You are on page 1of 12

STAGE: 04

DESIGNING PHASE

1. FUNCTIONS OF SYSTEM
a. Use – Case Diagrams

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 21
Sohil Vohra (Subject Co-ordinator - SAD)
Shri K.J. Polytechnic, Bharuch Page 22
2. DATA MODELING
a. Class Diagrams

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 23
b. E-R Diagrams

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 24
c. System Activity

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 25
d. Data Dictionary

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 26
3. FUNCTIONAL / BEHAVIORAL MODELING
a. Context Diagram

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 27
b. Data Flow Diagram (0 and 1 level)

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 28
c. Control Flow Diagram

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 29
4. MAIN MODULES OF NEW SYSTEM

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 30
5. SELECTION OF HARDWARE AND SOFTWARE JUSTIFICATION
a. Hardware Specifications :
1. Minimum RAM requirements (Required / Recommended) :

2. Minimum Hard Disk Requirements (Required / Recommended):

3. Specification of CPU(Required / Recommended) :

4. Display Monitor (Required / Recommended) :

b. Software Specifications :
1. Operating System (Required / Recommended) :

2. Any other requirements (Required / Recommended) :

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 31
6. Assignments :

a. What is meant by the scope of the system?


b. Why is documentation important for the information system
cycle?
c. What is the difference between System Analysis and System
Design?
d. What are the factors that should be kept in mind while designing
the GUI?
e. What are fact finding techniques? List out any seven.
f. A magazine is published monthly and is sent to the subscribers.
Two months before the expiry of subscription, a reminder is sent
to the subscriber. If subscription is not received in a month,
another reminder is sent. If the subscription is not received upto
two weeks before the expiry of the subscription, the subscriber’s
name is removed from the mailing list and the subscriber is
informed. Obtain a Data Flow Diagram and flow chart for the
above problem.

Date of Submission : Marks / Grades: .........................................

Signature of Co-ordinator :

Sohil Vohra (Subject Co-ordinator - SAD)


Shri K.J. Polytechnic, Bharuch Page 32

You might also like