FORM NO: QC-PCSECTION : CORE SHOP

SECTION PREVENTIVE MAINTENANCE PROGRAMME


NO

MACHINE/EQUIPMENT
1 CORE MACHINE AT THE SECTION:Check /Replace if needed of Sliding Rail
Check /Replace if needed of Heater
Cleaning
Check / Replace if needed of Sensors
Check/Replace if needed of Hopper
Check/ Replace if needed of Temperature Controller
Check / Replace if needed of Air Regulator and Gauge
Check / Replace if needed of Panel Wiring
Check / Replace if needed of Valves
Check / Replace if needed of Hoses

FREQUENCY

3
3
3
3
3
3
3
3
3
3

QUANTITY

Months
Months
Months
Months
Months
Months
Months
Months
Months
Months

4 units
4 units
1 job
5 units
1 job
1 job
1 job
1 job
1 job
1 job

3 Months
3 Months
3 Months

1 pc
1 pc
1 unit

2 SAND MIXER MACHINE


Check / Replace if needed of Motor
Check / Replace if needed of Wiring
Check / Replace if needed of Body
ISSUED BY
DATE

RECEIVED BY

DATE

FORM NO: QC-PC-016/09/REV.0

QUANTITY

PERSON IN CHARGE

4 units
4 units
1 job
5 units
1 job
1 job
1 job
1 job
1 job
1 job

Shift Supervisor S1

1 pc
1 pc
1 unit

Shift Supervisor S1

RECEIVED BY

DATE

Form NO: QC-PC-017


SECTION : CASTING
SECTION PREVENTIVE MAINTENANCE PROGRAMME

NO
1 FURNACE

MACHINE/EQUIPMENT

Cleaning - break dross / bottom


Degassing
Check Securing Bolt & Nut
Check / Change Thermocouple
Check & Change Cable Head
Check Coil and Change Gasket
Channel Cleaning

FREQUENCY

QUANTITY

Weekly
Daily
Weekly
Weekly
Weekly
6 Months
6 Months

2 units
1 times/ day
18 pcs
1 pc
3 units
2 units
1 job

Weekly
Weekly
Weekly
6 Months

1 unit
1 job
4 units
200 A - 6 units
6 A - 1 unit

Weekly
Weekly
2 Years
3 Months
6 Months
Monthly

1 unit
N/A
1 job
19 pcs
1 pc
1 job

Weekly
Weekly
3 Months
3 Months

1 job
1 job
1 pc
1 pc

Weekly
3 Months
3 Months

1 unit
1 unit
1 unit

Weekly
Weekly

1 job
3 units

2 CONTROL PANEL
Check Timer
Clean Dust Accumulation
Clean Contactors of Carbon Build Up
Check and Change Fuse

3 CASTING M/C
Check and Cleaning
Check and Top Up of Oiling/Greasing
Check /Change if needed of Hydraulic Fluid
Check/Replace if needed of Sensor
Check/Change of Rubber Coupling of Hydraulic Pump
Change of Dycote
4 SAND BLASTING M/C
Clean Sand in Vacuum Bag
Clean Machine
Check / Change of Blasting Nozzle
Cleaning of Filter Bag
5 CHIMNEY
Check and Cleaning
Check Blower Motor
Check Extractor Motor
6 GENERAL
Top Up Dycote
Check / Change Air Hoses and Valves

ISSUED BY
DATE

:
:

RECEIVED BY

DATE

Form NO: QC-PC-017/09/REV. 0

PERSON IN CHARGE

Shift Supervisor S2

Shift Supervisor S2

Shift Supervisor S2

Shift Supervisor S2

Shift Supervisor S2

Shift Supervisor S2

Page : 1 OF 2
FORM NO : QC-PC-018/09/REV.0
SECTION : FETTLING
SECTION PREVENTIVE MAINTENANCE PROGRAMME

NO

MACHINE/EQUIPMENT
1 DOUBLE CUT - OFF MACHINE

FREQUENCY

QUANTITY

2 Weeks
3 Months
Monthly
2 Weeks
6 Months

2 units
2 pcs
3 pcs
1 job
1 unit

Daily
Yearly
Daily

1 job
4 pcs
1 job

Yearly
Months
Months
Months
Months

2 pcs
2 liter
1 unit
2 sets
1 unit

2 Weeks
6 Months
6 Months
Yearly

1 unit
1 unit
1 job
1 job

a Turbine
- Visual Check - Wear and Tear Cleaning

3 Months

1 unit

b Spindle Housing Lubrication


- Check / Refill

3 Months

1 unit

c Transmission Belt Chain Stretching


- Check/Cleaning/Tightening

3 Months

1 unit

d Lining & Bolt


- Check/Replace

6 Months

1 unit

e Feed Duct
- Check and Cleaning

6 Months

1 unit

Cleaning
Check and Change Bearing
Check and Replace V Belt
Greasing
Check Motor
2 GRINDING MACHINE
Cleaning
Check and Change Bearing
Check Grinding Stone
3 RUMBLING MACHINE
Check and Change Bearing
Change of Oil - Gear Box
Check and Change Chain
Check and Change Sprocket
Check Motor

6
6
6
6

4 CYCLONE MACHINE
Clean Dust Collector
Ducting Hose
Check Motor
Painting (Epoxy)
5 TOSCA MACHINE

Page : 2 OF 2

FORM NO : QC-PC-018/09/REV.0
SECTION : FETTLING
SECTION PREVENTIVE MAINTENANCE PROGRAMME

NO

MACHINE/EQUIPMENT
f Abrasive Valve Tile
- Check/Replace
g Gear Boxes Lubricant Level
- Check/Refill

FREQUENCY

QUANTITY

6 Months

1 unit

6 Months

1 unit

6 Months

1 unit

i Elevator Bucket
- Check/Replace
- Cleaning

Yearly
Yearly

1 unit
1 unit

j Filter Bag
- Check/Cleaning

Yearly

1 unit

Yearly

1 unit

Yearly
Yearly

1 unit
1 unit

m Elevator Belt
- Check/Repair

Yearly

1 unit

n Vibrator
- Check/Repair
- Cleaning

Yearly
Yearly

1 unit
1 unit

o Sleeve
- Check / Replace
- Cleaning

Yearly
Yearly

1 unit
1 unit

h Hydraulic Plant Piping


- Check and Cleaning

k Pneumatic Electrovalves Lubrication


- Check/Refill
l Runnerhead Sand/Shot Separator
- Check/Replace
- Cleaning

ISSUED BY
DATE

:
:

F2
QC-PC-018/09/REV.0

F2

PERSON IN CHARGE

Section Head S3

Section Head S3

Section Head S3

Section Head S3

Section Head S3

QC-PC-018/09/REV.0

PERSON IN CHARGE

Section Head S3

FORM NO : QC-PCSECTION : MACHINING


SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO

MACHINE/EQUIPMENT
1 RIELLO 1 AND 2

FREQUENCY

QUANTITY

Topping Up Grease
Check of Brake Coil
Change of Hydraulic Fluid
Cleaning
Check / Replace Sensor & Limit Switch
Check Motor and Timing Belt
Check Gas at Accumulators
Check Hydraulic Pump and System
Check Panel Contactors, Timers, Wiring
Top Up Coolant
Check Jaw / Reamer

Weekly
6 Months
6 Months
Daily
3 Months
Yearly
6 Months
6 Months
6 Months
Weekly
Daily

30 points
16 pcs
208 litres
2 units
38 pcs
14 pcs
11 units
1 job
1 job
1 job
5sets / 3 sets

2 BROACHING
Check Motor
Lubricating Oil
Check Tool / Jaws
Cleaning
Check Press Button
Top Up Hydraulic oil

Yearly
Daily
Daily
Daily
Monthly
Monthly

1
1
1
1
1
1

job
job
job
job
job
job

3 JINFA DM 1,2, AND 3


Check / Replace V-Belt
Change of Hydraulic Fluid
Check / Replace Limit Switch
Clean Electrical Panel
Check Motor Condition
ISSUED BY
DATE

:
:

Yearly
6 Months
Monthly
Monthly
3 Months

8 pcs
100 liters
12 pcs
1 job
1 job
RECEIVED BY

DATE

FORM NO : QC-PC-019/09/REV.0

QUANTITY

PERSON IN CHARGE

30 points
16 pcs
208 litres
2 units
38 pcs
14 pcs
11 units
1 job
1 job
1 job
5sets / 3 sets

Section Head S4

1
1
1
1
1
1

job
job
job
job
job
job

Section Head S4

8 pcs
100 liters
12 pcs
1 job
1 job

Section Head S4

RECEIVED BY

DATE

FORM NO : QC-PCSECTION : BRAZING


SECTION : PREVENTIVE MAINTENANCE PROGRAMME
NO

MACHINE / EQUIPMENT
1 INDUCTION BRAZING M/C

FREQUENCY

QUANTITY

3 Months

1 unit

b Coil
- Check / Cleaning
- Change

Weekly

1 unit

c Foot Switch
- Check / Replace

6 Months

1 unit

d Connection
- Check

Weekly

8 units

e Cooling Water System Connection


- Check / Replace

Weekly

6 units

Weekly

I unit

a Main Power Switch Panel


- Cleaning Cover Panel Fan
- Check / Top Up Water

2 BRAZING TORCH
- Clean / Replace Brazing Nozzle
ISSUED BY
DATE

:
:

RECEIVED BY

DATE

FORM NO : QC-PC-020/09/REV.0

QUANTITY

PERSON IN CHARGE

1 unit

1 unit

1 unit

Section Head S5

8 units

6 units

I unit
RECEIVED BY

DATE

FORM NO : QC-PCSECTION : SUB ASSEMBLY


SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO

MACHINE / EQUIPMENT
1 AIR TESTING 1 AND 2
Check
Check
Check
Check
Check

& Cleaning Tank


& Service Air Cylinder
/ Replace of Pressure Gauge
/ Replace of Limit Switch
/ Repair of Testing Jig

FREQUENCY

QUANTITY

Daily
3 Months
3 Months
3 Months
Monthly

2
2
2
2
2

units
units
units
units
units

Monthly
Yearly
6 Months
Yearly
Monthly

1 unit
2 pcs
1 unit
1 unit
2 units

Monthly
6 Months
3 Months
Monthly
Monthly

1
1
1
1
1

2 WATER TESTING M/C PUMP


Check and Cleaning
Check/ Replace if needed of Seal
Check & Service of Motor
Check / Replace Pressure Gauge
Check/ Replace of Control Valves
3 WASHING MACHINE
Check and Cleaning
Service, Check Valve
Check /Replace of Air Cylinders
Check Nuts & Bolts
Check / Replace of Water Supply Control Valve

ISSUED BY
DATE

:
:

unit
unit
unit
unit
unit

RECEIVED BY

DATE

FORM NO : QC-PC-021/09/REV.0

QUANTITY

2
2
2
2
2

PERSON IN CHARGE

units
units
units
units
units

Shift Supervisor S6

1 unit
2 pcs
1 unit
1 unit
2 units

Shift Supervisor S6

1
1
1
1
1

Shift Supervisor S6

unit
unit
unit
unit
unit

RECEIVED BY

DATE

FORM NO : QC-PCSECTION : POLISHING


SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO

MACHINE / EQUIPMENT
1 POLISHING HEAD 1 TO 9
Check /Change if needed of bearing
Clean/ Change if needed of panel Contactor
Check/ Change if needed of Suction Hose
Check /Change if needed of Dust Guard

FREQUENCY

QUANTITY

2 Years
3 Months
3 Months
3 Months

2 pcs
3 units
1 unit
1 each

3 Months
Yearly

18 pcs
9 units

Weekly
6 Months
Yearly
Monthly
Monthly
Monthly

2 units
2 units
4 pcs
2 units
2 units
2 units

2 POLISHING IDLER 1 TO 5
Check /Change if needed of bearing
Check / Change if needed of Shaft Idler
3 CYCLONE MACHINE 1 & 2
Check
Check
Check
Check
Check
Check

/ Clean of Dust Collector


/ Clean of Ducting Hose
or Replace Bearing
Greasing
/ Clean of Filter Bag
Motor

ISSUED BY
DATE

:
:

RECEIVED BY

DATE

FORM NO : QC-PC-022/09/REV.0

QUANTITY

PERSON IN CHARGE

2 pcs
3 units
1 unit
1 each

Shift Supervisor S7

18 pcs
9 units

Shift Supervisor S7

2 units
2 units
4 pcs
2 units
2 units
2 units

Shift Supervisor S7

RECEIVED BY

DATE

Page : 1 OF 2
FORM NO : QC-PC-023/09/RE
SECTION : PLATING
SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO

MACHINE / EQUIPMENT
1 AUTO TRANSPORTERS 1 & 2
Checking / Replacement of Sensor
Check /Change if needed of Lifting Belt
Check / Change if needed of Roller
Change of Gear Box Oil
Check Brake Coil
Check and Maintain Transporter Rail

FREQUENCY

QUANTITY

6 Months
6 Months
Yearly
6 Months
Yearly
Yearly

20 pcs
4 pcs
28 pcs
2 litres
4 units
2 units

6 Months
Yearly
Yearly
6 Months
Yearly

8 pcs
2 pcs
4pcs
1 liter
1 unit

Weekly
Weekly
Weekly
6 Months

5 units
5 units
34 pcs
5 units

6 Months
6 Months
Yearly

1 unit
1 unit
1 unit

Yearly
Weekly

4 pcs
2 units

Yearly
6 Months

3 pcs
3 units

Weekly
6 Months
6 Months
6 Months

5 units
5 units
5 units
1 job

2 Weeks
3 Months
3 Months
Yearly

208 liter
2 pcs
6 pcs
1 unit

Monthly
Monthly
Monthly

1 unit
10 pcs
10 pcs

2 ABS TRANSPORTERS 1 & 2


Check Roller
Check Chain & Sprocket
Check Roller Shaft
Change of Gear Box Oil
Check and Maintain Transporters Rail
3 FILTER - CYANIDE COPPER, COPPER ACID, ABS & BRASS NICKEL
Cleaning Filter
Wash Filter Bag
Check / Change of Filter Cartridge & Bag
Check & Replace Seal
4 CHILLER MACHINE
Cleaning
Refilling of Gas
Painting Chiller Tank
5 AIR BLOWER 1& 2 (AIR AGITATION)
Check & Change Bearing
Cleaning Air Filter
6 EXHAUST 1 TO 4
Check and Change Bearing
Cleaning
7 RECTIFIER - BRASS & ABS CHROME, CYANIDE COPPER, ABS NICKEL,
COPPER ACID
Check
Check
Check
Check

Cable Lug Contact


& Cleaning PCB
& Replace Diodes if necessary
& Replace Wire if necessary

8 DEGREASING TANK
Renewal of Chemical
Check & Change of Seal
Check & Replace Heater
Painting Degreasing Tank
9 CONTROL PANEL AUTO LINE
Cleaning Panel
Check & Replace Contactor
Cleaning Contact Point

Page : 2 OF 2
FORM NO : QC-PC-023/09/RE
SECTION : PLATING
SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO
10 V BLOCK

MACHINE / EQUIPMENT

Cleaning Contact Point


Change if necessary

FREQUENCY

QUANTITY

Weekly
As Required

10 pcs
10 pcs

Weekly
As Required

10 pcs
10 pcs

Monthly
Yearly
6 Months
3 Months
6 Months
6 Months

1 job
5 units
14 pcs
1 unit
1 unit
1 unit

Monthly
Monthly
Monthly

1 unit
1 unit
1 unit

Weekly
Yearly

38 units
36 pcs

3 Months

1 job

3 Months
Weekly

1 unit
1 job

Weekly
Weekly
Weekly
3 Months

1 unit
1 job
1 job
1 job

11 FLIGHT BAR
Cleaning Contact Point
Change if necessary
12 EFFLUENT PLANT
Cleaning Effluent Plant Area
Painting Effluent Plant Tank
Check & change of Seal
Checking Filter Press - Bag / Hydraulics
Change of Carbon
Change of Sand
13 HOIST - DEGREASING
Cleaning
Greasing
Painting
14 ABS AND BRASS PLATING TANK
Wash all water rinse tanks
Painting (Epoxy)
15 CARBON TREATMENT - CYANIDE COPPER, COPPER ACID, BRASS &
ABS NICKEL
Addition of Carbon
16 OVEN
Check / Replace Heater
Clean Blower Filter
17 GENERAL
Clean Main Water Supply Filter Cartridges
Check Water Supply Pipe
Check Air Agitation Pipe
Clean Sludge of Brass and ABS Chrome Tanks

ISSUED BY
DATE

:
:

RECEIVED BY
DATE

:
:

Page : 1 OF 2
FORM NO : QC-PC-023/09/REV.0

PERSON IN CHARGE

Section Head S8 / Production


Assistant

Section Head S8

Section Head S8

Section Head S8

Section Head S8

Section Head S8

Section Head S8 / Production


Assistant

Section Head S8

Section Head S8 / Production


Assistant

Page : 2 OF 2
FORM NO : QC-PC-023/09/REV.0

PERSON IN CHARGE

Section Head S8

Section Head S8

Section Head S8

Section Head S8

Section Head S8

Section Head S8

Section Head S8

Section Head S8

FORM NO : QC-PCSECTION : FINAL ASSEMBLY


SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO

MACHINE / EQUIPMENT
1 WATER TESTING
Check & Clean Tanks
Check / Replace if needed of Seal
Check/Replace if needed of Motor and Pump
Check / Replace Pressure Gauge 1 & 2

FREQUENCY

QUANTITY

Daily
6 Months
6 Months
Daily

1 units

Daily
Yearly

1 unit
2 pcs

Yearly

2 pcs

3 Months

1 unit

3 Months

1 unit

3 Months

1 unit

2 units

2 BUFFING M/C
Check and Cleaning
Check/Replace of Bearing
3 DRILLING M/C
Check / Replace V- Belt
4 SCREW MOUNTING AIR TOOL
Check & Service
5 BONNET MOUNTING AIR TOOL
Check & Service
6 MONODE MARKER
Check & Service

ISSUED BY
DATE

:
:

RECEIVED BY

DATE

FORM NO : QC-PC-024/09/REV.1

QUANTITY

PERSON IN CHARGE

1 units
Section Head S9
2 units

1 unit
2 pcs

Section Head S9

2 pcs

Section Head S9

1 unit

Section Head S9

1 unit

Section Head S9

1 unit

Section Head S9

RECEIVED BY

DATE

Page : 1 OF 2
FORM NO : QC-PC-025/09/REV.0
SECTION : BUILDING AND EQUIPMENT
SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO

MACHINE / EQUIPMENT

FREQUENCY

QUANTITY

1 FACTORY SSB 1
Cleaning
Check Joint Connection
Check Ampere For Incoming Cable
Check Fuse For Outgoing Supply
Check Earthing For SSB
Check/Replace Insulation For Outgoing Supply Cable

Monthly
Monthly
Monthly
Monthly
Monthly
Monthly

1
1
1
1
1
1

job
job
job
job
job
job

Monthly
Monthly
Monthly
Monthly
Monthly

1
1
1
1
1

job
job
job
job
job

2 CAPACITOR BANK
Cleaning
Check or Replace Cables, Connectors, Fuse
Check or Replace Power Factor Regulator
Check Ampere For Capacitor Bank
Check Earthing For Capacitor Bank Panel
3 ROOFING & WALLS
Check, Repair or Replace

Yearly

1 job

Yearly

1 job

Yearly
5 Years

1 job
1 job

3 months
Monthly
Monthly
Monthly

1 job
1 job
1 job
1 unit

Monthly
3 Years
Monthly

1 job
1 job
1 job

3 Months

1 job

Yearly

1 job

3 Years
Yearly

1 units
1 units

2 Months
3 Years

1 unit
1 unit

6 Months

Monthly

1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
2 units

2 Months
3 Years

1 unit
1 unit

4 AWNING
Check / Replace
5 FENCING
Check / Repair
Painting
6 GUARD HOUSE
Check
Check
Check
Check

/
/
/
/

Repair Basic Facility


Repair Lighting, Fan, and DB Box
Replace Insulation of Outgoing Cable
Replace Safety Alarm Panel Battery and Power Supply

7 TOILET
Check / Replace Water Hose
Painting
Check / Repair Lighting
8 CANTEEN
Check / Repair Basic Facility
9 PARAMETER DRAIN
Check, Clean or Repair
10 WATER STORAGE TANK
Painting
Check Condition of Tank Appearance / Piping
11 AIR STORAGE SUMP (RESERVOIR)
Cleaning
Painting
12 COMPRESSOR - INGERSOLL RAND 1 & 2
Cleaning
Check Ultra Coolant Level
Change Oil Filter
Clean Air Filter
Greasing
Change Separator Element
Check Motor Condition
Check Ampere For Incoming Cable
Check Terminal Motor
Check / Clean Pre-Filter & After Filter
13 AIR DRYER
Cleaning
Refill Gas

Page : 2 OF 2
FORM NO : QC-PC-025/09/REV.0
SECTION : BUILDING AND EQUIPMENT
SECTION PREVENTIVE MAINTENANCE PROGRAMME
NO
14 PALLET TRUCK

MACHINE / EQUIPMENT

Check & Relubricate


Check / Repair Roller Oil Seal & Shaft

FREQUENCY

QUANTITY

Monthly
Yearly

1 job
4 units

Monthly
Monthly

3 units

Monthly
Monthly
Monthly
Monthly
Monthly

1 job
1 unit
1 job
1 job
1 job

3 Months

1 job
1 job
1 job

2 Months

1 job
1 job
1 job

15 FIRE HYDRANT
Check and Inspect
Discharge water to release mud clog
16 PUMP HOUSE MOTOR
Check
Check
Check
Check
Check

Diesel Level
And Test Condition of Diesel Pump
Insulation For Cable (Manual & Auto)
Voltage For Battery
Alarm For Panel

17 FOGGING
18 SEPTIC TANK
Check / Repair Panel Motor
Check Ampere For Outgoing Cantractor
Check Earthing For Motor
19 TNB SUBSTATION
Check Earthing For Factory
Check / Replace MCCB For Production SSB
Check / Replace Earth Leakage Regulator Factory

ISSUED BY
DATE

:
:

RECEIVED BY
DATE

:
:

Page : 1 OF 2
FORM NO : QC-PC-025/09/REV.0

PERSON IN CHARGE

Electrical Technician

Electrical Technician

Mechanical Technician (contractor)

Mechanical Technician

Mechanical Technician

Mechanical Technician
Electrical Technician

Mechanical Technician
Electrical Technician

Mechanical Technician

Mechanical Technician

Mechanical Technician

Mechanical Technician

Mechanical Technician (contractor)

Electrical Technician

Electrical Technician
Electrical Technician (contractor)

Page : 2 OF 2
FORM NO : QC-PC-025/09/REV.0

PERSON IN CHARGE

Mechanical Technician
Mechanical Technician (Contractor)

Electrical Technician

Electrical Technician

Mechanical Technician (contractor)

Electrical Technician

Electrical Technician

PAGE : 1 OF 2
FORM NO : QC-IT-019/09/REV.0

DOE Industries Sdn. Bhd


Hull Cell Test Report
SAMPLE TAKEN ON :

TEST BATH

POSSIBLE DEFECTS

ANALYSIS RESULT

BLUR
ACID COPPER

HIGH CURRENT
LOW CURRENT
BLUR

CYANIDE COPPER

HIGH CURRENT
LOW CURRENT

CROMID ACID ABS AND BRASS

BRIGHT NICKEL ABS AND


BRASS

WHITISH PROBLEM
CONTAMINATION
PEELING
PITTING

RECOMMENDATIONS :

Legend : Analysis Column


= Result Good
x = Result Not Good

ANALYZED BY LAB
ASSISTANT :

VERIFIED BY CHEMICAL
ENGINEER :

PAGE : 2 OF 2
FORM NO : QC-IT-019/09

STANDARD OF HULL CELL TEST CHEMICALS


ACID COPPER
SAMPLE

Standard 1

Possible Cause
1. Bright
2. Dull

Corrective Action
Ok

Possible Cause
1. Bright
2. Dull

Corrective Action
Ok

Possible Cause
1. Fully Bright and
Good Leveling

Corrective Action
Ok

3 - 5 mm

CYANIDE COPPER
SAMPLE

Standard 1
3 - 5 mm

ABS AND BRASS BRIGHT NICKEL


SAMPLE

Standard 1

ABS AND BRASS CHROME


SAMPLE

Standard 1
60-70 mm

Corrective Action
Possible Cause
1. Ratio CrO3 : H2SO4 Ok
240:1

OF 2
O : QC-IT-019/09/REV.0

dn. Bhd

ACTION PLAN

PAGE : 2 OF 2
FORM NO : QC-IT-019/09/REV.0

ICALS

Corrective Action

Corrective Action

Corrective Action

Corrective Action

PAGE : 2 OF 2
FORM NO : QC-IT-013/09/REV.5
RESULTS

Dim. #

Standard

Sample
1

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Note :
1) All dimensions in (mm) unless specified
2) Refer to the standard drawing during inspection.

Remarks :

Inspection Status

OF 2
: QC-IT-013/09/REV.5

Accept
Reject

PAGE : 2 OF 2
FORM NO : QC-IT-020/09/REV.0
RESULTS

Dim. #

Standard

Sample
1

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Note :
1) All dimensions in (mm) unless specified
2) Refer to the standard drawing during inspection.

Remarks :

Inspection Status

OF 2
: QC-IT-020/09/REV.0

Accept
Reject

FORM NO : MP-PC-016/09

DOE INDUSTRIES SDN BHD


TRAINING EVALUATION
Trainee Name

Position

Date Joined

Section/Type of Job Trained

Trainer Name

No.

DESCRIPTION OF TRAINING

Prepared BY

TRAINING EVALUATION
Note : Please (x) at the column be
DATE OF TRAINING
according to training evaluation
V.Good
Good

Approved By

FORM NO : MP-PC-016/09/REV.1

RAINING EVALUATION
ase (x) at the column below
to training evaluation
Average
Fail

Approved By

FORM NO :
S1 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST
Date
Shift / Time

Maintenance / Operator :

SAND MIXER

CORE MACHINE NO:

1
Check

Cond.

Remark

2
Remark

Check

3
Remark

Check

Sliding Rail

Motor

Heaters

Wiring

Cleaning

Body

Sensors
Hopper
Temperature Controller
Air Regulator & Gauge
Panel Wiring
Valves
Hoses

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Checked By

Verified By

Shift Supervisor S1

Prod. Assistant / Prod. En

FORM NO : QC-PC-005/09/REV.2

:
:

Shift / Time

4
Remark

Check

Remark

to Repair

Verified By

Prod. Assistant / Prod. Engineer/HOD Prod.

FORM NO : QC-PC-006/09/REV.1
DOE INDUSTRIES SDN BHD
PREVENTIVE MAINTENANCE MONTHLY CHECK SHEET
SECTION : S2 DIE - CASTING
MONTH : YEAR
MACHINE

JOB / PROCEDURES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

Cleaning Break Dross / Bottom


Check Secure Bolts & Nuts
FURNACE

Check / Change Thermocouple


Check / Change Cable Head
Check Coil and Change Gasket
Channel Cleaning
Check Timer

PANEL

Clean Dust Accumulation


Clean Contactors of Carbon Build Up
Check and Change Fuse
Check and Cleaning
Top Up of Oiling / Greasing

CASTING
MACHINE

Check / Change Hydraulic Fluid


Check /Change Sensor
Check /Change Rubber Coupling of Hydraulic Pum
Change of Dycote
Clean Sand In Vacuum Bag

SAND BLAST Clean Machine


MACHINE
Check / Change Blasting Nozzle
Cleaning Filter Bag
Check and Cleaning
CHIMNEY

Check Blower Motor


Check Extractor Motor

GENERAL

Top Up Dycote
Check Valves / Hose / Air Gun

Remark:

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

DONE BY OPERATOR

DONE BY OPERATOR

DONE BY OPERATOR

CHECK BY SHIFT SUPERVISOR S2

27

VERIFIED BY PROD. Assistant / PROD. ENGINEER/HOD PROD.

FORM NO : QC-PC-006/09/REV.1

28

29

31

S3 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST


Maintenance / Operator :

DOUBLE CUT -OFF MACHINE


Cond.

CYCLONE DUST EXTRACTOR


Remark

Cond.

RUMBLING MAC

Remark

Cleaning

Dust Collector

Bearing

Check/Change bearing

Ducting Hose

Oil-Gear Box

Motor

Motor

Chain

Greasing

Painting

Sprocket

Check V-Belt

Motor

GRINDING MACHINE
Cond.

Remark

Check/Change bearing

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Checked By

Verified By

Section Head S3

Prod. Assistant / Prod. Engineer/HO

FORM NO : QC-PC-007/09/REV.1

Date
Shift / Time

:
:

RUMBLING MACHINE
Cond.

Remark

Bearing
Oil-Gear Box
Chain
Sprocket
Motor

x Need to Repair
achine/part vibrates

rt is several worn out


e is potentially down

Prod. Assistant / Prod. Engineer/HOD Prod.

S3 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST


TOSCA MACHINE
Maintenance / Operator :

TURBINE

RUNNERHEAD SABD/SHOT SEPERATOR

Check

Remark

Check

Cleaning

Check /Replace

Wear & Tear

Cleaning

ELEVATOR BUCKET
Check

SPINDLE HOUSING LUBRICATION

Remark

Check

VIBRATOR
Remark

Check

SLEEVE
Remark

Check

Check /Replace

Check /Repair

Check /Replace

Cleaning

Cleaning

Cleaning

FILTER BAG
Check

GEAR BOXES LUBRICANT LEVEL


Remark

Check /Cleaning

Check

Check
Check /Cleaning

Section Head S3

Remark

Check

ELEVATOR BELT
Remark

Check & Cleaning

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
Checked By

Check
Check /Refill

FEED DUCT

Remark

Remark

PNEUMATIC ELECTROVALVES LUBRICATION

Remark

Check /Refill

HYDRAULIC PLANT PIPING

Remark

Check /Refill

Check

Remark

Check /Repair

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

FORM NO : QC-PC-014/09/REV.1

Date
Shift / Time

:
:

ABRASIVE VALVE TILE


Check

Remark

Check /Replace

TRANSMISSION BELT & CHAINS STRETCHING


Check

Remark

Check /Cleaning
Tightening

LINING & BOLT


Check

Remark

Check /Replace

Verified By

Prod. Assistant / Prod. Engineer/HOD Prod.

FORM NO : QC-PC-008/09/REV.2
S4 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST
Date
Shift / Time

Maintenance / Operator :
JINFA - 1
Cond.

RIELLO - 1
Remark

RIELLO - 2
Cond.

Remark

Cleaning Panel

Grease

Grease

V - Belt

Brake Coil

Brake Coil

Motor

Hydraulic Fluid

Hydraulic Fluid

Limit Switch

Sensor

Sensor

Hydraulic Fluid

Limit Switch

Limit Switch

Unit Motor

Unit Motor

Timing Belt

Timing Belt

Accumulators

Accumulators

Hydraulic Pump & System

Hydraulic Pump & System

Cleaning Panel

Panel Contactors, Timers, Wiring

Panel Contactors, Timers, Wiring

V - Belt

Coolant

Coolant

JINFA - 2
Cond.

Remark

:
:

Motor
Limit Switch
Hydraulic Fluid
JINFA - 3
Cond.

BROACHING MACHINE
Remark

Cond.

Cleaning Panel

Motor

V - Belt

Press Button

Motor

Hydraulic Oil

Remark

Limit Switch
Hydraulic Fluid

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Checked By

Verified By

Section Head S4

Prod. Assistant / Prod. Engineer/HOD Prod.

NO : QC-PC-008/09/REV.2

-2
Cond.

Remark

FORM NO : QC-PCS5 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST


Date
Shift / Time

Maintenance / Operator :

INDUCTION BRAZING MACHINE


MAIN POWER SWITCH PANEL
Item
Cover Panel Fan

Condition
Good
Not Good

Check

Remark

Cleaning

Item
Water Tank

Check

Min

Condition
Normal

Max

Level

COIL
Item
Coil

Condition
Good
Not Good

Check

Remark

Cleaning

Item
Coil

Foot Switch

Condition
Good
Not Good

Check

Remark

Function

Connection

Check

Item
Connection

Condition
Good
Not Good

Check

Condition
Good
Not Good

Remark

Function
BRAZING TORCH

Remark

Function

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

Condition
Not Good Change

COOLING WATER SYSTEM

CONNECTION
Item

Good

Function

FOOT SWITCH
Item

Check

Item
Brazing Nozzle

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

Check

Condition
Good
Not Good

Remark

Clean

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Done By

Checked By

Verified By

Electrical Technician/Operator

Section Head S5

Prod. Assistant / Prod. Engineer/ HOD Prod.

FORM NO : QC-PC-015/09/REV.1

Shift / Time

:
:

Remark

Remark

Remark

Remark

d to Repair

stant / Prod. Engineer/ HOD Prod.

FORM NO : QC-PCS6 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST


Date
Shift / Time

Maintenance / Operator :
AIR TESTING MACHINE NO.1
Cond.

AIR TESTING MACHINE NO.2


Remark

Air Cyclinder

Air Cyclinder

Pressure Gauge

Pressure Gauge

Limit Switch

Limit Switch

Testing Jig

Testing Jig

WATER TEST M/C PUMP


Cond.

WASHING MACHINE
Remark

Check & Cleaning

Check & Cleaning

Check / Replace Seal

Air Valves / Supply

Motor

Air Cyclinder

Pressure Gauge

Check Nuts & Bolts

Water Supply Control Valve

Water Supply Control Valves

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period
Checked By

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down
Verified By

Shift Supervisor S6

Prod. Assistant / Prod. Engineer/ HOD Prod

FORM NO : QC-PC-009/09/REV.1

:
:

Shift / Time

TESTING MACHINE NO.2


Cond.

Remark

WASHING MACHINE
Cond.

x Need to Repair
hine/part vibrates
loud noise
is several worn out
is potentially down

Remark

ant / Prod. Engineer/ HOD Prod.

FORM NO : QC-PC-010/09/REV.1
S7 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST
Date
Shift / Time

Maintenance / Operator :

:
:

POLISHING HEADS (BELTING)


1
Cond.

2
Remark

Cond.

3
Remark

Cond.

4
Remark

Cond.

Remark

Cond.

5
Remark

Cond.

Remark

Cond.

Remark

Bearing
Panel Contactor
Suction Hose
Dust Guard
IDLER
1
Cond.

2
Remark

Cond.

3
Remark

Cond.

5
Remark

Bearing
Shaft
POLISHING HEADS (MOPPING)
6
Cond.

7
Remark

Cond.

8
Remark

Cond.

9
Remark

Cond.

Remark

Bearing
Panel Contactor
Suction Hose
Dust Guard
CYCLONE / DUST EXTRACTOR - BELTING
Cond.

CYCLONE / DUST EXTRACTOR - MOPPING

Remark

Cond.

Dust Collector

Dust Collector

Ducting Hose

Ducting Hose

Motor

Motor

Bearing

Bearing

Filter Bag

Filter Bag

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

Remark

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Checked By

Verified By

Shift Supervisor S7

Prod. Assistant / Prod. Engineer/ HOD Prod.

S8 (ABS) - PREVENTIVE MAINTENANCE SERVICE CHECKLIST


MONTH :

Equipment Machine

YEAR :
Description of work to be done

Check

Week 1
Remarks/Comments

Check

Week 2
Remarks/Comments

Check

Week 3
Remarks/Comments

Week 4
Check

AIR BLOWER 1 (AIR Cleaning Air Filter


AGITATION)
ABS PLATING TANK

Wash all water rinse tanks

Operators :

Operators :

Operators :

Operators :

In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :

In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :

In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :

In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :

S8 (BRASS) - PREVENTIVE MAINTENANCE SERVICE CHECKLIST


MONTH :

Equipment Machine

YEAR :
Description of work to be done

CYANIDE COPPER
FILTER

Wash filter - 1 unit


Wash filter bag
Change filter bag and carbon cartridge

COPPER ACID
FILTER

Wash filter - 2 units


Wash filter bag
Change filter bag and carbon cartridge

Check

Week 1
Remarks/Comments

Check

Week 2
Remarks/Comments

Check

Week 3
Remarks/Comments

Week 4
Check

Wash filter - 1 unit


Wash filter bag
ABS NICKEL FILTER Change filter bag and carbon cartridge

BRASS NICKEL
FILTER
DEGREASING TANK
BRASS CHROME
RECTIFIER
CYANIDE COPPER
RECTIFIER
COPPER ACID
RECTIFIER
ABS NICKEL
RECTIFIER
ABS CHROME
RECTIFIER

Wash filter - 1 unit


Wash filter bag
Change filter bag and carbon cartridge
Renewal of chemical
Check cable lug contact
Check cable lug contact
Check cable lug contact
Check cable lug contact
Check cable lug contact

V BLOCK

Cleaning contact point


Change if necessary

FLIGHT BAR

Cleaning contact point


Change if necessary

BRASS PLATING Wash all water rinse tanks


TANK
AIR BLOWER 2 (AIR Cleaning Air Filter
AGITATION)
Cleaning Blower Filter
Oven

GENERAL

Clean main water supply filter cartridges


Check water supply pipe
Check air agitation pipe
Operators :

Operators :

Operators :

Operators :

1
2
3
4

1
2
3
4

1
2
3
4

1
2
3
4

In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :

In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :

In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :

In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :

PAGE : 1 OF 2
FORM NO : QC-PC-011/09/REV.1

Week 4
Remarks/Comments

Operators :
1
2
3
4

In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :

PAGE : 2 OF 2
FORM NO : QC-PC-011/09/REV.1

Week 4
Remarks/Comments

Operators :
1
2
3
4

In-Charge by
Section Head S8 :
Verified by Prod.
Assistant /
Chemical
Engineer /HOD
Date :

S9 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST


Maintenance / Operator :
BUFFING MACHINE
Cond.

DRILLING MACHINE
Remark

Check/Replace bearing

Cond.

MONODE MARKER
Remark

V-belt

Check & Service

WATER TESTING 1
Cond.

WATER TESTING 2
Remark

Cond.

Check/Replace Seal

Check/Replace Seal

Motor and Pump

Motor and Pump

SCREW MOUNTING (Air Tool)


Cond.

Remark

BONNET MOUNTING (Air Tool)


Remark

Check & Service

Cond.

Remark

Check & Service

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Checked By

Verified By

Section Head S9

Prod. Assistant / Prod. Engineer/H

FORM NO : QC-PC-012/09/REV.2

Date
Shift / Time

:
:

MONODE MARKER
Cond.

Remark

Service

ed to Repair

Verified By

Prod. Assistant / Prod. Engineer/HOD Prod.

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : CORE SHOP
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Check / Replace Sliding Rail

Check / Replace Heater

Cleaning

Check / Replace Sensor

Check / Repair Hopper


CORE MACHINE 1, 2, 3
&4

Check / Repair Temperature


Controller
Check / Replace Air Regulator
and Gauge

Check / Replace Panel Wiring

Check / Replace Valves

Check / Replace Hoses

Check / Replace Motor

SAND MIXER

Check / Replace Wiring

Check / Replace Body

Highlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Shift Supervisor S1

Prod. Assistant/Prod. Engine

FORM NO : QC-PC-026/09/REV.0

YEAR :
OCTOBER
NOVEMBER
DECEMBER
41 42 43 44 45 46 47 48 49 50 51 52

ified By :

od. Assistant/Prod. Engineer / HOD Prod.

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : CASTING
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Cleaning Break Dross / Bottom

Check Securing Bolt and Nut

Check / Change Thermocouple


FURNACE
Check / Change Cable Head

Check Coil & Change Gasket

Channel Cleaning

Check Timer

Clean Dust Accumulation


CONTROL PANEL
Clean Contactors of Carbon
Build Up

Check / Change Fuse

Clean Sand In Vacuum Bag

Clean Machine
SAND BLASTING M/C
Check /Change Blasting
Nozzle

Cleaning of Filter Bag


Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Shift Supervisor S2

Prod. Assistant/Prod. Engineer /HO

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : CASTING
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Check & Cleaning

Top Up/ Check Oiling or


Greasing
Check / Change Hydraulic
Fluid
CASTING M/C
Check / Replace Sensor

Check / Change Rubber


Coupling of Hydraulic Pump

Change of Dycote

Check and Cleaning

CHIMNEY

Check Blower Motor

Check Extractor Motor

Top Up Dycote
GENERAL
Check / Change Air Hoses and
Valves

Highlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Shift Supervisor S2

Prod. Assistant/Prod. Engineer /HO

TOBER

PAGE : 1 OF 2
FORM NO : QC-PC-027/09/REV.0

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer /HOD Prod.


PAGE : 2 OF 2
FORM NO : QC-PC-027/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer /HOD Prod.

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : FETTLING
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE

JANUARY
3
4

FEBRUARY
7
8
9

10

MARCH
11 12

13

14

APRIL
15 16

17

18

19

MAY
20 21

22

23

JUNE
24 25

26

27

28

JULY
29 30

31

32

AUGUST
33 34

35

36

SEPTEMBER
37 38 39

40

OCTOBER
41 42

Cleaning

Check / Change Bearing

Double Cut- Off


Machine

Check / Replace V.Belt

Greasing

Check Motor

GRINDING M/C

Check / Change Bearing

Clean Dust Collector

Ducting Hose
CYCLONE MACHINE
Check Motor

Painting (Epoxy)

Check / Change Bearing

Change Oil Gear Box

RUMBLING MACHINE Check / Change Chain

Check / Change Sprocket

Check Motor
Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S3

Prod. Assistant/Prod. Engineer / H

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : TOSCHA MACHINE
EQUIPMENT MACHINE
TURBINE

SPINDLE HOUSING
LUBRICATION

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Visual Check - Wear & Tear


Cleanning

Check / Refill

TRANSMISSION BELT &


Check / Cleaning / Tightening
CHAIN STRETCHING

LINING & BOLT

FEED DUCT

Check / Replace

Check/ Cleanning

ABRASIVE VALVE TILE Check / Replace

GEAR BOXES
LUBRICANT LEVEL

Check / Refill

HYDRAULIC PLANT
PIPING

Check / Cleaning

Check / Replace
ELEVATOR BUCKET
Cleaning

FILTER BAG
PNEUMATIC
ELECTROVALVE
LUBRICATION

Check / Cleanning

Check / Refill

Cleaning
RUNNERHEAD SAND /
SHOT SEPARATOR
Check / Replace

ELEVATOR BELT

Check/Repair
Higlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S3

Prod. Assistant/Prod. Engineer / H

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : TOSCHA MACHINE
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Cleaning
VIBRATOR
Check / Repair

Check / Replace
SLEEVE
Cleaning

Higlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S3

Prod. Assistant/Prod. Engineer / H

Page : 1 OF 3
FORM NO : QC-PC-028/09/REV.0

YEAR :

TOBER
43

44

NOVEMBER
45 46 47

48

49

DECEMBER
50 51 52

tant/Prod. Engineer / HOD Prod.

TOBER

Page : 2 OF 3
FORM NO : QC-PC-028/09/REV.0

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.


Page : 3 OF 3
FORM NO : QC-PC-028/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

PAGE : 1 OF 2
FORM NO : QC-PC-02

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : MACHINE SHOP
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Topping Up Grease

Check Brake Coil

Change of Hydraulic Fluid

Check & Replace Sensor &


Limit Switch

RIELLO M/C 1

Check Motor, Timing Belt

Check Gas at Accumulator

Check Hydraulic Pump &


System
Check Panel Contactor, Timer,
Wiring

Top Up Coolant

Check / Replace V-Belt

Change of Hydraulic Fluid

JINN FA 1, 2 & 3

Check & Replace Limit Switch

Clean Electrical Panel

Check Motor Condition


Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S4

Prod. Assistant/Prod. Engineer / H

PAGE : 2 OF 2
FORM NO : QC-PC-02

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : MACHINE SHOP
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Check Motor

BROACHING M/C

Check Press Button

Top Up Hydraulic Oil

Topping Up Grease

Check Brake Coil

Change of Hydraulic Fluid

Check & Replace Sensor &


Limit Switch

RIELLO M/C 2

Check Motor, Timing Belt

Check Gas at Accumulator

Check Hydraulic Pump &


System
Check Panel Contactor, Timer,
Welding

Top Up Coolant

Higlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S4

Prod. Assistant/Prod. Engineer / H

PAGE : 1 OF 2
FORM NO : QC-PC-029/09/REV.0

TOBER

YEAR :

NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

PAGE : 2 OF 2
FORM NO : QC-PC-029/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

FORM

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : BRAZING
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Cleaning Cover Panel Fan


MAIN POWER SWITCH
PANEL
Check / Top Up Water

COIL

Check / Cleaning

FOOT SWITCH

Check / Replace

CONNECTION

Check

COOLING WATER
Check / Replace
SYSTEM CONNECTION

BRAZING NOZZEL

Clean / Replace

Highlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S5

Prod. Assistant/Prod. Engineer / HOD Prod.

TOBER

FORM NO : QC-PC-030/09/REV.0

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

. Engineer / HOD Prod.

PAGE : 1 OF 2
FORM NO : QC-PC-03

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : SUB ASSEMBLY
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Check & Service Air Cylinder

AIR TESTING MACHINE


NO.1

Check / Replace Pressure


Gauge

Check / Replace Limit Switch

Check / Repair Testing Jig

Check & Service Air Cylinder

AIR TESTING MACHINE


NO.2

Check / Replace Pressure


Gauge

Check / Replace Limit Switch

Check / Repair Testing Jig

Check & Cleaning

Check & Replace Seal

WATER TESTING M/C


Check & Service Motor
PUMP
Check / Replace Pressure
Gauge
Check / Replace Control
Valves
Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Shift Supervisor S6

Prod. Assistant/Prod. Engineer / H

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : SUB ASSEMBLY
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Check & Cleaning

Service & Check Valves

WASHING MACHINE

Check / Replace Air Cylinders

Check Nuts & Bolts

Check / Replace Water Supply


Control Valve

Highlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Shift Supervisor S6

Prod. Assistant/Prod. Engineer / H

PAGE : 1 OF 2
FORM NO : QC-PC-031/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

TOBER

PAGE : 2 OF 2
FORM NO : QC-PC-031/09/REV.0

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

FORM

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : POLISHING
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Check / Change Bearing

Clean / Change Panel Contacto


POLISHING HEAD 1 TO 9

Check / Change Suction Hose

Check / Change Dust Guard

Check / Change Bearing


POLISHING IDLER 1 to
5
Check / Change Shaft Idler

Check / Cleaning Dust Collecto

Check / Cleaning Ducting Hose

Check / Replace Bearing


CYCLONE MACHINE 1
&2
Check Greasing

Check & Cleaning Filter Bag

Check Motor

Highlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Shift Supervisor S7

Prod. Assistant/Prod. Engineer / H

TOBER

FORM NO : QC-PC-032/09/REV.0

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : PLATING (ABS)
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Wash all water rinse tanks


ABS PLATING TANK
Painting

Check / Change Bearing


EXHAUST NO.1 AND
NO. 2
Cleaning

Check Roller

Check Chain & Sprocket


ABS TRANSPORTERS
Check Roller Shaft
NO.1
Change Gear Box Oil
Check / Maintain Transporters
Rail
Check Roller

Check Chain & Sprocket


ABS TRANSPORTERS
Check Roller Shaft
NO.2
Change Gear Box Oil
Check / Maintain Transporters
Rail
Check / Change Bearing
AIR BLOWER 1 (AIR
AGITATION)
Cleaning
Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S8

Prod. Assistant/Prod. Engineer / H

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : PLATING (BRASS)
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Wash all water rinse tanks


BRASS PLATING TANK
Painting

Check / Replace Sensor

Change Lifting Belt

Change Roller
AUTO TRANSPORTERS
NO.1
Change Gear Box Oil

Check Break Coil


Check / Maintain Transporters
Rail
Check / Replace Sensor

Change Lifting Belt

Change Roller
AUTO TRANSPORTERS
NO.2
Change Gear Box Oil

Check Break Oil


Check / Maintain Transporters
Rail
Check / Change Bearing
AIR BLOWER 2 (AIR
AGITATION)
Cleaning Air Filter
Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S8

Prod. Assistant/Prod. Engineer / H

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : PLATING (BRASS)
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Check Cable Lug Contact

CYANIDE COPPER
RECTIFIER

Cleaning & Check PCB


Check / Replace Diodes
Check / Replace Wire
Check Cable Lug Contact

COPPER ACID
RECTIFIER

Cleaning & Check PCB


Check / Replace Diodes
Check / Replace Wire
Check Cable Lug Contact
Cleaning & Check PCB

ABS NICKEL RECTIFIER


Check / Replace Diodes
Check / Replace Wire
Check Cable Lug Contact

ABS CHROME
RECTIFIER

Cleaning & Check PCB


Check / Replace Diodes
Check / Replace Wire
Check Cable Lug Contact

BRASS CHROME
RECTIFIER

Cleaning & Check PCB


Check / Replace Diodes
Check / Replace Wire
Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S8

Prod. Assistant/Prod. Engineer / H

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : PLATING (BRASS)
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Cleaning Filter

Wash Filter Bag


CYANIDE COPPER
FILTER

Check / Change Filter


Cartridge & Bag
Check / Replace Seal

Cleaning Filter

Wash Filter Bag


COPPER ACID FILTER
Check / Change Filter
Cartridge & Bag
Check / Replace Seal

Cleaning Filter

Wash Filter Bag


ABS NICKEL FILTER
Check / Change Filter
Cartridge & Bag
Check / Replace Seal

Cleaning Filter

Wash Filter Bag


BRASS NICKEL FILTER
Check / Change Filter
Cartridge & Bag
Check / Replace Seal
Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S8

Prod. Assistant/Prod. Engineer / H

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : PLATING (BRASS)
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Cleaning Contact Point


V BLOCK
Change if necessary
CYANIDE COPPER
Addition of Carbon
CARBON TREATMENT
COPPER ACID CARBON
Addition of Carbon
TREATMENT
BRASS NICKEL
Addition of Carbon
CARBON TREATMENT
ABS NICKEL CARBON
Addition of Carbon
TREATMENT
Cleaning Panel
CONTROL PANEL AUTO
Check / Replace Contactor
LINE
Cleaning Contact Point

Renewal of Chemical

Check / Change Seal


DEGREASING TANK
Check / Replace Heater

Painting Degreasing Tank

Cleaning Contact Point


FLIGHT BAR
Change if necessary

Check / Replace Heater


Oven
Clean Blower Filter
Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S8

Prod. Assistant/Prod. Engineer / H

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : PLATING
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Cleaning

CHILLER MACHINE

Refilling of Gas

Painting Chiller Tank

Check / Change Bearing


EXHAUST NO.3 AND
NO.4
Cleaning

Cleaning

HOIST - DEGREASING Greasing

Painting
Clean Main Water Supply Filter
Cartridges
Check Water Supply Pipe
GENERAL
Check Air Agitation Pipe
Clean Sludge of ABS and Brass
Chrome Tanks

Highlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S8

Prod. Assistant/Prod. Engineer / H

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : PLATING
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Cleaning Effluent Plant Area

Painting Effluent Plant Tank

Check/ Change Seal


EFFLUENT PLANT
Check Filter Press Bag/Hydraulics
Change Carbon

Change Sand

Highlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S8

Prod. Assistant/Prod. Engineer / H

PAGE : 1 OF 7
FORM NO : QC-PC-033/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

PAGE : 2 OF 7
FORM NO : QC-PC-033/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

PAGE : 3 OF 7
FORM NO : QC-PC-033/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

PAGE : 4 OF 7
FORM NO : QC-PC-033/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

PAGE : 5 OF 7
FORM NO : QC-PC-033/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

PAGE : 6 OF 7
FORM NO : QC-PC-033/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

PAGE : 7 OF 7
FORM NO : QC-PC-033/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

FORM

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : FINAL ASSEMBLY
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Check / Replace Seal


WATER TESTING
Check / Replace Motor and
Pump

BUFFING M/C

Check/ Replace Bearing


Condition

DRILLING M/C

Check / Replace V-Belt

SCREW MOUNTING AIR


Check & Service
TOOL
BONNET MOUNTING
Check & Service
AIR TOOL

MONODE MARKER

Check & Service

Highlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Section Head S9

Prod. Assistant/Prod. Engineer / H

TOBER

FORM NO : QC-PC-034/09/REV.1

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

PAGE : 1 OF 2
FORM NO : QC-PC-035/09
DOE INDUSTRIES SDN BHD

PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE


SECTION : BUILDING AND MAINTENANCE
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Cleaning
FACTORY SSB 1
Check Joint Connection

Cleaning
CAPACITOR BANK
Check / Replace Cables,
Connectors, Fuse

Cleaning

Check Ultra Coolant Level

COMPRESSOR INGERSOLL RAND 1 &


2

Change Oil Filter

Clean Air Filter

Greasing

Change Separator Element

Cleaning
AIR DRYER
Refill Gas

Highlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Electrical Technician

Prod. Assistant/Prod. Engineer / H

PAGE : 2 OF 2
FORM NO : QC-PC-035/09

DOE INDUSTRIES SDN BHD


PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE
SECTION : BUILDING AND MAINTENANCE
EQUIPMENT MACHINE
ROOFING & WALLS

AWNING

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Check, Repair / Replace

Check / Replace

Check/ Repair
FENCING
Painting

Check / Repair
GUARD HOUSE
Safety Alarm Panel

Painting
TOILET
Check, Clean / Repair

CANTEEN

Check, Clean / Repair

PARAMETER DRAIN

Check, Clean / Repair

Cleaning

WATER STORAGE TANK Painting

Check Structure Condition

Cleaning
AIR STORAGE SUMP
(RESERVOIR)
Painting

PALLET TRUCK

Check & Relubricate Roller &


Oil Seal
Highlighted "C" denotes Preventive Maintenance Completed
Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

Verified By :

Mechanical Technician

Prod. Assistant/Prod. Engineer / H

GE : 1 OF 2
ORM NO : QC-PC-035/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

GE : 2 OF 2
ORM NO : QC-PC-035/09/REV.0

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

tant/Prod. Engineer / HOD Prod.

FORM NO : MP-PC-006

DOE INDUSTRIES SDN BHD

Hourly Inspection Sheet


Legend:
Machine No. /
Process

Product

No inspection
Inspected
Threading

Production
Period
Dimensions Specification Range

Seat

MD
SE
Reamed Size A
[mm]

Machine Down
Setting/Service
Reamed Size B
[mm]

Section : S
Date
:
Flange Size
[mm]

Hole Size
[mm]

RIELLO M/C 1

RIELLO M/C 2

JF 2 WAY 1

JF 2 WAY 2

JF 2 WAY 3

BROACHING

MANUAL CUT

Inspection methodology :

Inspected by

1) Use threaded, ring or plug gauges for Go and No Go ends

Name

Date

Name

Date

Setter

Checked by
Section Head S4

2) To record dimensions

Remarks: [to comment on non-inspection, if any]

3) Each box denotes per hour inspection

Tube Size
[mm]

FORM NO : MP-PC-006/09/REV.2

TRIES SDN BHD

spection Sheet
Section : S4
Date
:
Bonnet Size
[mm]

4) Sample size: min. 2pcs

FORM NO : MP-PC-0
DOE INDUSTRIES SDN BHD
CORE SHOP (S1)
Checklist for Mixing Core Sand / Operating Parameters
Shift

Working Hours

Mixing Formula
Description

Silica Sand
20/60 (KG)

Silica Sand
30/60 (KG)

Resin HP
301 (ml)

Catalyst
Harter
AT7 (ml)

Quantity

Ammonium
(ml)

Silica
Std.
Mixing
Timer

Total Used

Resin
Catalyst
Ammonia

Record time for each as stated below:Machine

Mix No.

Start Mix

Stop Mix

Machine 1

Machine 2

To Hopper

1
2
3
4
5
6
7
8
9
10
11
12

Parameters

Machine 3

Product
Core Box Temperature
(260-450C)
Blowing Pressure (4 to 6 Bar)
Curing Time

(8 -40 sec.)

Note : All the mixing must be use within an hour after mixed it

Prepared By,

Operator

Checked By,

Shift Supervisor S1

Approved By,

Prod. Assistant/Prod. Engineer/HOD

FORM NO : MP-PC-001/09/REV.5

ng Parameters
Date

Std.

Act.

1 min
2 min
1 min
1 min

Completed

Machine 3

Operator

Machine 4

Approved By,

Prod. Assistant/Prod. Engineer/HOD Prod.

FORM NO : MP-PC-005/09/REV.1
DOE INDUSTRIES SDN BHD
CHECK LIST FOR CASTING
Shift

Date

NO

DESCRIPTION

STD

Temperature

9501070C

Furnace Brass Level

Dycote Top-Up & Level

Heating Up Laddies

Prepared By,

Operator

3/4 min
Full Bin

OK

NOT OK

:
FREQUENCY
Start - Up
Start - Up

Start - Up
(1st & 2nd Shift)
Start - Up
(1st & 2nd Shift)

FORM NO : MP-PC-005/09/REV.1

REMARKS

Checked By,

Shift Supervisor S2

FORM NO : MP-PC-007/09/REV.2
DOE INDUSTRIES SDN BHD
METAL CHARGING FORMAT
CHARGER

VERIFIED BY SHIFT
SUPERVISOR S2
:

TIME

INGOT

FURNACE
PCS

KGS

RUNNERS/
REJECTS ZINC KGS
KGS

DATE

SHIFT

ALUMINUM
KGS

AE

BE

REMARKS

MP-PC-007/09/REV.2

AE

BE

REMARKS

FORM NO : MP-PC-009/09/R
DOE INDUSTRIES SDN BHD
CHECK LIST FOR ELECTROPLATING (S8) - BRASS LINE
Date :

Check By

Working Hours :

Operator :

Verified By Section Head S8 :

At prestart level, to ensure that all switches are ON position


DESCRIPTION

ON

OFF

DEGREASER HEATER
TRANSPORTER MCB
MAIN WATER SUPPLY
RECTIFIER
AIR BLOWER

Frequency : Every 3 hours


REQUIRED TEMP
CHEMICAL
OP 283

(C)
40-65

CYANIDE COPPER

60-70

ACID COPPER

24-40

ABS NICKEL

49-60

BRASS NICKEL

49-60

ABS CHROME

45-55

BRASS CHROME

45-55

ACTUAL READING (C)


7:00/8:00 AM

10:00/11:00 AM

1:00/2:00 PM

4:00/5:00 PM

Frequency : Every 3 hours


ACTUAL READING (pH)
CHEMICAL

STD pH

ABS NICKEL

4.0 - 4.5

BRASS NICKEL

4.0 - 4.5

7:00/8:00 AM

10:00/11:00 AM

7:00/8:00 AM

10:00/11:00 AM

7:00/8:00 AM

10:00/11:00 AM

1:00/2:00 PM

4:00/5:00 PM

Frequency : Every 3 hours


BRASS
PRODUCT CATEGORY

STD Volts & Amp

SMALL

5~7

MEDIUM

5~7

500~800

BIG

6~8

600~1500

ACTUAL READING (Volts & Amp)


1:00/2:00 PM

4:00/5:00 PM

500~800

Frequency : Every 3 hours


ABS
PRODUCT CATEGORY

STD Volts & Amp

SMALL

5~7

1500~3400

MEDIUM

6~8

2500~4000

ACTUAL READING (Volts & Amp)


1:00/2:00 PM

4:00/5:00 PM

FORM NO : MP-PC-009/09/REV.5

NE

ING (C)
7:00/8:00PM

10:00/11:00 PM

7:00/8:00PM

10:00/11:00 PM

7:00/8:00PM

10:00/11:00 PM

7:00/8:00PM

10:00/11:00 PM

ING (pH)

Volts & Amp)

Volts & Amp)

FORM NO : MP-PC-008/09/REV.2
DOE INDUSTRIES SDN BHD
BAR TRACKING FORM
OPERATOR NAME
SHIFT

Good

Reject

DATE

CHECKED BY SECTION HEAD S8 :

Good

Reject

Good

Reject

Good

Reject

Total Qty

Good

Reject

Good Qty

Good

Reject

Rej Qty

Good

Rej %

BRASS

Bars

pcs

pcs

pcs

ABS

Bars

pcs

pcs

pcs

TOTAL

Bars

pcs

pcs

pcs

Reject

FORM NO : MP-PC-008/09/REV.2

DATE

TION HEAD S8 :

Reject

Good

Reject

FORM NO : MP-PC-014/
DOE INDUSTRIES SDN BHD
WASTE WATER TREATMENT RECORD
Section

: Effluent Treatment Plant

Date

Type :

Cyanide
Item

Type :
Qty

pH (Be)

pH (Af)

ORP (Be)

ORP (Af)

Chrome
Item

Caustic Soda (Kg)

Sulphuric Acid (Kg)

S. Hypochloride (Ltr)

S.Metabisulphate (Kg)

Sulphuric Acid (Kg)

Caustic Soda (Kg)

Polyfloc 10P (Kg)

Sulphuric Acid (Kg)

Polyfloc 20L (Ltr)

Polyfloc 10P (Kg)

Qty

pH (Be)

pH (Af)

pH (Be)

pH (Af)

Polyfloc 20L (Ltr)


Type :

Acid & Alkali (1st)


Item
Qty

Type :
pH (Be)

pH (Af)

Acid & Alkali (2nd)


Item
Qty

Caustic Soda (Kg)

Caustic Soda (Kg)

Sulphuric Acid (Kg)

Sulphuric Acid (Kg)

Polyfloc 10P (Kg)

Polyfloc 10P (Kg)

Polyfloc 20L (Ltr)

Polyfloc 20L (Ltr)

Note :
Be - Before dosing

Af - After dosing

Remark :

Recorded By,

Checked By,

Waste Water Treatment Plant Operator

Section Head S8

FORM NO : MP-PC-014/09/REV.1

ORP (Be)

Checked By,

Section Head S8

ORP (Af)

FORM NO : MP-PCDOE INDUSTRIES SDN BHD


CHECK LIST FOR ELECTROPLATING (S8) - ABS LINE
Date :

Checked By Operator:

Working Hours :

Verified By Section Head S8 :

Frequency : Every 3 hours


STD
(C)

CHEMICAL
Udyprep 110EC

40-50

Etching

65-70

Accelerator

35-40

ENP

40-50

7:00/8:00 AM

10:00/11:00 AM

ACTUAL READING (C)


1:00/2:00 PM
4:00/5:00 PM

7:00/8:00 AM

10:00/11:00 AM

ACTUAL READING (C)


1:00/2:00 PM
4:00/5:00 PM

Frequency : Every 3 hours


CHEMICAL
ENP

Remarks:

STD pH
6-8

FORM NO : MP-PC-015/09/REV.4

LINE

G (C)
7:00/8:00PM

10:00/11:00 PM

7:00/8:00PM

10:00/11:00 PM

G (C)

FORM NO : QC-PC-013/09/REV.1
DOE INDUSTRIES SDN BHD

PREVENTIVE MAINTENANCE SERVICE REPORT


PERSON IN CHARGE

DATE :

TIME START :

EQUIPMENT

1.

&

2.

LOCATION :

3.

TIME FINISH :

WORK DONE :
1.
2.
3.
4.
5.
6.
FAULT :
1.
2.
3.
4.
PARTS CHANGED :
1.
2.
3.
REMARKS :

Prepared By,

Checked By,

Verified By,

Person In Charge

Prod. Assistant

Engineer /HOD Prod.

RM NO : QC-PC-013/09/REV.1

Verified By,

Engineer /HOD Prod.

S8 (ABS) - PREVENTIVE MAINTENANCE SERVICE CHECKLIST

Maintenance / Operator :

1.
2.

ABS PLATING TANK


Cond.

EXHAUST NO.1
Time Start

Time End

Painting

Cond.

Time Start

Time Start

Time End

Cleaning

Cleaning

Check / Change Bearing

Check / Change Bearing

ABS TRANSPORTERS NO. 1


Cond.

EXHAUST NO.2

ABS TRANSPORTERS NO. 2


Time End

Cond.

Check Roller

Check Roller

Check Chain & Sprocket

Check Chain & Sprocket

Check Roller Shaft

Check Roller Shaft

Change Gear Box Oil


Check / Maintain Transporters
Rail

Change Gear Box Oil


Check / Maintain Transporters
Rail

Time Start

AIR BLOWER 1 (AIR AGI


Time End
Check / Change Bearing

Remarks:

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Checked By

Verified By

Section Head S8

Prod. Assistant / Prod. Engineer/H

S8 (BRASS) - PREVENTIVE MAINTENANCE SERVICE CHECKLIST

Maintenance / Operator :

1.
2.

BRASS PLATING TANK


Cond.

Time Start

EXHAUST NO.3
Time End

Painting

Cond.

Time Start

Time Start

Time End

Cleaning

Cleaning

Check / Change Bearing

Check / Change Bearing

AUTO TRANSPORTERS NO. 1


Cond.

EXHAUST NO.4

AUTO TRANSPORTERS NO. 2


Time End

Cond.

Time Start

CHILLER MACHIN
Time End

Check / Replace Sensor

Check / Replace Sensor

Cleaning

Check / Change Timing Belt

Check / Change Timing Belt

Refilling of Gas

Check / Change Roller

Check / Change Roller

Painting Chiller Tank

Change Gear Box Oil

Change Gear Box Oil

Check / Maintain Transporters


Rail

Check / Maintain Transporters


Rail

AIR BLOWER 2 (AIR AGITATION)


Cond.
Check / Change Bearing

Time Start

CYANIDE COPPER FILTER


Time End

Cond.

Time Start

Check / Replace Seal

COPPER ACID FILT


Time End
Check / Replace Seal

Remarks:

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Checked By

Verified By

Section Head S8

Prod. Assistant / Prod. Engineer/H

S8 (BRASS) - PREVENTIVE MAINTENANCE SERVICE CHECKLIST


Maintenance / Operator :

1.
2.

ABS NICKEL FILTER


Cond.

BRASS NICKEL FILTER


Time Start

Time End

Check / Replace Seal

Cond.

Time Start

V BLOCK
Time End

Check / Replace Seal

BRASS CHROME RECTIFIER


Cond.

Time Start

Change if necessary
ABS CHROME RECTIFIER

Time End

Cond.

Time Start

CYANIDE COPPER REC


Time End

Check & Cleaning PCB

Check & Cleaning PCB

Check & Cleaning PCB

Check / Replace Diodes

Check / Replace Diodes

Check / Replace Diodes

Check / Replace Wire

Check / Replace Wire

Check / Replace Wire

ABS NICKEL RECTIFIER


Cond.

Time Start

COPPER ACID RECTIFIER


Time End

Cond.

Time Start

DEREASING TANK
Time End

Check & Cleaning PCB

Check & Cleaning PCB

Check / Change Seal

Check / Replace Diodes

Check / Replace Diodes

Check / Replace Heater

Check / Replace Wire

Check / Replace Wire

Painting Degreasing Tank

Remarks:

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Checked By

Verified By

Section Head S8

Prod. Assistant / Prod. Engineer/H

S8 (BRASS) - PREVENTIVE MAINTENANCE SERVICE CHECKLIST

Maintenance / Operator :

1.
2.

CYANIDE COPPER CARBON TREARMENT


Cond.

Time Start

COPPER ACID CARBON TREARMENT


Time End

Addition of Carbon

Cond.

Time Start

BRASS NICKEL CARBON TR


Time End

Addition of Carbon

ABS NICKEL CARBON TREARMENT


Cond.

Time Start

Addition of Carbon
FLIGHT BAR

Time End

Addition of Carbon

Cond.

CONTROL PANEL AUTO


Time Start

Time End

Change if necessary

Cleaning Panel
Check / Replace Contactor
Cleaning Contact Point

HOIST - DEGREASING
Cond.
Cleaning

Time Start

OVEN
Time End

Cond.

GENERAL
Time Start

Check / Replace Heater

Greasing

Time End
Clean Sluge of Brass & ABS
Chrome Tank

Painiting

Remarks:

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Checked By

Verified By

Section Head S8

Prod. Assistant / Prod. Engineer/H

S8 - PREVENTIVE MAINTENANCE SERVICE CHECKLIST

Maintenance / Operator :

1.
2.

EFFLUENT PLANT
Cond.

Time Start

Time End

Cleaning Effluent Plant Area


Painting Effluent Plant Tank
Check / Change Seal
Check Filter Press - Bag / Hydraulics
Change Carbon
Change Sand

Remarks:

Good Condition
a) Machine / part is running smooth
No unusual noise
b) Machine / part as good as original
c) Grease/oil still in validity period

CONDITION
* Maintenance Required
a) The machine is not running smoothly
Slight unusual sound heard
b) The part is slightly worn out
c) Grease / oil close to renewal time

x Need to Repair
a) The machine/part vibrates
Creates loud noise
b) The part is several worn out
c) Machine is potentially down

Checked By

Verified By

Section Head S8

Prod. Assistant / Prod. Engineer/H

PAGE : 1 OF 5
FORM NO : QC-PC-036/09/REV.0

Date :

EXHAUST NO.2
Cond.

Time Start

Time End

Change Bearing

AIR BLOWER 1 (AIR AGITATION)


Cond.

Time Start

Change Bearing

Verified By

Prod. Assistant / Prod. Engineer/HOD Prod.

Time End

PAGE : 2 OF 5
FORM NO : QC-PC-036/09/REV.0

Date :

EXHAUST NO.4
Cond.

Time Start

Time End

Time Start

Time End

Time Start

Time End

Change Bearing
CHILLER MACHINE
Cond.

g
of Gas

COPPER ACID FILTER


Cond.

Replace Seal

Verified By

Prod. Assistant / Prod. Engineer/HOD Prod.

PAGE : 3 OF 5
FORM NO : QC-PC-036/09/REV.0

Date :

V BLOCK
Cond.

Time Start

Time End

if necessary
CYANIDE COPPER RECTIFIER
Cond.

Time Start

Time End

Time Start

Time End

Cleaning PCB

Replace Diodes

Replace Wire
DEREASING TANK
Cond.

Change Seal

Replace Heater
Degreasing Tank

Verified By

Prod. Assistant / Prod. Engineer/HOD Prod.

PAGE : 4 OF 5
FORM NO : QC-PC-036/09/REV.0

Date :

BRASS NICKEL CARBON TREARMENT


Cond.

Time Start

Time End

of Carbon
CONTROL PANEL AUTO LINE
Cond.

Time Start

Time End

Time Start

Time End

g Panel

Replace Contactor

g Contact Point
GENERAL
Cond.

n Sluge of Brass & ABS


Chrome Tank

Verified By

Prod. Assistant / Prod. Engineer/HOD Prod.

PAGE : 5 OF 5

FORM NO : QC-PC-036/09/REV.0

Date :

Verified By

Prod. Assistant / Prod. Engineer/HOD Prod.

FORM NO

DOE INDUSTRIES SDN BHD


DAILY PREVENTIVE MAINTENANCE SERVICE CHECK SHEET
SECTION : CASTING

JOB / MAINTENANCE

YEAR :

EQUIPMENT
MACHINE
Month

Day

FURNACE
1

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

JANUARY

FEBRUARY

MARCH

APRIL

MAY

JUNE

DEGASSING
JULY

AUGUST

SEPTEMBER

OCTOBER

NOVEMBER

DECEMBER

Highlighted "" denotes Preventive Maintenance Completed


Highlighted "X" denotes Preventive Maintenance Incompleted
Note:
Degassing to be done end of 1st shift on daily basis.

Prepared by Shift
Supervisor S2

FORM NO : QC-PC-037/09/REV.1

NDUSTRIES SDN BHD

AINTENANCE SERVICE CHECK SHEET

Verified by Prod. Assistant / Prod.


Engineer / HOD Prod.

DOE INDUSTRIES SDN BHD


DAILY PREVENTIVE MAINTENANCE SERVICE CHECK SHEET
SECTION : FETTLING
EQUIPMENT MACHINE

DAY
JOB/MAINTENANCE

10

11

12

13

14

MONTH :
15 16 17

18

19

20

21

22

23

Cleaning
GRINDING MACHINE
Check Grinding Stone

Highlighted "" denotes Preventive Maintenance Completed


Highlighted "X" denotes Preventive Maintenance Incompleted

Prepared By,

Verified By,

Section Head S3

Prod. Assistant / Prod. Engin

FORM NO : QC-PC-038/09/REV.0

YEAR :

24

25

26

27

28

29

rod. Assistant / Prod. Engineer / HOD Prod.

30

31

DOE INDUSTRIES SDN BHD


DAILY PREVENTIVE MAINTENANCE SERVICE CHECK SHEET
SECTION : MACHINING
EQUIPMENT MACHINE

DAY
JOB/MAINTENANCE

10

11

12

13

14

MONTH :
15 16 17

18

19

20

21

22

23

Cleaning
RIELLO - 1
Check Jaw/Reamer
Cleaning
RIELLO - 2
Check Jaw/Reamer
Lubricating Oil
BROACHING

Check Tool / Jaws


Cleaning

Highlighted "" denotes Preventive Maintenance Completed


Highlighted "X" denotes Preventive Maintenance Incompleted

Prepared By,

Verified By,

Section Head S4

Prod. Assistant / Prod. Engin

FORM NO : QC-PC-039/09/REV.0

YEAR :

24

25

26

27

28

29

rod. Assistant / Prod. Engineer / HOD Prod.

30

31

DOE INDUSTRIES SDN BHD


DAILY PREVENTIVE MAINTENANCE SERVICE CHECK SHEET
SECTION : SUB ASSEMBLY
EQUIPMENT MACHINE

DAY
JOB/MAINTENANCE

AIR TESTING
MACHINE NO. 1

Check & Cleaning Tank

AIR TESTING
MACHINE NO. 2

Check & Cleaning Tank

10

11

12

13

14

MONTH :
15 16 17

18

19

20

21

22

23

Highlighted "" denotes Preventive Maintenance Completed


Highlighted "X" denotes Preventive Maintenance Incompleted

Prepared By,

Verified By,

Shift Supervisor S6

Prod. Assistant / Prod. Engin

FORM NO : QC-PC-040/09/REV.0

YEAR :

24

25

26

27

28

29

rod. Assistant / Prod. Engineer / HOD Prod.

30

31

DOE INDUSTRIES SDN BHD


DAILY PREVENTIVE MAINTENANCE SERVICE CHECK SHEET
SECTION : FINAL ASSEMBLY
EQUIPMENT MACHINE

DAY
JOB/MAINTENANCE

10

11

12

13

14

MONTH :
15 16 17

18

19

20

21

22

23

Check & Clean Tank


WATER TESTING

BUFFING M/C

Check / Replace Pressure Gauge


1&2
Check & Cleaning

Highlighted "" denotes Preventive Maintenance Completed


Highlighted "X" denotes Preventive Maintenance Incompleted

Prepared By,

Verified By,

Section Head S9

Prod. Assistant / Prod. Engin

FORM NO : QC-PC-041/09/REV.1

YEAR :

24

25

26

27

28

29

rod. Assistant / Prod. Engineer / HOD Prod.

30

31

FORM NO:QC-IT-021/09/REV.0

DOE Industries Sdn. Bhd


Calibration of Thickness Tester Report
Brand / Model :
Calibration
Date

Calibration
Reading

Variance

Remarks

Calibrated By Lab Assitant

Note:
1. Calibrate before first use of this thickness tester
2. The calibration is considered failed if it not able to achieve 10.7m5%

RM NO:QC-IT-021/09/REV.0

Bhd

rt

Verified By Chemical
Engineer

FORM NO:QC-IT-022/09/REV.0

DOE Industries Sdn. Bhd


Condition of Hydrometer Report
Equitment No :
Date

SG Reading

Remarks

Calibrated By Lab Assitant

Note:
1. Check the condition of hydrometer once a year
2. The hydrometer is considered faulty if it not able to return back to SG 1000

RM NO:QC-IT-022/09/REV.0

Bhd

Verified By Chemical
Engineer

DAILY PREVENTIVE MAINTENANCE SERVICE CHECK SHEET


SECTION : LYK
EQUIPMENT MACHINE

DAY
JOB/MAINTENANCE

Check & Clean Tank


WATER TESTING

BUFFING M/C

Check / Replace Pressure Gauge


1&2
Check & Cleaning

Highlighted "" denotes Preventive Maintenance Completed


Highlighted "X" denotes Preventive Maintenance Incompleted

Prepared By,

LYK

10

11

12

13

14

MONTH :
15 16 17

18

19

20

21

22

23

YEAR :

24

25

26

27

28

29

Verified By,

Section Head S9

30

31

PREVENTIVE MAINTENANCE YEARLY MASTER SCHEDULE


SECTION : LYK
EQUIPMENT MACHINE

MONTH / WEEK
JOB/MAINTENANCE
1

JANUARY
2
3
4

FEBRUARY
7
8
9

Check / Replace Seal


WATER TESTING
Check / Replace Motor and
Pump

Highlighted "C" denotes Preventive Maintenance Completed


Denotes PM postponed to new date
PM day - Saturday
Note : i) 1 day adjustment on delay fixed day
ii) PM Schedule circulated to Supervisor, Engineer, Manager
Legend :
W = Weekly
M = Monthly
Q = Quarterly
Y = Yearly

Prepared By :

LYK

MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

TOBER

YEAR :
NOVEMBER
DECEMBER
43 44 45 46 47 48 49 50 51 52

Verified By :

Section Head S9