This procedure provides rules and governance for the numbering of
documentation produced by, and on behalf of the Kashagan
Development Experimental Program. This procedure shall apply to all
technical and administrative documents produced by or on behalf of
the Project.
D01
10/12/2003
K. Halton
M.Gillan
P01
03/10/2003
Review Issue
K. Halton
M.Gillan
F01
21/05/2003
M.ONeill
G.Aisbett
D.Faso
B01
21/01/2002
M.ONeill
A.Carter
R.Luetchford
P00
30/10/2001
M.ONeill
M.ONeill
PREPARED
CHECKED
REV.
DATE
P.Moir
APPROVED
The copyright of this document is vested in Agip KCO NV, The Hague. All rights reserved. Neither the whole nor any part of this document may be
reproduced, stored in any retrieval system or transmitted in any form or by any means (electronic, mechanical, reprographic, recording or
otherwise) without the prior consent of the copyright owner,
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 2 of 30
Document Verification
RACIE Record
esponsible:
Signed:
Date:
A ccountable:
Signed:
Date:
C onsulted:
I
nformed:
EP Project Manager
E ndorsed
EP Services Manager
Signed:
Date:
RACIE Terms
R
A
C
I
E
Responsible
The person who actually does the work and/or produces the document.
Accountable
The person who has to answer for success or failure of the work and/or the quality and timeliness of the document.
Consulted
Those who must be consulted during the work and/or before the document is published..
Informed
Those who must be informed in order to do the job and/or produce the document.
Endorsed
Those who must approve the work completion and/or document before publication.
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 3 of 30
Revision Record
Rev
Rev Date
P00
30-Oct-01
Issued for Review. The document was numbered as Doc Type PS (procedural
standard)
B01
21-Jan-02
21-May-03
06-Oct-03
RACIE changed
Hold Record
Mark
Page Number
HOLD
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 4 of 30
TABLE OF CONTENTS
1.
1.1
1.2
1.3
1.4
1.4.1
INTRODUCTION
5
PURPOSE
5
SCOPE
5
DISTRIBUTION, INTENDED USE AND REGULATORY CONSIDERATIONS
5
DEFINITIONS
5
GENERAL DEFINITIONS
5
1.4.2
SPECIFIC DEFINITIONS
6
1.5
ABBREVIATIONS
6
CROSS REFERENCES
7
1.5
2.
3.
REQUIREMENTS
7
GENERAL
7
DOCUMENT NUMBERING
7
PROJECT DOCUMENTS
7
3.1
3.2
3.2.1
3.2.2
3.2.3
SUPPLIER DOCUMENTS
7
3.3
3.3.1
3.3.2
3.3.3
3.4
ANNEX NUMBERING
8
ATTACHMENT NUMBERING
8
FIGURES/TABLES NUMBERING
8
FILE NAME
8
REVISION NUMBERING
9
DOCUMENT REVISION IDENTIFIERS
9
3.5
3.6
3.7
3.8
3.9
DOCUMENT NUMBERING
Agip KCO
3.10
3.11
3.12
3.12.1
3.12.2
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 5 of 30
CANCELLATION OF DOCUMENTS
9
RENUMBERING OF DOCUMENTS
9
PACKAGE AND PURCHASE ORDER NUMBERING
10
PROCUREMENT PACKAGE
10
PURCHASE ORDER NUMBERING
10
ANNEXES
ANNEX A : DOCUMENT NUMBERING STRUCTURES
ANNEX B : REVISON STATUS CODING
ANNEX C : ASSET CODING
ANNEX D : SUB-PROJECT CODING
ANNEX E: PACKAGE AND PO NUMBERING
ANNEX F : DISCIPLINE TYPE CODES
ANNEX G : DOCUMENT TYPE CODES
ANNEX H : DOCUMENT ORIGINATOR CODING
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 6 of 30
INTRODUCTION
1.1
PURPOSE
all data relating to documentation and files can be identified and is available to
satisfy the Project IMIS needs and the Project Quality requirements;
all personnel involved are aware of both the Project Numbering System and the
method of implementation for project & supplier documentation;
1.2
SCOPE
This procedure provides rules and guidelines for the numbering of technical & administrative
documentation generated for the Kashagan Experimental Program Project (henceforth the
Project). It shall not apply to the numbering of Contracts or Project correspondence.
1.3
1.4
DEFINITIONS
1.4.1
GENERAL DEFINITIONS
For the purpose of this procedure the following definitions shall apply:
The Contractor is the party which carries out all or part of the design, engineering,
procurement, construction, commissioning or management of a project, or operation or
maintenance of a facility. The Company may undertake all or part of the duties of the
Contractor.
The Manufacturer/Supplier is the party which manufactures or supplies equipment and
services to perform the duties specified by the Contractor.
The Company is the party which initiates the project and ultimately pays for its design and
construction. The Company will generally specify the technical requirements. The Company
may also include an agent or consultant authorised to act for, and on behalf of, the
Company.
The Project is the Kashagan Development Experimental Project.
The word shall indicates a requirement.
DOCUMENT NUMBERING
Agip KCO
1.4.2
1.5
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 7 of 30
SPECIFIC DEFINITIONS
Annex
Asset
Attachment
Discipline
Facility Functional
Unit
Project Documents
SubProject
Supplier Documents
Technical documents produced by Supplier or their subsuppliers for materials and equipment.
ABBREVIATIONS
Agip KCO
IMIS
EDMS
EPMT
SDRS
PDC
CDC
DOCUMENT NUMBERING
Agip KCO
1.6
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 8 of 30
CROSS REFERENCES
KE01-00-000-AK-A-PS-0668-000
KE01-00-000-AK-A-PS-0002-000
KE01-00-000-KD-Z-PR-0004-000
KE01-00-000-AK-A-PR-0660-000
KE01-00-000-AK-A-PR-0655-000
The EPMT shall have responsibility for the implementation of this procedure across the
Integrated Management Team and subsequent Execution Contracts associated with the
project.
Individual Project Engineer Team Leaders and Discipline Specialists shall be responsible for
ensuring that all applicable documents within their sphere of influence and authority are
numbered in accordance with the requirements of the procedure.
The Contractors PDC shall be responsible for allocating numbers and for maintaining a
register of all Project and Supplier documentation, Procurement Packages & Purchase
Orders. If a Contractor has his own numbering system this must be reconciled to comply
with the requirements of this procedure. The Project reserves the right to confirm
compliance with these requirements.
The Project CDC shall approve any requests for additional codes contained within this
procedure.
REQUIREMENTS
3.1
GENERAL
All documents produced by or on behalf of the Project shall comply with the requirements of
this procedure.
In addition, they shall contain master index sheets detailing the revision level of each sheet
within the document.
3.2
DOCUMENT NUMBERING
3.2.1
PROJECT DOCUMENTS
All relevant documents identified (but not limited to) in the Table G.1 shall be numbered in
accordance with the format indicated in Figure A.1.
This applies to all documents produced by or on behalf of the Project or for the Integrated
Project Management Team activities not directly linked with a specific operating project.
This applies from the Project Feasibility Study through Basic/Detail stage to Construction
and Hand Over to Operations and with any extensions to the facility operational activities.
3.2.2
Piping isometric drawings will be assigned a document number in accordance with the
format Figure A.1. The line number will be entered into the title in the Project Document
register. Refer KE01.00.000.AK.A.PS.0001.000 for details of line numbering conventions.
3.2.3
SUPPLIER DOCUMENTS
All relevant documents identified (but not limited to) in the Table G.2 shall be numbered in
accordance with the format indicated in Figure A.2.
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 9 of 30
This applies from the Project Feasibility Study through Basic/Detail stage to Construction
and Hand Over to Operations and with any extensions to the facility operational activities.
3.3
A multi-sheet Project or Supplier document shall be numbered using the three last
characters of the document numbering structure in accordance with the following
instructions.
3.3.1
MULTI-SHEET TEXTUAL
All drawings shall be allocated one unique document number per sheet (e.g. Document
Sheet Sequential Number 001, 002, 003 etc. for sheet 1,2,3 etc )
All multi-sheet A3 and A4 size drawings, shall be numbered as (3.3.1) above.
3.4
ANNEX NUMBERING
Annexes shall appear in the order in which they are cited in the text. Each annex shall be
designated by a heading comprising of word Annex followed by a capital letter designating
its serial order, beginning with A (e.g. Annex A). Numbers given to the clauses, sub
clauses, figures, tables and mathematical formulae of an annex shall be preceded by the
letter designating that annex followed by a full-stop. The numbering shall start afresh with
each annex. A single annex shall be designated Annex A.
3.5
ATTACHMENT NUMBERING
Where Attachments (including forms) are identified in the text of a document, they shall
have a specific reference (e.g. Attachment 1) and shall be numbered using the three last
characters of the document numbering structure indicated in ANNEX A (e.g. A01, A02, A03
etc.) . They shall be listed in the Table of Contents of the document.
3.6
FIGURES/TABLES NUMBERING
FILE NAME
All files shall be uniquely identified by bearing the same naming convention as the
document number structure indicated in ANNEX A. This information shall be presented in
the following manner:
Each document number component part shall be separated by the hyphen character (- )
and include the revision indicator, followed by the format separated by dot (.), thus:
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 10 of 30
Engineering Documents
XXXX-XX-XXX-XX-X-XX-XXXX-XXX-D01.dgn
Supplier Documents
XXXX-XX-XXXXXXX-XXX-XXXX-01.dgn
3.8
REVISION NUMBERING
The document issue/revision status numbering shall be applied following the revision codes
described in Annex B.
3.9
Revisions shall be identified by means of a 'cloud' and/or 'revision triangle'. Contained within
the triangle must be the issue reference number corresponding to the revision status of the
document.
For textual documents, the revision indicator shall be a vertical line in the right hand margin
with the revision triangle adjacent to it. The vertical line will commence at the text line in
which the change starts, and extend past all lines affected by the change.
For drawings, the revision indicator shall be a 'cloud' closely surrounding the area of change
with the revision triangle within or immediately adjacent to the 'cloud'.
When previously revised documents are re-issued at a later status, all previous revision
clouds/triangles shall be removed.
Any 'holds' or restraints on the document shall be clearly indicated either by the use of 'hold
clouds' and notes on drawings or <hold> on text documents. Hold clouds shall remain on
documents until cleared by a subsequent revision issue.
For Flow-Sheets in particular, a detailed change list shall be maintained stating all
modifications carried out at a particular revision status. Change lists for other key
documents shall be maintained as and when required.
If the change is due to a technical query, concession, design change note, etc. the relevant
document number shall be referenced in the revisions comments box.
3.10
CANCELLATION OF DOCUMENTS
Any document that has been formally issued to the Project, which is found to be redundant
or invalid, shall be formally issued Cancelled. This is to ensure that redundant / invalid
information is clearly identified. This is of particular importance when operating EDMS
systems. The document shall be issued formally at revision V01 (refer Table B.1). Where the
document to be cancelled is a multi-page textual document then it is acceptable to issue the
Front Sheet only.
Where appropriate, the reason for the cancellation shall be noted on the document in the
Reason for Issue column. For example where a document has been cancelled because it
has been superseded by another document, then this other document shall be referenced
(e.g. Issued Cancelled Superseded by document number KE01)
3.11
RENUMBERING OF DOCUMENTS
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 11 of 30
the cancelled issue in the Reason for Issue column (e.g. Issued Cancelled renumbered
as KE01).
When the new document number is issued it shall clearly state in the Reason for Issue
column (and for documents, in the Revision Record) that it has been renumbered (e.g.
Issued AFD - previously issued as KE01.). Revisions for renumbered documents shall
progress from the history generated under the old number (e.g. where the previous issue
under its old number was Rev D02, then the new document number shall start at D03).
3.12
The details associated with all commitments made by all Contractors will be stored in the
IMIS System and to this effect we require a commonality of structure and uniqueness that
identifies some key data. They shall be numbered in accordance with the format defined in
Annex E and further described below.
3.12.1
PROCUREMENT PACKAGE
Most Contractors use a concept whereby like packages of materials are assembled and
marshalled through the design and procurement process.
An example might be the main Electrical Switchboards. There may be an expectation at the
outset that this package of equipment should be designed and brought together on a single
Purchase Order (PO) on a single Supplier.
In most Contractors the Package Number is the root of the PO Number and this is required
for Kashagan. An example PO Number that follows this section, the root Procurement
Status Report (PSR) Package ID is KDE01.
The actual structure of the Package Number is:
Each Contractor is required to assign PSR Package Codes on this basis using the
Organisation and Discipline codes to create the appropriate scope of work list for each
Contractor involved in Package Numbering and/or PO Issue.
3.12.2
The PO Number is critical as many related functions may include this number in their own
systems and numbering, such as Supplier Documents.
The purpose of the PO Number is:
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 12 of 30
Here is an example:
KASH AA01 PKDE01A
Change Order 00
KASH is the Kashagan IMIS System PROJECT Code there is no higher level.
AA01 is a combination of codes that define the specific contract scope it is composed of
two parts:
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 13 of 30
APPLICATION
The instructions in this section shall apply to:
Project Document Numbering
Supplier Document Numbering
A.2 DEVIATION
Not permitted.
A.3 DOCUMENT NUMBERING FORMAT
The formats established in this procedure are indicated in the following:
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 14 of 30
A
A A N N - A N - N N N - A A - A - A A - N N N N - / N N
N
e.g.
KE01-A1-230-KD-R-HP-0001-001
Figure A.1 - Project Document Numbering Format
(ii)
Asset
Code
Sub-Project
Code
Two character alpha- numeric; identifies the specific sub-project to which the
document refers.
Coding Instructions: Annex D
(iii)
Facility
Functional Unit
Three character numeric; identifies the specific Project functional unit to which the
document refers.
Reference: KE01-00-000-AK-A-PS-0002-000 Facility Functional Unit Numbering
(iv)
(v)
Document
Originator
Code
Discipline Code
(vi)
Document
Type
Code
(vii)
Sequential
Number
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 15 of 30
A
A A N N - A N - A A A A N N A - A N N - N N N N - / N N
N
e.g.
KE01-A1-PPAM01A-B02-0001-001
Figure A.2 - Supplier Document Numbering Format
Table A.2 - Supplier Document Numbering Format Description
(i)
Asset
Code
(ii)
Sub-Project
Code
(iii)
Purchase Order Seven character alpha-numeric; identifies the specific project purchase
Number
order package with which the document is associated
Coding Instructions: Annex E
(iv)
(v)
Sequential
Number
(vi)
Sheet Numbers Three character numeric; sequential number applicable to the sheets
or
Attachment
Number
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 16 of 30
APPLICATION
The instructions in this section shall apply to:
Project Documents Numbering
Supplier Document Numbering
B.2 DEVIATION
Not permitted.
B.3
R E V I S I O N S T A T U S CODES
The method to define
following:
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 17 of 30
(PROGRESSING
P02, P03 ETC)
REVIEW ISSUE
A01
(PROGRESSING
A02, A03 ETC)
Approved
B01
(PROGRESSING
B02, B03 ETC)
F01
APPROVED for FEED
Documents approved as fit for purpose for FEED
(PROGRESSING
F02, F03 ETC)
D01
(PROGRESSING
D02, D03 ETC)
C01
(PROGRESSING
C02, C03 ETC)
APPROVED FOR
CONSTRUCTION
X01
AS BUILT
(PROGRESSING
X02, X03 ETC)
M01
OPERATIONS MODIFICATIONS
(PROGRESSING
E02, E03 ETC)
T01
(PROGRESSING
M02, M03 ETC)
E01
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 18 of 30
(PROGRESSING
T02, T03 ETC)
V01
LATER
01
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 19 of 30
APPLICATION
The instructions in this section shall apply to:
Project Document Numbering
Supplier Document Numbering
C.2 DEVIATION
Not permitted.
C.3
ASSET CODES
The codes have been assigned by as indicated in the following Table C.1.
Any new code shall be formally requested from the AgipKCO Corporate CDC.
Table C.1 - Project Code List
Location
All Location
Kashagan (includes EP
& Early Works)
Kalamkas
Aktote
Kashagan Southwest
Asset
Code
GE00
KE01
KA00
AK00
KS00
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 20 of 30
APPLICATION
The instructions in this section:
shall apply to
Project Document Numbering
D.2
DEVIATION
Not permitted.
D.3
SUB-PROJECT NUMBERS
The sub-project number shall be established/approved by the EPMT Document
Management and endorsed by AgipKCO Corporate CDC.
The codes that have been assigned are shown in Table D.1.
Table D.1 - Sub-Project Numbers
Sub Project
Code
Description
00
A0
A1
B0
Offshore - general
B1
Offshore Complex A
B2
Offshore Complex B
B3
Offshore Complex C
B4
Offshore Complex D
C0
Pipelines - general
C1
Flowlines
C2
Trunklines
C3
Export Pipelines
D0
D1
D2
D3
D4
D5
D6
D7
D8
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 21 of 30
Note: Where a document relates to both A1 (Onshore Plant 1 st Phase) and D0 (Early Works
general) then Sub Project Code A0 shall be used.
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 22 of 30
APPLICATION
The instructions in this section:
shall apply to
Package Numbers
Purchase Order Numbers
The Purchase Order component of the Supplier Document Number
E.2
DEVIATION
Not permitted.
E.3
DOCUMENT NUMBERING
Agip KCO
A N N
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 23 of 30
A A
N N
(vi) Suffix
(v) Sequential Number
(v) Discipline
(iv) Originator
(iii) Type of Award
(ii) WBS Level 7 - Contract
(i) WBS Level 4 - Tranche
(i)
(ii)
Three character alpha- numeric; identifies the specific execution subproject to which the document refers.
Coding Instructions: KE01-00-000-AK-A-PR-0668-000
(iii)
Type of Award
(iv)
Originator
(v)
Discipline
(vi)
Sequential
Number
(vii) Suffix
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 24 of 30
APPLICATION
The instructions in this section:
shall apply
to Project Document Numbering & the Purchase Order number element
of the Supplier Document Number
F.2
DEVIATION
The discipline type shall be established/approved by the EPMT Document Management
and endorsed by AgipKCO Corporate CDC.
F.3
CODE
DISCIPLINE
ELECTRICAL
FINANCE
GEOSCIENCE
MATERIAL MANAGEMENT
PIPELINES
MECHANICAL
OPERATIONS
PIPING
PROCESS
OFFSHORE STRUCTURAL
TELECOMMUNICATIONS
SUBSEA TECHNOLOGY
MAINTENANCE
EXPLORATION
INFORMATION TECHNOLOGY
MISCELLANEOUS
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 25 of 30
APPLICATION
The instructions in this section:
shall apply to the Project Document Numbering, , referring to Table G. 1
shall apply
G.2
DEVIATION
Document type codes shall be established/approved by the EPMT Document Management
and endorsed by AgipKCO Corporate CDC.
G.3
DOCUMENTS CODE
The following T a b l e s G 1 & G 2 indicates the Documents codified by the Project
CDC for the above applications.
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 26 of 30
Table G.1 Project Document Type Codes
CODE
AA
BA
BC
BP
BR
BS
CA
DA
DD
DE
DG
DI
DL
DM
DP
DR
DS
DT
DX
EC
EE
EG
EL
ET
EV
FR
GL
GS
GU
HB
HC
HE
HF
HG
HH
HI
HL
HO
HP
HT
HW
DESCRIPTION
APPLICATION FOR AUTHORITIES
APPLICATION FOR AUTHORITIES
CONTRACTS
INSTRUCTION TO TENDER
CONTRACT
BUSINESS CASE PROPOSAL
REQUISITION
SCOPE OF WORK
CALCULATION & ANALYSIS
CALCULATION & ANALYSIS
DRAWINGS
ARRANGEMENT
DETAIL
ELEVATION
DRAWING
ISOMETRIC
LAYOUT
MAP
PLOT PLAN
ROUTING
STANDARD DRAWING
LOCATION
CROSS SECTION
EVALUATIONS
COST ESTIMATE
ECONOMIC EVALUATION
EVALUATION
COMMERCIAL EVALUATION
TECHNICAL EVALUATION
EVALUATION (GENERAL)
FORM
FORM
GENERAL
GUIDELINE
GLOSSARY
GUIDANCE
SCHEMATIC
BLOCK DIAGRAM
CAUSE EFFECT TABLE
HEAT & MASS BALANCE CHARTS/DIAGS
FLOW DIAGRAM
LOGIC DIAGRAM
SCHEMATIC DIAGRAM
INTERCONNECTING DIAGRAM
LOOP DIAGRAM
ON LINE DIAGRAM
P&I DIAGRAM
KS
TERMINATION DIAGRAM
WIRING DIAGRAM
SKETCH
SKETCH
LA
LC
LD
LE
Ll
LJ
LL
LM
LN
LO
LP
LS
LT
INSTRUMENTS LIST
JUNCTION BOXES SCHEDULES
LINES LIST
MATERIAL LIST
INTERCONNECTION LIST
LOAD LIST
SPARE PARTS LIST
LIST & SCHEDULE
MATERIAL TAKE OFF
CODE
DESCRIPTION
LV
VALVE SCHEDULE
MANUAL
MA
MANUAL
MI
USER MANUAL
MM
MAINTENANCE MANUAL
MO
OPERATING MANUAL
MS
STANDARD MANUAL
MY
SAFETY CASE
NETWORK/BARCHART/ "S" CURVES
NE
NETWORK BARCHART/S CURVES
DOSSIER
OC
CERTIFICATION DOSSIER
OD
DOSSIER
OS
SURVEY DOSSIER
OT
DATA DOSSIER
PROCEDURES
PN
PROJECT INITIATION NOTE
PP
PROJECT PROGRAM
PR
PROCEDURE
PS
PROCEDURAL STANDARD
PLAN
QC
QUALITY PLAN
QH
HSE PLAN
QM
QUALITY MANAGEMENT SYSTEM
QP
PLAN (NON SPECIFIC)
QT
PROJECT EXECUTION PLAN
REPORT
RB
RC
RE
RF
RM
RN
RP
RQ
RS
RT
RW
YA
YC
YD
YE
YF
YG
YH
YP
YS
YT
BASIC OF DESIGN
COST REPORT
REPORT
FINAL REPORT
COMMISSIONING REPORT
TECHNICAL NOTE
PROGRESS REPORT
QUARTERLY REPORT
SURVEY REPORT
TECHNICAL REPORT
WEIGHT REPORT
SPECIFICATION
FUNCTIONAL SPECIFICATION
SPECIFICATION
TECHNICAL STANDARD
TECHNICAL SPECIFICATION
DATA SHEET
TECHNICAL QUERIES
METHOD STATEMENTS
CHANGE CONTROL
SITE QUERY
CONCESSION REQUEST
CHANGE REQUEST
TREND FORM
WORK INSTRUCTION
WORK PACK
STUDIES
ASSESSMENT STUDY
DISCUSSION PAPER
DESIGN BRIEF
ENVIRONMENTAL IMPACT ASSESSMENT
FEASIBILITY STUDY
SCREENING STUDY
HAZOP
PHILOSOPHY
STUDY
STRATEGY
ZZ
MISCELLANEOUS
SF
SP
SD
ST
TD
TQ
TT
VS
VC
VR
VF
WI
WP
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 27 of 30
Table G.2 Supplier Document Type Codes
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 28 of 30
Table G.2 Supplier Document Type Codes (contd)
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 29 of 30
APPLICATION
The instructions in this section:
shall apply to Project Document Numbering, referring to Table H. 1
shall apply to Supplier Document Numbering, referring to Table H. 2
H.2
DEVIATION
Originator codes shall be established/approved by the EPMT Document Management and
endorsed by AgipKCO Corporate CDC.
H.3
DOCUMENT NUMBERING
Agip KCO
KE01-00-000-AK-A-PR-0001-000
Rev. D01- December
Page 30 of 30
Table H.1 - Project Document Originator Codes
CODE
A
AB
AC
AD
AE
AH
AK
AL
AM
AO
AP
AQ
AT
B
BE
BJ
BP
BR
BS
BV
CE
CH
DESCRIPTION
ABB
ACS
Adani
Aktau Energo Stroy
Atyrau Heat & Power Supply
Agip KCO
Almatykurylys
AKMO-88
Atyrauozenport OJSC
Andrew Palmer
Aquater
Atyrau Heat & Power
Bechtel
Bauta JSC
British Petroleum
Kellogg Brown & Root
Bonatti Sicim
Vegyepszer
Caspy Engineering
Chimzashit LLP
EN
EP
ENI
KASHAGAN PROJECT EPMT
FC
FI
FL
FU
GE
GM
GO
Genesis
Global Maritime
GEOKEN LLP
H
HO
Hydromash-Orion
I
IM
IN
IS
Imstalcon
Intereng
ISM LLP
J
K
KA
KD
KH
KM
KN
KR
KV
KZ
L
M
N
NF
NP
NW
CODE
0
DESCRIPTION
P
PA
PH
PM
PN
Parsons
Physe Limited
Prommontazh KH Atyrau
Penspen Andrew Palmer
R
RD
RDS
S
SG
SP
SU
T
TE
TC
TH
TK
Tecnomare
Technip
Thales
TKA
U
UV
UralVod Project
Y
NipiNeftiGas
Nuovo Pignone
NWKC
ZD
Zheldorstroy
DOCUMENT NUMBERING