Professional Documents
Culture Documents
MACHINE/EQUIPMENT
1 CORE MACHINE AT THE SECTION:Check /Replace if needed of Sliding Rail
Check /Replace if needed of Heater
Cleaning
Check / Replace if needed of Sensors
Check/Replace if needed of Hopper
Check/ Replace if needed of Temperature Controller
Check / Replace if needed of Air Regulator and Gauge
Check / Replace if needed of Panel Wiring
Check / Replace if needed of Valves
Check / Replace if needed of Hoses
FREQUENCY
3
3
3
3
3
3
3
3
3
3
QUANTITY
Months
Months
Months
Months
Months
Months
Months
Months
Months
Months
4 units
4 units
1 job
5 units
1 job
1 job
1 job
1 job
1 job
1 job
3 Months
3 Months
3 Months
1 pc
1 pc
1 unit
RECEIVED BY
DATE
QUANTITY
PERSON IN CHARGE
4 units
4 units
1 job
5 units
1 job
1 job
1 job
1 job
1 job
1 job
Shift Supervisor S1
1 pc
1 pc
1 unit
Shift Supervisor S1
RECEIVED BY
DATE
NO
1 FURNACE
MACHINE/EQUIPMENT
FREQUENCY
QUANTITY
Weekly
Daily
Weekly
Weekly
Weekly
6 Months
6 Months
2 units
1 times/ day
18 pcs
1 pc
3 units
2 units
1 job
Weekly
Weekly
Weekly
6 Months
1 unit
1 job
4 units
200 A - 6 units
6 A - 1 unit
Weekly
Weekly
2 Years
3 Months
6 Months
Monthly
1 unit
N/A
1 job
19 pcs
1 pc
1 job
Weekly
Weekly
3 Months
3 Months
1 job
1 job
1 pc
1 pc
Weekly
3 Months
3 Months
1 unit
1 unit
1 unit
Weekly
Weekly
1 job
3 units
2 CONTROL PANEL
Check Timer
Clean Dust Accumulation
Clean Contactors of Carbon Build Up
Check and Change Fuse
3 CASTING M/C
Check and Cleaning
Check and Top Up of Oiling/Greasing
Check /Change if needed of Hydraulic Fluid
Check/Replace if needed of Sensor
Check/Change of Rubber Coupling of Hydraulic Pump
Change of Dycote
4 SAND BLASTING M/C
Clean Sand in Vacuum Bag
Clean Machine
Check / Change of Blasting Nozzle
Cleaning of Filter Bag
5 CHIMNEY
Check and Cleaning
Check Blower Motor
Check Extractor Motor
6 GENERAL
Top Up Dycote
Check / Change Air Hoses and Valves
ISSUED BY
DATE
:
:
RECEIVED BY
DATE
PERSON IN CHARGE
Shift Supervisor S2
Shift Supervisor S2
Shift Supervisor S2
Shift Supervisor S2
Shift Supervisor S2
Shift Supervisor S2
Page : 1 OF 2
FORM NO : QC-PC-018/09/REV.0
SECTION : FETTLING
SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO
MACHINE/EQUIPMENT
1 DOUBLE CUT - OFF MACHINE
FREQUENCY
QUANTITY
2 Weeks
3 Months
Monthly
2 Weeks
6 Months
2 units
2 pcs
3 pcs
1 job
1 unit
Daily
Yearly
Daily
1 job
4 pcs
1 job
Yearly
Months
Months
Months
Months
2 pcs
2 liter
1 unit
2 sets
1 unit
2 Weeks
6 Months
6 Months
Yearly
1 unit
1 unit
1 job
1 job
a Turbine
- Visual Check - Wear and Tear Cleaning
3 Months
1 unit
3 Months
1 unit
3 Months
1 unit
6 Months
1 unit
e Feed Duct
- Check and Cleaning
6 Months
1 unit
Cleaning
Check and Change Bearing
Check and Replace V Belt
Greasing
Check Motor
2 GRINDING MACHINE
Cleaning
Check and Change Bearing
Check Grinding Stone
3 RUMBLING MACHINE
Check and Change Bearing
Change of Oil - Gear Box
Check and Change Chain
Check and Change Sprocket
Check Motor
6
6
6
6
4 CYCLONE MACHINE
Clean Dust Collector
Ducting Hose
Check Motor
Painting (Epoxy)
5 TOSCA MACHINE
Page : 2 OF 2
FORM NO : QC-PC-018/09/REV.0
SECTION : FETTLING
SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO
MACHINE/EQUIPMENT
f Abrasive Valve Tile
- Check/Replace
g Gear Boxes Lubricant Level
- Check/Refill
FREQUENCY
QUANTITY
6 Months
1 unit
6 Months
1 unit
6 Months
1 unit
i Elevator Bucket
- Check/Replace
- Cleaning
Yearly
Yearly
1 unit
1 unit
j Filter Bag
- Check/Cleaning
Yearly
1 unit
Yearly
1 unit
Yearly
Yearly
1 unit
1 unit
m Elevator Belt
- Check/Repair
Yearly
1 unit
n Vibrator
- Check/Repair
- Cleaning
Yearly
Yearly
1 unit
1 unit
o Sleeve
- Check / Replace
- Cleaning
Yearly
Yearly
1 unit
1 unit
ISSUED BY
DATE
:
:
F2
QC-PC-018/09/REV.0
F2
PERSON IN CHARGE
Section Head S3
Section Head S3
Section Head S3
Section Head S3
Section Head S3
QC-PC-018/09/REV.0
PERSON IN CHARGE
Section Head S3
MACHINE/EQUIPMENT
1 RIELLO 1 AND 2
FREQUENCY
QUANTITY
Topping Up Grease
Check of Brake Coil
Change of Hydraulic Fluid
Cleaning
Check / Replace Sensor & Limit Switch
Check Motor and Timing Belt
Check Gas at Accumulators
Check Hydraulic Pump and System
Check Panel Contactors, Timers, Wiring
Top Up Coolant
Check Jaw / Reamer
Weekly
6 Months
6 Months
Daily
3 Months
Yearly
6 Months
6 Months
6 Months
Weekly
Daily
30 points
16 pcs
208 litres
2 units
38 pcs
14 pcs
11 units
1 job
1 job
1 job
5sets / 3 sets
2 BROACHING
Check Motor
Lubricating Oil
Check Tool / Jaws
Cleaning
Check Press Button
Top Up Hydraulic oil
Yearly
Daily
Daily
Daily
Monthly
Monthly
1
1
1
1
1
1
job
job
job
job
job
job
:
:
Yearly
6 Months
Monthly
Monthly
3 Months
8 pcs
100 liters
12 pcs
1 job
1 job
RECEIVED BY
DATE
FORM NO : QC-PC-019/09/REV.0
QUANTITY
PERSON IN CHARGE
30 points
16 pcs
208 litres
2 units
38 pcs
14 pcs
11 units
1 job
1 job
1 job
5sets / 3 sets
Section Head S4
1
1
1
1
1
1
job
job
job
job
job
job
Section Head S4
8 pcs
100 liters
12 pcs
1 job
1 job
Section Head S4
RECEIVED BY
DATE
MACHINE / EQUIPMENT
1 INDUCTION BRAZING M/C
FREQUENCY
QUANTITY
3 Months
1 unit
b Coil
- Check / Cleaning
- Change
Weekly
1 unit
c Foot Switch
- Check / Replace
6 Months
1 unit
d Connection
- Check
Weekly
8 units
Weekly
6 units
Weekly
I unit
2 BRAZING TORCH
- Clean / Replace Brazing Nozzle
ISSUED BY
DATE
:
:
RECEIVED BY
DATE
FORM NO : QC-PC-020/09/REV.0
QUANTITY
PERSON IN CHARGE
1 unit
1 unit
1 unit
Section Head S5
8 units
6 units
I unit
RECEIVED BY
DATE
MACHINE / EQUIPMENT
1 AIR TESTING 1 AND 2
Check
Check
Check
Check
Check
FREQUENCY
QUANTITY
Daily
3 Months
3 Months
3 Months
Monthly
2
2
2
2
2
units
units
units
units
units
Monthly
Yearly
6 Months
Yearly
Monthly
1 unit
2 pcs
1 unit
1 unit
2 units
Monthly
6 Months
3 Months
Monthly
Monthly
1
1
1
1
1
ISSUED BY
DATE
:
:
unit
unit
unit
unit
unit
RECEIVED BY
DATE
FORM NO : QC-PC-021/09/REV.0
QUANTITY
2
2
2
2
2
PERSON IN CHARGE
units
units
units
units
units
Shift Supervisor S6
1 unit
2 pcs
1 unit
1 unit
2 units
Shift Supervisor S6
1
1
1
1
1
Shift Supervisor S6
unit
unit
unit
unit
unit
RECEIVED BY
DATE
MACHINE / EQUIPMENT
1 POLISHING HEAD 1 TO 9
Check /Change if needed of bearing
Clean/ Change if needed of panel Contactor
Check/ Change if needed of Suction Hose
Check /Change if needed of Dust Guard
FREQUENCY
QUANTITY
2 Years
3 Months
3 Months
3 Months
2 pcs
3 units
1 unit
1 each
3 Months
Yearly
18 pcs
9 units
Weekly
6 Months
Yearly
Monthly
Monthly
Monthly
2 units
2 units
4 pcs
2 units
2 units
2 units
2 POLISHING IDLER 1 TO 5
Check /Change if needed of bearing
Check / Change if needed of Shaft Idler
3 CYCLONE MACHINE 1 & 2
Check
Check
Check
Check
Check
Check
ISSUED BY
DATE
:
:
RECEIVED BY
DATE
FORM NO : QC-PC-022/09/REV.0
QUANTITY
PERSON IN CHARGE
2 pcs
3 units
1 unit
1 each
Shift Supervisor S7
18 pcs
9 units
Shift Supervisor S7
2 units
2 units
4 pcs
2 units
2 units
2 units
Shift Supervisor S7
RECEIVED BY
DATE
Page : 1 OF 2
FORM NO : QC-PC-023/09/RE
SECTION : PLATING
SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO
MACHINE / EQUIPMENT
1 AUTO TRANSPORTERS 1 & 2
Checking / Replacement of Sensor
Check /Change if needed of Lifting Belt
Check / Change if needed of Roller
Change of Gear Box Oil
Check Brake Coil
Check and Maintain Transporter Rail
FREQUENCY
QUANTITY
6 Months
6 Months
Yearly
6 Months
Yearly
Yearly
20 pcs
4 pcs
28 pcs
2 litres
4 units
2 units
6 Months
Yearly
Yearly
6 Months
Yearly
8 pcs
2 pcs
4pcs
1 liter
1 unit
Weekly
Weekly
Weekly
6 Months
5 units
5 units
34 pcs
5 units
6 Months
6 Months
Yearly
1 unit
1 unit
1 unit
Yearly
Weekly
4 pcs
2 units
Yearly
6 Months
3 pcs
3 units
Weekly
6 Months
6 Months
6 Months
5 units
5 units
5 units
1 job
2 Weeks
3 Months
3 Months
Yearly
208 liter
2 pcs
6 pcs
1 unit
Monthly
Monthly
Monthly
1 unit
10 pcs
10 pcs
8 DEGREASING TANK
Renewal of Chemical
Check & Change of Seal
Check & Replace Heater
Painting Degreasing Tank
9 CONTROL PANEL AUTO LINE
Cleaning Panel
Check & Replace Contactor
Cleaning Contact Point
Page : 2 OF 2
FORM NO : QC-PC-023/09/RE
SECTION : PLATING
SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO
10 V BLOCK
MACHINE / EQUIPMENT
FREQUENCY
QUANTITY
Weekly
As Required
10 pcs
10 pcs
Weekly
As Required
10 pcs
10 pcs
Monthly
Yearly
6 Months
3 Months
6 Months
6 Months
1 job
5 units
14 pcs
1 unit
1 unit
1 unit
Monthly
Monthly
Monthly
1 unit
1 unit
1 unit
Weekly
Yearly
38 units
36 pcs
3 Months
1 job
3 Months
Weekly
1 unit
1 job
Weekly
Weekly
Weekly
3 Months
1 unit
1 job
1 job
1 job
11 FLIGHT BAR
Cleaning Contact Point
Change if necessary
12 EFFLUENT PLANT
Cleaning Effluent Plant Area
Painting Effluent Plant Tank
Check & change of Seal
Checking Filter Press - Bag / Hydraulics
Change of Carbon
Change of Sand
13 HOIST - DEGREASING
Cleaning
Greasing
Painting
14 ABS AND BRASS PLATING TANK
Wash all water rinse tanks
Painting (Epoxy)
15 CARBON TREATMENT - CYANIDE COPPER, COPPER ACID, BRASS &
ABS NICKEL
Addition of Carbon
16 OVEN
Check / Replace Heater
Clean Blower Filter
17 GENERAL
Clean Main Water Supply Filter Cartridges
Check Water Supply Pipe
Check Air Agitation Pipe
Clean Sludge of Brass and ABS Chrome Tanks
ISSUED BY
DATE
:
:
RECEIVED BY
DATE
:
:
Page : 1 OF 2
FORM NO : QC-PC-023/09/REV.0
PERSON IN CHARGE
Section Head S8
Section Head S8
Section Head S8
Section Head S8
Section Head S8
Section Head S8
Page : 2 OF 2
FORM NO : QC-PC-023/09/REV.0
PERSON IN CHARGE
Section Head S8
Section Head S8
Section Head S8
Section Head S8
Section Head S8
Section Head S8
Section Head S8
Section Head S8
MACHINE / EQUIPMENT
1 WATER TESTING
Check & Clean Tanks
Check / Replace if needed of Seal
Check/Replace if needed of Motor and Pump
Check / Replace Pressure Gauge 1 & 2
FREQUENCY
QUANTITY
Daily
6 Months
6 Months
Daily
1 units
Daily
Yearly
1 unit
2 pcs
Yearly
2 pcs
3 Months
1 unit
3 Months
1 unit
3 Months
1 unit
2 units
2 BUFFING M/C
Check and Cleaning
Check/Replace of Bearing
3 DRILLING M/C
Check / Replace V- Belt
4 SCREW MOUNTING AIR TOOL
Check & Service
5 BONNET MOUNTING AIR TOOL
Check & Service
6 MONODE MARKER
Check & Service
ISSUED BY
DATE
:
:
RECEIVED BY
DATE
FORM NO : QC-PC-024/09/REV.1
QUANTITY
PERSON IN CHARGE
1 units
Section Head S9
2 units
1 unit
2 pcs
Section Head S9
2 pcs
Section Head S9
1 unit
Section Head S9
1 unit
Section Head S9
1 unit
Section Head S9
RECEIVED BY
DATE
Page : 1 OF 2
FORM NO : QC-PC-025/09/REV.0
SECTION : BUILDING AND EQUIPMENT
SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO
MACHINE / EQUIPMENT
FREQUENCY
QUANTITY
1 FACTORY SSB 1
Cleaning
Check Joint Connection
Check Ampere For Incoming Cable
Check Fuse For Outgoing Supply
Check Earthing For SSB
Check/Replace Insulation For Outgoing Supply Cable
Monthly
Monthly
Monthly
Monthly
Monthly
Monthly
1
1
1
1
1
1
job
job
job
job
job
job
Monthly
Monthly
Monthly
Monthly
Monthly
1
1
1
1
1
job
job
job
job
job
2 CAPACITOR BANK
Cleaning
Check or Replace Cables, Connectors, Fuse
Check or Replace Power Factor Regulator
Check Ampere For Capacitor Bank
Check Earthing For Capacitor Bank Panel
3 ROOFING & WALLS
Check, Repair or Replace
Yearly
1 job
Yearly
1 job
Yearly
5 Years
1 job
1 job
3 months
Monthly
Monthly
Monthly
1 job
1 job
1 job
1 unit
Monthly
3 Years
Monthly
1 job
1 job
1 job
3 Months
1 job
Yearly
1 job
3 Years
Yearly
1 units
1 units
2 Months
3 Years
1 unit
1 unit
6 Months
Monthly
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
2 units
2 Months
3 Years
1 unit
1 unit
4 AWNING
Check / Replace
5 FENCING
Check / Repair
Painting
6 GUARD HOUSE
Check
Check
Check
Check
/
/
/
/
7 TOILET
Check / Replace Water Hose
Painting
Check / Repair Lighting
8 CANTEEN
Check / Repair Basic Facility
9 PARAMETER DRAIN
Check, Clean or Repair
10 WATER STORAGE TANK
Painting
Check Condition of Tank Appearance / Piping
11 AIR STORAGE SUMP (RESERVOIR)
Cleaning
Painting
12 COMPRESSOR - INGERSOLL RAND 1 & 2
Cleaning
Check Ultra Coolant Level
Change Oil Filter
Clean Air Filter
Greasing
Change Separator Element
Check Motor Condition
Check Ampere For Incoming Cable
Check Terminal Motor
Check / Clean Pre-Filter & After Filter
13 AIR DRYER
Cleaning
Refill Gas
Page : 2 OF 2
FORM NO : QC-PC-025/09/REV.0
SECTION : BUILDING AND EQUIPMENT
SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO
14 PALLET TRUCK
MACHINE / EQUIPMENT
FREQUENCY
QUANTITY
Monthly
Yearly
1 job
4 units
Monthly
Monthly
3 units
Monthly
Monthly
Monthly
Monthly
Monthly
1 job
1 unit
1 job
1 job
1 job
3 Months
1 job
1 job
1 job
2 Months
1 job
1 job
1 job
15 FIRE HYDRANT
Check and Inspect
Discharge water to release mud clog
16 PUMP HOUSE MOTOR
Check
Check
Check
Check
Check
Diesel Level
And Test Condition of Diesel Pump
Insulation For Cable (Manual & Auto)
Voltage For Battery
Alarm For Panel
17 FOGGING
18 SEPTIC TANK
Check / Repair Panel Motor
Check Ampere For Outgoing Cantractor
Check Earthing For Motor
19 TNB SUBSTATION
Check Earthing For Factory
Check / Replace MCCB For Production SSB
Check / Replace Earth Leakage Regulator Factory
ISSUED BY
DATE
:
:
RECEIVED BY
DATE
:
:
Page : 1 OF 2
FORM NO : QC-PC-025/09/REV.0
PERSON IN CHARGE
Electrical Technician
Electrical Technician
Mechanical Technician
Mechanical Technician
Mechanical Technician
Electrical Technician
Mechanical Technician
Electrical Technician
Mechanical Technician
Mechanical Technician
Mechanical Technician
Mechanical Technician
Electrical Technician
Electrical Technician
Electrical Technician (contractor)
Page : 2 OF 2
FORM NO : QC-PC-025/09/REV.0
PERSON IN CHARGE
Mechanical Technician
Mechanical Technician (Contractor)
Electrical Technician
Electrical Technician
Electrical Technician
Electrical Technician
PAGE : 1 OF 2
FORM NO : QC-IT-019/09/REV.0
TEST BATH
POSSIBLE DEFECTS
ANALYSIS RESULT
BLUR
ACID COPPER
HIGH CURRENT
LOW CURRENT
BLUR
CYANIDE COPPER
HIGH CURRENT
LOW CURRENT
WHITISH PROBLEM
CONTAMINATION
PEELING
PITTING
RECOMMENDATIONS :
ANALYZED BY LAB
ASSISTANT :
VERIFIED BY CHEMICAL
ENGINEER :
PAGE : 2 OF 2
FORM NO : QC-IT-019/09
Standard 1
Possible Cause
1. Bright
2. Dull
Corrective Action
Ok
Possible Cause
1. Bright
2. Dull
Corrective Action
Ok
Possible Cause
1. Fully Bright and
Good Leveling
Corrective Action
Ok
3 - 5 mm
CYANIDE COPPER
SAMPLE
Standard 1
3 - 5 mm
Standard 1
Standard 1
60-70 mm
Corrective Action
Possible Cause
1. Ratio CrO3 : H2SO4 Ok
240:1
OF 2
O : QC-IT-019/09/REV.0
dn. Bhd
ACTION PLAN
PAGE : 2 OF 2
FORM NO : QC-IT-019/09/REV.0
ICALS
Corrective Action
Corrective Action
Corrective Action
Corrective Action
PAGE : 2 OF 2
FORM NO : QC-IT-013/09/REV.5
RESULTS
Dim. #
Standard
Sample
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Note :
1) All dimensions in (mm) unless specified
2) Refer to the standard drawing during inspection.
Remarks :
Inspection Status
OF 2
: QC-IT-013/09/REV.5
Accept
Reject
PAGE : 2 OF 2
FORM NO : QC-IT-020/09/REV.0
RESULTS
Dim. #
Standard
Sample
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Note :
1) All dimensions in (mm) unless specified
2) Refer to the standard drawing during inspection.
Remarks :
Inspection Status
OF 2
: QC-IT-020/09/REV.0
Accept
Reject
FORM NO : MP-PC-016/09
Position
Date Joined
Trainer Name
No.
DESCRIPTION OF TRAINING
Prepared BY
TRAINING EVALUATION
Note : Please (x) at the column be
DATE OF TRAINING
according to training evaluation
V.Good
Good
Approved By
FORM NO : MP-PC-016/09/REV.1
RAINING EVALUATION
ase (x) at the column below
to training evaluation
Average
Fail
Approved By
FORM NO :
S1 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST
Date
Shift / Time
Maintenance / Operator :
SAND MIXER
1
Check
Cond.
Remark
2
Remark
Check
3
Remark
Check
Sliding Rail
Motor
Heaters
Wiring
Cleaning
Body
Sensors
Hopper
Temperature Controller
Air Regulator & Gauge
Panel Wiring
Valves
Hoses
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Checked By
Verified By
Shift Supervisor S1
FORM NO : QC-PC-005/09/REV.2
:
:
Shift / Time
4
Remark
Check
Remark
to Repair
Verified By
FORM NO : QC-PC-006/09/REV.1
DOE INDUSTRIES SDN BHD
PREVENTIVE MAINTENANCE MONTHLY CHECK SHEET
SECTION : S2 DIE - CASTING
MONTH : YEAR
MACHINE
JOB / PROCEDURES
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PANEL
CASTING
MACHINE
GENERAL
Top Up Dycote
Check Valves / Hose / Air Gun
Remark:
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
DONE BY OPERATOR
DONE BY OPERATOR
DONE BY OPERATOR
27
FORM NO : QC-PC-006/09/REV.1
28
29
31
Cond.
RUMBLING MAC
Remark
Cleaning
Dust Collector
Bearing
Check/Change bearing
Ducting Hose
Oil-Gear Box
Motor
Motor
Chain
Greasing
Painting
Sprocket
Check V-Belt
Motor
GRINDING MACHINE
Cond.
Remark
Check/Change bearing
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Checked By
Verified By
Section Head S3
FORM NO : QC-PC-007/09/REV.1
Date
Shift / Time
:
:
RUMBLING MACHINE
Cond.
Remark
Bearing
Oil-Gear Box
Chain
Sprocket
Motor
x Need to Repair
achine/part vibrates
TURBINE
Check
Remark
Check
Cleaning
Check /Replace
Cleaning
ELEVATOR BUCKET
Check
Remark
Check
VIBRATOR
Remark
Check
SLEEVE
Remark
Check
Check /Replace
Check /Repair
Check /Replace
Cleaning
Cleaning
Cleaning
FILTER BAG
Check
Check /Cleaning
Check
Check
Check /Cleaning
Section Head S3
Remark
Check
ELEVATOR BELT
Remark
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
Checked By
Check
Check /Refill
FEED DUCT
Remark
Remark
Remark
Check /Refill
Remark
Check /Refill
Check
Remark
Check /Repair
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
FORM NO : QC-PC-014/09/REV.1
Date
Shift / Time
:
:
Remark
Check /Replace
Remark
Check /Cleaning
Tightening
Remark
Check /Replace
Verified By
FORM NO : QC-PC-008/09/REV.2
S4 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST
Date
Shift / Time
Maintenance / Operator :
JINFA - 1
Cond.
RIELLO - 1
Remark
RIELLO - 2
Cond.
Remark
Cleaning Panel
Grease
Grease
V - Belt
Brake Coil
Brake Coil
Motor
Hydraulic Fluid
Hydraulic Fluid
Limit Switch
Sensor
Sensor
Hydraulic Fluid
Limit Switch
Limit Switch
Unit Motor
Unit Motor
Timing Belt
Timing Belt
Accumulators
Accumulators
Cleaning Panel
V - Belt
Coolant
Coolant
JINFA - 2
Cond.
Remark
:
:
Motor
Limit Switch
Hydraulic Fluid
JINFA - 3
Cond.
BROACHING MACHINE
Remark
Cond.
Cleaning Panel
Motor
V - Belt
Press Button
Motor
Hydraulic Oil
Remark
Limit Switch
Hydraulic Fluid
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Checked By
Verified By
Section Head S4
NO : QC-PC-008/09/REV.2
-2
Cond.
Remark
Maintenance / Operator :
Condition
Good
Not Good
Check
Remark
Cleaning
Item
Water Tank
Check
Min
Condition
Normal
Max
Level
COIL
Item
Coil
Condition
Good
Not Good
Check
Remark
Cleaning
Item
Coil
Foot Switch
Condition
Good
Not Good
Check
Remark
Function
Connection
Check
Item
Connection
Condition
Good
Not Good
Check
Condition
Good
Not Good
Remark
Function
BRAZING TORCH
Remark
Function
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
Condition
Not Good Change
CONNECTION
Item
Good
Function
FOOT SWITCH
Item
Check
Item
Brazing Nozzle
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
Check
Condition
Good
Not Good
Remark
Clean
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Done By
Checked By
Verified By
Electrical Technician/Operator
Section Head S5
FORM NO : QC-PC-015/09/REV.1
Shift / Time
:
:
Remark
Remark
Remark
Remark
d to Repair
Maintenance / Operator :
AIR TESTING MACHINE NO.1
Cond.
Air Cyclinder
Air Cyclinder
Pressure Gauge
Pressure Gauge
Limit Switch
Limit Switch
Testing Jig
Testing Jig
WASHING MACHINE
Remark
Motor
Air Cyclinder
Pressure Gauge
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
Checked By
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Verified By
Shift Supervisor S6
FORM NO : QC-PC-009/09/REV.1
:
:
Shift / Time
Remark
WASHING MACHINE
Cond.
x Need to Repair
hine/part vibrates
loud noise
is several worn out
is potentially down
Remark
FORM NO : QC-PC-010/09/REV.1
S7 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST
Date
Shift / Time
Maintenance / Operator :
:
:
2
Remark
Cond.
3
Remark
Cond.
4
Remark
Cond.
Remark
Cond.
5
Remark
Cond.
Remark
Cond.
Remark
Bearing
Panel Contactor
Suction Hose
Dust Guard
IDLER
1
Cond.
2
Remark
Cond.
3
Remark
Cond.
5
Remark
Bearing
Shaft
POLISHING HEADS (MOPPING)
6
Cond.
7
Remark
Cond.
8
Remark
Cond.
9
Remark
Cond.
Remark
Bearing
Panel Contactor
Suction Hose
Dust Guard
CYCLONE / DUST EXTRACTOR - BELTING
Cond.
Remark
Cond.
Dust Collector
Dust Collector
Ducting Hose
Ducting Hose
Motor
Motor
Bearing
Bearing
Filter Bag
Filter Bag
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
Remark
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Checked By
Verified By
Shift Supervisor S7
Equipment Machine
YEAR :
Description of work to be done
Check
Week 1
Remarks/Comments
Check
Week 2
Remarks/Comments
Check
Week 3
Remarks/Comments
Week 4
Check
Operators :
Operators :
Operators :
Operators :
In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :
In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :
In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :
In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :
Equipment Machine
YEAR :
Description of work to be done
CYANIDE COPPER
FILTER
COPPER ACID
FILTER
Check
Week 1
Remarks/Comments
Check
Week 2
Remarks/Comments
Check
Week 3
Remarks/Comments
Week 4
Check
BRASS NICKEL
FILTER
DEGREASING TANK
BRASS CHROME
RECTIFIER
CYANIDE COPPER
RECTIFIER
COPPER ACID
RECTIFIER
ABS NICKEL
RECTIFIER
ABS CHROME
RECTIFIER
V BLOCK
FLIGHT BAR
GENERAL
Operators :
Operators :
Operators :
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :
In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :
In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :
In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :
PAGE : 1 OF 2
FORM NO : QC-PC-011/09/REV.1
Week 4
Remarks/Comments
Operators :
1
2
3
4
In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :
PAGE : 2 OF 2
FORM NO : QC-PC-011/09/REV.1
Week 4
Remarks/Comments
Operators :
1
2
3
4
In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :
DRILLING MACHINE
Remark
Check/Replace bearing
Cond.
MONODE MARKER
Remark
V-belt
WATER TESTING 1
Cond.
WATER TESTING 2
Remark
Cond.
Check/Replace Seal
Check/Replace Seal
Remark
Cond.
Remark
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Checked By
Verified By
Section Head S9
FORM NO : QC-PC-012/09/REV.2
Date
Shift / Time
:
:
MONODE MARKER
Cond.
Remark
Service
ed to Repair
Verified By
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Cleaning
SAND MIXER
Prepared By :
Verified By :
Shift Supervisor S1
FORM NO : QC-PC-026/09/REV.0
YEAR :
OCTOBER
NOVEMBER
DECEMBER
41 42 43 44 45 46 47 48 49 50 51 52
ified By :
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Channel Cleaning
Check Timer
Clean Machine
SAND BLASTING M/C
Check /Change Blasting
Nozzle
Prepared By :
Verified By :
Shift Supervisor S2
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Change of Dycote
CHIMNEY
Top Up Dycote
GENERAL
Check / Change Air Hoses and
Valves
Prepared By :
Verified By :
Shift Supervisor S2
TOBER
PAGE : 1 OF 2
FORM NO : QC-PC-027/09/REV.0
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
MONTH / WEEK
JOB/MAINTENANCE
JANUARY
3
4
FEBRUARY
7
8
9
10
MARCH
11 12
13
14
APRIL
15 16
17
18
19
MAY
20 21
22
23
JUNE
24 25
26
27
28
JULY
29 30
31
32
AUGUST
33 34
35
36
SEPTEMBER
37 38 39
40
OCTOBER
41 42
Cleaning
Greasing
Check Motor
GRINDING M/C
Ducting Hose
CYCLONE MACHINE
Check Motor
Painting (Epoxy)
Check Motor
Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly
Prepared By :
Verified By :
Section Head S3
SPINDLE HOUSING
LUBRICATION
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Check / Refill
FEED DUCT
Check / Replace
Check/ Cleanning
GEAR BOXES
LUBRICANT LEVEL
Check / Refill
HYDRAULIC PLANT
PIPING
Check / Cleaning
Check / Replace
ELEVATOR BUCKET
Cleaning
FILTER BAG
PNEUMATIC
ELECTROVALVE
LUBRICATION
Check / Cleanning
Check / Refill
Cleaning
RUNNERHEAD SAND /
SHOT SEPARATOR
Check / Replace
ELEVATOR BELT
Check/Repair
Higlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly
Prepared By :
Verified By :
Section Head S3
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Cleaning
VIBRATOR
Check / Repair
Check / Replace
SLEEVE
Cleaning
Prepared By :
Verified By :
Section Head S3
Page : 1 OF 3
FORM NO : QC-PC-028/09/REV.0
YEAR :
TOBER
43
44
NOVEMBER
45 46 47
48
49
DECEMBER
50 51 52
TOBER
Page : 2 OF 3
FORM NO : QC-PC-028/09/REV.0
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
PAGE : 1 OF 2
FORM NO : QC-PC-02
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Topping Up Grease
RIELLO M/C 1
Top Up Coolant
JINN FA 1, 2 & 3
Prepared By :
Verified By :
Section Head S4
PAGE : 2 OF 2
FORM NO : QC-PC-02
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Check Motor
BROACHING M/C
Topping Up Grease
RIELLO M/C 2
Top Up Coolant
Prepared By :
Verified By :
Section Head S4
PAGE : 1 OF 2
FORM NO : QC-PC-029/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
PAGE : 2 OF 2
FORM NO : QC-PC-029/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
FORM
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
COIL
Check / Cleaning
FOOT SWITCH
Check / Replace
CONNECTION
Check
COOLING WATER
Check / Replace
SYSTEM CONNECTION
BRAZING NOZZEL
Clean / Replace
Prepared By :
Verified By :
Section Head S5
TOBER
FORM NO : QC-PC-030/09/REV.0
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
PAGE : 1 OF 2
FORM NO : QC-PC-03
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Prepared By :
Verified By :
Shift Supervisor S6
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
WASHING MACHINE
Prepared By :
Verified By :
Shift Supervisor S6
PAGE : 1 OF 2
FORM NO : QC-PC-031/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
TOBER
PAGE : 2 OF 2
FORM NO : QC-PC-031/09/REV.0
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
FORM
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Check Motor
Prepared By :
Verified By :
Shift Supervisor S7
TOBER
FORM NO : QC-PC-032/09/REV.0
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Check Roller
Prepared By :
Verified By :
Section Head S8
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Change Roller
AUTO TRANSPORTERS
NO.1
Change Gear Box Oil
Change Roller
AUTO TRANSPORTERS
NO.2
Change Gear Box Oil
Prepared By :
Verified By :
Section Head S8
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
CYANIDE COPPER
RECTIFIER
COPPER ACID
RECTIFIER
ABS CHROME
RECTIFIER
BRASS CHROME
RECTIFIER
Prepared By :
Verified By :
Section Head S8
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Cleaning Filter
Cleaning Filter
Cleaning Filter
Cleaning Filter
Prepared By :
Verified By :
Section Head S8
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Renewal of Chemical
Prepared By :
Verified By :
Section Head S8
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Cleaning
CHILLER MACHINE
Refilling of Gas
Cleaning
Painting
Clean Main Water Supply Filter
Cartridges
Check Water Supply Pipe
GENERAL
Check Air Agitation Pipe
Clean Sludge of ABS and Brass
Chrome Tanks
Prepared By :
Verified By :
Section Head S8
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Change Sand
Prepared By :
Verified By :
Section Head S8
PAGE : 1 OF 7
FORM NO : QC-PC-033/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
PAGE : 2 OF 7
FORM NO : QC-PC-033/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
PAGE : 3 OF 7
FORM NO : QC-PC-033/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
PAGE : 4 OF 7
FORM NO : QC-PC-033/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
PAGE : 5 OF 7
FORM NO : QC-PC-033/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
PAGE : 6 OF 7
FORM NO : QC-PC-033/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
PAGE : 7 OF 7
FORM NO : QC-PC-033/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
FORM
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
BUFFING M/C
DRILLING M/C
MONODE MARKER
Prepared By :
Verified By :
Section Head S9
TOBER
FORM NO : QC-PC-034/09/REV.1
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
PAGE : 1 OF 2
FORM NO : QC-PC-035/09
DOE INDUSTRIES SDN BHD
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Cleaning
FACTORY SSB 1
Check Joint Connection
Cleaning
CAPACITOR BANK
Check / Replace Cables,
Connectors, Fuse
Cleaning
Greasing
Cleaning
AIR DRYER
Refill Gas
Prepared By :
Verified By :
Electrical Technician
PAGE : 2 OF 2
FORM NO : QC-PC-035/09
AWNING
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Check / Replace
Check/ Repair
FENCING
Painting
Check / Repair
GUARD HOUSE
Safety Alarm Panel
Painting
TOILET
Check, Clean / Repair
CANTEEN
PARAMETER DRAIN
Cleaning
Cleaning
AIR STORAGE SUMP
(RESERVOIR)
Painting
PALLET TRUCK
Prepared By :
Verified By :
Mechanical Technician
GE : 1 OF 2
ORM NO : QC-PC-035/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
GE : 2 OF 2
ORM NO : QC-PC-035/09/REV.0
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
FORM NO : MP-PC-006
Product
No inspection
Inspected
Threading
Production
Period
Dimensions Specification Range
Seat
MD
SE
Reamed Size A
[mm]
Machine Down
Setting/Service
Reamed Size B
[mm]
Section : S
Date
:
Flange Size
[mm]
Hole Size
[mm]
RIELLO M/C 1
RIELLO M/C 2
JF 2 WAY 1
JF 2 WAY 2
JF 2 WAY 3
BROACHING
MANUAL CUT
Inspection methodology :
Inspected by
Name
Date
Name
Date
Setter
Checked by
Section Head S4
2) To record dimensions
Tube Size
[mm]
FORM NO : MP-PC-006/09/REV.2
spection Sheet
Section : S4
Date
:
Bonnet Size
[mm]
FORM NO : MP-PC-0
DOE INDUSTRIES SDN BHD
CORE SHOP (S1)
Checklist for Mixing Core Sand / Operating Parameters
Shift
Working Hours
Mixing Formula
Description
Silica Sand
20/60 (KG)
Silica Sand
30/60 (KG)
Resin HP
301 (ml)
Catalyst
Harter
AT7 (ml)
Quantity
Ammonium
(ml)
Silica
Std.
Mixing
Timer
Total Used
Resin
Catalyst
Ammonia
Mix No.
Start Mix
Stop Mix
Machine 1
Machine 2
To Hopper
1
2
3
4
5
6
7
8
9
10
11
12
Parameters
Machine 3
Product
Core Box Temperature
(260-450C)
Blowing Pressure (4 to 6 Bar)
Curing Time
(8 -40 sec.)
Note : All the mixing must be use within an hour after mixed it
Prepared By,
Operator
Checked By,
Shift Supervisor S1
Approved By,
FORM NO : MP-PC-001/09/REV.5
ng Parameters
Date
Std.
Act.
1 min
2 min
1 min
1 min
Completed
Machine 3
Operator
Machine 4
Approved By,
FORM NO : MP-PC-005/09/REV.1
DOE INDUSTRIES SDN BHD
CHECK LIST FOR CASTING
Shift
Date
NO
DESCRIPTION
STD
Temperature
9501070C
Heating Up Laddies
Prepared By,
Operator
3/4 min
Full Bin
OK
NOT OK
:
FREQUENCY
Start - Up
Start - Up
Start - Up
(1st & 2nd Shift)
Start - Up
(1st & 2nd Shift)
FORM NO : MP-PC-005/09/REV.1
REMARKS
Checked By,
Shift Supervisor S2
FORM NO : MP-PC-007/09/REV.2
DOE INDUSTRIES SDN BHD
METAL CHARGING FORMAT
CHARGER
VERIFIED BY SHIFT
SUPERVISOR S2
:
TIME
INGOT
FURNACE
PCS
KGS
RUNNERS/
REJECTS ZINC KGS
KGS
DATE
SHIFT
ALUMINUM
KGS
AE
BE
REMARKS
MP-PC-007/09/REV.2
AE
BE
REMARKS
FORM NO : MP-PC-009/09/R
DOE INDUSTRIES SDN BHD
CHECK LIST FOR ELECTROPLATING (S8) - BRASS LINE
Date :
Check By
Working Hours :
Operator :
ON
OFF
DEGREASER HEATER
TRANSPORTER MCB
MAIN WATER SUPPLY
RECTIFIER
AIR BLOWER
(C)
40-65
CYANIDE COPPER
60-70
ACID COPPER
24-40
ABS NICKEL
49-60
BRASS NICKEL
49-60
ABS CHROME
45-55
BRASS CHROME
45-55
10:00/11:00 AM
1:00/2:00 PM
4:00/5:00 PM
STD pH
ABS NICKEL
4.0 - 4.5
BRASS NICKEL
4.0 - 4.5
7:00/8:00 AM
10:00/11:00 AM
7:00/8:00 AM
10:00/11:00 AM
7:00/8:00 AM
10:00/11:00 AM
1:00/2:00 PM
4:00/5:00 PM
SMALL
5~7
MEDIUM
5~7
500~800
BIG
6~8
600~1500
4:00/5:00 PM
500~800
SMALL
5~7
1500~3400
MEDIUM
6~8
2500~4000
4:00/5:00 PM
FORM NO : MP-PC-009/09/REV.5
NE
ING (C)
7:00/8:00PM
10:00/11:00 PM
7:00/8:00PM
10:00/11:00 PM
7:00/8:00PM
10:00/11:00 PM
7:00/8:00PM
10:00/11:00 PM
ING (pH)
FORM NO : MP-PC-008/09/REV.2
DOE INDUSTRIES SDN BHD
BAR TRACKING FORM
OPERATOR NAME
SHIFT
Good
Reject
DATE
Good
Reject
Good
Reject
Good
Reject
Total Qty
Good
Reject
Good Qty
Good
Reject
Rej Qty
Good
Rej %
BRASS
Bars
pcs
pcs
pcs
ABS
Bars
pcs
pcs
pcs
TOTAL
Bars
pcs
pcs
pcs
Reject
FORM NO : MP-PC-008/09/REV.2
DATE
TION HEAD S8 :
Reject
Good
Reject
FORM NO : MP-PC-014/
DOE INDUSTRIES SDN BHD
WASTE WATER TREATMENT RECORD
Section
Date
Type :
Cyanide
Item
Type :
Qty
pH (Be)
pH (Af)
ORP (Be)
ORP (Af)
Chrome
Item
S. Hypochloride (Ltr)
S.Metabisulphate (Kg)
Qty
pH (Be)
pH (Af)
pH (Be)
pH (Af)
Type :
pH (Be)
pH (Af)
Note :
Be - Before dosing
Af - After dosing
Remark :
Recorded By,
Checked By,
Section Head S8
FORM NO : MP-PC-014/09/REV.1
ORP (Be)
Checked By,
Section Head S8
ORP (Af)
Checked By Operator:
Working Hours :
CHEMICAL
Udyprep 110EC
40-50
Etching
65-70
Accelerator
35-40
ENP
40-50
7:00/8:00 AM
10:00/11:00 AM
7:00/8:00 AM
10:00/11:00 AM
Remarks:
STD pH
6-8
FORM NO : MP-PC-015/09/REV.4
LINE
G (C)
7:00/8:00PM
10:00/11:00 PM
7:00/8:00PM
10:00/11:00 PM
G (C)
FORM NO : QC-PC-013/09/REV.1
DOE INDUSTRIES SDN BHD
DATE :
TIME START :
EQUIPMENT
1.
&
2.
LOCATION :
3.
TIME FINISH :
WORK DONE :
1.
2.
3.
4.
5.
6.
FAULT :
1.
2.
3.
4.
PARTS CHANGED :
1.
2.
3.
REMARKS :
Prepared By,
Checked By,
Verified By,
Person In Charge
Prod. Assistant
RM NO : QC-PC-013/09/REV.1
Verified By,
Maintenance / Operator :
1.
2.
EXHAUST NO.1
Time Start
Time End
Painting
Cond.
Time Start
Time Start
Time End
Cleaning
Cleaning
EXHAUST NO.2
Cond.
Check Roller
Check Roller
Time Start
Remarks:
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Checked By
Verified By
Section Head S8
Maintenance / Operator :
1.
2.
Time Start
EXHAUST NO.3
Time End
Painting
Cond.
Time Start
Time Start
Time End
Cleaning
Cleaning
EXHAUST NO.4
Cond.
Time Start
CHILLER MACHIN
Time End
Cleaning
Refilling of Gas
Time Start
Cond.
Time Start
Remarks:
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Checked By
Verified By
Section Head S8
1.
2.
Time End
Cond.
Time Start
V BLOCK
Time End
Time Start
Change if necessary
ABS CHROME RECTIFIER
Time End
Cond.
Time Start
Time Start
Cond.
Time Start
DEREASING TANK
Time End
Remarks:
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Checked By
Verified By
Section Head S8
Maintenance / Operator :
1.
2.
Time Start
Addition of Carbon
Cond.
Time Start
Addition of Carbon
Time Start
Addition of Carbon
FLIGHT BAR
Time End
Addition of Carbon
Cond.
Time End
Change if necessary
Cleaning Panel
Check / Replace Contactor
Cleaning Contact Point
HOIST - DEGREASING
Cond.
Cleaning
Time Start
OVEN
Time End
Cond.
GENERAL
Time Start
Greasing
Time End
Clean Sluge of Brass & ABS
Chrome Tank
Painiting
Remarks:
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Checked By
Verified By
Section Head S8
Maintenance / Operator :
1.
2.
EFFLUENT PLANT
Cond.
Time Start
Time End
Remarks:
Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time
x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Checked By
Verified By
Section Head S8
PAGE : 1 OF 5
FORM NO : QC-PC-036/09/REV.0
Date :
EXHAUST NO.2
Cond.
Time Start
Time End
Change Bearing
Time Start
Change Bearing
Verified By
Time End
PAGE : 2 OF 5
FORM NO : QC-PC-036/09/REV.0
Date :
EXHAUST NO.4
Cond.
Time Start
Time End
Time Start
Time End
Time Start
Time End
Change Bearing
CHILLER MACHINE
Cond.
g
of Gas
Replace Seal
Verified By
PAGE : 3 OF 5
FORM NO : QC-PC-036/09/REV.0
Date :
V BLOCK
Cond.
Time Start
Time End
if necessary
CYANIDE COPPER RECTIFIER
Cond.
Time Start
Time End
Time Start
Time End
Cleaning PCB
Replace Diodes
Replace Wire
DEREASING TANK
Cond.
Change Seal
Replace Heater
Degreasing Tank
Verified By
PAGE : 4 OF 5
FORM NO : QC-PC-036/09/REV.0
Date :
Time Start
Time End
of Carbon
CONTROL PANEL AUTO LINE
Cond.
Time Start
Time End
Time Start
Time End
g Panel
Replace Contactor
g Contact Point
GENERAL
Cond.
Verified By
PAGE : 5 OF 5
FORM NO : QC-PC-036/09/REV.0
Date :
Verified By
FORM NO
JOB / MAINTENANCE
YEAR :
EQUIPMENT
MACHINE
Month
Day
FURNACE
1
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
DEGASSING
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Prepared by Shift
Supervisor S2
FORM NO : QC-PC-037/09/REV.1
DAY
JOB/MAINTENANCE
10
11
12
13
14
MONTH :
15 16 17
18
19
20
21
22
23
Cleaning
GRINDING MACHINE
Check Grinding Stone
Prepared By,
Verified By,
Section Head S3
FORM NO : QC-PC-038/09/REV.0
YEAR :
24
25
26
27
28
29
30
31
DAY
JOB/MAINTENANCE
10
11
12
13
14
MONTH :
15 16 17
18
19
20
21
22
23
Cleaning
RIELLO - 1
Check Jaw/Reamer
Cleaning
RIELLO - 2
Check Jaw/Reamer
Lubricating Oil
BROACHING
Prepared By,
Verified By,
Section Head S4
FORM NO : QC-PC-039/09/REV.0
YEAR :
24
25
26
27
28
29
30
31
DAY
JOB/MAINTENANCE
AIR TESTING
MACHINE NO. 1
AIR TESTING
MACHINE NO. 2
10
11
12
13
14
MONTH :
15 16 17
18
19
20
21
22
23
Prepared By,
Verified By,
Shift Supervisor S6
FORM NO : QC-PC-040/09/REV.0
YEAR :
24
25
26
27
28
29
30
31
DAY
JOB/MAINTENANCE
10
11
12
13
14
MONTH :
15 16 17
18
19
20
21
22
23
BUFFING M/C
Prepared By,
Verified By,
Section Head S9
FORM NO : QC-PC-041/09/REV.1
YEAR :
24
25
26
27
28
29
30
31
FORM NO:QC-IT-021/09/REV.0
Calibration
Reading
Variance
Remarks
Note:
1. Calibrate before first use of this thickness tester
2. The calibration is considered failed if it not able to achieve 10.7m5%
RM NO:QC-IT-021/09/REV.0
Bhd
rt
Verified By Chemical
Engineer
FORM NO:QC-IT-022/09/REV.0
SG Reading
Remarks
Note:
1. Check the condition of hydrometer once a year
2. The hydrometer is considered faulty if it not able to return back to SG 1000
RM NO:QC-IT-022/09/REV.0
Bhd
Verified By Chemical
Engineer
DAY
JOB/MAINTENANCE
BUFFING M/C
Prepared By,
LYK
10
11
12
13
14
MONTH :
15 16 17
18
19
20
21
22
23
YEAR :
24
25
26
27
28
29
Verified By,
Section Head S9
30
31
MONTH / WEEK
JOB/MAINTENANCE
1
JANUARY
2
3
4
FEBRUARY
7
8
9
Prepared By :
LYK
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
TOBER
YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52
Verified By :
Section Head S9