You are on page 1of 8

REVISION CERTIFICATION

(DCC) NO.:

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

CONSTRUCTION OF OFFSHORE
PLATFORMS AND PIPELINES

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER

SPECIFICATION
FOR
MONEL SHEATHING
INSTALLATION

Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY

Date:

OPERATIONS

Date:

MONEL SHEATHING INSTALLATION

SPECIFICATION FOR

ARABIAN GULF

DWG. TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

JOB# *

DRAWING NO.

DE-119951

SHT. NO. REV. NO.

1
of
8

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

By:
Date:

CONTROL NUMBER

EDSD
VERIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

rmr\DE-119951\24-jul-96\bjp

Saudi Aramco 2616-ENG. (03/99)

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

1.0 SCOPE

2.0 APPLICABLE CODES, STANDARDS, SPECIFICATIONS AND REFERENCES

3.0 MATERIAL

4.0 FABRICATION

5.0 WELDING

6.0 FABRICATION

7.0 INSPECTION

8.0 PAINTING

9.0 REPAIR PROCEDURE

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

ENGG

TABLE OF CONTENTS

DISCIPLINE
ENGINEER

Required from CONTRACTOR prior to fabrication or installation as applicable


(where referenced herein).

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

(*)

DWG. TYPE PLANT NO. INDEX

MONEL SHEATHING INSTALLATION

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119951

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

rmr\DE-119951\24-jul-96\bjp

Saudi Aramco 2616-ENG. (03/99)

CERT

PMT

1.0

SCOPE

ENGG

This specification defines the minimum requirements for the fabrication and attachment
of monel sheathing to offshore jacket members, risers, caissons and conductor for
corrosion protection which are located in the splash zone area. Refer to the contract
drawings for the limits of the monel sheathing.

DESCRIPTION

APPLICABLE CODES, STANDARDS, SPECIFICATIONS AND


REFERENCES

REV.
NO.

DATE

JOB/EWO

2.1

2.2

DISCIPLINE
ENGINEER

The latest revision of the following Construction Specifications shall apply:


DE-119885

Quality Assurance and Quality Control

DE-119889

Painting of Offshore Platforms

DE-119892

Material Procurement, Receiving, Handling and


Storage

DE-119896

Welding

The latest issue of the following SAUDI ARAMCO Materials System


Specifications (SAMSS) shall apply:
09-SAMSS-069

Epoxy Coating for Atmospheric Service

09-SAMSS-070

Epoxy Splash Zone Compound

09-SAMSS-071

Inorganic Zinc Primer

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

2.3

Date:

CONSTRUCTION
AGENCY
Date:

The latest issue of the following Industry Codes and Standards shall apply:
ASTM B127

Nickel-Copper Alloy (UNS NO4400) Plate, Sheet


and Strip

ASME Section IX

Welding and Brazing Qualifications

SSPC

Steel Structures Painting Council - Manual Volumes


1 and 2

SIS-05-5900

Swedish Standard Pictorial Surface Preparation


Standards for Painting Steel Surface

OPERATIONS

By:
Date:

CONTROL NUMBER

3.0

MATERIAL
The sheathing material shall be 16 USS gauge {approximately 1.5 mm (0.06 inch])}
monel, ASTM B127.

SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

MONEL SHEATHING INSTALLATION

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119951

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPERNS.

SAUDI ARABIAN OIL COMPANY

2.0

rmr\DE-119951\24-jul-96\bjp

Saudi Aramco 2616-ENG. (03/99)

CERT

PMT

4.0

FABRICATION

ENGG

4.1

General
Stock size sheets may be joined to form larger sheets and trimmed to the
required size.
Butt Joints (Shop Fabrication)

DESCRIPTION

It is recommended that all butt joints be welded using ceramic backing strips with
a shallow groove {0.6 mm (0.025 inch) deep} under the weld. After welding, the
butt weld shall be ground flush.

REV.
NO.

DATE

JOB/EWO

4.3

4.4

DISCIPLINE
ENGINEER

Date:

CERTIFIED BY

4.3.1

Lap joints shall have a minimum overlap of 25 mm (1 inch).

4.3.2

Lap joints fabricated in a shop shall be welded on both sides.

4.3.3

Where more than two sheets are to be joined, the laps shall always
be on the same side of the sheet, ensuring that the other side is flat.

Rolling
Monel sheets shall be rolled to the proper diameter of the pipe. This rolling may
be performed by hand or machine.

Date:

PROJECT
ENGINEER

Lap Joints

5.0

WELDING
5.1

General
All welding to be in accordance with DE-119896. Procedures shall be qualified in
accordance with ASME Section IX.

Date:

CONSTRUCTION
AGENCY

5.2

Preparation

Date:

Immediately prior to the commencement of welding all joints shall be wire


brushed and cleaned with a SAUDI ARAMCO approved solvent to remove all
traces of impurities. Benzene, gasoline, carbon tetrachloride, and chlorinated
hydrocarbons shall not be used for cleaning.

OPERATIONS

By:
Date:

CONTROL NUMBER

5.3

Shop Welding
5.3.1

All shop welding shall be by the gas tungsten arc-welding method


(GTAW) using argon.

5.3.2

When welding monel to monel the filler metal shall be 1.5 mm (1/16
inch) diameter ERNiCu-7 (for example, INCO Filler Metal 60).

SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

MONEL SHEATHING INSTALLATION

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119951

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPERNS.

SAUDI ARABIAN OIL COMPANY

4.2

rmr\DE-119951\24-jul-96\bjp

Saudi Aramco 2616-ENG. (03/99)

CERT

PMT

5.3.3

Field Welding
5.4.1

All field welding shall be conducted by either the GTAW or shielded


metal arc welding (SMAW) processes. For the GTAW process,
adequate wind guard protection shall be provided for satisfactory
welding.

5.4.2

SMAW electrodes for welding either monel to monel or monel to


carbon steel shall be 2 mm (3/32 inch) diameter ENiCu-7 (e.g. INCO
monel welding electrode 190). GTAW filler metal shall be as
specified in Sections 5.3.2 or 5.3.3 of this Specification, as
appropriate.

5.4.3

When piping containing monel sheathing is being erected in the field,


CONTRACTOR shall have at least two welders qualified for monel
welding available at the installation site.

DATE

JOB/EWO

DESCRIPTION

ENGG

5.4

REV.
NO.

6.0

When welding monel to carbon steel the filler metal shall be 1.5 mm
(1/16 inch) diameter ERNiCu-1 (for example, INCO Filler Metal 61).
Only direct current (DC) straight polarity shall be used.

FABRICATION
6.1

General
Sections of monel sheathing shall be installed on steel pipe so that only the
extreme ends of the first and last section of monel sheathing are welded to the
carbon steel pipe. All intermediate sections of monel sheathing shall overlap and
be welded to adjoining sections of monel with a minimum overlap of 25 mm (1
inch). Monel sheathing shall be attached in accordance with Section 4.0 of this
Specification.

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

6.1.1

The general direction of overlap shall be such that the higher


elevation section overlaps on top of the adjacent lower section,
except for "fill-in" pieces at nodes, doubler plates, and so forth.

6.1.2

Each sheathing section shall be so installed that the sheathing


section longitudinal seam is diametrically opposite (180 degrees
staggered) to the adjacent section longitudinal seam and with at least
100 mm (4 inches) spacing between other adjacent seams and
sheathing joints. All monel sheathing fitment/installation shall be
subject to prior SAUDI ARAMCO approval before welding takes
place.

6.1.3

After wrapping each section of sheathing, the section shall be tack


welded at both ends (monel to monel on the bottom end and monel
to carbon steel on the top end) and the longitudinal joint. The tacks
shall be spaced at no more than 100mm (4 inches).

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

MONEL SHEATHING INSTALLATION

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119951

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

rmr\DE-119951\24-jul-96\bjp

Saudi Aramco 2616-ENG. (03/99)


Protection
6.2.1

Steel strapping with adequate padding for protection shall be


employed to fit the sheathing tightly around the pipe before
attachment welding.

6.2.2

No slings chains, or other objects shall come into contact with the
monel sheathing before, during, or after installation. Damaged
monel sheathing shall be replaced by CONTRACTOR.

7.0

INSPECTION

(*)

7.1

The final installation shall be inspected by testing with a dry inert gas at 5 to
10 psi to assure a complete seal. The test method is subject to approval by
SAUDI ARAMCO. This testing shall be completed prior to coating described
in Section 8.2 of this Specification.

7.2

The nipple penetration shall be filled or patched, and subjected to liquid


penetrant inspection (LPI).

DATE

JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

6.2

REV.
NO.

8.0

Date:

PAINTING
8.1

All surface preparation and painting procedures shall be in accordance with


Specification DE-119889.

8.2

Surface Preparation

PROJECT
ENGINEER

8.2.1

Date:

CERTIFIED BY

Circumferential weld joints between monel sheathing and steel


elements (jacket legs, braces, risers, and other similar members)
shall be prepared as follows:
8.2.1.1

Abrasive blast the steel to a minimum Sa 2.5 cleanliness


in a band 75 mm (3 inches) from the circumferential
weld.

8.2.1.2

Thoroughly clean the weld by abrasive blasting,


overlapping onto the monel approximately 75 mm (3
inches) with a sand sweep.

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

NOTE: SSPC - Sa 2.5 is defined as follows:

By:
Date:

CONTROL NUMBER

SSPC - Sa 2.5, Near-White Metal Blast: A surface where at


least 95% of each element of area in the white metal
condition. All oil, grease, dirt, mill scale, rust, corrosion
products, oxides, paints, or other foreign matter shall be
completely removed from the surface except for very light
shadows, very slight streaks or slight discolorations caused
by rust stain, mill scale oxides or slight residues of paint or
coating that may remain.

SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

MONEL SHEATHING INSTALLATION

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119951

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

rmr\DE-119951\24-jul-96\bjp

Saudi Aramco 2616-ENG. (03/99)

JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

8.3

DATE

9.0

8.3.1

Mask off the steel and monel sheathing approximately 75 mm (3


inches) from each side of the weld.

8.3.2

Spray apply one coat of an approved inorganic zinc primer per


Specification 09-SAMSS-071, on the steel up to the weld, at a dry
film thickness of 64 to 102 microns (2.5 to 4.0 mils).

8.3.3

Brush apply one coat of an approved epoxy primer (reference


Specification 09-SAMSS-069) to the welded area. After the brush
application, spray one coat of the epoxy primer to the weld,
overlapping onto the inorganic zinc and the monel sheathing by
approximately 75 mm (3 inches).

8.3.4

Apply the approved intermediate and subsequent top coats to the


areas primed in Sections 8.3.2 and 8.3.3 herein in accordance with
Specification DE-119889.

REPAIR PROCEDURE
9.1

REV.
NO.

Coating

Above Water
If during the installation of the jacket, the monel sheathing is damaged above the
water, the following repair procedure shall be followed:

Date:

PROJECT
ENGINEER

9.1.1

All damaged monel shall be ground or hammered smooth to


eliminate all protrusions, risers, and so forth. The surface shall be
cleaned and buffed.

9.1.2

A monel patch shall be welded over the damaged area with a


minimum overlap of 25mm (1 inch). The weld shall be conducted as
per Section 5.0 of this Specification.

9.1.3

All welds shall be subjected to liquid penetrant inspection (LPI).

9.1.4

Repair work shall be accomplished as soon as possible after the


damage has been discovered.

Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

Below Water
If during the installation of the jacket, the monel sheathing is damaged below the
water, the following repair procedure shall be followed:

By:
Date:

CONTROL NUMBER

9.2

SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

MONEL SHEATHING INSTALLATION

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119951

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

rmr\DE-119951\24-jul-96\bjp

Saudi Aramco 2616-ENG. (03/99)


9.2.1

All damaged monel shall be ground or hammered smooth to


eliminate all protrusions, risers, and so forth. The surface shall be
cleaned and buffed.

9.2.2

A burlap strip of a length equal to 1.5 times the diameter of the


tubular to be repaired shall be impregnated with substantial amounts
of "Epoxy Splash Zone Compound" (09-SAMSS-070). The width of
strip shall be a minimum of 300mm (12 inches) and shall overlap the
damaged monel at least 150mm (6 inches) on either side of the
damage.

9.2.3

Divers shall wrap the tubular with the impregnated burlap and band
the strip top and bottom. All water shall be worked out of the burlap,
bonding the "Splash Zone Compound" to the tubular.

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

DWG. TYPE PLANT NO. INDEX

MONEL SHEATHING INSTALLATION

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119951

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

rmr\DE-119951\24-jul-96\bjp

Saudi Aramco 2616-ENG. (03/99)