke to Brett and asked him to revise design to make existing flowlines work

14:00

Meeting atEBMUD with Rolando, Roberts, Bob, NC ,DT


Review sawcut numbers for 8/3 & 8/4

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

1 2

9
3

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Elec
Elec

Foremen

CONTRACTOR & SUB


M&H
Hunt
Columbia
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/19/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

2 4
1
1

1 1

1 2

Cleaner

1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


Hunt
continues
to
lay
bricks
on
Broadway
side of Cathedral Building
10:00 AM
Columbia pulling safety lighting at 15th - installing final can for uplight - Scott here next week
M&H rolling 16th St intersection and digging out concrete bands

1:30 PM

M&H gradding/rolling Telegraph


Columbia off-site
Hunt continues to install bricks toward fountains - also installing slip sheet on T&M
Bruce plans to pour nose of median on Tuesday/ bands at 16th on Wednesday/ entire rat slab on Thursday
Asked him to check on weephole installs

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Elec

Foremen

CONTRACTOR & SUB


M&H
Hunt
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/18/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

2 3
1
1

Cleaner

1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


Existing
casting
is
shallow
at
16th
St/
may need to weld bars to set frame
10:00 AM
1 from Hunt grinding out ribs on electrical boxes as extra work ~5 hours
M&H installing perforated pipe/underdrain along Rotunda building edge
DI punched - pea gravel/pipe onsite
Columbia continue to set cans - will set 1/8" high for drainage purposes - may need to move conduit
Hunt installing bricks along Cathedral Building
13:30

UD installed / bore hole mortared/ pea gravel installed - filter fabric installed
Hunt continues to install bricks along Cath building / Barry setting the header course of bricks from Telegraph to
Broadway
Nail gun broke, silicone from liner not holding - spoke to Keith and will fix tomorrow
Plastic removed from curb and seat wall
Shelf 14" from TC - 9" from FOC
Columbia set all uplights but 1

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

1 1

9
3

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Elec

Foremen

CONTRACTOR & SUB


M&H
Hunt
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/17/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1

1 3
10

Cleaner

1 2
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)

10:00 AM Barry onsite installin gbricks


Latham building closing sidewalk to remove scaffold
M&H removing asphalt at 16th
Additional signage up at 16th/san pablo and channelizers

1:00 PM

1 existing casting at 16th needs to replaced since it is only 5" and will not set into the concrete - need 8"
Directed labor to cover stockpiles

Spoke to Christopher about closure


415-419-7385 Christopher Stanley - Cath Building Entrance

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone

Foremen

CONTRACTOR & SUB


M&H
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/16/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

4
1

Cleaner

1
1

1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)

10:00 AM M&H setting up 16th St closure


Pouring concrete with pump
Latham building should be done in 6 weeks- need a crane to lift panels
Bayline onsite to sawcut intersection
Directed Bruce to set up channelizers at 16th/post additional signs/move ROAD CLOSED sign

12:00

Barry can come in Thursday at 5:00 pm to set up area


Complete the area, come back and gruot Friday morning
reopen by 5 pm on Friday

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

1 2

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Conc
Elec
Fount
Saw

Foremen

CONTRACTOR & SUB


M&H
M*H
Hunt
Pump
Bayline

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/12/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

2 3
1
1

Cleaner

1
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


2
valves
in
irrigation
box
1
for
irrgation
at top the ot her for lion spout
1:00pm
Hunt installing basalt at Telegraph/mortar delivery
Slip sheeting being tracked on T&M
Granite curb number low/need to renegotiate
Abbandoned waterline runs underneath tree
M&H installing irrigation
M&H offhauling from yard
Water valve in the concrete band
2:10 PM Rachel onsite with Morten - terracotta joint approved

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

1 2

2
6

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Conc
Elec
Fount

Foremen

CONTRACTOR & SUB


M&H
M*H
Hunt
Waterscape

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/11/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

2 3
1
1

Cleaner

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


Hunt
onsite
with
4
people
to
continue
laying
out basalt - saw on site
10:00 AM
Irrigation held at 120 psi
Barry using terracotta for joint
Columbia onsite pulling wire/setting boxes
Rock compacted around fountain
M&H continue to dig out planters and install top soil

2:00 PM

Irrigation holding at 120


2 from Hunt fixing granite curbs
M&H cleaning up around site
Power temporarily hard piped to fountain pump
Columbia pulled wire to uplights

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Elec

SuperInt

CONTRACTOR & SUB


M&H
Hunt
Columbia

Foremen

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/10/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Cleaner

1 1
1
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


Armando
onsite
to
pull
wire/Scott
on
site
for setting cans
8:30 AM
1. Need to pull streetlight to 16th St controller / not shown on plans or diagram
2. Box needs to be reset into planter near Kahn's alley
3. Question about string light power
M&H digging out planters near Cat building/located fiber optic - asked for RFI to reduce tree size
TC/sawcut on Tuesday for 16th/ breaking on Wednesday

2:30 AM

312' on Broadway
Irrigation test tomorrow
Color swatch for grout

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

1 3
1 1
1
3
1
1

Worker

Operator

TRADE

GC
Stone
Elec
Fount

Foremen

CONTRACTOR & SUB


M&H
Hunt
Columbia
Waterscape

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/9/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Cleaner

1 1
1
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)

11:00 AM Grout and sand onsite for mockup


Spoke to Nick/Diane about cobblestones in road
Columbia installing conduit for uplight - provide drainage guide to Scott
Top soil installed along planters on Telegraph
Begin layout of Black basalt on Broadway

14:00

Columbia backfilling uplights at fountain


Mockup continues

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

1 3
1 1
1
3
1
1

Worker

Operator

TRADE

GC
Stone
Elec
Fount

Foremen

CONTRACTOR & SUB


M&H
Hunt
Columbia
Waterscape

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/8/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1

Cleaner

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)

10:00 AM M&H digging out soil for planters


1 laborer breaking around fountain foundation
Sharif onsite to test compaction - all good
Hunt onsite to deliver bricks
Begin layout of Black basalt on Broadway

14:00

Spoke to Barry - will do mockup with mortar and 2 sand colors

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC

Foremen

CONTRACTOR & SUB


M&H
Hunt
CoO

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/5/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

3 3
1

2 1

Cleaner

1 1

1
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)

9:00 AM Concrete pump onsite


M&H onsite with first pour
Schedule Ghulam for compaction next week
G&B demoing at corner of 17th/Telegraph

1:30 PM

Check on site - reminded Keith and Bruce to cover again


G&B still demoing at 17th/Telegraph

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Irr
Fount

Foremen

CONTRACTOR & SUB


M&H
M&H
M&H
Waterscape

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/4/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

3 3
1

2 1

Cleaner

1 1

1
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
poured
controller
and
inlet
at
drainage
swale
10:00 AM
M&H rolled base in plaza area
Bayline completed coring
Waterscape onsite setting boxes
M&H prepiing landscape area
1:30 PM

Irr work continues with Casey onsite


M&H performing general cleanup
Granite curb shrinkwrapped on site

1:45 AM Ghulam onsite to tes base


M&H pouring tomorrow at 8:30 am
All area tested passed after 4 retests total

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Irr
Fount

Foremen

CONTRACTOR & SUB


M&H
M&H
M&H
Waterscape

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/3/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1

2
1

Cleaner

1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)

10:00 AM Barry onsite cleaning up


M&H preparing to pour DI and irrigation controller
Pewter for granite color
Casey onsite with 2 workers setting irrigation

1:30 PM

Bayline onsite coring


3.5' down and hasnt reached the bottom, will stop core at 2' and core through to set conduit
2 workers diging out irrigation

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Saw

Foremen

CONTRACTOR & SUB


M&H
Hunt
Bayline

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/2/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1

Cleaner

1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


Meeting
with
NC,
DT,
KA,
BD,
BG,
and
Barry from Hunt and TB
9:00 AM
Substitution request for mortar and sand

11:00 AM

Terence on site, concern with perpendicular granite curb


Keith to write RFI for tip of plaza
Hunt on site setting remaninig curb
M&H onsite to pump water, called off work

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone

Foremen

CONTRACTOR & SUB


M&H
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/1/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

2
1
1

Cleaner

1
1

1 3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


Curb
poured
back
at
trapezoidal
planter
10:00 AM
PG&E onsite setting rims/vaults - Bruce assisting with excavator
Hunt on site continue to install granite curb/should set last of the curb at planters today
2 workers working at yard preparing for irrigation
PG&E will return to site tomorrow to set rims
New rims onsite

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

1
2

2
1

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Stone
Elec
Util

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia
PG&E

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

1/29/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Cleaner

GC
conc
Stone
Elec
Fountain
SITE INSPECTION CHECKLIST (Check applicable items)

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME
9:00 AM

Porta potty.

REMARKS (State in full progress of work)


Spoke To Keith/Bruce
Rain day

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia
Waterworks

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

1/28/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
1
2 2
conc
Stone
1
3
Elec
3
Fountain 1
2

Cleaner

1
1
1
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

TIME

REMARKS (State in full progress of work)


Fountain
sub
onsite
to
relocate
plumbing
- concrete foundation is deeper than it appears
9:00 AM
Columbia onsite setting boxes to correct grade
Hunt continue to set granite curbs
Keith to write RFI for changing reveal versus flat hatch top
M&H onsite paving small area / Ghulam onsite testing compaction
10:00 AM
12:00

Measured quantities with Keith (see Payment No. 10)


Last lift of AC delivered
Asked Bruce to sweep up around exits and to plastic around tree well
Bruce demoed curb that wasn't aligned with Cat Building

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia
Waterworks

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

1/27/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Cleaner

GC
conc
Stone

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)


See Jose report

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

1/26/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Cleaner

GC
conc
Stone

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)


See Jose report

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

1/25/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1
1

Cleaner

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)

10:00 AM M& poured curbs and ramps


Removed fence, finishing concrete
Hunt onsite continue to lay granite curb
2:15 AM

Curb at plaza island poured incorrectly due to survey error


M&H demoing out curb
Barry thinks 3 more days for curbs / has questions for brick pavers

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Stone

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

1/22/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1

Cleaner

1
3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)

10:30 AM Crew onsite forming curbs


11:00 AM

Roberts/Rolando/ NC, RM, DT, AC meeting


Bruce/Tony pumping out water
Look into AC restoration price, send fullsize drawings

Roberts to talk to Carlton/Legal


Do cal for EBMUD trench restoration/ send spreadsheet of costs

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc

Foremen

CONTRACTOR & SUB


M&H
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

1/21/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1
1

Cleaner

1
2

SITE INSPECTION CHECKLIST (Check applicable items)

TIME

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

REMARKS (State in full progress of work)


M&H breaking out curb at Telegraph to get steel face
Columbia onsite to relocate controller/tesco
M&H preparing curb along Telegraph
M&H forming planters at Cat Building

1:30 PM

Granite curb set at Broadway by Hunt


Tree well shelfs formed at Cat Building
Columbia moved fiber and set box
PGE onsite to meet with Bruce on Tuesday
Bruce will work tomorrow with concrete crew

2:00 PM Backhoe hit tesco at 16th


Installing new lids withcutout for access
M<&H restoring fence, setting plastic

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

1 3

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Elec
conc
Stone

Foremen

CONTRACTOR & SUB


M&H
Columbia
M&H
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

1/20/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Cleaner

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Barry
with
Hunt
onsite
to
begin
setting
granite curbs
10:00 AM
Will have more labor tomorrow - 1 laborer today marking/drilling curbs
ADA ramp tagged at SW corner of 16th - asked Bruce to clean
Sandbag around plug at Cat building
2:30 AM

Guillermo onsite with 1 laborer to discuss work tomorrow


Foundry onsite with panel
Piero, owener and Tom on site with laborer

3:00 PM

Drill out (E) holes / epoxy into holes/allthread


KA, NC, RM, DT, Piero, Tom, GD on site
Pricing for additional security option
Potential to adhere steel to bowl and panel to steel

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
1
Stone
Fountain 1

Foremen

CONTRACTOR & SUB


M&H
Hunt
Foundry

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

You might also like