Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Model Generation
Girder line model for hog estimation
RB01 Construction staging model
RB01 Composite SLS space frame model (considering gross uncracked properties)
RB01 Composite ULS space frame model (considering cracked torsional stiffness)
RB01 Foundation Loads Model
RB01 Pier Foundation FE Model
RB01 Abutment Foundation FE Model
RB01 Seismic space frame model
SUPERSTRUCTURE
Precast Girders
Girder section checks at transfer
Section checks at non-composite
Composite Girder SLS section checks
Composite Girder ULS section checks
Composite Girder continuity calcs
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Girder Design Actions Summary
Girder Max Shear Assessment
Deck
Deck SLS section checks
Deck ULS section checks
Deck cantilever SLS section checks
Deck cantilever ULS section checks
Mechanical Bearings
Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Bearing Replacement Assessment
Early thermal cracking
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Impact Assessment
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Impact Assessment
Bearing Friction Assessment
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Foundations
Abutment spread foundation design
Pier spread foundation design
Foundation loads
Foundation stability checks
Early thermal cracking
MISCELLANEOUS
MJ Installation data
Parapet & parapet/deck connection design
Approach slabs
Parapet impact effect on Girders & global structure
Cladding Details
REPORTS
Calculation workbook
SKETCHES
Girder concrete details
Girder reinforcement
Girder strand layout
Deck & diaphragm concrete
Pier concrete
Abutment concrete
Foundation concrete
Approach slab concrete
Bearing schedule
Deck & diaphragm reinforcement
Pier reinforcement
Abutment reinforcement
Foundation reinforcement
Approach slab reinforcement
Cladding Details
Design Checker
% Status Resource
Date
Verifier
% Status Resource
Date
Notes:
Methodology
Resource
CAD
CAD
Spreadsheet
FP
FP
25.03.15
25.03.15
100%
100%
LL
LL
LA
LA
% Status
90%
90%
Spreadsheet
Spreadsheet
Spreadsheet
GC
GC
GC
25.03.15
25.03.15
25.03.15
100%
100%
100%
LL
LL
LL
LA
LA
LA
70%
STAAD
ASBD
ASBD
ASBD
ASBD
STAAD
STAAD
ASBD
JAC
JAC
JAC
JAC
JAC
JAC
JAC
LL
25.03.15
25.03.15
25.03.15
100%
100%
100%
25.03.15
100%
LL
LL
LL
LL
LL
LL
LL
LL
LA
LA
LA
LA
LA
LA
LA
LA
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD
Spreadsheet
Spreadsheet/ASBD
LL
LL
LL
LL
LL
LL
LL
GC
100%
JAC
JAC
JAC
JAC
JAC
JAC
JAC
LL
LA
LA
LA
LA
LA
LA
LA
LA
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
DECK ASSESSED QUALITATIVELY AND B16-150 T/B TRANSVERSE REINFORCEMENT BELIEVED TO BE SUFFICIENT AS IS TYPICALLY
USED FOR OTHER EXW PACKAGES (P25).
TRANSVERSE ANALYSIS MAY BE COMPLETED AS PART OF OTHER MB DESIGNS IF DESIGN TIME PERMITS
i)
ii)
Design Issues:
07.04.15
Rev A -
90%
Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
LL
25.03.15
25.03.15
100%
100%
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet
ASBD
Spreadsheet
GC
TOTAL COMPLETED
24%
0%
5%
LA
Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Model Generation
Girder line model for hog estimation
RB01 Construction staging model
RB01 Composite Long Term space frame model (considering long term concrete modulus)
RB01 Composite SLS space frame model (considering gross uncracked properties)
RB01 Composite ULS space frame model (considering cracked torsional stiffness)
RB01 Foundation Loads Model
RB01 Pier Foundation FE Model
RB01 Abutment Foundation FE Model
RB01 Seismic space frame model
SUPERSTRUCTURE
Precast Girders
Girder section checks at transfer
Section checks at non-composite
Composite Girder SLS section checks (transfer & flexure)
Composite Girder ULS section checks (shear & torsion)
Composite Girder continuity calcs
Composite Girder continuity - bearing replacement assessment
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Girder Design Actions Summary
Girder Max Shear Assessment
Deck
Deck SLS section checks
Deck ULS section checks
Deck cantilever SLS section checks
Deck cantilever ULS section checks
Mechanical Bearings
Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Pier 6 & 7 Diaphragm SLS section checks
Pier 6 & 7 Diaphragm ULS section checks
Piers 6 & 7 deflection
Bearing Replacement Assessment
Early thermal cracking
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Bearing Friction Assessment
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Abutment 1 wall collision
Foundations
Abutment spread foundation design
Pier spread foundation design
Foundation loads
Foundation stability checks
Early thermal cracking
MISCELLANEOUS
MJ Installation data
Parapet/deck connection design
Parapet design
Approach slabs
Parapet impact effect on Girders & global structure
Cladding Details
REPORTS
Calculation workbook
SKETCHES
Design Checker
% Status Resource
Date
Verifier
% Status Resource
Date
Notes:
Methodology
Resource
CAD
CAD
Spreadsheet
FP
FP
KT/JP
19.05.15
19.05.15
06.08.15
100%
100%
90%
LL
LL
JAC
LA
LA
% Status
90%
90%
Spreadsheet
Spreadsheet
Spreadsheet
GC
GC
GC
25.03.15
25.03.15
25.03.15
100%
100%
100%
LL
LL
LL
LA
LA
LA
90%
90%
90%
STAAD
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
STAAD
ASBD
JP
JAC/JP
JAC/JP
JAC/JP
JAC/JP
JP/JAC
JP
JP
LL
06.07.15
15.06.15
24.07.15
15.06.15
15.06.15
26.06.15
100%
100%
100%
100%
100%
100%
LL
LL
LL
LL
LL
LL
LL
75%
JP
LA
75%
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD
Spreadsheet
Spreadsheet/ASBD
LL/JP
LL/JP
LL/JP
JAC
JP
JP
JP
LL/JP
JAC
24.06.15
24.06.15
24.06.15
24.06.15
19.06.15
05.08.15
06.07.15
24.06.15
24.06.15
JAC
JAC
JAC
LL
LL
LL
JAC
JAC
LL
LA
LA
LA
LA
LA
LA
LA
LA
LA
90%
90%
90%
75%
90%
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
DECK ASSESSED QUALITATIVELY AND B16-150 T/B TRANSVERSE REINFORCEMENT BELIEVED TO BE SUFFICIENT AS IS TYPICALLY
USED FOR OTHER EXW PACKAGES (P25).
TRANSVERSE ANALYSIS MAY BE COMPLETED AS PART OF OTHER MB DESIGNS IF DESIGN TIME PERMITS
Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet
JP
JP
JP
JP
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
JAC/LL
JAC
JAC
JAC
JAC
LL
LL
LL
JAC/LL
JAC/LL
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
i)
ii)
Design Issues:
15.06.15
24.07.15
15.06.15
15.06.15
100%
100%
100%
100%
LA
LA
LA
LA
LA
LA
LA
90%
90%
90%
90%
100%
100%
100%
100%
100%
100%
100%
100%
100%
90%
90%
40%
04.08.15
04.08.15
06.08.15
100%
100%
100%
RR
RR
RR
LL
LL
LL
31.07.15
31.07.15
31.07.15
100%
100%
100%
75%
75%
75%
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
JAC/RR
JAC/RR
JAC/RR
JAC/RR
JAC/RR
07.08.15
07.08.15
07.08.15
07.08.15
07.08.15
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
LL
LL
RR
RR
10.07.15
10.07.15
10.07.15
24.07.15
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
JP
JP
JAC
JP
RR
Spreadsheet
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
ASBD
Spreadsheet
KT
LL/JAC
29.06.15
Additional beam modules to confirm strand arrangements to be developed
Rev A Rev B Girder strand &
reinforcement
markup
LL
LA
24.06.15
LL
LA
LL
LA
JAC
LA
LL
LA
Diaphragm
reinforcement
markup
90%
90%
90%
80%
50%
80%
90%
90%
80%
Monolithic pier
reinforcement
markup
Bearing pier
reinforcement
markup
Abutment
reinforcement
markup
100%
29.06.15
27.07.15
Foundation concrete
reinforcement
markup
100%
100%
58%
6%
JP
LA
03.07.15
TOTAL COMPLETED
29%
JL
24.07.15
24.07.15
RS/LA
16 1.3.8
2.0
2.1
17 2.1.1
18 2.1.3
19 2.1.4
20 2.1.5
21 2.1.6
22 2.1.7
23 2.1.8
24 2.1.9
2.2
25 2.2.1
2.3
26 2.3.1
27 2.3.2
28 2.3.3
29 2.3.4
2.4
30 2.4.1
31 2.4.2
32 2.4.3
33 2.4.4
34 2.4.5
35 2.4.6
36 2.4.7
3.0
3.1
37 3.1.1
38 3.1.2
39 3.1.3
40 3.1.4
41 3.1.5
42 3.1.6
3.2
43 3.2.1
44 3.2.2
45 3.2.3
46 3.2.4
47 3.2.6
48 3.2.7
3.3
49 3.3.1
50 3.3.2
51 3.3.3
52 3.3.4
53 3.3.5
3.4
54 3.4.1
55 3.4.2
56 3.4.3
57 3.4.4
58 3.4.5
59 3.4.6
60 3.4.7
61 3.4.8
4.0
62 4.1
63 4.3
64 4.4
65 4.5
Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
CAD Model generation
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Seismic Static load generation
Model Generation
Girder line model for hog estimation
RB01 Construction staging model
RB01 Composite Long Term space frame model (considering long term concrete modulus)
RB01 Composite SLS space frame model (considering gross uncracked properties)
RB01 Composite ULS space frame model (considering cracked torsional stiffness)
RB01 Foundation Loads Model
RB01 Pier Foundation FE Model
RB01 Bored Pile Foundation Model
RB01 Abutment Foundation FE Model
RB01 Seismic space frame model
SUPERSTRUCTURE
Precast Girders
Non-composite Girder SLS section checks at transfer
Composite Girder SLS section checks (flexure)
Composite Girder ULS section checks (shear & torsion)
Composite Girder continuity calcs
Composite Girder continuity - bearing replacement assessment
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Girder Design Actions Summary
Girder Max Shear Assessment
Deck
Transverse Deck Analysis
Mechanical Bearings
Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Early thermal cracking
Diaphragm ULS seismic design
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Bearing Friction Assessment
Column ULS seismic section checks
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Abutment 1 wall collision
Abutment ULS seismic shear block
Foundations
Foundation loads
Foundation stability checks
Abutment spread foundation design
Pier spread foundation design
Abt 1 & Pier 1 pile cap design
Abt 1 & Pier 1 bored pile design
Early thermal cracking
Foundation ULS seismic design
MISCELLANEOUS
MJ Installation data
Parapet (type 2) design
Approach slabs
Parapet impact effect on Girders & global structure
5.0
66 5.1
6.0
REPORTS
Calculation workbook
SKETCHES
15 1.3.8
Resource
CAD
CAD
Spreadsheet
CAD
FP
FP
JP
KA
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
JAC
GC
GC
LL
STAAD
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
STAAD
ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD
Spreadsheet
Spreadsheet/ASBD
Date
Design Checker
% Status Resource
Date
Verifier
% Status Resource
Notes:
i)
ii)
11.09.15
11.09.15
LL
LL
LL
RR/LL/JP
25.03.15
25.03.15
50%
100%
100%
LL
LL
LL
LA
LA
LA
50%
90%
90%
90%
KA/JP/RR
80%
100%
JAC/LL
LA
JAC
LL
LA
JAC
LL
LA
Design Issues:
% Status
50%
50%
100%
100%
11.09.15
LA
LA
LA
LA
Date
11.09.15
100%
LL
50%
JP
LA
50%
LL/JP
LL/JP
JAC
JP
JP
JP
LL/JP
JAC
50%
50%
50%
50%
50%
50%
50%
50%
JAC
JAC
LL
LL
LL
JAC
JAC
LL
LA
LA
LA
LA
LA
LA
LA
LA
50%
50%
50%
50%
50%
50%
50%
50%
To do
In Progress
Complete
LA
Rev C -
Spreadsheet/STAAD
Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
LA
LL
LA
LL
LA
LL
LA
LL
LA
Monolithic pier
reinforcement
markup
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
LL
Diaphragm
reinforcement
markup
Bearing pier
reinforcement
markup
May not be required depending on design actions
KA
KA
KA
KA
Abutment
reinforcement
markup
Check if abutment 2 needs to be designed for collision after relocation
Depending on design actions but ideal to have all piers & abutments with inner guided bearing and remove shear block
JP/RR
JP/RR
JP/RR
JP/RR
JAC
JAC
JP/RR
Foundation concrete
reinforcement
markup
Spreadsheet
Spreadsheet
Spreadsheet
ASBD
KT/LL
Generate parapet std design calculation
TOTAL COMPLETED
16%
2%
13%
LA
Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
CAD Model generation
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Collision Load generation
Seismic Static load generation
Model Generation (RB01A & B)
RB01 Composite SLS space frame model (considering gross uncracked properties)
RB01 Composite ULS space frame model (considering cracked torsional stiffness)
RB01 Foundation Loads Model
RB01 Foundation Overturning Model
RB01 Pier Foundation FE Model
RB01 Pier 8A Foundation Model
RB01 Pier 1-3 Pile Cap & Bored Pile Foundation Model
RB01 Abutment Foundation FE Model
RB01 Construction staging model
Girder Beam Design Models
Girder line model for hog estimation
RB01 Seismic space frame model
SUPERSTRUCTURE
Precast Girders
Girder Design Actions Summary
Non-composite Girder SLS section checks at transfer
Composite Girder SLS section checks (flexure)
Composite Girder ULS section checks (shear & torsion)
Composite Girder continuity calcs
Composite Girder continuity - bearing replacement assessment
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Deck
Transverse Deck Analysis
Mechanical Bearings
Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Early thermal cracking
Diaphragm ULS seismic design
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Bearing Friction Assessment
Column ULS seismic section checks
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Abutment 2 wall collision (TBC)
Abutment ULS seismic shear block
Foundations
Foundation loads
Foundation stability checks
Abutment spread foundation design
Pier 7 & 8 spread foundation design
Bearing Pier spread foundation design
Monolithic Pier spread foundation design
Pier 1, 2 & 3 pile cap design
Pier 1, 2 & 3 bored pile design
Monolithic Pier spread foundation ULS seismic design
Pier 7 & 8 spread foundation ULS seismic design
MISCELLANEOUS
MJ Installation data
Parapet (type 2) design
Approach slabs
Parapet impact effect on Girders & global structure
5.0
69 5.1
70 5.2
6.0
REPORTS
Substructure Calculation workbook
Superstructure Calculation workbook
SKETCHES
Resource
Date
Design Checker
% Status Resource
Date
Verifier
% Status Resource
Date
05.10.15
05.10.15
12.10.15
12.10.15
Notes:
Design Issues:
% Status
CAD
CAD
Spreadsheet
CAD
FP
FP
JP
JP/KA
29.09.15
29.09.15
05.10.15
05.10.15
100%
100%
100%
100%
LL
LL
LL
LL
05.10.15
05.10.15
12.10.15
12.10.15
100%
100%
100%
100%
LA
LA
LA
LA
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
KT/AA
GC
GC
KT/AA
RR
02.10.15
25.03.15
25.03.15
02.10.15
12.10.15
100%
100%
100%
100%
100%
LL
LL
LL
LL
LL
12.10.15
12.10.15
12.10.15
12.10.15
12.10.15
100%
100%
100%
100%
100%
LA
LA
LA
LA
LA
90%
90%
90%
90%
50%
ASBD
ASBD
ASBD
ASBD
ASBD
MIDAS
STAAD
JP/KA
13.10.15
100%
LL
14.10.15
100%
LA
90%
JP
RR
JP
RR
MS
13.10.15
27.10.15
27.11.15
08.12.15
08.12.15
100%
100%
100%
100%
100%
LL
JP
LL
LL
LL
12.10.15
09.11.15
08.12.15
14.12.15
14.12.15
100%
100%
100%
100%
100%
LA
LL
LA
LA
LA
13.11.15
90%
100%
14.12.15
100%
ASBD
ASBD
STAAD
ASBD
JP
13.10.15
LL
14.10.15
100%
LA
90%
LL/RR
23.10.15
100%
50%
50%
100%
JP
27.10.15
100%
LA
90%
i)
ii)
100%
100%
100%
100%
To do
In Progress
Complete
Rev A Rev B Model RB01A&B initially. RB01C will be included once
off hold
Rev C -
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
Spreadsheet/STAAD
RB01C ON HOLD
Pier 10 relocation and foundation offset to avoid existing water main
Abutment 2 relocation to avoid existing sewer
LL
LA
LL
LA
LL
LA
LL
LA
LL
LA
LL
LA
Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Diaphragm
reinforcement
markup
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
KA/RR
KA/RR
KA/RR
KA/RR
KA/RR
KA/RR
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
KA/AA
KA/AA
KA/AA
KA/AA
KA/AA
KA/AA
18.12.15
18.12.15
18.12.15
23.10.15
18.12.15
100%
100%
100%
100%
100%
LL
LL
LL
LL/JR
LL
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
KA/AA
KA/AA
KA/AA
KA/AA
KT
19.10.15
19.10.15
19.10.15
100%
100%
100%
28.10.15
100%
LL/JR
LL/JR
LL/JR
LL
LL
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
JP/KT
RR/JP
RR/JP
RR/JP
JP
JP
MS/JP
MS/JP
RR/JP
RR/JP
Monolithic pier
reinforcement
markup
18.12.15
18.12.15
18.12.15
18.12.15
18.12.15
100%
100%
100%
100%
100%
90%
90%
90%
90%
90%
27.10.15
06.11.15
17.11.15
08.12.15
08.12.15
08.12.15
14.12.15
30.10.15
08.12.15
08.12.15
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Spreadsheet
Spreadsheet
Spreadsheet
ASBD
LL
LL/JR
LL/JR
LL/JR
LL/JR
LL/JR
LL
LL/JR
LL
LL
80%
80%
80%
28.10.15
27.10.15
10.12.15
14.12.15
05.11.15
100%
100%
100%
75%
50%
75%
75%
100%
100%
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
Abutment
reinforcement
markup
Check if abutment 2 needs to be designed for collision after relocation
27.10.15
58%
46%
100%
90%
Foundation concrete
reinforcement
markup
90%
90%
TOTAL COMPLETED
Bearing pier
reinforcement
markup
36%
KT/LL
LA
28.09.15 28.09.15
Project Number:
Design Items/Task list
Item
0.0
1 0.1
2 0.2
3 0.3
4 0.4
1.0
1.1
5 1.1.1
6 1.1.2
7 1.1.3
8 1.1.4
9 1.1.5
1.2
10 1.2.1
11 1.2.2
12 1.2.3
13 1.2.4
14 1.2.5
15 1.2.6
16 1.2.7
17 1.2.8
18 1.2.9
19 1.2.10
20 1.2.11
21 1.2.12
22 1.2.13
2.0
2.1
23 2.1.1
24 2.1.2
25 2.1.3
26 2.1.4
27 2.1.5
28 2.1.6
29 2.1.7
2.2
30 2.2.1
2.3
31 2.3.1
32 2.3.2
33 2.3.3
34 2.3.4
2.4
35 2.4.1
36 2.4.2
37 2.4.3
38 2.4.4
39 2.4.5
40 2.4.6
41 2.4.7
3.0
3.1
42 3.1.1
43 3.1.2
44 3.1.3
45 3.1.4
46 3.1.5
47 3.1.6
3.2
48 3.2.1
49 3.2.2
50 3.2.3
51 3.2.4
52 3.2.6
3.2.7
3.3
53 3.3.1
54 3.3.2
55 3.3.3
3.3.4
56 3.3.5
3.4
57 3.4.1
58 3.4.2
59 3.4.3
60 3.4.4
61 3.4.5
62 3.4.6
63 3.4.7
64 3.4.8
65 3.4.9
66 3.4.10
67 3.4.11
4.0
68 4.1
4.3
69 4.4
70 4.5
Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
CAD Model generation
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Collision Load generation
Seismic Static load generation
Model Generation (RB01A,B&C)
RB01 Construction staging model (Satges 1 to 3)
RB01 Composite SLS space frame model (considering gross uncracked properties) - for live load influencing
RB01 Centrifugal model
RB01 Composite ULS space frame model (considering cracked torsional stiffness) - for live load influecing
RB01 Collision model (uls)
RB01 Foundation Loads/Stabliity Models
RB01 Refined Pier Foundation Model (for foundation reinforcement design)
RB01 Pier 8A Foundation Model (for foundation reinforcement design)
RB01 Pier 1-3 Pile Cap & Bored Pile Foundation Model (for pilecap reinforcement design)
RB01 Pier 11 Foundation Model (for foundation reinforcement design)
Girder Beam Design Models
Girder line model for hog estimation
RB01 Seismic space frame models
SUPERSTRUCTURE
Precast Girders
Girder Design Actions Summary
Non-composite Girder SLS section checks at transfer
Composite Girder SLS section checks (flexure)
Composite Girder ULS section checks (shear & torsion)
Composite Girder continuity calcs
Composite Girder continuity - bearing replacement assessment
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Deck
Transverse Deck Analysis
Mechanical Bearings
Preliminary Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Early thermal cracking
Diaphragm ULS seismic design
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Bearing Friction Assessment
Column ULS seismic section checks
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Abutment 2 wall collision (TBC)
Abutment ULS seismic shear block
Foundations
Foundation loads
Foundation stability checks
Abutment spread foundation design
Pier 7 & 8 spread foundation design
Bearing Pier spread foundation design
Monolithic Pier spread foundation design
Monolithic Pier 11 spread foundation design
Pier 1, 2 & 3 pile cap design
Pier 1, 2 & 3 bored pile design
Monolithic Pier spread foundation ULS seismic design
Pier 7 & 8 spread foundation ULS seismic design
MISCELLANEOUS
EJ movements
Parapet (type 2) design
Approach slabs
Parapet impact effect on Girders & global structure
5.0
71 5.1
72 5.2
6.0
REPORTS
Substructure Calculation workbook
Superstructure Calculation workbook
SKETCHES
Resource
Date
% Status Resource
Design Checker
Date
Verifier
% Status Resource
Date
Design Issues:
% Status
Refer to 23RB01 GEC RFI Register
CAD
CAD
Spreadsheet
CAD
To do
In Progress
Complete
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Rev A Rev B -
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
MIDAS
STAAD
STAAD
ASBD
STAAD
ASBD
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD
DELIVERABLES:
Spreadsheet/MIDAS
Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet
ASBD
TOTAL COMPLETED
0%
0%
0%
SUBSTRUCTURE D1A
(Drawings & Calculations)
5-Feb
SUPERSTRUCTURE D1A
(Drawings & Calculations)
26-Feb
Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Model Generation
Girder line model for hog estimation
RB01 Construction staging model
RB01 Composite Long Term space frame model (considering long term concrete modulus)
RB01 Composite SLS space frame model (considering gross uncracked properties)
RB01 Composite ULS space frame model (considering cracked torsional stiffness)
RB01 Foundation Loads Model
RB01 Pier Foundation FE Model
RB01 Abutment Foundation FE Model
RB01 Seismic space frame model
SUPERSTRUCTURE
Precast Girders
Girder section checks at transfer
Section checks at non-composite
Composite Girder SLS section checks (transfer & flexure)
Composite Girder ULS section checks (shear & torsion)
Composite Girder continuity calcs
Composite Girder continuity - bearing replacement assessment
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Girder Design Actions Summary
Girder Max Shear Assessment
Deck
Deck SLS section checks
Deck ULS section checks
Deck cantilever SLS section checks
Deck cantilever ULS section checks
Mechanical Bearings
Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Pier 6 & 7 Diaphragm SLS section checks
Pier 6 & 7 Diaphragm ULS section checks
Piers 6 & 7 deflection
Bearing Replacement Assessment
Early thermal cracking
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Bearing Friction Assessment
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Abutment 1 wall collision
Foundations
Abutment spread foundation design
Pier spread foundation design
Foundation loads
Foundation stability checks
Early thermal cracking
MISCELLANEOUS
MJ Installation data
Parapet/deck connection design
Parapet design
Approach slabs
Parapet impact effect on Girders & global structure
Cladding Details
REPORTS
Calculation workbook
SKETCHES
Resource
CAD
CAD
Spreadsheet
Design Checker
% Status
FP
FP
KT/JP
19.05.15
19.05.15
100%
100%
LL
LL
JAC
LA
LA
90%
90%
Spreadsheet
Spreadsheet
Spreadsheet
GC
GC
GC
25.03.15
25.03.15
25.03.15
100%
100%
100%
LL
LL
LL
LA
LA
LA
90%
90%
90%
STAAD
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
STAAD
ASBD
JP
JAC/JP
JAC/JP
JAC/JP
JAC/JP
JP/JAC
JP
JP
LL
06.07.15
15.06.15
24.07.15
15.06.15
15.06.15
26.06.15
100%
100%
100%
100%
100%
100%
LL
LL
LL
LL
LL
LL
LL
75%
JP
LA
75%
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD
Spreadsheet
Spreadsheet/ASBD
LL/JP
LL/JP
LL/JP
JAC
JP
JP
JP
LL/JP
JAC
24.06.15
24.06.15
24.06.15
24.06.15
19.06.15
05.08.15
06.07.15
24.06.15
24.06.15
JAC
JAC
JAC
LL
LL
LL
JAC
JAC
LL
LA
LA
LA
LA
LA
LA
LA
LA
LA
90%
90%
90%
75%
90%
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
DECK ASSESSED QUALITATIVELY AND B16-150 T/B TRANSVERSE REINFORCEMENT BELIEVED TO BE SUFFICIENT AS IS TYPICALLY
USED FOR OTHER EXW PACKAGES (P25).
Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet
JP
JP
JP
JP
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
JAC/LL
JAC
JAC
JAC
JAC
LL
LL
LL
JAC/LL
JAC/LL
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
RR
RR
RR
LL
LL
LL
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
JAC/RR
JAC/RR
JAC/RR
JAC/RR
JAC/RR
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
LL
LL
RR
RR
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
JP
JP
JAC
JP
RR
Spreadsheet
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
ASBD
Spreadsheet
KT
LL/JAC
100%
100%
100%
100%
100%
100%
100%
100%
100%
04.08.15
04.08.15
06.08.15
100%
100%
100%
31.07.15
31.07.15
31.07.15
100%
100%
100%
75%
75%
75%
Resource
Date
Verifier
Date
15.06.15
24.07.15
15.06.15
15.06.15
% Status Resource
100%
100%
100%
100%
Date
LA
LA
LA
LA
LA
LA
LA
90%
90%
90%
90%
90%
90%
50%
50%
50%
80%
50%
80%
80%
90%
24.07.15
100%
29.06.15
27.07.15
100%
100%
80%
TOTAL COMPLETED
56%
% Status
6%
27%