Professional Documents
Culture Documents
Group 410 A
DE-060300
6
6.1
6.1.1
6.1.2
6.1.3
6.2
6.2.1
6.2.2
6.3
6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
6.1
Process
6.1.1
Revision: 0
Date: 29.09.2006
Page 1 of 7
6.1.2
138-02-043
Group 410 A
DE-060300
Revision: 0
Date: 29.09.2006
file: 138-02-043_06_0.doc, Codeword: Vedanta
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-048
1 (1)
Rev. 00
132-01-073 UB
P&I Diagram:
133-50-049 UB sheet 1, 2, 3, 4, 5, 6
6.1.3
138-02-043
Group 410 A
DE-060300
Revision: 0
Date: 29.09.2006
Page 3 of 7
Smoking and open fire is strictly prohibited in the pitch unloading area and around the
pitch storage tanks.
In case that maintenance work like grinding, burning or welding has to be done,
special rules have to be established by VEDANTA that have to be strictly obeyed.
The operators have to be aware that the facility includes heated equipment avoid
burns on hot machine parts, tanks, valves, pipes, etc.
138-02-043
Group 410 A
DE-060300
Revision: 0
Date: 29.09.2006
file: 138-02-043_06_0.doc, Codeword: Vedanta
6.2
Process Control
6.2.1
138-02-043
Group 410 A
DE-060300
(work copies)
Revision: 0
Date: 29.09.2006
Page 5 of 7
138-02-043
Group 410 A
DE-060300
Revision: 0
Date: 29.09.2006
file: 138-02-043_06_0.doc, Codeword: Vedanta
CONTROL PHILOSOPHY
05.10.2006
1 (16)
Rev. 00
Control Philosophy
of
Process Group 410 A
- Liquid Pitch Unloading & Storage Reference:
Process Flow Sheet:
132-01-073 UB
P&I Diagram:
133-50-049 UB sheet 1, 2, 3, 4, 5, 6
2
2.1
2.2
2.3
2.3.1
2.3.2
2.3.3
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.5
2.5.1
2.5.2
2.5.3
2.6
2.6.1
2.6.2
2.6.3
2.6.4
2.7
2.7.1
2.8
CONTROL PHILOSOPHY
05.10.2006
2 (16)
Rev. 00
The three pitch tanks (410 A 200, 410 A 300 and 410 A 400) can be filled individually from
either unloading stations or simultaneously from both unloading stations. The operator in the
central control room (CCR) can select 6 different routes for the filling of one or two tanks.
Two trucks can be unloaded simultaneously, each one connected to a separate unloading
facility. The truck nozzle is connected to a hose by a flange connection. The truck unloading
process is manually controlled from local pushbutton stations [410 LOP-A1] and [410 LOP-A2].
The central control room operator determines which tank is to be filled from the unloading
pump (410 A 055) or (410 A 070) respectively. He selects Route 1, 2 or 3 for pump (410 A
050) and/or route 4, route 5 or route 6 for pump (410 A 070).
The local operator has to open and close the corresponding manual pitch valves as required
for the selected route. With the valves in the correct position for the selected route the local
operator receives the confirmation by a pilot light on the local panel of the corresponding
unloading pump [410 LOP-A1] and [410 LOP-A2] respectively. Prior to connecting the hose
between the truck discharge nozzle and the unloading station the tanker vents are opened,
only then can the truck discharge valve be opened and the unloading can commence. He then
has to push the "Start SLOW" pushbutton for pump (410 A 055) or pump (410 A 070)
respectively. The pneumatic valve at the suction side (410 A 010) for pump (410 A 055) or
valve (410 A 030) for pump (410 A 070) is opened and the corresponding pump starts at slow
speed. At slow speed the pump suction side is flushed and any obstruction particles are
caught in the filter. During the flushing time (2 minutes adjusted in the PLC) the local operator
has to observe the operation and watch for unusual noise or cavitation. He can then switch the
corresponding pump to high speed if the pitch temperature is high enough (> 160C) and if the
pump is operating smoothly. In case that the pitch temperature is too low or if the filter is close
to get plugged he has to leave the pump operating on slow speed.
The corresponding pump can only be started if the selected tank is not full i.e. under 95% of its
filling capacity. The actual tank level is displayed on the local control panel.
2
2.1
AUTOMATIC
CONTROL PHILOSOPHY
05.10.2006
Rev. 00
3 (16)
MAINTENANCE
HORN OFF
ALARM ACKNOWLEDGEMENT
PB resets alarm
LAMP TEST
AUTOMATIC / MAINTENANCE
PUMP STOP
ROUTE OK
FILTER PLUGGED
LI-410 A 200
LI-410 A 300
LI-410 A 400
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-048
2.2
4 (16)
Rev. 00
The exchange of control signals is described in the following chapters and especially under 2.8
below.
2.3
Selections
2.3.1
CONTROL PHILOSOPHY
05.10.2006
Rev. 00
5 (16)
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 A 050)
CLOSE:
(410 A 230)
(410 A 025)
The pitch sample valve (410 A 080) has to be closed during the start of pitch pump (410 A
055) but may be opened after the start for minimum periods for sampling (time adjusted in
PLC: 60 seconds).
This Route Selection cannot be made if:
pump (410 A 055) is in operation with a different route (Route 2 Selection SE 2-2 or Route
3 Selection SE 2-3).
With the verification of the above valve positions this route is set in the PLC.
SE 2-2:
Route 2: Unloading Pump 410 A 055 to pitch storage tank 410 A 300
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 A 050)
CLOSE:
(410 A 330)
(410 A 025)
CONTROL PHILOSOPHY
05.10.2006
6 (16)
Rev. 00
pump (431 A 055) is in operation with a different route (Route 1 Selection SE 2-1 or Route
3 Selection SE 2-3).
With the verification of the above valve positions this route is set in the PLC.
SE 2-3:
Route 3: Unloading Pump 410 A 055 to pitch storage tank 410 A 400
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 A 050)
CLOSE:
(410 A 430)
(410 A 025)
The pitch sample valve (410 A 080) has to be closed during the start of pitch pump (410 A
055) but may be opened after the start for minimum periods for sampling (time adjusted in
PLC: 60 seconds).
This Route Selection cannot be made if:
pump (410 A 055) is in operation with a different route (Route 1 Selection SE 2-1 or Route
2 Selection SE 2-2).
With the verification of the above valve positions this route is set in the PLC.
2.3.3
CONTROL PHILOSOPHY
05.10.2006
7 (16)
Rev. 00
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 A 065)
CLOSE:
(410 A 230)
(410 A 045)
The pitch sample valve (410 A 085) has to be closed during the start of pitch pump (410 A
070) but may be opened after the start for minimum periods for sampling (time adjusted in
PLC: 60 seconds).
This Route Selection cannot be made if:
pump (410 A 070) is in operation with a different route (Route 5 Selection SE 3-2 or Route
6 Selection SE 3-3 ).
With the verification of the above valve positions this route is set in the PLC.
SE 3-2:
Route 5: Unloading Pump 410 A 070 to pitch storage tank 410 A 300
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 A 065)
CLOSE:
(410 A 330)
(410 A 045)
The pitch sample valve (410 A 085) has to be closed during the start of pitch pump (410 A
070) but may be opened after the start for minimum periods for sampling (time adjusted in
PLC: 60 seconds).
This Route Selection cannot be made if:
pump (410 A 070) is in operation with a different route (Route 4 Selection SE 3-1 or Route
6 Selection SE 3-3 ).
CONTROL PHILOSOPHY
05.10.2006
8 (16)
Rev. 00
With the verification of the above valve positions this route is set in the PLC.
SE 3-3:
Route 6: Unloading Pump 410 A 070 to pitch storage tank 410 A 400
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 A 065)
CLOSE:
(410 A 430)
(410 A 045)
The pitch sample valve (410 A 085) has to be closed during the start of pitch pump (410 A
070) but may be opened after the start for minimum periods for sampling (time adjusted in
PLC: 60 seconds).
This Route Selection cannot be made if:
pump (410 A 070) is in operation with a different route (Route 4 Selection SE 3-1 or Route
5 Selection SE 3-2).
With the verification of the above valve positions this route is set in the PLC.
2.4
Group Start
2.4.1
2.4.2
Start Preconditions
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-048
9 (16)
Rev. 00
2.4.4
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-048
10 (16)
Rev. 00
Normal Operation
2.5.1
2.5.2
2.5.3
2.6
Shut Down
2.6.1
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-048
2.6.2
11 (16)
Rev. 00
2.6.3
2.6.3.1 Fast Shut Down by the Operator from local operating panel [410 LOP-A1]
The operator initiates the STOP pushbutton for unloading pump (410 A 055).
Pump (410 A 055) is stopped immediately.
Pneumatic Pitch Valve (410 A 010) is closed
The operator closes the truck valve and disconnects the hose from the tanker truck nozzle.
In case that no additional truck has to be unloaded within the next hour the pitch in the
hose has to be drained in order to avoid freezing of pitch in the hose.
2.6.3.2 Fast Shut Down by the Operator from local operating panel [410 LOP-A2]
The operator initiates the STOP pushbutton for unloading pump (410 A 070).
Pump (410 A 070) is stopped immediately.
Pneumatic Pitch Valve (410 A 030) is closed
The operator closes the truck valve and disconnects the hose from the tanker truck
nozzle.
In case that no additional truck has to be unloaded within the next hour the pitch in the
hose has to be drained in order to avoid freezing of pitch in the hose.
2.6.4
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-048
12 (16)
Rev. 00
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-048
Rev. 00
13 (16)
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-048
14 (16)
Rev. 00
2.7
2.7.1
Pitch Sampling
The operator may take samples from the incoming pitch by opening the corresponding
sample valve (410 A 080) or (410 A 085) for maximum periods of 60 seconds, see also
(2.6.4.7 and 2.6.4.8).
CONTROL PHILOSOPHY
05.10.2006
Rev. 00
Signal Exchange with Sub-Groups of this Group and Other Process Groups
Signal
Description
Sort of Signal
HTM SECONDARY 5 IN
OPERATION Group 431 S / 410 S is
running in AUTOMATIC mode,
minimum 2 primary pumps in
operation, minimum 1 pump of
secondary 5 in operation, minimum 1
Heater no Common Fault
HTM SECONDARY 6 IN
OPERATION Group 431 S / 410 S is
running in AUTOMATIC mode,
minimum 2 primary pumps in
operation, minimum 1 pump of
secondary 6 in operation, minimum 1
Heater no Common Fault
Compressed air pressure above 6
bar (no low-pressure indicated by
410 A 009-PE1)
Pitch Valve 410 A 230 closed
DRAIN TANK 1 CLOSED
Pitch Valve 410 A 330 closed
DRAIN TANK 2 CLOSED
Pitch Valve 410 A 430 closed
DRAIN TANK 3 CLOSED
Actual level [410 A 200-LI] in tank 1
LEVEL TANK 1
Actual level [410 A 300-LI] in tank 2
LEVEL TANK 2
Actual level [410 A 400-LI] in tank 3
LEVEL TANK 3
Pitch Valve 410 A 230 closed
DRAIN TANK 1 CLOSED
Pitch Valve 410 A 330 closed
DRAIN TANK 2 CLOSED
Pitch Valve 410 A 430 closed
DRAIN TANK 3 CLOSED
Actual level [410 A 200-LI] in tank 1
LEVEL TANK 1
Actual level [410 A 300-LI] in tank 2
LEVEL TANK 2
Actual level [410 A 400-LI] in tank 3
LEVEL TANK 3
15 (16)
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-048
from Group 410 A to Group 410 C
from Group 410 A to Group 410 C
from Group 410 A to Group 410 C
from Group 410 A to Group 410 C
from Group 410 A to Group 410 C
from Group 410 A to Group 410 C
from Group 410 A to Group 410 C
from Group 410 A to Group 410 C
from Group 410 A to Group 410 C
Rev. 00
16 (16)
6.3
Main Equipment
6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
138-02-043
Group 410 A
DE-060300
Revision: 0
Date: 29.09.2006
Page 7 of 7