You are on page 1of 17

Scene described HUMVEE production of (working title)

It is the Tamiya Humvee production did not


proceed from the beginning of May 2004, the
beginning of the year.
Although Humvee was often seen in the wide
range of visual media in Iraq, last year, "B
movie actually
It is up to you are significantly delayed had
intended to finish using the New Year holidays
are tight from Hamatte to see BLACK HAWK
DOWN ".
Various reasons I have, I'd like to reproduce
any of the movie and the scene became the
reason to choose this subject if you do it at all,
to me immature because it is likely a lot of
hurdles and begin emergency, this and Re A
I'm still stupid you're wondering from the start
and develop an idea or.
I do not get along and work still remains
indecisive feeling, came before the paint
during the holidays.
I decided to think of things from Ru later
to complete the vehicle and Ri A First For
example, because there is no way even if
they say just whining.
Initiative without Matomara 19 May, was first
started the production of the base Mashi. Pace
does not rise profusely at work
It is finished in three days-long. I think one of
two things one small Ri and 45 30cm, and
will go in either.
During this time May 28, I have one more
trial fitting the Humvee.
Left is where you have placed the
Humvee to the base of the larger of the
two. , "Between sparse and non-" in this
state
But I will elaborate a plan currently in the
forest one (?) To a larger structure.
On the set, because it seems to represent
a child next to a flat terrain in the city,
but in the "liver" later in this work, I have
just the production I finally!

PART2 scene described HUMVEE production of (working title)

June 8
But little by little every day lately, I have been the production of the structure.
However, while you are looking at (which is almost DVD movies even said materials),
more of the time it is this is suffering or good or good, but it is longer than the time you
move your hand when you try to form emergency (laughs).
Well, is why out of this hobby of "fun" as well let Megura feelings in one way or another
while imagining the finished product as it were, part of the production of each important
meaning that there is a "gestation period" is, I you're something you are or think.
I came to this area in the form until this week. At this point is a sequence alignment of a
kind place as usual. I hope if the atmosphere in the form of Dere (Somalia) is a little
easier to understand Africa was the subject of scene in it, I would like to elaborate a little
more difficult as the challenges it while.
For me, not even experience of traveling abroad, the part that does not come out of the
region of the imagination is the most state of the city of Somalia image of the video of
the movie is almost less material, however.
Do you want to how much height at any position on the base first, the actual production,
he decided to tangle with the thinking of two Humvees. The building in the photo is
going to add a second floor after this.
By the way, according to the Ministry of Foreign Affairs overseas safety current HP June
09, throughout Somalia were in evacuation recommendation still continues.

Circumference portion of the first floor

The interior of the first floor

Temporarily assembled to make a pillar of


balsa

Since a long time off work June 13, it is a


production of over half a day. I started from the
first floor of the building and roof accessories
(shutter).
I teamed up with instant adhesive Yuku a plate
of thinly sliced 1. Pula. Strength was anxious, I
was able to set up and surprisingly durable.
I hung the paper in order to give the details of
the edge portion of the roof 2., Then cut with a
cutter that was a rough cut to a square of
styrene board. Photos have just fixed with
double-sided tape on the ruler.
I was stuck to fit with the slope 3.. I have the
form in the "priority" Image only things that
came out of the movie in the movie the reason
why I decided to buildings like this by the way.
But somehow I ended up was a series of four
simple tasks..
After this, was troubled to balance the height, I
take the plunge this time (?) I tried on three floors. At first, I thought was going to fit
Paste styrene board surface configuration simple fact, since the exit height, rather there
was a good or stepped wall and, voila I became a form of this for the time being.
The details yet, but is likely to be put in hand now, work on this day was the end where
the form came into view.

I was challenged for the first time in the making structures aside the finish of the
structure of the building, "cars that have been discarded" by aluminum cans at the whim
of all.
Although this might be "reckless challenge" conceived as a certain sense to me, but I
had to there from the beginning, and then try with the intention of "have nothing to lose"
including the meaning of the study I decided to see.

June 24
Without writing a barely drawing, I started by making scissors and cutter tin momentum
suddenly just as usual. The image remains as set prima facie "was discarded old car that
has been well-thumbed burn." The most of the cut-and-paste or cut freehand also
"Norisuru" (laughs). I do not care even if the bonnet and the frame is distorted because
Ponkotsu! I mean, I intend to try it like that "cars that get squashed" dare, I honestly
do not know himself what would be the what now voila.
Back of the car and the body of a little work, I'm going to put the pallet was irresponsible
Sorry, this destination journey went smoothly if
(I forgot to take the body to the dimensions of the triangular portion of the door window
as expected) at the end of the cut-and-paste of force here, I tried to blow the surfacer for
the time being.
I just as soon as the recovery in the future and for now, I want to work hard to be able to
appear in the scene somehow safely.

July 1
I fell in production for the first time in a week. You are "palm tree" is the image above.
To those in A4 size printer paper folded in two, I went to put the cut with scissors. I have
pasted the masking tape to the brass core wire was annealed to it. Tree trunk used was
wound "towel" in bundled wire.

3
It is a "crunchy " Sase was forced to eat my son to use for real palm
. I am going to use and dry after this.
I went with the details of the tree trunk with a spatula to wire things that come with the
washcloth ~ , rubbed with a finger on it Epopate from Tamiya.
the leaves are wrapped around a little bit from here to the base Epopate also, I tried to
stab paying careful attention to the spacing stem leaves large and small.

I painted from the retouch of the pieces waiting for the cure of the putty was molded
parts July 2. Part of the leaves began to strengthen towards the destination color that
leaves mix yellow and buff, brown and olive green color to the base. After blowing a red
brown lacquer spray, then wash with brown and black enamel, the stem is dry brush in
the buff at the end.

To the roof of the building forming part of July 15, I was painting the base of the outer
wall.
After you form like "it" styrene board, I'm brushing with water-based paints on a base of
stone gray eyes.

I went shed plaster mixed with the ground-based India ink on July 19. I painted a thin
layer of filling material for the flooring of acrylic hardens to some extent. On top of this
was going to scatter his tea strainer in the soil "red ball", said some of the essential tea
strainer is not found, I color-wash of gray brick forced (laughs)

Disposal of vehicle production is July 18. I gather the parts from junk parts and stock.
Is the carrier that once assembled, I will have Ari degree wheel 1cm or truncated part
because he felt disconnected rather large size.

PART4 scene described HUMVEE production of


(working title)

7/29
I went to finish the details of the window portion
of the outer wall of the building.
I was worried about the processing of the left part
of the space from the beginning,
After thinking and so that it does not match the
window on the right, after all, I became an
orthodox form.
Half overlay 5 mm plastic board on top of the
recessed portion in the square, behind it, the
mesh is pasted. I do not know whether it is really
such a structure, openness and so furnished
except sunshine imagine selfish I'm going for (?)
(Laughs).
Below that is the same texture as the surrounding
wall, the bottom left of the window is one of four
state awnings were dropped out.

I did a painting of the second generation Humvee July 30. Including the opening and
closing of the door that has been temporarily fixed, retouching and finishing fine,
thinking you are going to decide the placement of the figure.
Also, I going to put the vehicle disposal as compared with the Humvee, as well as the
vehicle here, I Ji ..., I'd like to Kalamai a structure something, time (sweat) !

Although it is up to figure, I think is going to be a rough layout like this.


By the way, I will still represent the soil in the ground is not paved, does not give much
relief.

Figure the difference in the end has become the order of the production so far diorama
August 1.
Fine work is likely to continue,
If you get over here, the goal is likely to come into view I somehow!

Expressed using the plate weight band of "knee" and goggles to rely on photo material
on August 5.
However, this day I have just finished working on this. I've been focused in various
speed, the production does not proceed.
Every day, I want to put a hand even by little by little, this time of the spring and
summer, I overlap with the peak of the work,
Does not work as expected expedite (sob).

Am I that I would only take six hours to make this ......


"Slowness of the hand", the nature?

Is it summer lethargy <BR> August 11, I was wasting time busting also the physical
condition for three days over the weekend to the point. Is the detail work (laughs),
with epoxy putty nowadays they come in such a situation is no longer me.
It is not meant to be able to work this hand Kosaeru from scratch with putty, a
"kidnapping" as in "How to gurus" of many that have been published works over the

internet and those modelers decorating magazine model for me, hurdle fucked I such a
high, I had become a rash challenge for just a costume of Delta Force comes out in I saw
(?) happened to the "Black Hawk Down", I want to reproduce (lol ). I also Wakarimasen
himself ... whether in time for the deadline of the "snap" Te doing such a thing though!
(Sorry for lack of ability investigation as usual), in this case, to make a virtue of necessity
go to "my way" Daiichi, but there is also a question of I and whether the same
"delta" and the actual equipment in the movie Hey ... What is the: !

Sun August 13-14


It came off a three-day Bon vacation, can not produce in the preparation of work from
the next day, the last day is the result of two days of real production. & Detail up only
small modifications within the scope of self-satisfaction I tried it (?), A set of dessert
Soldier "Tamiya" figures. Pose is intact, the radio which is also basically the other to add
tools Epopate and 2 servings of goggles and put magazine, some were transplanted from
junk parts the arm line brass with emphasis on atmosphere I put the Te annealed.

August 19
I went into the painting of the figure. The paint in decent figure of this size that mean for
the first time in more than a year I think, does not go hand in much puzzled myself (sob).
There is a sense that the model was reminded that the world still make Nambour. After
the primer was going to finish your face with oil, but so is the drying time, here, I think it
is going to go back to basics, and will go with anything else only enamel.

First, Mr. Black soldiers of Delta Force (intended), it started around Ranger soldiers then
took off the helmet (intended) for the first time, to the speed of progress of the
"presbyopia" in the past year (laughs), it is a work I remember the feeling hungry while
little by surprise each time.
It was no different from before, but I every time, they struggled to put out the texture of
the skin, the representation of the feeling it was Hair close - clipped at the back short of
the figure of one person that you want to appear in a situation where we were injured,
the hair, this Also there is so hard to (sweat).

Managed to work past the peak of August 29, I tried to place based on the figures you
have finally finished painting. Coating technology aside, and all of a sudden rise in the
base figure "color" was still riding.
Forget the deadline of the "snap" moment, when many thought this is also the time
booze Window - side during daytime while watching this (exaggerated!) But what Cup
Tour, including the twists and turns in my head hung far.
Work detail that was originally planned is still time to this time applied to the fabrication
diorama is very limited, their own, this day was about to give up the application "snap"
half-volume in (?) Thanks to the typhoon One job is canceled, I will is a consequence that
can be made 18 hours round the unusual to me (laughs).

PART5 scene described HUMVEE production of (working title)


August 30
Yet in the wake of the typhoon in the Kanto region, in cooperation with the second son
has helped me out of a job every year, I went to outdoor photography. The weather was
cloudy with rain Paratsuku occasionally, was to meet the deadline for application to take
pictures "snap" somehow before the condition becomes worse than this.
There are at such a relief anyway, is a picture of several layers that, what is it to "snap"
is also a major goal of life model I was able to apply this year with this throughout the
year, the following read so far Thank you very much indeed for us. I turned the big
picture while always from personal feeling,
(Laughs) 've Ya~tsu watching please if it is good.
Upon shooting, we have changed slightly from the previous day by considering the angle
position of the figure by the way.
Also, "Mogadishu" in Somalia's capital stage of "Black Hawk Down" is the title of the
movie diorama
I was in that "MOGADISHU-1993" from easily.

You might also like