17
Chan
Credi~
-r ~p:r.-F~g-
Deletion:
materials necessary related to the following: Reference RFP #7,
RFI #33 (partial), and PC0#24rev1 (Otto's tracking number). Summary of W ork; Delete
lowering of existing conduit which crossed east path as bid.
Agreed Lump Sum ... .. . ..... ... . ....... .... ... . .. . .. . .. . ... ... .. . .. . .. . ..... . ...... .. ... . .. ... ... . .. . .. .
2
(3,018.00)
(3,018.00)
CONTRACT PRICE
Total decrease in contract price
CONTRACT TIME
None
0
$
(3,018.00)
$
$
1,462,236.00
100,542.00
97,524.00
Decrease
6. 7%
760.00
We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this p roposal is
appro ved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services
necessary for the work above specified, and will accept as full payment therefore the price shown above.
JAccecteo Date _ __ _ _ _....;...
)o
_ _______ _
Contractor:
Otto Construction Co
========~~=~~::=:=======::::::==:::::===::::;;;:--
Signed By:
If the contractor does not sign acceptance of this order, his attention is directed to the requirements of the
Submitted By:
Approved:
Authorized :
1&1
1&1
Date
City Administrator
Date
Authorized:
00 City Council
Attachments:
fl /J D../fj
~
Lt1.dt~
RF I#33 ~~y
RFP#7
Note to Contracts and Budgets Office: Council awarded a 10% construction contingency in the amount of $146,224.00 and the cost of
ceo #4 i.e. the "Terraced Step" design at a Not to Exceed amount of $45,000.00 (actual cost@ $21,346.00). Thus $167,570.00 is the
adjusted total amount of all change orders which the City Administrator has authority, or 11.46% of the Original Contract Price.
City ofCarmel-by-the-Sea
PUBLIC WORKS DEPARTMENT
POST OFFICE BOX CC
CARMEL-BY-THE-SEA, CA 93921
(831 ) 620-2070 OFFICE
DATE:
PROPOSAL
PROJECT 10.
CONTRACT:
TO:
7
13-70904
John Garayalde
Otto Construction
FROM:
Andy Vanderford
City of Carmel-by-the-Sea
SUBJECT:
Description of Proposed Changes
Please find attached RFI 33, which reduces the scope of work identified within
the original bid documents. Provide cost credit for PCCO.
This request for proposal is neither a change in the subject Contract, nor an order to the Contractor to
perform any work. However, it pertains to certain proposed modifications to the wo rk covered by said
contract. The provisions, drawings and specifications of said Contract and previous modifications thereto
will apply, as applicable, unless specifically indicated otherwise herein.
The City of Carmel-by-the-Sea hereby requests that the Contractor submit within ten (10) working days
after receipt of this request a proposal to make the changes described herein. All changes to the Contract
Price and Contract Time should be detailed for each separate item listed. Detailed breakdown must include
deductive or added cost for all labor, equipment, materials and all applicable mark-ups.
Nothing written in this Request for Proposal will obligate the City of Carmel-by-the-Sea to incur any costs nor
change the Contract Time unless such changes are included in an approved Contract Change Order.
Signed
Andy Vanderford
Enclosure:
RFI33
Distribution:
CAW Architects
#18001
9/8/20'15
Revs. 10/28!1 5
DESCRIPTION OF WORK: Credit for key note #3 & 10 on E1.1 as per RFI #38.
Any change order not accepted within 10 days is subject to price Increases.
AS A RESULT OF THIS CHANGE ORDER, THE TIME FOR COMPLETION OF THE ABOVE MENTIONED CONTRACT IS HEREBY EXTENDED BY
Onltlt=xtended
Number
of Units
-2
-20
-4
-2
-6
Cost
$350.00
$185.00
$1 .63
$3 06
$18.55
$000
$0.00
$0.00
$000
Note;
DAYS.
nit
Number
of Units
Extended
Cost
-1
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$850.00
I
CIRCLE "C" ELECTRIC'S LABOR COST
EMPLOYEE'S NAME & WORK DESCRIPTION
Journeyman #1 PB
Journeyman #2 JG
Journeyman #3 CCT
Apprentice Lvi #7 TW
Number
Hourly
of Hours
Rate
-8
-6
$97.50
$102.00
$105.00
$75.50
($935.20)1
SUBCONTRACTOR'S FEES
SUBCONTRACTOR NAME & WORK DESCRIPTION
Number
of Units
untt
l:.xtenoeo
Cost
Fee
Extended
Cost
$0.00 .
($780.00)
$0.00
$0.00
($4b:5.UU)
Fee
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$850.00
$0 00
$0 00
$850.00
0.00
($850.00)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0 00
$0 00
$0.00
($1,233.00
$0.00
($1 ,233 00
$0.00
TOTAL of EQUIPMENT
TOTAL of MATERIAL
TOTAL of SUBCONTRACTOR FEES
TOTAL of CONTRACTOR'S LABOR
SUBTOTAL
($850.00)
($935.20)
$0.00
($1,233.00)
. ($3,0 18.20)
TOTAL OF COP
_($ 3,01~~()_[
Subtotal
Employee Burden 0%
Subtotal
---~-
OTTO
CONSTRUCTION
RFI
To:
Andrew Vanderford
RFI # : 33
Date: 7/15/2015
Jilian Cadouri (Cody Anderson Wasney) , Monique 'Nood (Cody Anderson Wasney), John Garayalde (Otto Co nstruction),
Oscar Cisneros (Otto Construction)
Subject:
Drawing:
Feeder Lines
E1 .1
Cost Impact:
Spec Section:
TBD
Request:
There are two 2" and one 6" lines that will penetrate footing for the masonry wall. These are the feeder lines as indicated per note 3
and 10 sheet E1 .1. From top of conduit to top of masonry walls+/- 24". Contractor proposes to leave conduits as is and wrap the
conduits with foam.
Please advise if it is acceptable . Please see attached picture and sheet for location.
Requested by:
Response:
Mary-Sonja Beasley
Answered by
07/21 /15
Date
Page 1 of 1
OTTO
CONSTRUCiiON
RFI
To:
CC:
Andrew Vanderford
RFI #: 38
Date: 7/27/2015
Job: 15-3141-00 FOREST THEATER RENOVATIONS
Phone: (831 )620-2078
John Garayalde (Otto Construction), Oscar Cisneros (Otto Construction), Jilian Cadouri (Cody Anderson Wasney), Monique
Wood (Cody Anderson Wasney)
Subject:
Drawing:
Spec Section:
Cost Impact:
Potential Credit
Request:
Per keynote 3 and 10 on sheet E1 .1 the existing feeder line is to be re-routed where crossing the new ADA path and new 2'x4'x4'
concrete electrical handholes are to be installed for the interception/re-routing of the existing underground feeder line.
The existing feeder line is located below subgrade at the bottom of the footing excavation. There is no conflict with the existing feeder
line location and the new ADA pathway. In relation to RFI #33, we recommend leaving the existing feeder line in place and not
re-routing the line. This will eliminate the need to install new handholes.
Please confirm, new handholes do not need to be installed.
Requested by:
Matt Wetmore
OTTO CONSTRUCTION
Response:
Agreed
APPROVED
By Andy Vanderford at 3:44pm, Aug 05, 2015
Answered by
Company
Date
Page 1 of 1