You are on page 1of 1

LEED 2009 for New Construction and Major Renovations

Project Name

Project Checklist

Sustainable Sites
Y

Date

Possible Points:

Materials and Resources, Continued

26

Y
Prereq 1
Credit 1
Credit 2
Credit 3
Credit 4.1
Credit 4.2
Credit 4.3
Credit 4.4
Credit 5.1
Credit 5.2
Credit 6.1
Credit 6.2
Credit 7.1
Credit 7.2
Credit 8

Construction Activity Pollution Prevention


Site Selection
Development Density and Community Connectivity
Brownfield Redevelopment
Alternative TransportationPublic Transportation Access
Alternative TransportationBicycle Storage and Changing Rooms
Alternative TransportationLow-Emitting and Fuel-Efficient Vehicles
Alternative TransportationParking Capacity
Site DevelopmentProtect or Restore Habitat
Site DevelopmentMaximize Open Space
Stormwater DesignQuantity Control
Stormwater DesignQuality Control
Heat Island EffectNon-roof
Heat Island EffectRoof
Light Pollution Reduction

N
Credit 4

1
5
1
6
1
3
2
1
1
1
1
1
1
1

Credit 5
Credit 6
Credit 7

Possible Points:

10

Y
Y

Prereq 1
Prereq 2
Credit 1
Credit 2
Credit 3.1
Credit 3.2
Credit 4.1
Credit 4.2

Credit 4.4
Credit 5

Prereq 1
Credit 1
Credit 2
Credit 3

Water Use Reduction20% Reduction


Water Efficient Landscaping
Innovative Wastewater Technologies
Water Use Reduction

Credit 6.1

2 to 4
2
2 to 4

Credit 6.2
Credit 7.1
Credit 7.2
Credit 8.1

Energy and Atmosphere


Y
Y
Y

Prereq 1
Prereq 2
Prereq 3
Credit 1
Credit 2
Credit 3
Credit 4
Credit 5
Credit 6

Possible Points:

Fundamental Commissioning of Building Energy Systems


Minimum Energy Performance
Fundamental Refrigerant Management
Optimize Energy Performance
On-Site Renewable Energy
Enhanced Commissioning
Enhanced Refrigerant Management
Measurement and Verification
Green Power

Materials and Resources

35

Credit 8.2

Prereq 1
Credit 1.1
Credit 1.2
Credit 2
Credit 3

Possible Points:

Minimum Indoor Air Quality Performance


Environmental Tobacco Smoke (ETS) Control
Outdoor Air Delivery Monitoring
Increased Ventilation
Construction IAQ Management PlanDuring Construction
Construction IAQ Management PlanBefore Occupancy
Low-Emitting MaterialsAdhesives and Sealants
Low-Emitting MaterialsPaints and Coatings
Low-Emitting MaterialsFlooring Systems
Low-Emitting MaterialsComposite Wood and Agrifiber Products
Indoor Chemical and Pollutant Source Control
Controllability of SystemsLighting
Controllability of SystemsThermal Comfort
Thermal ComfortDesign
Thermal ComfortVerification
Daylight and ViewsDaylight
Daylight and ViewsViews

Innovation and Design Process


Credit 1.1

1 to 19
1 to 7
2
2
3
2

Credit 1.2
Credit 1.3
Credit 1.4
Credit 1.5
Credit 2

Innovation in Design: Specific


Innovation in Design: Specific
Innovation in Design: Specific
Innovation in Design: Specific
Innovation in Design: Specific
LEED Accredited Professional

Possible Points:
Title
Title
Title
Title
Title

Regional Priority Credits


Possible Points:

Storage and Collection of Recyclables


Building ReuseMaintain Existing Walls, Floors, and Roof
Building ReuseMaintain 50% of Interior Non-Structural Elements
Construction Waste Management
Materials Reuse

Credit 1.2

1 to 3
1
1 to 2
1 to 2

Credit 1.3
Credit 1.4

Regional
Regional
Regional
Regional

Priority:
Priority:
Priority:
Priority:

Specific
Specific
Specific
Specific

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

6
1
1
1
1
1
1

Credit
Credit
Credit
Credit

Total
Certified 40 to 49 points

15

Possible Points: 4

14
Credit 1.1

1 to 2
1 to 2
1
1

Indoor Environmental Quality

Credit 4.3

Water Efficiency

Recycled Content
Regional Materials
Rapidly Renewable Materials
Certified Wood

1
1
1
1

Possible Points: 110


Silver 50 to 59 points

Gold 60 to 79 points

Platinum 80 to 110

You might also like