You are on page 1of 80

Project: Metro Gaisano Cavite

Location: E. Aguinaldo Hi-Way Corner Daanghari, Imus Cavite


Subject: Summary of Variation Order (Electrical)

pmi #
29

DESCRIPTION

43
64
65
71
75
78
79
80

REVISED THIRD FLOOR AND MCC


REVISED WALL AND FLOOR OUTLET 2ND AND 3RD
FLOOR
FIRE RATED ROLL UP DOOR
REVISED CCTV LAYOUT UPPER GROUND FLOOR
BILLBOARD LIGHTING
ADDITIONAL TRACKLIGHTS
LIGHTINGS AT COLUMN AT GR 14'/R AND 15'/R
RELOCATION OF ATM POWER PROVISION
STP LAYOUT
DPCE

81

EXTENSION OF POWER LAYOUT FOR POS AT 2F AND 3F

42

82
85
86
91
102
106
129
143
149
164
166
169
187
199
200
201
202
203
213
214
215

1
2
3
4
5

ADDITIONAL LIGHTING LAYOUT FOR WALKALATOR AND


ESCALATOR AT LGF TO 3F
JEWELRY LIGHTING LAYOUT
SLIDING DOOR
EXTENSION OF POWER LAYOUT ON COLUMN CLADDING
AT UPPER GROUND FLOOR 2F AND 3F
COLD ROOM POWER PROVISION
DUCT BANK
LIGTHING LAYOUT AT UGF BASED ON REV RCP
PACP
WALKALATOR TRANSFORMER
RELOCATION OF TAPPING POINT OF SUMP PUMP
REVISED TAPPING POINT OF EF-1 AND EF-2
ADDITIONAL LAYOUT FOR REFRIGIRATION COOLING
TOWER
provision of two 200mm dia pinlight at cashiers
power supply for exhaust fan at transformer vault room
relocation of fuel transfer pump control system
transfer of booster pump tapping point
required power supply for MVSG battery bank
required power supply for two meat grinder
additional power provision for eye wear tenant
additional roughing-ins and wiring for ahu
installation of additional controls for exhaust fan
other claims
switch bank (material only)
purchase of PATB and FATB
BID TO FCD REVISIONS
Revised CCTV Layout
FCU deduction

PSI SUBMISSION
2,336,665.07
800,000.00
380,053.84
2,213,987.41
347,457.71
152,548.24
35,096.00
197,789.52
262,950.89
546,939.78
33,692.91
20,684.96
29,527.25
29,046.91
45,943.95
206,708.00
406,000.00
159,032.00
240,338.23
63,446.10
65,970.00
218,132.00
10,681.00
17,065.00
5,000.00
16,339.04
8,000.00
56,000.00
32,693.00
176,933.00
30,000.00

95,000.00
33,000.00

TOTAL

9,272,721.81

TOTAL ADDITIONAL WORKS


TOTAL DEDUCTION FROM ORIGINAL CONTRACT
NET AMOUNT PAYABLE TO PSI (CHANGE ORDER)
less:

variance

Evaluated by:

Paolo Alvarez
Electrical Supervisor

RECONCILED AMOUNT

REMARKS

1,293,884.48
800,000.00 WITH SEPARATE P.O.
380,053.84 w/ dls
159,713.41
66,276.23 w/ dls
5,667.02
164,770.92 w/ dls
89,041.37
325,863.85
30,677.20
20,684.96
15,424.84
5,630.40
15,586.47
48,991.86
WORK DONE BY FODC
248,635.58
65,493.30 w/ dls
154,782.61
63,446.10 charge to mechanical
58,395.21 w/ dls
76,022.26 deductive of psi is included on bid to for con
7,297.94
912.88
4,879.51
16,339.04
8,000.00
24,305.36
23,153.05
47,783.74
19,465.70

w/ dls
w/ dls
included to bid to fcd
w/ dls
w/ dls

95,000.00 with separate p.o.


33,000.00
(3,950,062.17)
550,945.01
(31,810.11)

938,251.87

4,920,124.15
(3,981,872.28)
938,251.87
95,000.00 PO # 3122 (please proceed with payment)
800,000.00 PO # 3115 (please proceed with payment)
43,251.87 for PO issuance

Checked by:

Jes Alagon
Project Control Head

Conforme:

Vic Serrano
Powertrunking Systems, Inc.

Project: Metro Gaisano Cavite


Location: E. Aguinaldo Hi-Way Corner Daanghari, Imus Cavite
Subject: Summary of Variation Order (Electrical)

pmi #
29

DESCRIPTION

43
64
65
71
75
78
79
80

REVISED THIRD FLOOR AND MCC


REVISED WALL AND FLOOR OUTLET 2ND AND 3RD
FLOOR
FIRE RATED ROLL UP DOOR
REVISED CCTV LAYOUT UPPER GROUND FLOOR
BILLBOARD LIGHTING
ADDITIONAL TRACKLIGHTS
LIGHTINGS AT COLUMN AT GR 14'/R AND 15'/R
RELOCATION OF ATM POWER PROVISION
STP LAYOUT
DPCE

81

EXTENSION OF POWER LAYOUT FOR POS AT 2F AND 3F

42

82
85
86
91
102
106
129
143
149
164
166
169
187
199
200
201
202
203
213
214
215

1
2
3
4
5

ADDITIONAL LIGHTING LAYOUT FOR WALKALATOR AND


ESCALATOR AT LGF TO 3F
JEWELRY LIGHTING LAYOUT
SLIDING DOOR
EXTENSION OF POWER LAYOUT ON COLUMN CLADDING
AT UPPER GROUND FLOOR 2F AND 3F
COLD ROOM POWER PROVISION
DUCT BANK
LIGTHING LAYOUT AT UGF BASED ON REV RCP
PACP
WALKALATOR TRANSFORMER
RELOCATION OF TAPPING POINT OF SUMP PUMP
REVISED TAPPING POINT OF EF-1 AND EF-2
ADDITIONAL LAYOUT FOR REFRIGIRATION COOLING
TOWER
provision of two 200mm dia pinlight at cashiers
power supply for exhaust fan at transformer vault room
relocation of fuel transfer pump control system
transfer of booster pump tapping point
required power supply for MVSG battery bank
required power supply for two meat grinder
additional power provision for eye wear tenant
additional roughing-ins and wiring for ahu
installation of additional controls for exhaust fan
other claims
switch bank (material only)
purchase of PATB and FATB
BID TO FCD REVISIONS
Revised CCTV Layout
FCU deduction

PSI SUBMISSION
2,336,665.07
800,000.00
380,053.84
2,213,987.41
347,457.71
152,548.24
35,096.00
197,789.52
262,950.89
546,939.78
33,692.91
20,684.96
29,527.25
29,046.91
45,943.95
206,708.00
406,000.00
159,032.00
240,338.23
63,446.10
65,970.00
218,132.00
10,681.00
17,065.00
5,000.00
16,339.04
8,000.00
56,000.00
32,693.00
176,933.00
30,000.00

95,000.00
33,000.00

TOTAL

9,272,721.81

TOTAL ADDITIONAL WORKS


TOTAL DEDUCTION FROM ORIGINAL CONTRACT
NET AMOUNT PAYABLE TO PSI (CHANGE ORDER)
less:

variance

Evaluated by:

Paolo Alvarez
Electrical Supervisor

RECONCILED AMOUNT

REMARKS

1,293,884.48
800,000.00 WITH SEPARATE P.O.
380,053.84 w/ dls
159,713.41
66,276.23 w/ dls
5,667.02
164,770.92 w/ dls
89,041.37
325,863.85
30,677.20
20,684.96
15,424.84
5,630.40
15,586.47
48,991.86
WORK DONE BY FODC
248,635.58
65,493.30 w/ dls
154,782.61
63,446.10 charge to mechanical
58,395.21 w/ dls
76,022.26 deductive of psi is included on bid to for con
7,297.94
912.88
4,879.51
16,339.04
8,000.00
24,305.36
23,153.05
47,783.74
19,465.70

w/ dls
w/ dls
included to bid to fcd
w/ dls
w/ dls

95,000.00 with separate p.o.


33,000.00
(3,950,062.17)
550,945.01
(31,810.11)

938,251.87

4,920,124.15
(3,981,872.28)
938,251.87
95,000.00 PO # 3122 (please proceed with payment)
800,000.00 PO # 3115 (please proceed with payment)
43,251.87 for PO issuance

Checked by:

Jes Alagon
Project Control Head

Conforme:

Vic Serrano
Powertrunking Systems, Inc.

consideration for new quantity:


PROJECT: METRO GAISANO CAVITE DEPARTMENT STORE & SUPERMARKET
LOCATION:
Gen. E. Aguinaldo Hiway, Imus, Cavite, City

1.DEDUCTIVE/ ALLOTED LOAD FOR REF


2.ADDITIVE FOR INSTALLED PVC FOR VOICE AND DATA AND POS
3.ADDITIVE FOR PANEL BOARDS
4. for con drawings

SUBCONTRACTOR: POWERTRUNKING SYSTEMS, INC.


SUBJECT: BID TO FCD FINAL EVALUATION

Item
1.0

Material Description
Electrical Works
1.01 Incoming Main and Switchgear
1.01.01
Pipes and Conduits (Concrete Pedestal to TX)
100mm uPVC Pipes
100mm uPVC Elbow
1.01.02

1.01.03

1.01.04

1.01.03

1.01.04
1.01.05
1.01.06

100mm uPVC End Bell


Pipes and Conduits (TX to 4000AT,ECB)
100mm uPVC Pipes
100mm uPVC Elbow
100mm uPVC End Bell
Wires and Cables (TX to 4000AT, ECB)
250mm THHN Wire PD
50mm THHN Wire PD
Pipes and Conduits (4000AT to LVSG)
90mm IMC Pipes
Pullbox
Wires and Cables (TX to 4000AT, ECB)
250mm THHN Wire PD
50mm THHN Wire PD
2.0MVA, 3, 34.5KV/460V, 60Hz
Low voltage switchgear (LVSG)
Capacitor bank, multi step with auto controller including enclosure

700KVAR
1.01.07
Enclosed circuit breaker (ECB) in NEMA-1
700AT, 3P, 460V
4000AT, 3P, 460V
1.01.08
Civil Works, Hanger, Support, Fittings and Consumables
1.01 Incoming Main and Switchgear - SUB TOTAL
1.02 Main and Sub-Main Distribution System
1.02.01
IMC Pipes and Conduits
15mm diameter
25mm diameter
32mm diameter
50mm diameter
65mm diameter
80mm diameter
90mm diameter
1.02.02
Feeder Wires and Cables THHN WIRES PD
2.0 mm
3.5 mm

Specs

New Qty

Unit

Crown
Crown
Crown

Labor

Material

317.90
673.20
112.20

140.00
140.00
140.00

42,916.50
5,385.60
897.60

317.90
673.20
112.20

140.00
140.00
140.00

13,351.80
5,385.60
897.60

m
m

1,531.20
330.53

52.50
21.00

189,868.80
13,551.65

m
set

1,081.00
1,100.00

287.00
245.00

216,200.00
5,500.00

m
m
lot
lot

1,531.20
330.53
osm
osm

52.50
21.00
14,000.00
10,500.00

918,720.00
66,105.60

lot

osm

lot
lot
lot

osm
osm
44,000.00

3,500.00
3,500.00
17,500.00

m
m
m
m
m
m
m

88.00
180.00
247.10
372.00
590.00
720.00
1,081.00

23.80
48.30
70.00
99.40
157.50
192.50
287.00

42
8

m
pcs

pcs

Philflex
Philflex

108
36
158
4
475
158
1
1

Philflex
Philflex

Material

Amount

m
pcs
pcs

Crown
Crown
Crown

Smart Tube
Local

Unit Rate

Local

Smart Tube
Smart Tube
Smart Tube
Smart Tube
Smart Tube
Smart Tube

1
1
1
1
348
817
2,393
218
270
54
213

m
m

Page 9 of 80

7,000.00

44,000.00
1,522,780.75

275,400.00
205,093.00
193,440.00
82,600.00
261,360.00
313,490.00

Item

Material Description

1.02.03

1.02.04

Specs

5.5 mm
8.0 mm
14 mm
22 mm
30 mm
50 mm
60 mm
125 mm
200 mm
250 mm
Fire Rated Cables
50 mm
240 mm
Panelboards and Distribution Board
Panelboards; PP-UN1 (Unitized Panel 1) and PP-UN2 (Unitized Panel 2)

Philflex
Philflex
Philflex
Philflex
Philflex
Philflex
Philflex
Philflex
Philflex
J-jlapp
J-jlapp

Panelboards; DP-BM
Panelboards; DP-GF
Panelboards; DP-SF
Panelboards; DP-TF
Panelboards; RP-BM
Panelboards; LP-BM
Panelboards; LP-SM-A (Supermarket)
Panelboards; LP-SM-B (Supermarket)
Panelboards; LP-SM-C (Supermarket)
Panelboards; PP-CH-A (Cooling Loads)
Panelboards; PP-CH-B (Cooling Loads)
Panelboards; PP-CASH1 (Cashier)
Panelboards; PP-CASH2 (Cashier)
Panelboards; RP-SM (Supermarket)
Panelboards; LP-DS-A (Dept Store)
Panelboards; LP-DS-B (Dept Store)
Panelboards; LP-DS-C (Dept Store)
Panelboards; RP-DS (Dept Store)
Panelboards; LP-TF-A
Panelboards; LP-TF-B
Panelboards; RP-TF
Panelboards; PP-ACCU1
Panelboards; PP-ACCU2
Panelboards; PP-MCC
100A, 3P, 460V
Non-fusible disconnect switches (NFDS) with built-in start stop
push button, indicating light and magnetic starter in NEMA-1
20A, 2P, 230V
50A, 3P, 460V
100A, 3P, 230V
150A, 3P, 460V
Non-fusible disconnect switches (NFDS) with built-in start stop
50A, 3P, 460V

Page 10 of 80

New Qty

Unit

3,133
1,451
2,307
2,699
214
784
218
630
273
453
-

Unit Rate
Material

Amount
Labor

Material

m
m
m
m
m
m
m
m
m
m

55.62
88.53
139.04
202.58
330.53
406.74
792.00
1,189.76
1,531.20

8.40
10.50
12.00
14.00
21.00
24.50
35.00
45.50
52.50

220,294.98
261,157.60
542,903.68
104,116.32
626,373.44
332,640.00
340,271.36
1,439,328.00

m
m

414.75
2,504.25

14.00
45.50

124,425.00
1,870,674.75

No

1
1

No
No

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

6
6
9
3
2

osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm
osm

1,750.00
1,050.00
1,050.00
1,050.00
1,050.00
1,050.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
1,050.00
1,050.00
1,050.00

No
No
No
No

osm
osm
osm
osm

350.00
350.00
350.00
350.00

No

osm

350.00

Item

Material Description

1.02.05

1.02.05

1.02.05

Specs

Automatic transfer switch (ATS)


1000A, 3P, 460V
Manual transfer switch (MTS)
600A, 3P, 460V
Dry type transformer
300KVA, 3, 460V primary / 230V secondary, 60Hz
Allow for the provision of
roughing-ins and wiring for the power supply of exhaust fan no.
06 (EF-06) and exhaust fan no. 08 (EF-08) located main
loading/unloading dock
Hanger and Support
Unistrut Channel
15mm diameter Strut Clamp
25mm diameter Strut Clamp
32mm diameter Strut Clamp
50mm diameter Strut Clamp
65mm diameter Strut Clamp
80mm diameter Strut Clamp
90mm diameter Strut Clamp
1/2' Threaded Rod
Fittings and Consumables
Conduit Fittings
Pull Boxes
Consumables
Elbows
Electrical Tagging and Signages
Bonding Jumpers
Others cutting tools

Local
Local
Local
Local
Local
Local
Local
Local
Local
Local
Local
Local
Smart Tube
Local
Local
Local

1.02 Main and Sub-Main Distribution System - SUB TOTAL


1.03 General Lighting and Power System
1.03.01
Lighting Fixtures
600mm x 1200mm troffer light
600mm x 1200mm troffer light with battery pack
600mm x 600mm troffer light
600mm x 600mm troffer light with battery pack
suspended lighting fixture (double)
suspended lighting fixture (double) with battery pack
suspended lighting fixture (single)
suspended lighting fixture (single) with battery pack
200mm diameter CFL recessed downlight c/w 18W CFL
200mm diameter CFL recessed downlight c/w 18W CFL with battery
pack
T5 fluorescent cove light
T5 fluorescent cove light with battery pack
suspended industrial lighting fixture
suspended industrial lighting fixture with battery pack
Directional Downlight

Page 11 of 80

New Qty

Unit

1
1
2
2
295
174
409
1,197
146
180
27
142
1,739
1
1
1
1
1
1
1
139
56
420
3
136
38
112
54
1,499

assy
assy
assy
assy
assy
assy
assy
assy
assy

117

assy

268
16
24
6
448

assy
assy
assy
assy
assy

Unit Rate
Material

Amount
Labor

Material

No

osm

3,500.00

No

osm

3,500.00

No

osm

7,000.00

item

osm

350.00

m
set
set
set
set
set
set
set
m

330.00

105.00

99,000.00

27.50
33.00
38.50
44.00
49.50
55.00
55.00

3.50
5.60
8.40
10.50
12.60
14.70
21.00

21,037.50
13,695.00
13,346.67
4,106.67
8,984.25
10,633.33
110,000.00

lot
lot
lot
lot
lot
lot
lot

50,000.00
16,500.00
55,000.00
22,000.00
5,500.00
16,500.00
11,000.00

11,550.00
5,775.00
19,250.00
7,700.00
1,925.00
5,775.00
3,850.00

50,000.00
16,500.00
55,000.00
22,000.00
5,500.00
16,500.00
11,000.00
7,650,871.54

osm
osm
osm
osm
osm
osm
osm
osm
osm

210.00
210.00
210.00
210.00
210.00
210.00
210.00
210.00
175.00

osm
osm
osm
osm
osm
osm

175.00
175.00
175.00
175.00
175.00

Item

Material Description

Specs

New Qty

Directional Downlight w/ Battery


10 watts slim type, double face configuration, illuminated type

Unit
5

assy

10 watts slim type, single face configuration, illuminated type


1.03.02

assy

Electrical Devices
1 way 1 gang
1 way 2 gang
1 way 3 gang
Receptacle outlets
duplex receptacle outlet, 3 wire, 10A, 250V, grounding type
duplex receptacle outlet, 3 wire, 10A, 250V, grounding type weatherproof
duplex receptacle outlet, 3 wire, 10A, 250V, grounding type

industrial plug and socket power outlet; for air cooled condensing unit
(ACCU)
Switchbank
Switches

1.03.06

No

No

No

3
52

No
No

11

No

No

Philflex
Philflex
Philflex
Smart Tube
Smart Tube
Smart Tube
Crown
Smart Tube
Steel City
Steel City
Steel City
Local

Page 12 of 80

No
6

No

19

no

19
217

no
no

86,478
2,704
5,769
4,391

20,521
3,387
2,512
276
4,131
43
1
-

Material
osm

Amount
Labor

Material

175.00

osm
osm
osm
osm
osm
osm
osm

140.00
140.00
140.00

osm

140.00

osm
osm
osm
osm

16

industrial plug and socket power outlet; for air handling unit (AHU)

1.03.05

172

special purpose outlet, 3 wire, grounding type, 20A, 250V; for Elevator
pit
special purpose outlet, 3 wire, grounding type, 20A, 250V; for counter

1.03.04

No
No
No

No

ground fault circuit interrupted (GFCI); mounted at 150mm above


working counter
socket outlet; floor mounted
special purpose outlet, 3 wire, grounding type, 20A, 250V
special purpose outlet, 3 wire, grounding type, 20A, 250V; for hand dryer

Wires and Cables


2.0 mm(solid)
3.5 mm
5.5 mm
Pipes and Conduits
15mm diameter FMC
15mm diameter IMC Pipes
20mm diameter IMC Pipes
15mm diameter uPVC Pipes
20mm diameter uPVC Pipes
15mm EMT
Boxes
Utility Box
Junction Box
Square Box
Pull Box
Fittings

31
13
2
-

mounted at 150mm mounted at 150mm


duplex receptacle outlet, 3 wire, 10A, 250V, grounding type

1.03.03

assy

Unit Rate

osm
osm
osm

140.00
140.00
140.00

osm

140.00

osm

140.00

osm
osm

140.00

osm
osm
osm

140.00
2,500.00
140.00

m
m
m

19.54
23.23
35.55

3.50
4.20
6.30

1,273,747.20
53,201.28
190,203.20

m
m
m
m
m
lm

48.40
88.00
128.00
26.40
33.19
46.00

14.00
23.80
35.00
14.00
21.00
14.00

121,000.00
1,161,600.00
284,160.00
126,720.00
-

set
set
set
lot

72.99
130.57
108.41
11,000.00

35.00
35.00
35.00
3,850.00

18,976.10
248,083.00
5,420.25
11,000.00

Item

Material Description

Specs

Bushing 15mm dia. IMC


Locknut 15mm dia. IMC
Adapter uPVC 15mm dia.
15mm dia. FMC Straight Connector
15mm dia. EMT Connector
1.03.07
Consumables
1.03.08
Hanger and Support
15mm Conduit Hanger with complete accessories
20mm Conduit Hanger with complete accessories
25mm Conduit Hanger with complete accessories
15mm Climp Strut Clamp
20mm Climp Strut Clamp
25mm Climp Strut Clamp
C-Channel
1/4" Threaded Rod
1/2" Threaded Rod
1/4" Nuts and Washer
1/2" Nuts and Washer
1.03 General Lighting and Power System SUB- TOTAL

Smart Tube
Smart Tube
Smart Tube

Local
Local
Local
Local
Local
Local
Local
Local
Local
Local
Local

1.04 GROUNDING SYSTEM


Polyvinyl chloride (PVC) conduit
1.04.01
25mm diameter
Bare copper wire (BCW)
1.04.02
100mm
Ground rod including connecting accessories and required enclosure
1.04.04
Ground rod test station including connecting accessories and required enclosure
1.04.05
20mm x 600mm length
Grounding busbar including connecting accessories and insulation size as
1.04.06
required (located at LVSG room)
1.04 GROUNDING SYSTEM SUB-TOTAL
1.05 LIGHTNING PROTECTION SYSTEM
Polyvinyl chloride (PVC) conduit
1.05.01
25mm diameter
Bare
copper
wire (BCW)
1.05.02
100mm
Ground rod including connecting accessories and required enclosure
1.05.03
20mm x 600mm length
Ground rod test station including connecting accessories and required enclosure
1.05.04
20mm x 600mm length
Lightning protection early streamer emission arrester
1.05.05
size and rating as required 75 Meter Radi of Protection

Crown
Philflex

New Qty

Unit

8,900
8,900
261
8,783
1,140
1
10,261
1,694
13,681
2,258
1,368
226
1,739
903
6,956
87
87

Unit Rate
Material

Crown
Philflex

1.05 LIGHTNING PROTECTION SYSTEM SUB-TOTAL


2.0 COMMUNICATION SYSTEM
2.01 VOICE AND DATA SYSTEM and POS
2.01.01
Equipment & Devices

Page 13 of 80

Labor

Material

pcs
pcs
pcs
pcs
pcs
lot

11.00
5.00
5.50
11.98
26.18
55,000.00

3.50
3.50
3.50
3.50
5.00
19,250.00

48,620.00
44,200.00
1,100.00
58,697.10
55,000.00

set
set
set
set
set
set
m
m
m
m
m

11.00
16.50

3.50
3.50

72,600.00
18,315.00

11.00
16.50

3.50
3.50

96,800.00
24,420.00

330.00
33.00
33.00
2.20
2.20

42.00
21.00
21.00
2.10
2.10

290,400.00
4,884.00
66,000.00
1,302.40
17,600.00
4,294,049.53

39.97

28.00

3,996.67

542.26

28.00

54,226.00

9
3

No

No

30
30

Amount

350.00

350.00

350.00

58,222.67

39.97

28.00

1,199.00

542.26

28.00

16,267.80

No

350.00

No

350.00

No

10,500.00

1
1
-

17,466.80

Item

Material Description
Main Telephone Terminal Cabinet
Telephone Terminal Cabinet
Telephone Pullbox (commercial space)
Telephone outlet
2.01.02
Wires & Cables
Data Grade Cable, Cat. 6
25-Pairs Cat5e Multi-pair cable
14mm TW (ground)
Ground Rod
GR Test Station
2.01.03
Testing & Commissioning
2.01.04
Consumables
2.01.05
Conduits, Boxes, & Fittings
2-100mm IMC
4-50mm IMC
20mm EMT
25mm EMT
Pullbox
Utility box
2.01.06
Hangers & Supports
2.01.07
Conduit Accessories
2.01 VOICE AND DATA SYSTEM and POS SYSTEM SUB-TOTAL
2.03 BACKGROUND MUSIC AND PAGING SYSTEM
Equipment & Devices
DVD/Tuner/MP3 Station
Booster 240W, 230V
6W Ceiling Speaker
6W Wall Mounted
Accessories and Equipments for PG
Wires & Cables
1.25mm TF wire
Testing & Commissioning
Consumables
Conduits, Boxes, & Fittings
15mm EMT
Copper clad ground rod (16mmx3000mm)
Junction box
Hangers & Supports
Conduit Accessories

Specs

Unit
assy
assy
assy
assy

clipsal
clipsal
43
UL
UlL
Local

Unit Rate
Material
osm
osm
osm
osm

Amount
Labor
2,100.00
1,050.00
245.00
175.00

lm
lm
lm
assy
assy
lot
lot

27,500.00

9,625.00

lm
lm
lm
lm
set
set
lot
lot

1,300.00
372.00
69.00
96.00
550.00
72.99
44,000.00
11,000.00

346.50
99.40
21.00
28.00
245.00
35.00
15,400.00
3,850.00

30.00
195.00
88.53

Material

3.50
17.50
10.50
350.00
350.00

549,000.00
195,000.00
4,426.40
27,500.00

Smart Tube
Smart Tube
Smart Tube
Smart Tube
Local
Steel City
Local
Local
1
9
142
-

Local
Smart Tube
Steel City
Local
Local

2.03 BACKGROUND MUSIC AND PAGING SYSTEM SUB-TOTAL


3

New Qty

ELECTRONIC SAFETY AND SECURITY


3.01 FIRE DETECTION AND ALARM SYSTEM
Equipment & Devices
FACP PANEL
addressable photoelectric smoke detector
slave photoelectric smoke detector
master base photoelectric smoke detector

Page 14 of 80

1
5,400
1
1
2,043
1
280
1
1
1
53
82
27

assy
assy
assy
assy
lot

osm
osm
osm

350.00
175.00
175.00

osm

10,500.00

325,000.00
189,720.00
414,000.00
120,000.00
16,500.00
25,544.75
44,000.00
11,000.00
1,921,691.15

lm
lot
lot

15.84
44,000.00
11,000.00

3.50
15,400.00
3,850.00

71,280.00
44,000.00
11,000.00

lm
assy
set
lot
lot

46.00
osm
130.57
33,000.00
16,500.00

14.00
245.00
35.00
11,550.00
5,775.00

87,400.00
36,559.60
33,000.00
16,500.00
299,739.60

assy
assy
assy
assy

1,050.00
175.00
175.00
175.00

Item

Material Description
addressable rate-of-rise heat detector
slave rate-of-rise heat detector
master base rate-of-rise heat detector
addressable fixed type heat detector
slave fixed type heat detector
local combination box
monitor module for supervisory and flow switch
end of line resistor
1.25mm THHN
Testing & Commissioning
Consumables
Conduits, Boxes, & Fittings
50mm EMT
15mm EMT
15mm Flexible metallic conduit
15mm Straight connector
Pullbox
Junction box
Utility box
Copper clad ground rod (16mmx3000mm)
Hangers & Supports
Conduit Accessories
3.01 FIRE DETECTION AND ALARM SYSTEM SUB-TOTAL
3.02 CCTV SYSTEM Equipment & Devices
Digital Survaillance System System 16 Port
PC Workstation (keyboard, mouse, OS) with LCD Monitor
Network Attached Storage with 8tb
CCTV Camera dome type
Wires & Cables
4Pairs Cat6e cable
8.0mm TW
2.0mm THHN
3.5mm THHN
Testing & Commissioning
Consumables
Conduits, Boxes, Fittings & Accessories
15mm EMT
15mm Flexible Conduit
15mm Straight Connector
Junction box
Copper Ground Rod (20mmx3m)
Hangers & Supports
Conduit Accessories
3.02 CCTV SYSTEM SUB-TOTAL

Specs

Philflex
Local
Smart Tube
Smart Tube
Smart Tube
Smart Tube
Local
Steel City
Steel City
Local
Local

Unit

5
23
6
8
4
8
11
33
5,500
1
1
50
2,400
220
437
1
310
11
1
1
1
-

Local
Local

Material

16,500.00

lm
lm
lm
pcs
lot
set
set
assy
lot
lot

218.00
46.00
46.20
11.98
5,500.00
130.57
72.99
osm
33,000.00
11,000.00

assy
assy
assy
assy

osm
osm
osm
osm

lm
lm
lm
assy
assy
lot
lot

Smart Tube
Smart Tube
Smart Tube
Steel City

Unit Rate

assy
assy
assy
assy
assy
assy
assy
assy
lm
lot
lot

lm
lm
lm
lm
lot
lot

Local

12.00

Local
Local
Page 15 of 80

1
1

lot
lot

Amount
Labor
175.00
175.00
175.00
175.00
175.00
245.00
245.00
35.00
4.20
42,000.00
5,775.00
59.50
14.00
21.00
4.20
175.00
35.00
35.00
245.00
11,550.00
3,850.00

Material
66,000.00
16,500.00
10,900.00
110,400.00
10,164.00
5,234.82
5,500.00
40,476.70
802.84
33,000.00
11,000.00
309,978.36

1,750.00
350.00
350.00
245.00
29.18
55.62
15.84
23.23

62,300.00
2,780.80
3,484.80

osm
osm

3.50
8.40
8.40
4.20
21,000.00
3,500.00

46.00
48.40
11.98
130.57
osm
33,000.00
11,000.00

14.00
21.00
4.20
35.00
245.00
11,550.00
3,850.00

24,012.00
10,357.60
1,677.06
6,528.50

GENERAL REQUIREMENTS

Mobilization/Demobilization
Safety Requirements (Safety Shoes, Helmet, Uniform)

New Qty

75,000
75,000

33,000.00
11,000.00
155,140.76

75,000.00
75,000.00

Item

Material Description

Specs

Temporary Facilities
Tools, Equipment, Scaffolding, etc.,
Transportation/Delivery
Shelter/Barracks
Surety Bond
Performance Bond

Local
Local
Local
Local
Local
Local

SUB - TOTAL GEN. REQUIREMENTS

New Qty

Unit

1
1
1
1
1
1

lot
lot
lot
lot
lot
lot

Unit Rate
Material

75,000
50,000
273,000
140,000
61,000
65,000

Amount
Labor

Material

75,000.00
50,000.00
273,000.00
140,000.00
61,000.00
65,000.00
814,000.00

TOTAL ELECTRICAL WORKS

17,043,941.16

General Requirements
Materials
Labor
Markup & Profit
Taxes

GRAND TOTAL BASED ON BID TO FOR CON REVISIONS


ORIGINAL CONTRACT
NET AMOUNT DEDUCTIVE

Page 16 of 80

5. incoming mains pedestal to TX done by FODC


6. change of IMC to PVC for lighting and power
7.Deletion of voice and data AND pos

Amount

Amount

Total Amount

Labor

Material

Total Amount

Labor

18,900.00
1,120.00
1,120.00

61,816.50
6,505.60
2,017.60

5,880.00
1,120.00
1,120.00

19,231.80
6,505.60
2,017.60

13,351.80
5,385.60
897.60

5,880.00
1,120.00
1,120.00

19,231.80
6,505.60
2,017.60

6,510.00
861.00

196,378.80
14,412.65

165,369.60
11,899.01

5,670.00
756.00

171,039.60
12,655.01

57,400.00
1,225.00

273,600.00
6,725.00

170,798.00
4,400.00

45,346.00
980.00

216,144.00
5,380.00

31,500.00
4,200.00
14,000.00
10,500.00

950,220.00
70,305.60
14,000.00
10,500.00

727,320.00
52,223.42

24,937.50
3,318.00
14,000.00
10,500.00

752,257.50
55,541.42
14,000.00
10,500.00

7,000.00

7,000.00

7,000.00

7,000.00

3,500.00
3,500.00
17,500.00
186,956.00

3,500.00
3,500.00
61,500.00
1,709,736.75

44,000.00
1,195,645.03

3,500.00
3,500.00
17,500.00
145,127.50

3,500.00
3,500.00
61,500.00
1,340,772.53

73,899.00
58,100.00
51,688.00
22,050.00
69,877.50
83,230.00

349,299.00
263,193.00
245,128.00
104,650.00
331,237.50
396,720.00

30,624.00
147,060.00
591,310.30
81,244.80
159,300.00
38,556.00
230,253.00

8,282.40
39,461.10
167,510.00
21,708.96
42,525.00
10,308.38
61,131.00

38,906.40
186,521.10
758,820.30
102,953.76
201,825.00
48,864.38
291,384.00

Page 17 of 80

Amount

Amount

Total Amount

Labor

Material

Total Amount

Labor

33,272.40
30,975.00
37,520.00
6,615.00
37,730.00
14,700.00
13,013.00
49,350.00

253,567.38
292,132.60
580,423.68
110,731.32
664,103.44
347,340.00
353,284.36
1,488,678.00

174,244.93
128,454.13
546,752.62
70,799.10
620,928.00
259,843.58
964,656.00

26,317.20
15,235.50
37,786.00
4,498.20
27,440.00
9,937.20
33,075.00

200,562.13
143,689.63
584,538.62
75,297.30
648,368.00
269,780.78
997,731.00

4,200.00
33,988.50

128,625.00
1,904,663.25

232,050.00
1,583,925.00

3,822.00
20,591.03

235,872.00
1,604,516.03

3,500.00
1,050.00
1,050.00
1,050.00
1,050.00
1,050.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
1,050.00
1,050.00
1,050.00

3,500.00
1,050.00
1,050.00
1,050.00
1,050.00
1,050.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
1,050.00
1,050.00
1,050.00

3,500.00
1,050.00
1,050.00
1,050.00
1,050.00
1,050.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
486.96
486.96
486.96
486.96
913.04
913.04
913.04

3,500.00
1,050.00
1,050.00
1,050.00
1,050.00
1,050.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
560.00
486.96
486.96
486.96
486.96
913.04
913.04
913.04

2,450.00
2,450.00
3,500.00
1,400.00

2,450.00
2,450.00
3,500.00
1,400.00

2,100.00
2,100.00
3,150.00
1,050.00

2,100.00
2,100.00
3,150.00
1,050.00

700.00

700.00

700.00

700.00

Page 18 of 80

Amount

Amount

Total Amount

Labor

Material

Total Amount

Labor

3,500.00

3,500.00

3,500.00

3,500.00

3,500.00

3,500.00

3,500.00

3,500.00

14,000.00

14,000.00

14,000.00

14,000.00

700.00

700.00

700.00

700.00

31,500.00

130,500.00

97,350.00

30,975.00

128,325.00

2,677.50
2,324.00
2,912.00
980.00
2,286.90
2,842.00
42,000.00

23,715.00
16,019.00
16,258.67
5,086.67
11,271.15
13,475.33
152,000.00

11,233.75
39,484.50
5,605.60
7,920.00
1,325.36
7,810.00
95,645.00

1,429.75
6,700.40
1,223.04
1,890.00
337.37
2,087.40
36,519.00

12,663.50
46,184.90
6,828.64
9,810.00
1,662.73
9,897.40
132,164.00

11,550.00
5,775.00
19,250.00
7,700.00
1,925.00
5,775.00
3,850.00

61,550.00
22,275.00
74,250.00
29,700.00
7,425.00
22,275.00
14,850.00

40,885.00
13,492.05
44,973.50
17,989.40
4,497.35
13,492.05
8,994.70

9,444.44
4,722.22
15,740.73
6,296.29
1,574.07
4,722.22
3,148.15

50,329.44
18,214.27
60,714.23
24,285.69
6,071.42
18,214.27
12,142.85

816,615.80

8,467,487.34

6,270,699.72

707,395.97

6,978,095.70

29,400.00
16,170.00
6,510.00
3,360.00
51,450.00
16,800.00
2,100.00
1,050.00
215,425.00

29,400.00
16,170.00
6,510.00
3,360.00
51,450.00
16,800.00
2,100.00
1,050.00
215,425.00

29,190.00
11,760.00
88,200.00
630.00
28,560.00
7,980.00
23,520.00
11,340.00
262,325.00

29,190.00
11,760.00
88,200.00
630.00
28,560.00
7,980.00
23,520.00
11,340.00
262,325.00

41,125.00
46,025.00

41,125.00
46,025.00

20,475.00
46,900.00

20,475.00
46,900.00

5,425.00
2,450.00

5,425.00
2,450.00

4,200.00
1,050.00
78,400.00

4,200.00
1,050.00
78,400.00

Page 19 of 80

Amount

Amount

Total Amount

Labor

Material

Total Amount

Labor
875.00

875.00

5,040.00
2,100.00
280.00

5,040.00
2,100.00
280.00

4,340.00
1,820.00
280.00

4,340.00
1,820.00
280.00

24,360.00

24,360.00

24,080.00

24,080.00

1,400.00
420.00
2,940.00

1,400.00
420.00
2,940.00

2,240.00
420.00
7,280.00

2,240.00
420.00
7,280.00

1,400.00

1,400.00

1,540.00

1,540.00

420.00

420.00

420.00

420.00

560.00

560.00

840.00

840.00

2,800.00
-

2,800.00
-

2,660.00
47,500.00
30,380.00

2,660.00
47,500.00
30,380.00

228,200.00
9,618.00
33,705.00

1,501,947.20
62,819.28
223,908.20

1,689,434.21
62,819.33
205,099.49

302,673.00
11,356.80
36,344.70

1,992,107.21
74,176.13
241,444.19

35,000.00
314,160.00
77,700.00
67,200.00
-

156,000.00
1,475,760.00
361,860.00
193,920.00
-

212,524.40

61,474.00

541,754.40
112,414.53
115,552.00

287,294.00
71,127.00
35,168.00

273,998.40
829,048.40
183,541.53
150,720.00

9,100.00
66,500.00
1,750.00
3,850.00

28,076.10
314,583.00
7,170.25
14,850.00

20,143.86
539,384.67
4,661.42
11,000.00

9,660.00
144,585.00
1,505.00
3,850.00

29,803.86
683,969.67
6,166.42
14,850.00

Page 20 of 80

Amount

Amount

Total Amount

Labor

Material

Total Amount

Labor

15,470.00
30,940.00
700.00
17,150.00
19,250.00

64,090.00
75,140.00
1,800.00
75,847.10
74,250.00

97,900.00
44,500.00
1,435.50
105,211.56
29,841.69
56,760.00

31,150.00
31,150.00
913.50
30,740.50
5,700.00
19,866.00

129,050.00
75,650.00
2,349.00
135,952.06
35,541.69
76,626.00

23,100.00
3,885.00

95,700.00
22,200.00

112,865.50
27,942.75

35,911.75
5,927.25

148,777.25
33,870.00

30,800.00
5,180.00

127,600.00
29,600.00

150,487.33
37,257.00

47,882.33
7,903.00

198,369.67
45,160.00

36,960.00
3,108.00
42,000.00
1,243.20
16,800.00
1,572,379.20

327,360.00
7,992.00
108,000.00
2,545.60
34,400.00
5,866,428.73

451,462.00
7,451.40
57,387.00
1,987.04
15,303.20
4,712,580.27

57,458.80
4,741.80
36,519.00
1,896.72
14,607.60
2,036,610.75

508,920.80
12,193.20
93,906.00
3,883.76
29,910.80
6,749,191.02

2,800.00

6,796.67

3,477.10

2,436.00

5,913.10

2,800.00

57,026.00

47,176.62

2,436.00

49,612.62

3,150.00

3,150.00

3,150.00

3,150.00

1,050.00

1,050.00

1,050.00

1,050.00

1,050.00
10,850.00

1,050.00
69,072.67

50,653.72

1,050.00
10,122.00

1,050.00
60,775.72

840.00

2,039.00

1,199.00

840.00

2,039.00

840.00

17,107.80

16,267.80

840.00

17,107.80

1,050.00

1,050.00

1,050.00

1,050.00

350.00

350.00

350.00

350.00

10,500.00
13,580.00

10,500.00
31,046.80

10,500.00
13,580.00

10,500.00
31,046.80

17,466.80

Page 21 of 80

Amount

Total Amount

Labor

Amount
Material

Total Amount

Labor

2,100.00
3,150.00
6,370.00
17,150.00

2,100.00
3,150.00
6,370.00
17,150.00

64,050.00
17,500.00
525.00
350.00
350.00
9,625.00

613,050.00
212,500.00
4,951.40
350.00
350.00
37,125.00

3,849.04
-

456.52
-

4,305.57
-

86,625.00
50,694.00
126,000.00
35,000.00
7,350.00
12,250.00
15,400.00
3,850.00
458,339.00

411,625.00
240,414.00
540,000.00
155,000.00
23,850.00
37,794.75
59,400.00
14,850.00
2,380,030.15

3,849.04

456.52

4,305.57

350.00
2,275.00
21,525.00

350.00
2,275.00
21,525.00

350.00
1,575.00
24,850.00

350.00
1,575.00
24,850.00

10,500.00

10,500.00

10,500.00

10,500.00

15,750.00
15,400.00
3,850.00

87,030.00
59,400.00
14,850.00

85,536.00
44,000.00
11,000.00

18,900.00
15,400.00
3,850.00

104,436.00
59,400.00
14,850.00

26,600.00
245.00
9,800.00
11,550.00
5,775.00

114,000.00
245.00
46,359.60
44,550.00
22,275.00

93,978.00
36,559.60
33,000.00
16,500.00

28,602.00
245.00
9,800.00
11,550.00
5,775.00

122,580.00
245.00
46,359.60
44,550.00
22,275.00

123,620.00

423,359.60

320,573.60

131,397.00

451,970.60

1,050.00
9,275.00
14,350.00
4,725.00

1,050.00
9,275.00
14,350.00
4,725.00

1,050.00
9,275.00
14,350.00
4,725.00

1,050.00
9,275.00
14,350.00
4,725.00

Page 22 of 80

Amount

Amount

Total Amount

Labor

Material

875.00
4,025.00
1,050.00
1,400.00
700.00
1,960.00
2,695.00
1,155.00
23,100.00
42,000.00
5,775.00

875.00
4,025.00
1,050.00
1,400.00
700.00
1,960.00
2,695.00
1,155.00
89,100.00
42,000.00
22,275.00

2,975.00
33,600.00
4,620.00
1,835.40
175.00
10,850.00
385.00
245.00
11,550.00
3,850.00
184,220.40

13,875.00
144,000.00
14,784.00
7,070.22
5,675.00
51,326.70
1,187.84
245.00
44,550.00
14,850.00
494,198.76

1,750.00
350.00
350.00
7,840.00

1,750.00
350.00
350.00
7,840.00

7,472.50
420.00
630.00
21,000.00
3,500.00

69,772.50
3,200.80
4,114.80
21,000.00
3,500.00

7,308.00
4,494.00
588.00
1,750.00
245.00
11,550.00
3,850.00
73,097.50

31,320.00
14,851.60
2,265.06
8,278.50
245.00
44,550.00
14,850.00
228,238.26

75,000.00
75,000.00

Total Amount

Labor

66,000.00
16,500.00
10,900.00
110,400.00
10,164.00
5,234.82
5,500.00
40,476.70
802.84
33,000.00
11,000.00
309,978.36

875.00
4,025.00
1,050.00
1,400.00
700.00
1,960.00
2,695.00
1,155.00
23,100.00
42,000.00
5,775.00

875.00
4,025.00
1,050.00
1,400.00
700.00
1,960.00
2,695.00
1,155.00
89,100.00
42,000.00
22,275.00

2,975.00
33,600.00
4,620.00
1,835.40
175.00
10,850.00
385.00
245.00
11,550.00
3,850.00
184,220.40

13,875.00
144,000.00
14,784.00
7,070.22
5,675.00
51,326.70
1,187.84
245.00
44,550.00
14,850.00
494,198.76

75,000.00
75,000.00

Page 23 of 80

75,000.00
75,000.00

Amount

Total Amount

Labor

3,439,657.90

Amount
Material

Labor

75,000.00
50,000.00
273,000.00
140,000.00
61,000.00
65,000.00
814,000.00

75,000.00
50,000.00
273,000.00
140,000.00
61,000.00
65,000.00
814,000.00

20,483,599.06

13,695,446.55

17,043,941.16
3,439,657.90
1,660,754.92
855,646.03

Total Amount
75,000.00
50,000.00
273,000.00
140,000.00
61,000.00
65,000.00
814,000.00

3,228,910.15

16,924,356.70

13,695,446.55
3,228,910.15
1,372,181.16
753,399.98

23,000,000.00

19,049,937.83
23,000,000.00
(3,950,062.17)

Page 24 of 80

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. MCC WYE-DELTA
Contracor: Power Trunking Systems Inc.
MCC Y-

LOCATION

ITEM
LVSG TO MCC
CHILLER
COWP
C.TOWER
CHWP
AHU

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY
1
2
3
2
2
4

unit
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT

PSI unit rate


479,033.53
394,707.28
52,716.42
5,217.81
139,058.98
223,150.46

AMOUNT
479,033.53
394,707.28
52,716.42
5,217.81
139,058.98
223,150.46

1,293,884.48

Noted By:
Carlo A. Perez
Project Manager

BILLBOARD

LOCATION

ITEM
15mm dia imc pipe
15mm dia imc coupling
15mm dia imc locknut
15mm dia imc Bushing
jbox
2.0 sq.mm. thhn wire
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY
580
193
80
80
56
1740
1

PSI unit rate


119.07
11.00
8.60
15.80
190.57
29.54
6,760.36

AMOUNT
69,060.60
2,123.00
688.00
1,264.00
10,671.92
51,399.60
6,760.36
141,967.48
10,647.56
7,098.37
159,713.41

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 75
Contracor: Power Trunking Systems Inc.
COLUMN LIGHTING AT ENTRANCE

LOCATION

ITEM
15mm dia. emt pipe
15mm dia. emt coupling
junction box
2.0 sq.mm. thhn wire
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

unit
30
10
5
90

lm
pcs
pcs
lm

ok

PSI unit rate


60.00
33.59
165.57
23.04

AMOUNT
1,800.00
335.90
827.85
2,073.60
5,037.35
377.80
251.87
5,667.02

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 78
Contracor: Power Trunking Systems Inc.
ATM

LOCATION

ITEM
20mm dia. Imc pipe
25mm dia. Upvc pipe
20mm dia. Imc coupling
25mm dia. Upvc adapter
20mm dia. Imc locknut
20mm dia. Imc bushing
junction box
square box
pullbox 6"x6"
3.5 sq.mm. thhn wire
5.5 sq.mm. thhn wire
SPO
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

UNIT
320
400
107
15
30
30
12
4
2
320
960
3
1

lm
lm
pcs
pcs
pcs
pcs
pcs
pcs
set
lm
lm
set
lot

PSI unit rate


163.00
67.97
14.60
17.68
11.00
21.80
165.57
143.41
2,700.00
27.43
41.85
140.00
6,974.43

AMOUNT
52,160.00
27,188.00
1,557.33
265.20
330.00
654.00
1,986.84
573.64
5,400.00
8,777.60
40,176.00
420.00
6,974.43
146,463.04
10,984.73
7,323.15
164,770.92

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 79
Contracor: Power Trunking Systems Inc.
STP

LOCATION

ITEM
32mm dia imc pipe
32mm dia imc coupling
32mm dia imc locknut
32mm dia imc Bushing
Pullbox 8"x8"
14 sq.mm. thhn wire
38 sq.mm. thhn wire
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

unit
62
25
12
12
2
62
186
1

lm
pcs
pcs
pcs
set
lm
lm
lot

PSI unit rate


317.10
23.00
34.00
58.00
3,250.00
99.03
222.58
3,768.95

AMOUNT
19,660.20
575.00
408.00
696.00
6,500.00
6,139.86
41,399.88
3,768.95
79,147.89
5,936.09
3,957.39
89,041.37

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 80
Contracor: Power Trunking Systems Inc.
DPCE

LOCATION

ITEM
80mm dia. Imc pipe
80mm dia. Imc locknut AND BUSHI
30 sq.mm. thhn wire
200sq.mm. thhn wire
pullbox 6"X6"
ECB, 60AT,3P, 460V
panelboard dpce
hangers and support
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

unit
51
18
51
153
3
1
1
1
1

lm
pcs
lm
lm
set
set
set
lot
lot

ok

PSI unit rate


912.50
200.00
216.58
1235.26
2,700.00
800.00
2,500.00
15,000.00
13,078.89

AMOUNT
46,537.50
3,600.00
11,045.58
188,994.78
8,100.00
800.00
2,500.00
15,000.00
13,078.89
289,656.75
21,724.26
14,482.84
325,863.85

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 81
Contracor: Power Trunking Systems Inc.
pos

LOCATION

ITEM
15mm dia. emt pipe
15mm dia. emt coupling
15mm dia. Emt connector
junction box
2.0 sq.mm. thhn wire
Hangers and Support
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

unit
75
24
30
28
240
1
1

lm
pcs
pcs
pcs
lm
lot
lot

PSI unit rate


60.00
33.59
35.13
165.57
23.04
6,138.91
4,604.18

AMOUNT
4,500.00
806.16
1,053.81
4,635.96
5,529.60
6,138.91
4,604.18
27,268.62
2,045.15
1,363.43
30,677.20

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 82
Contracor: Power Trunking Systems Inc.
escalator lighting

LOCATION

ITEM
15mm dia. emt pipe
15mm dia. emt coupling
15mm dia. Emt connector
junction box
2.0 sq.mm. thhn wire
15mm dia FMC
15mm dia straight con.
T-5 flourecent light
Hangers and Support
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

unit
51
17
11
4
155
31
6
10
1
1

lm
pcs
pcs
pcs
lm
lm
pcs
set
lot
lot

PSI unit rate


60.00
33.59
33.59
165.57
23.04
80.00
15.48
350.00
2,040.32
1,530.24

AMOUNT
3,060.00
571.03
369.49
662.28
3,571.20
2,480.00
92.88
3,500.00
2,040.32
1,530.24
17,877.44
1,340.81
893.87
20,112.12

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 85
Contracor: Power Trunking Systems Inc.
JEWELRY

LOCATION

ITEM
15mm dia. emt pipe
15mm dia. emt coupling
15mm dia. Emt connector
junction box
2.0 sq.mm. thhn wire
Hangers and Support
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

unit
50
17
8
6
150
1
1

lm
pcs
pcs
pcs
lm
lot
lot

ok

PSI unit rate


60.00
33.59
39.03
165.57
23.04
3,644.73
1,733.55

AMOUNT
3,000.00
571.03
312.24
993.42
3,456.00
3,644.73
1,733.55
13,710.97
1,028.32
685.55
15,424.84

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 86
Contracor: Power Trunking Systems Inc.
SLIDING DOOR

LOCATION

ITEM
15mm dia. emt pipe
15mm dia. emt coupling
junction box
2.0 sq.mm. thhn wire
Hangers and Support
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

unit
25
13
2
75
1

lm
pcs
pcs
lm
lot

ok

PSI unit rate


60.00
31.18
165.57
23.04
1,040.32

AMOUNT
1,500.00
405.34
331.14
1,728.00
1,040.32
5,004.80
375.36
250.24
5,630.40

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 91
Contracor: Power Trunking Systems Inc.
COLUMN CLADDING

LOCATION

ITEM
junction box
2.0 sq.mm. thhn wire
15mm dia FMC
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY
30
30
86
1

unit

PSI unit rate

pcs
lm
lm
lot

165.57
23.04
80.00
1,316.34

AMOUNT
4,967.10
691.20
6,880.00
1,316.34
13,854.64
1,039.10
692.73
15,586.47

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 129
Contracor: Power Trunking Systems Inc.
UG REV RCP

LOCATION

ITEM
15mm dia. emt pipe
15mm dia. emt coupling
15mm dia. Emt connector
junction box
2.0 sq.mm. thhn wire
Hangers and Support
consumables
subtotal
markup and profit
vat
total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY
780
260
150
260
2496
1
1

ok

unit

UNIT PRICE

lm
pcs
pcs
pcs
lm
lot
lot

60.00
30.23
35.13
165.57
23.04
50,000.00
10,524.26

AMOUNT
46,800.00
7,860.06
5,269.05
43,048.20
57,507.84
50,000.00
10,524.26
221,009.41
16,575.71
11,050.47
248,635.58

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 143
Contracor: Power Trunking Systems Inc.
PACP

LOCATION

ITEM
32mm dia imc pipe
32mm dia imc coupling
32mm dia imc L&B
Pullbox 8"x8"
1.6sq.mm. thhn wire
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY
9
10
12
2
1624

unit

PSI unit rate

lm
pcs
pcs
set
lm

317.10
23.00
92.00
2,250.00
20.00

AMOUNT
2,853.90
230.00
1,104.00
4,500.00
32,480.00
41,167.90
3,087.59
2,058.40
46,313.89

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 187
Contracor: Power Trunking Systems Inc.
additional pinlights at cashiers

LOCATION

ITEM
junction box
2.0 sq.mm. thhn wire
15mm dia FMC
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY
16
40
20
1

unit

PSI unit rate

pcs
lm
lm
lot

165.57
23.04
80.00
1,316.34

AMOUNT
2,649.12
921.60
1,600.00
1,316.34
6,487.06
486.53
324.35
7,297.94

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 200
Contracor: Power Trunking Systems Inc.
FTP

LOCATION

ITEM
20mm dia. Imc pipe
20mm dia. Imc locknut
20mm dia. Imc bushing
3.5 sq.mm. thhn wire
5.5 sq.mm. thhn wire
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

UNIT
13
7
7
13
39

lm
pcs
pcs
lm
lm

PSI unit rate


163.00
11.00
21.80
27.43
41.85

AMOUNT
2,119.00
77.00
152.60
356.59
1,632.15
4,337.34
325.30
216.87
4,879.51

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 203
Contracor: Power Trunking Systems Inc.
MEAT GRINDER

LOCATION

ITEM
20mm dia. Imc pipe
20mm dia. Imc locknut
20mm dia. Imc bushing
3.5 sq.mm. thhn wire
5.5 sq.mm. thhn wire
NFDS
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

UNIT
56
12
12
56
168
2
1

lm
pcs
pcs
lm
lm
unit
lot

PSI unit rate


163.00
11.00
21.80
27.43
41.85
450.00
2,616.28

AMOUNT
9,128.00
132.00
261.60
1,536.08
7,030.80
900.00
2,616.28
21,604.76
1,620.36
1,080.24
24,305.36

Noted By:
Carlo A. Perez
Project Manager

Project: Metro Gaisano Cavite


Location: E. Aguinaldo Hi-Way Corner Daanghari, Imus Cavite
Subject: Summary of Variation Order (Electrical)

pmi #
29

DESCRIPTION

43
64
65
71
75
78
79
80

REVISED THIRD FLOOR AND MCC


REVISED WALL AND FLOOR OUTLET 2ND AND 3RD
FLOOR
FIRE RATED ROLL UP DOOR
REVISED CCTV LAYOUT UPPER GROUND FLOOR
BILLBOARD LIGHTING
ADDITIONAL TRACKLIGHTS
LIGHTINGS AT COLUMN AT GR 14'/R AND 15'/R
RELOCATION OF ATM POWER PROVISION
STP LAYOUT
DPCE

81

EXTENSION OF POWER LAYOUT FOR POS AT 2F AND 3F

42

82
85
86
91
102
106
129
143
149
164
166
169
187
199
200
201
202
203
213
214
215

1
2
3
4
5

ADDITIONAL LIGHTING LAYOUT FOR WALKALATOR AND


ESCALATOR AT LGF TO 3F
JEWELRY LIGHTING LAYOUT
SLIDING DOOR
EXTENSION OF POWER LAYOUT ON COLUMN CLADDING
AT UPPER GROUND FLOOR 2F AND 3F
COLD ROOM POWER PROVISION
DUCT BANK
LIGTHING LAYOUT AT UGF BASED ON REV RCP
PACP
WALKALATOR TRANSFORMER
RELOCATION OF TAPPING POINT OF SUMP PUMP
REVISED TAPPING POINT OF EF-1 AND EF-2
ADDITIONAL LAYOUT FOR REFRIGIRATION COOLING
TOWER
provision of two 200mm dia pinlight at cashiers
power supply for exhaust fan at transformer vault room
relocation of fuel transfer pump control system
transfer of booster pump tapping point
required power supply for MVSG battery bank
required power supply for two meat grinder
additional power provision for eye wear tenant
additional roughing-ins and wiring for ahu
installation of additional controls for exhaust fan
other claims
switch bank (material only)
purchase of PATB and FATB
BID TO FCD REVISIONS
Revised CCTV Layout
FCU deduction

PSI SUBMISSION
2,336,665.07
800,000.00
380,053.84
2,213,987.41
347,457.71
152,548.24
35,096.00
197,789.52
262,950.89
546,939.78
33,692.91
20,684.96
29,527.25
29,046.91
45,943.95
206,708.00
406,000.00
159,032.00
240,338.23
63,446.10
65,970.00
218,132.00
10,681.00
17,065.00
5,000.00
16,339.04
8,000.00
56,000.00
32,693.00
176,933.00
30,000.00

95,000.00
33,000.00

TOTAL

9,272,721.81

less:

variance

Evaluated by:

Paolo Alvarez
Electrical Supervisor

RECONCILED AMOUNT

REMARKS

1,293,884.48
800,000.00 WITH SEPARATE P.O.
380,053.84 w/ dls
159,713.41
66,276.23 w/ dls
5,667.02
164,770.92 w/ dls
89,041.37
325,863.85
30,677.20
20,684.96
15,424.84
5,630.40
15,586.47
48,991.86
WORK DONE BY FODC
248,635.58
65,493.30 w/ dls
154,782.61
63,446.10 charge to mechanical
58,395.21 w/ dls
76,022.26 deductive of psi is included on bid to for con
7,297.94
912.88
4,879.51
16,339.04
8,000.00
24,305.36
23,153.05
47,783.74
19,465.70

w/ dls
w/ dls
included to bid to fcd
w/ dls
w/ dls

95,000.00 with separate p.o.


33,000.00 with separate p.o.
(3,950,062.17)
550,945.01
(31,810.11)

938,251.87
95,000.00 PO # 3122
800,000.00 PO # 3115
43,251.87 for PO issuance

Checked by:

Jes Alagon
Project Control Head

Conforme:

Vic Serrano
Powertrunking Systems, Inc.

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 102
Contracor: Power Trunking Systems Inc.
COLD ROOM

LOCATION

ITEM
15mm dia. Imc pipe
20mm dia. emt pipe
15mm dia. Imc coupling
20mm dia. Emt coupling
15mm dia. Imc locknut
15mm dia. Imc bushing
pullbox 6"X6"
2.0 sq.mm. thhn wire
3.5 sq.mm. thhn wire
5.5 sq.mm. thhn wire
hangers and support
CO
NFDS
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY
62
28
21
10
11
11
3
186
28
84
1
16
3
1

ok

UNIT

PSI unit rate

lm
lm
pcs
pcs
pcs
pcs
set
lm
lm
lm
lot
PCS
PCS
lot

111.80
90.00
11.00
8.60
8.60
15.80
2,875.00
23.04
27.43
41.85
7,444.25
140.00
350.00
5,583.19

AMOUNT
6,931.60
2,520.00
231.00
86.00
94.60
173.80
8,625.00
4,285.44
768.04
3,515.40
7,444.25
2,240.00
1,050.00
5,583.19
43,548.32
3,266.12
2,177.42
48,991.86

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 213
Contracor: Power Trunking Systems Inc.
eye wear tenant

LOCATION

ITEM
15mm dia. IMC pipe
15mm dia. IMC coupling
15mm dia. IMC Locknut
15mm dia. IMC bushing
junction box
2.0 sq.mm. thhn wire
Hangers and Support
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY
80
27
13
13
6
240
1
1

unit

PSI unit rate

lm
pcs
pcs
pcs
pcs
lm
lot
lot

116.05
10.72
8.38
15.40
185.74
23.90
2,318.47
1,530.24

AMOUNT
9,284.27
289.44
108.97
200.14
1,114.45
5,736.27
2,318.47
1,530.24
20,582.25
1,543.67
1,029.11
23,155.03

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 214
Contracor: Power Trunking Systems Inc.
AHU

LOCATION

ITEM
200x100 wire gutter
22 sq.mm. thhn wire
8.0 sq.mm. thhn wire
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

unit
5
73
146
1

lgt
lm
lm
lot

PSI unit rate


4,015.80
151.04
64.02
-

AMOUNT
20,079.00
11,025.92
9,346.92
40,451.84
3,033.89
2,022.59
45,508.32

Noted By:
Carlo A. Perez
Project Manager

FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.


Metro Gaisano Cavite
PMI no. 215
Contracor: Power Trunking Systems Inc.
CONTROL PANEL FOR EF

LOCATION

ITEM
20mm dia. Imc pipe
20mm dia. Imc locknut
20mm dia. Imc bushing
3.5 sq.mm. thhn wire
5.5 sq.mm. thhn wire
consumables
subtotal
markup and profit
vat

Additional to PSI

total amount

Evaluated by:

Checked By:

P.T. Alvarez
FODC-EE

J.A. Alagon
FODC-Control Head

Date Agreed:
Contractor:
FODC:

QTY

UNIT
50
18
18
52
108
1

lm
pcs
pcs
lm
lm
lot

PSI unit rate


163.00
11.00
21.80
27.43
41.85
2,616.28

AMOUNT
8,150.00
198.00
392.40
1,426.36
4,519.80
2,616.28
17,302.84
1,297.71
865.14
19,465.70

Noted By:
Carlo A. Perez
Project Manager

FCU TO ACCU

LOCATION

ITEM
20mm dia uPVC pipe
20 mm dia uPVC locknut and bushing
utility box
2.0 sq.mm. thhn wire
consumables
subtotal
markup and profit
vat

DEDUCTIVE TO PSI

RENATO S. SIERRA
PSI- EE

total amount

PAOLO T. ALVAREZ
FODC-EE

QTY

UNIT
169
38
19
507
1

lm
pcs
pcs
lm
lot

PSI unit rate


53.8
10.64
122.99
29.54
5000

AMOUNT
9,092.20
404.32
2,336.81
14,976.78
5,000.00
31,810.11
2,385.76
1,590.51
35,786.37

JESSIE A. ALAGON
CONTROL HEAD

cctv new plan

LOCATION

Additional to PSI

RENATO S. SIERRA
PSI- EE

ITEM
Equipment & Devices
Digital Survaillance System System 16 Port
PC Workstation (keyboard, mouse, OS) with LCD Monitor
Network Attached Storage with 8tb
CCTV Camera dome type
Wires & Cables
4Pairs Cat6e cable
8.0mm TW
2.0mm THHN
3.5mm THHN
Testing & Commissioning
Consumables
Conduits, Boxes, Fittings & Accessories
15mm EMT
15mm Flexible Conduit
15mm Straight Connector
Junction box
Copper Ground Rod (20mmx3m)

hangers and support


consumables
subtotal
markup and profit
vat
total amount

QTY

unit
1
1
1
62
5185
3250
1
1
1795
214
140
90
1
1
1

assy
assy
assy
assy
lm
lm
lm
lm
lot
lot
lm
lm
lm
assy
assy
lot
lot

PAOLO T. ALVAREZ
FODC-EE

PSI unit rate


1,750.00
350.00
350.00
245.00
32.68
24.24
21,000.00
3,500.00
60.00
69.40
16.18
165.57
245.00
44,550.00
14,850.00

AMOUNT
1,750.00
350.00
350.00
15,190.00
169,445.80
78,780.00
21,000.00
3,500.00
107,700.00
14,851.60
2,265.20
14,901.30
245.00
44,550.00
14,850.00
489,728.90
36,729.67
24,486.45
550,945.01

OLD PLAN
TOTAL

550,945.01

JESSIE A. ALAGON
CONTROL HEAD

fcu issue
pmi 215
pmi 203
35,786.37
19,465.70
24,305.36
43,084.32

43,771.05

pmi 200
pmi 187
pmi 91
pmi 86
pmi 85
pmi 81
pmi 75
4,879.51
7,297.94
15,586.47
5,630.40
15,424.84
30,677.20
5,667.02