Sr. No.

Project CRM

Project Title

IND-2471

Modern integrated check post at Peddikuppam,


Gummidipundi Taluk for P & C construction

IND-2591

National Project

Sarda Sahayak Feeder Canal

Bhutan L1 Proposal

IND-2752

NMIA- Ulwe River

Sanima Mai Hydropower Project

Sikta Irrigation Scheme

IND-2479

Nathula Sikkim Project

Delhi L1 Proposal

10

GTM- Delhi Project

11

Ground Improvement Proposal

12

IND-2753

Goa Project

13

IND-2076

KIAL Project

Level

Application

Region

Name of TCR/Region
Head

L2

Basal Reinforcement

South

Reginald

L2

Basal Reinforcement

East

Premal

L1

Canal Lining

West

RM

23-9-2014

L1

Gabion/Paramesh

North-East

RM

8/9/2014

L1

Paramesh Structure

West

Subhajit

L2

Drainage Composite

Nepal

Pokhrel Ji

10/10/2014

Nepal

Ashish Pippal

20-10-2014

L2

Submission date

L2

Paramesh Structure

East

Joydeep

17-10-2014

L1

Gabion/Paramesh

North

RM

16-10-2014

L2

GTM

North

Ashish Pippal

21-10-2014

L1

Basal Reinforcement

Mini mam/RM

22-10-2014

L2

Paramesh Structure

West

Subhajit

28-10-2014

L2

GTM

South

Reginald

30-10-2014

Feedback &
Acknowledgment Form

Remark

Y
Y
Y
Y
Y
Y
Y

Laying Cost and BoQ

Input data received on 1710-2014

N
Y
Y
Y
Y

Sr. No.

Project CRM

WDC-WT-2014-XXXX-DT

WDC-WT-2014-2701-DT

WDC-WT-2014-XXXX-DT

WDC-WT-2014-2563-DT

WDC-SH-2014-2078-DT

WDC-WT-2014-2589-DT

WDC-WT-2014-2223-DT

WDC-SH-2014-2756-DT

WDC-SH-2014-2773-DT

10

WDC-SH-2014-2755-DT

11

WDC-SH-2014-2216-DT

12

WDC-SH-2014-2584-DT

13

WDC-SH-2014-2556-DT

14

WDC-SH-2014-2400-DT

15

WSC-ET-2014-2840-MX

16

WDC-ET-2014-xxxx-DT

17

WDC-NH-2014-XXXX-MX

18

WDC-ET-2014-XXXX-DT

19

WDC-ET-2013-2185-DT

20

WDC-ET-2013-2185-DT

21

WDC-WT-2014-2579-DT

Project Title

Level

Slope Protection Work Near Northern culvert, GIFT CITY

L3

Gabion Retaining Wall at Katraj

L2

Design of Gabion Wall at DK Project

L1

Lunavada Agarwada Project

L1

IIM Calicut Project

L3

Nandur Bar Project

L3

Kondva Project

L2

RVNL Project

L2

RGCB Akkulam

L2

Embankment Protection at RMZ, Ecoworld

L2

KSTP NAPC-Phase II

L3

TransTroy Theno

L2

Reach 3 Kalthuruthy to Edamann Cross Section

L2

SWR Mysore Bridge Approach Ch.104 to Ch.107

L2

Paramesh Wall for Madhucon Projects LTD.

L2

MCL Angul, Orissa

L2

PitthoraGarh Project

L2

GB wall at Cuttak for R&B Orissa

L3

Hindalco (Muri) Srana Land

L3

Hindalco (Muri) S

L3

Monte Carlo Project

L2

Application

Region

Name of TCR/Region
Head

Earth Retention

West

Manish/Lakshmi

Earth Retention

West

Subhajit

Earth Retention

West

Manish/Lakshmi

Earth Retention

West

Manish/Lakshmi

Earth Retention

South

Reginald

Earth Retention

West

Subhajit

Earth Retention

West

Lakshmi

Earth Retention

South

Reginald

Earth Retention

South

Reginald

Earth Retention

South

Reginald

Earth Retention

South

Reginald

Earth Retention

South

Reginald

Earth Retention

South

Reginald

Earth Retention

South

Reginald

Earth Retention

East

Joydeep/Subir

Earth Retention

East

Joydeep/Subir

Earth Retention

North

Nishant

Earth Retention

East

Joydeep/Subir

Earth Retention

East

Joydeep/Subir

Earth Retention

East

Joydeep/Subir

Earth Retention

West

Lakshmi/Mrinal

Client

Receiving Date

Delivery requested

GIFT

26.09.2014

29.09.2014

WindSor Reality

13.11.2014

17.11.2014

13.10.2014
R&B Godhar Division

12.10.2014

16.10.2014

IIM Calicut

08.10.14

08.10.14

29.09.2014

09.10.2014

04.09.2014

09.09.2014

Pune Kondwa Reality Pvt. Ltd.


GVR Infra Projects Ltd.

03.12.2014

Iyer & Mahesh

30.11.2014

RMZ Ecoworld

31.10.2014

NAPC Ltd.

21.08.15

26.08.15

Transtroy Indial Ltd.

24.07.2014

30.07.2014

Southern Railway

24.07.2014

11.08.2014

South Western Railway

02.09.14

04.09.14

03.12.2014

Ranchi Expressways LTD.

09.12.15

12.12.15

MCL

10.07.15

10.07.15

04.12.2014

07.12.2014

Roads & building division Orissa

04.07.14

04.07.14

HINDALCO

25.06.14

30.06.14

HINDALCO

07.09.14

Monte Carlo

02.09.2014

08.09.2014

Submission date

01.10.2014

18.11.2014

03.11.2014
20.10.2014

08.10.14

10.10.2014
09.09.2014
05.12.2014

04.12.2014

04.11.2014
27.08.15
04.08.2014
19.08.2014
03.09.15

12.12.15

10.07.15
07.12.2014
04.07.14
08.07.14
09.09.14
10.09.2014

Remark

First Submission was followed by change in design due to change in TWL and EGL.Final Elevation drawing was
submitted after amking the change I evels.

Preliminary Submission was done based on assumed soil properties. Cross Section Drawing, Design and BOQ w
Submitted.
Cross Section Design and Drawing were submitted based on assumed soil properties.
Design and Cross Section drawing were Submitted

Design and Cross Section drawing were Submitted preliminary. Designs wrere later changed as per client require
Detailed Elevation drawing was also submiited

Preliminary Submission was done based on provided sketch.Design were resubmitted as change in wall location
there
Cross Section Design and Drawing were submitted based based on inputs provided.

Cross Section Design and Drawing were submitted based based on inputs provided. Further Design were optimi
per site requirements

Cross Section Design and Drawing were submitted based based on inputs provided. Further Designs were chan
suggested by the internal customer.

Design and Drawings were submitted preliminarily. Further, resubmission was done due to addition of gabion ma
near the toe in the cross section

Design and Drawing were submitted as per provide input. Later several revisions were made in the design due to
properties changes and requirements of the client
GAD for Cascade structure was submiited as per requirement of the internal customer.
Design and Cross Section Drawing were Submitted

Design, Drawing and BOQ were submitted as per provided input. Later the submission were revised as per instru
from the internal customer

Design , Cross Section Drawing and BOQ were submitted as per provided input

Design , Cross Section Drawing and BOQ were submitted as per provided input. Further Revisions were done du
change in scheme.

Design , Cross Section Drawing and BOQ were submitted as per provided input. Further Revisions were done du
change in levels and profile.
Design , Cross Section Drawing and BOQ were submitted as per provided input. Further designs were changed
site conditions
Design , Cross Section Drawing and BOQ were submitted as per provided input
Contionuos Submission for required side as per clients requirement

Design , Cross Section Drawing and BOQ were submitted as per provided input. Further changes in designs wer
as per client's requirement

No. of working days for


completing the project

Sr. No.

Project CRM

WDC-SH-2014-2280-DT

WDC-SH-2014-2078-DT

WDC-SH-2013-1393-DT

WDC-WT-2014-2223-DT

WDC-SH-2014-2216-DT

WDC-SH-2014-2253-DT

WDC-ET-2015-2947-MX

WDC-ET-2015-2921-DT

WDC-NH-2012-2019-DT

10

WDC-NH-2015-XXXX-DT

11

WDC-ET-2015-2921-DT

12

WDC-ET-2013-2185-DT

13

WDC-NH-2015-XXXX-DT

14

WDC-WT-2015-2953-DT

15

WDC-WT-2015-2952-DT

16

WDC-SH-2015-2632-DT

17

WDC-NH-2015-XXXX-DT

18

WDC-NH-2015-XXXX-DT

19

WDC-NH-2015-XXXX-DT

20

WDC-ET-2015-XXXX-DT

21

WDC-WT-2015-2954-DT

22

WDC-NH-2015-XXXX-DT

23

WDC-NH-2015-XXXX-DT

24

WDC-NH-2015-XXXX-DT

Project Title

Level

Application

Sewage treatment plant at Bellandur

L3

Earth Retention

IIM Calicut Project

L3

Earth Retention

DLF Cochin

L3

Earth Retention

Kondva Project

L3

Earth Retention

KSTP NAPC-Phase II

L3

Earth Retention

Retaining and Slope stabilization Works for Promenade


Square

L2

Slope Retention

Protection of Tower for AEGCL, Guwahati

L2

Earth Retention

Ayur Sundra Project

L2

Earth Retention

Tata Housing Kasauli

L3

Earth Retention

Dehradun

L2

Road Widening

GB wall at Cuttak for R&B Orissa

L3

Earth Retention

Hindalco (Muri)

L3

Earth Retention

Maithana

L2

Slope Protection

Serrano Farms

L3

Earth Retention

Roadways

L3

Road Widening

GVR Project

L3

Slope Retention

Bangapani

L2

Slope Retention

Gaurikund

L2

Slope Retention

Govindghat

L2

Slope Retention

Guwahati Project

L2

Slope Retention

Kundalika Valley

L3

Earth Retention

Naya Basti

L2

Slope Retention

Ratigarh

L2

Slope Retention

Retaining wall for Vidya Infra, Solan

L2

Slope Retention

Product

BOQ (Sqm)

Region

Gabion

2595.00 (519m Length)

South

Gabion

South

Gabion/Terramesh

South

Gabion

West

Gabion

South

Gabion

South

Terramesh

22.00(2m Length)

East

East

Gabion/Terramesh

North

North

Gabion

East

Terramesh

East

Gabion

North

Gabion

West

Gabion

1132.00(132.0m Length)

West

Gabion

South

Gabion

North

Gabion/Terramesh

North

Terramesh

North

North-East

Gabion

West

Gabion

North

Gabion

North

Terramesh

60.00(2.0m Length)

North

Name of TCR/Region
Head

Client

Receiving Date

Reginald

VA TECH WABAG Ltd.

08.01.15

Reginald

IIM Calicut

06.01.15

Reginald

DLF

06.01.15

Lakshmi

Pune Kondhwa Reality Pvt. Ltd.

08.01.15

Reginald

NAPC Ltd.

08.01.15

Reginald

Sowparnika Projects & Infrastructure pvt. ltd.

8.01.15

Joydeep/Subir

AEGCL

13.03.15

Joydeep/Subir

Ayur Sundra HealthCare Private LTD.

17.02.15

Seyed Althaf

TATA Housing

09.02.15

Seyed Althaf

Joydeep/Subir

Roads & building division Orissa

03.02.15

Casta

09.02.15

Joydeep/Subir

Ashis/Althaf

Lakshmi/Mrinal

04.02.2015

Lakshmi

Roadways Pvt. Ltd

27.01.2015

Reginald

RVNL

16.02.15

Ashis/Althaf

MES

Ashis/Althaf

AECOM

Ashis/Althaf

AECOM

11.02.15

Joydeep/Subir

Lakshmi

03.04.2015

Ashis/Althaf

AECOM

Ashis/Althaf

AECOM

Ashish Pippal

Delivery requested

Submission date

Feedback &
Acknowledgment Form

12.01.15

12.01.15

12.01.15

16.01.15

06.01.15

06.01.15

13.01.2015

12.01.15

12.01.15

09.01.15

09.01.15

18.03.15

18.03.15

20.02.15

20.02.15

02.03.15

03.02.15

03.02.15

11.02.2015

13.02.2105

06.02.2015

06.02.2015

06.02.2015

31.03.15

06.03.15

09.04.2015

03.03.15

05.03.15

Remark

Design and Drawings were submitted as per provided input. Later it was
coveyed that the section provided by the client is to fe finalised for
construction hence the change in design was done and project was
resubmitted
New Scope of wall 5 design and drawing submission done
As built drawing submitted
Earlier submission design was revised as per client requirement
Change in designs of previous submission as per clients
requirement.Revised cross sectional drawing and designs were submitted
and layer arrangement drawing was submitted
Cross sectional design and drawing were submitted

Cross sectional design and drawing were submitted

Cross sectional design and drawing were submitted

New elevation drawing for CUL-DE-SAC portion was submitted

Revised design and drawing were submitted as per site conditions

Cross sectional design and drawing were submitted

Cross sectional design and drawing were submitted

Cross sectional design and drawing were submitted. Constant submission


based on revision were made after that.
Cross sectional design and drawing were submitted initially. Revision
were done as per client's requirement and site conditions

Cross sectional design and drawing were submitted. Revision in designs


were done due to change in profile

No. of working days for


completing the project

Sewage treatment plant at Bellandur


IIM Calicut Project
DLF Cochin
Kondva Project
KSTP NAPC-Phase II

L3
L3
L3
L3
L3

Retaining and Slope stabilization Works for Promenade Square

L2

Protection of Tower for AEGCL, Guwahati

L2

Ayur Sundra Project

L2

Tata Housing Kasauli

L3

Dehradun

L1

GB wall at Cuttak for R&B Orissa

L3

Hindalco (Muri)

L3

Maithana

L1

Serrano Farms

L3

Roadways

L3

GVR Project

L3

Bangapani

L1

Gaurikund

L2

Govindghat

L2

Guwahati Project

L2

Kundalika Valley
Naya Basti
Ratigarh
Retaining wall for Vidya Infra, Solan
Ruispata

L3
L1
L1
L2
L1

4 laning of NH47- Port Connectivity Road

L3

Sonprayag
GIFT city
Karanprayag
Rajnoli & Mankoli

L2
L3
L1
L1

Rangpo
MCL Lingaraj
NH-21 Kiratpur Nar chauk
KSEL Project
Khed Sinnar Monte Carlo

L1
L2
L3
L1
L3

Level
Earth Retention
Earth Retention
Earth Retention
Earth Retention
Earth Retention

L3
L3
L3
L3
L3

Slope Retention

L2

Earth Retention

L2

Earth Retention

L2

Earth Retention

L3

Road Widening

L1

Earth Retention

L3

Earth Retention

L3

Slope Protection

L1

Earth Retention

L3

Road Widening

L3

Slope Retention

L3

Slope Retention

L1

Slope Retention

L2

Slope Retention

L2

Slope Retention

L2

Earth Retention
Slope Retention
Slope Retention
Slope Retention
Slope Retention

L3
L1
L1
L2
L1

Road Widening

L3

Slope Retention
Earth Retention
Slope Retention
Earth Retention

L2
L3
L1
L1

Earth Retention
Earth Retention
Road Widening
Road Widening
Road Widening

ER=16
RW=6

L1
L2
L3
L1
L3

Total Working hours (From Jan 2015)


49.5
62
16.5
12
8.5

3.814286

15

8
6.5
27
6
37.5
47
17.5
42.5

2.178333

196.5
53.5
16
23

l2

34

26.14
3.075294

11.5
74
14
16
43.5
8
63.5
15
7.5
38

l1

16.11
1.895294

22
49.5
365
35.5
258.5

294

L3

91.8

L3

10.8