DXW - 23RB01 Detailed Design

Design Items/Task list


Item
0.0
1 0.1
2 0.2
3 0.3
1.0
1.1
4 1.1.1
5 1.2.3
6 1.2.4
1.3
7 1.3.1
8 1.3.2
9 1.3.3
10 1.3.4
11 1.3.5
12 1.3.6
13 1.3.7
14 1.3.8
2.0
2.1
15 2.1.1
16 2.1.2
17 2.1.3
18 2.1.4
19 2.1.5
20 2.1.6
21 2.1.7
22 2.1.8
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.3
23 2.3.1
24 2.3.2
25 2.3.3
26 2.3.4
2.4
27 2.4.1
28 2.4.2
29 2.4.3
30 2.4.4
31 2.4.5
32 2.4.6
33 2.4.7
3.0
3.1
34 3.1.1
35 3.1.2
36 3.1.3
37 3.1.4
38 3.1.5
39 3.1.6
3.2
40 3.2.1
41 3.2.2
42 3.2.3
43 3.2.4
3.3
44 3.3.1
45 3.3.2
46 3.3.3
3.4
47 3.4.1
48 3.4.2
49 3.4.3
50 3.4.4
51 3.4.5
4.0
52 4.1
4.2
4.3
53 4.4
54 4.5
5.0
55 5.1
6.0
6.1
6.2
56 6.3
57 6.4
58 6.5
59 6.6
60 6.7
61 6.8
62 6.9
63 6.10
64 6.11
65 6.12
66 6.13
67 6.14
68 6.15

Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Model Generation
Girder line model for hog estimation
RB01 Construction staging model
RB01 Composite SLS space frame model (considering gross uncracked properties)
RB01 Composite ULS space frame model (considering cracked torsional stiffness)
RB01 Foundation Loads Model
RB01 Pier Foundation FE Model
RB01 Abutment Foundation FE Model
RB01 Seismic space frame model
SUPERSTRUCTURE
Precast Girders
Girder section checks at transfer
Section checks at non-composite
Composite Girder SLS section checks
Composite Girder ULS section checks
Composite Girder continuity calcs
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Girder Design Actions Summary
Girder Max Shear Assessment
Deck
Deck SLS section checks
Deck ULS section checks
Deck cantilever SLS section checks
Deck cantilever ULS section checks
Mechanical Bearings
Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Bearing Replacement Assessment
Early thermal cracking
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Impact Assessment
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Impact Assessment
Bearing Friction Assessment
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Foundations
Abutment spread foundation design
Pier spread foundation design
Foundation loads
Foundation stability checks
Early thermal cracking
MISCELLANEOUS
MJ Installation data
Parapet & parapet/deck connection design
Approach slabs
Parapet impact effect on Girders & global structure
Cladding Details
REPORTS
Calculation workbook
SKETCHES
Girder concrete details
Girder reinforcement
Girder strand layout
Deck & diaphragm concrete
Pier concrete
Abutment concrete
Foundation concrete
Approach slab concrete
Bearing schedule
Deck & diaphragm reinforcement
Pier reinforcement
Abutment reinforcement
Foundation reinforcement
Approach slab reinforcement
Cladding Details

Detailed Design - Rev A


Date

Design Checker

% Status Resource

Date

Verifier
% Status Resource

Date

Notes:

Methodology

Resource

CAD
CAD
Spreadsheet

FP
FP

25.03.15
25.03.15

100%
100%

LL
LL

LA
LA

% Status
90%
90%

Spreadsheet
Spreadsheet
Spreadsheet

GC
GC
GC

25.03.15
25.03.15
25.03.15

100%
100%
100%

LL
LL
LL

LA
LA
LA

70%

STAAD
ASBD
ASBD
ASBD
ASBD
STAAD
STAAD
ASBD

JAC
JAC
JAC
JAC
JAC
JAC
JAC
LL

25.03.15
25.03.15
25.03.15

100%
100%
100%

25.03.15

100%

LL
LL
LL
LL
LL
LL
LL
LL

LA
LA
LA
LA
LA
LA
LA
LA

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD
Spreadsheet
Spreadsheet/ASBD

LL
LL
LL
LL
LL
LL
LL
GC

100%

JAC
JAC
JAC
JAC
JAC
JAC
JAC
LL

LA
LA
LA
LA
LA
LA
LA
LA

Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet

DECK ASSESSED QUALITATIVELY AND B16-150 T/B TRANSVERSE REINFORCEMENT BELIEVED TO BE SUFFICIENT AS IS TYPICALLY
USED FOR OTHER EXW PACKAGES (P25).
TRANSVERSE ANALYSIS MAY BE COMPLETED AS PART OF OTHER MB DESIGNS IF DESIGN TIME PERMITS

i)
ii)

Design Issues:

07.04.15

i) Structure type still to be approved by KBR - risk of abortive work


ii) Road alignment design still progressing - risk of alignment changes
iii) Previous preliminary design iterations indicated 6 no girders was not adequate. Structure will be reassesed cons
iv)
v)
vi)

Rev A -

In accordance with preliminary design P1A

90%

Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet/ASBD

LL

25.03.15
25.03.15

100%
100%

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet
ASBD
Spreadsheet

GC

Refer to Std Design Calculations

Generate approach slab std design calculation

Refer to Std Drawings


80%
80%
80%
80%
80%

TOTAL COMPLETED

24%

0%

5%

LA

DXW - 23RB01 Detailed Design


Design Items/Task list
Item
0.0
1 0.1
2 0.2
3 0.3
1.0
1.1
4 1.1.1
5 1.2.3
6 1.2.4
1.3
7 1.3.1
8 1.3.2
9 1.3.3
10 1.3.4
11 1.3.5
12 1.3.6
13 1.3.7
14 1.3.8
2.0
2.1
15 2.1.1
16 2.1.2
17 2.1.3
18 2.1.4
19 2.1.5
20 2.1.6
21 2.1.7
22 2.1.8
23 2.1.9
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.3
24 2.3.1
25 2.3.2
26 2.3.3
27 2.3.4
2.4
28 2.4.1
29 2.4.2
30 2.4.3
31 2.4.4
32 2.4.5
33 2.4.6
34 2.4.7
35 2.4.8
36 2.4.9
37 2.4.10
3.0
3.1
38 3.1.1
39 3.1.2
40 3.1.3
41 3.1.4
42 3.1.5
43 3.1.6
3.2
44 3.2.1
45 3.2.2
46 3.2.3
47 3.2.4
48 3.2.6
3.3
49 3.3.1
50 3.3.2
51 3.3.3
52 3.3.4
3.4
53 3.4.1
54 3.4.2
55 3.4.3
56 3.4.4
57 3.4.5
4.0
58 4.1
59 4.2
60 4.3
61 4.4
62 4.5
63 4.6
5.0
64 5.1
6.0

Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Model Generation
Girder line model for hog estimation
RB01 Construction staging model
RB01 Composite Long Term space frame model (considering long term concrete modulus)
RB01 Composite SLS space frame model (considering gross uncracked properties)
RB01 Composite ULS space frame model (considering cracked torsional stiffness)
RB01 Foundation Loads Model
RB01 Pier Foundation FE Model
RB01 Abutment Foundation FE Model
RB01 Seismic space frame model
SUPERSTRUCTURE
Precast Girders
Girder section checks at transfer
Section checks at non-composite
Composite Girder SLS section checks (transfer & flexure)
Composite Girder ULS section checks (shear & torsion)
Composite Girder continuity calcs
Composite Girder continuity - bearing replacement assessment
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Girder Design Actions Summary
Girder Max Shear Assessment
Deck
Deck SLS section checks
Deck ULS section checks
Deck cantilever SLS section checks
Deck cantilever ULS section checks
Mechanical Bearings
Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Pier 6 & 7 Diaphragm SLS section checks
Pier 6 & 7 Diaphragm ULS section checks
Piers 6 & 7 deflection
Bearing Replacement Assessment
Early thermal cracking
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Bearing Friction Assessment
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Abutment 1 wall collision
Foundations
Abutment spread foundation design
Pier spread foundation design
Foundation loads
Foundation stability checks
Early thermal cracking
MISCELLANEOUS
MJ Installation data
Parapet/deck connection design
Parapet design
Approach slabs
Parapet impact effect on Girders & global structure
Cladding Details
REPORTS
Calculation workbook
SKETCHES

Detailed Design - Rev B


Date

Design Checker

% Status Resource

Date

Verifier
% Status Resource

Date

Notes:

Methodology

Resource

CAD
CAD
Spreadsheet

FP
FP
KT/JP

19.05.15
19.05.15
06.08.15

100%
100%
90%

LL
LL
JAC

LA
LA

% Status
90%
90%

Spreadsheet
Spreadsheet
Spreadsheet

GC
GC
GC

25.03.15
25.03.15
25.03.15

100%
100%
100%

LL
LL
LL

LA
LA
LA

90%
90%
90%

STAAD
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
STAAD
ASBD

JP
JAC/JP
JAC/JP
JAC/JP
JAC/JP
JP/JAC
JP
JP
LL

06.07.15
15.06.15
24.07.15
15.06.15
15.06.15
26.06.15

100%
100%
100%
100%
100%
100%

LL
LL
LL
LL
LL
LL
LL

75%

JP

LA

75%

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD
Spreadsheet
Spreadsheet/ASBD

LL/JP
LL/JP
LL/JP
JAC
JP
JP
JP
LL/JP
JAC

24.06.15
24.06.15
24.06.15
24.06.15
19.06.15
05.08.15
06.07.15
24.06.15
24.06.15

JAC
JAC
JAC
LL
LL
LL
JAC
JAC
LL

LA
LA
LA
LA
LA
LA
LA
LA
LA

90%
90%
90%
75%
90%

Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet

DECK ASSESSED QUALITATIVELY AND B16-150 T/B TRANSVERSE REINFORCEMENT BELIEVED TO BE SUFFICIENT AS IS TYPICALLY
USED FOR OTHER EXW PACKAGES (P25).
TRANSVERSE ANALYSIS MAY BE COMPLETED AS PART OF OTHER MB DESIGNS IF DESIGN TIME PERMITS

Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet

JP
JP
JP
JP

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

JAC/LL
JAC
JAC
JAC
JAC
LL
LL
LL
JAC/LL
JAC/LL

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD

i)
ii)

Design Issues:

15.06.15
24.07.15
15.06.15
15.06.15

100%
100%
100%
100%

LA
LA
LA
LA
LA
LA
LA

90%
90%
90%
90%

Assess using handcalcs

100%
100%
100%
100%
100%
100%
100%
100%
100%

90%
90%

40%

04.08.15
04.08.15
06.08.15

100%
100%
100%

RR
RR
RR
LL
LL
LL

31.07.15
31.07.15
31.07.15

100%
100%
100%
75%
75%
75%

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

JAC/RR
JAC/RR
JAC/RR
JAC/RR
JAC/RR

07.08.15
07.08.15
07.08.15
07.08.15
07.08.15

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

LL
LL
RR
RR

10.07.15
10.07.15
10.07.15
24.07.15

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet/ASBD

JP
JP
JAC
JP
RR

Spreadsheet
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
ASBD
Spreadsheet

KT
LL/JAC

29.06.15
Additional beam modules to confirm strand arrangements to be developed
Rev A Rev B Girder strand &
reinforcement
markup

LL
LA
24.06.15

LL

LA

LL

LA

JAC

LA

LL

LA

Diaphragm
reinforcement
markup

90%
90%
90%

80%
50%
80%
90%
90%

80%

Monolithic pier
reinforcement
markup

Bearing pier
reinforcement
markup

Abutment
reinforcement
markup
100%

29.06.15
27.07.15

Foundation concrete
reinforcement
markup

100%
100%

58%

6%

JP
LA
03.07.15

Generate parapet std design calculation


Generate approach slab std design calculation
JP
LA
Cladding markup

Refer to Std Design Calculations


LL/JAC
JP

TOTAL COMPLETED

i) Structure type still to be approved by KBR - risk of abortive work


ii) Road alignment design still progressing - risk of alignment changes
iii) Potential clash with utilities - foundation arrangement (potential for change in structure type!)
iv) Confirmation that MSE wall height at abt 1 is suitable for MSE wall designer - should MSE wall height need to be
v) MSE wall alignments need to be updated to reflect current bridge geometry
vi) Pier 1 foundation type change to pile and pilecap to be confirmed
vii) Reduction of weathered simsima E to 90mpa to be confirmed
viii) Weathered simsima to be confirmed.
ix) Cladding material and aesthetics to be confirmed

29%

JL
24.07.15
24.07.15

RS/LA

DXW - 23RB01 Detailed Design


Design Items/Task list
Item
0.0
1 0.1
2 0.2
3 0.3
4 0.4
1.0
1.1
5 1.1.1
6 1.2.3
7 1.2.4
8 1.2.5
1.3
9 1.3.1
10 1.3.2
11 1.3.3
12 1.3.4
13 1.3.5
14 1.3.6

16 1.3.8
2.0
2.1
17 2.1.1
18 2.1.3
19 2.1.4
20 2.1.5
21 2.1.6
22 2.1.7
23 2.1.8
24 2.1.9
2.2
25 2.2.1
2.3
26 2.3.1
27 2.3.2
28 2.3.3
29 2.3.4
2.4
30 2.4.1
31 2.4.2
32 2.4.3
33 2.4.4
34 2.4.5
35 2.4.6
36 2.4.7
3.0
3.1
37 3.1.1
38 3.1.2
39 3.1.3
40 3.1.4
41 3.1.5
42 3.1.6
3.2
43 3.2.1
44 3.2.2
45 3.2.3
46 3.2.4
47 3.2.6
48 3.2.7
3.3
49 3.3.1
50 3.3.2
51 3.3.3
52 3.3.4
53 3.3.5
3.4
54 3.4.1
55 3.4.2
56 3.4.3
57 3.4.4
58 3.4.5
59 3.4.6
60 3.4.7
61 3.4.8
4.0
62 4.1
63 4.3
64 4.4
65 4.5

Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
CAD Model generation
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Seismic Static load generation
Model Generation
Girder line model for hog estimation
RB01 Construction staging model
RB01 Composite Long Term space frame model (considering long term concrete modulus)
RB01 Composite SLS space frame model (considering gross uncracked properties)
RB01 Composite ULS space frame model (considering cracked torsional stiffness)
RB01 Foundation Loads Model
RB01 Pier Foundation FE Model
RB01 Bored Pile Foundation Model
RB01 Abutment Foundation FE Model
RB01 Seismic space frame model
SUPERSTRUCTURE
Precast Girders
Non-composite Girder SLS section checks at transfer
Composite Girder SLS section checks (flexure)
Composite Girder ULS section checks (shear & torsion)
Composite Girder continuity calcs
Composite Girder continuity - bearing replacement assessment
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Girder Design Actions Summary
Girder Max Shear Assessment
Deck
Transverse Deck Analysis
Mechanical Bearings
Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Early thermal cracking
Diaphragm ULS seismic design
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Bearing Friction Assessment
Column ULS seismic section checks
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Abutment 1 wall collision
Abutment ULS seismic shear block
Foundations
Foundation loads
Foundation stability checks
Abutment spread foundation design
Pier spread foundation design
Abt 1 & Pier 1 pile cap design
Abt 1 & Pier 1 bored pile design
Early thermal cracking
Foundation ULS seismic design
MISCELLANEOUS
MJ Installation data
Parapet (type 2) design
Approach slabs
Parapet impact effect on Girders & global structure

5.0
66 5.1
6.0

REPORTS
Calculation workbook
SKETCHES

15 1.3.8

Detailed Design - Rev C


Methodology

Resource

CAD
CAD
Spreadsheet
CAD

FP
FP
JP
KA

Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet

JAC
GC
GC
LL

STAAD
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
STAAD
ASBD

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD
Spreadsheet
Spreadsheet/ASBD

Date

Design Checker

% Status Resource

Date

Verifier
% Status Resource

Notes:
i)
ii)

11.09.15
11.09.15

LL
LL
LL
RR/LL/JP

25.03.15
25.03.15

50%
100%
100%

LL
LL
LL

LA
LA
LA

50%
90%
90%

90%

KA/JP/RR

80%

100%

JAC/LL

LA

JAC

LL

LA

JAC

LL

LA

Design Issues:

% Status

50%
50%
100%
100%

11.09.15

LA
LA
LA
LA

Date

11.09.15

Refer to 23RB01 GEC RFI Register

100%

LL

50%

JP

LA

50%

LL/JP
LL/JP
JAC
JP
JP
JP
LL/JP
JAC

50%
50%
50%
50%
50%
50%
50%
50%

JAC
JAC
LL
LL
LL
JAC
JAC
LL

LA
LA
LA
LA
LA
LA
LA
LA

50%
50%
50%
50%
50%
50%
50%
50%

To do
In Progress
Complete

Assess all pad footings using handcalcs


If bored piles modelled into main model (recommended) do not need this?
Assess using handcalcs
Bored piles will need to be included

Additional beam modules to confirm strand arrangements to be developed


Rev A Rev B LL

LA

Girder strand &


reinforcement
markup

Rev C -

Spreadsheet/STAAD

In accordance with preliminary design P1A


Updated RB01C geometry
Updated foundation rotational stiffness (E=90mpa) for weathered Simsima
In accordance with preliminary design P01
Abutment 1 foundation change to bored piles
Pier 1 foundation change to bored piles
Pier columns changed to single blade column
Removal of pier 6 & 7 portal arrangement
Removal of cladding

Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

LA

LL

LA

LL

LA

LL

LA

LL

LA

Pier 7 foundation offset to avoid existing water main


Pier 10 relocation and foundation offset to avoid existing water main
Abutment 2 relocation to avoid existing sewer

Monolithic pier
reinforcement
markup

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

LL
Diaphragm
reinforcement
markup

Bearing pier
reinforcement
markup
May not be required depending on design actions
KA
KA
KA
KA

Abutment
reinforcement
markup
Check if abutment 2 needs to be designed for collision after relocation
Depending on design actions but ideal to have all piers & abutments with inner guided bearing and remove shear block

JP/RR
JP/RR
JP/RR
JP/RR
JAC
JAC
JP/RR

Foundation concrete
reinforcement
markup

Spreadsheet
Spreadsheet
Spreadsheet
ASBD

KT/LL
Generate parapet std design calculation

Refer to Std Design Calculations

TOTAL COMPLETED

16%

2%

13%

LA

DXW - 23RB01 Detailed Design


Design Items/Task list
Item
0.0
1 0.1
2 0.2
3 0.3
4 0.4
1.0
1.1
5 1.1.1
6 1.1.2
7 1.1.3
8 1.1.4
9 1.1.5
1.2
10 1.2.1
11 1.2.2
12 1.2.3
13 1.2.4
14 1.2.5
15 1.2.6
16 1.2.7
17 1.2.7
18 1.2.8
19 1.2.9
20 1.2.10
2.0
2.1
21 2.1.1
22 2.1.2
23 2.1.3
24 2.1.4
25 2.1.5
26 2.1.6
27 2.1.7
2.2
28 2.2.1
2.3
29 2.3.1
30 2.3.2
31 2.3.3
32 2.3.4
2.4
33 2.4.1
34 2.4.2
35 2.4.3
36 2.4.4
37 2.4.5
38 2.4.6
39 2.4.7
3.0
3.1
40 3.1.1
41 3.1.2
42 3.1.3
43 3.1.4
44 3.1.5
45 3.1.6
3.2
46 3.2.1
47 3.2.2
48 3.2.3
49 3.2.4
50 3.2.6
3.2.7
3.3
51 3.3.1
52 3.3.2
53 3.3.3
54 3.3.4
55 3.3.5
3.4
56 3.4.1
57 3.4.2
58 3.4.3
59 3.4.4
60 3.4.5
61 3.4.6
62 3.4.7
63 3.4.8
64 3.4.9
65 3.4.10
4.0
66 4.1
4.3
67 4.4
68 4.5

Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
CAD Model generation
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Collision Load generation
Seismic Static load generation
Model Generation (RB01A & B)
RB01 Composite SLS space frame model (considering gross uncracked properties)
RB01 Composite ULS space frame model (considering cracked torsional stiffness)
RB01 Foundation Loads Model
RB01 Foundation Overturning Model
RB01 Pier Foundation FE Model
RB01 Pier 8A Foundation Model
RB01 Pier 1-3 Pile Cap & Bored Pile Foundation Model
RB01 Abutment Foundation FE Model
RB01 Construction staging model
Girder Beam Design Models
Girder line model for hog estimation
RB01 Seismic space frame model
SUPERSTRUCTURE
Precast Girders
Girder Design Actions Summary
Non-composite Girder SLS section checks at transfer
Composite Girder SLS section checks (flexure)
Composite Girder ULS section checks (shear & torsion)
Composite Girder continuity calcs
Composite Girder continuity - bearing replacement assessment
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Deck
Transverse Deck Analysis
Mechanical Bearings
Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Early thermal cracking
Diaphragm ULS seismic design
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Bearing Friction Assessment
Column ULS seismic section checks
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Abutment 2 wall collision (TBC)
Abutment ULS seismic shear block
Foundations
Foundation loads
Foundation stability checks
Abutment spread foundation design
Pier 7 & 8 spread foundation design
Bearing Pier spread foundation design
Monolithic Pier spread foundation design
Pier 1, 2 & 3 pile cap design
Pier 1, 2 & 3 bored pile design
Monolithic Pier spread foundation ULS seismic design
Pier 7 & 8 spread foundation ULS seismic design
MISCELLANEOUS
MJ Installation data
Parapet (type 2) design
Approach slabs
Parapet impact effect on Girders & global structure

5.0
69 5.1
70 5.2
6.0

REPORTS
Substructure Calculation workbook
Superstructure Calculation workbook
SKETCHES

Detailed Design - Rev C


Methodology

Resource

Date

Design Checker

% Status Resource

Date

Verifier
% Status Resource

Date
05.10.15
05.10.15
12.10.15
12.10.15

Notes:

Design Issues:

% Status

CAD
CAD
Spreadsheet
CAD

FP
FP
JP
JP/KA

29.09.15
29.09.15
05.10.15
05.10.15

100%
100%
100%
100%

LL
LL
LL
LL

05.10.15
05.10.15
12.10.15
12.10.15

100%
100%
100%
100%

LA
LA
LA
LA

Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet

KT/AA
GC
GC
KT/AA
RR

02.10.15
25.03.15
25.03.15
02.10.15
12.10.15

100%
100%
100%
100%
100%

LL
LL
LL
LL
LL

12.10.15
12.10.15
12.10.15
12.10.15
12.10.15

100%
100%
100%
100%
100%

LA
LA
LA
LA
LA

90%
90%
90%
90%
50%

ASBD
ASBD
ASBD
ASBD
ASBD
MIDAS
STAAD

JP/KA

13.10.15

100%

LL

14.10.15

100%

LA

90%

JP
RR
JP
RR
MS

13.10.15
27.10.15
27.11.15
08.12.15
08.12.15

100%
100%
100%
100%
100%

LL
JP
LL
LL
LL

12.10.15
09.11.15
08.12.15
14.12.15
14.12.15

100%
100%
100%
100%
100%

LA
LL
LA
LA
LA

13.11.15

90%
100%

14.12.15

100%

ASBD
ASBD
STAAD
ASBD

JP

13.10.15

LL

14.10.15

100%

LA

90%

LL/RR

23.10.15

100%
50%
50%
100%

JP

27.10.15

100%

LA

90%

i)
ii)

100%
100%
100%
100%

Refer to 23RB01 GEC RFI Register

To do
In Progress
Complete
Rev A Rev B Model RB01A&B initially. RB01C will be included once
off hold

Rev C -

Assess using handcalcs

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD

In accordance with preliminary design P1A


Updated RB01C geometry
Updated foundation rotational stiffness (E=90mpa) for weathered Simsima
In accordance with preliminary design P01
Additional span added to RB01A
Abutment 1 relocated
New Pier 1 foundation to bored piles
Pier 2 (old pier 1) foundation change to bored piles
Pier 3 (old pier 2) foundation change to bored piles
Removal of cladding
Pier 7 foundation offset to avoid existing water main
Pier 6 & 7 column thickness increased to 2m

Additional beam modules to confirm strand arrangements to be developed

50%
50%
50%
50%
50%
50%
50%

50%
50%
50%
50%
50%
50%
50%

Spreadsheet/STAAD

RB01C ON HOLD
Pier 10 relocation and foundation offset to avoid existing water main
Abutment 2 relocation to avoid existing sewer

Bored piles will need to be included

LL

LA

LL

LA

LL

LA

LL

LA

LL

LA

LL

LA

Girder strand &


reinforcement
markup

Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

Diaphragm
reinforcement
markup

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD

KA/RR
KA/RR
KA/RR
KA/RR
KA/RR
KA/RR

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

KA/AA
KA/AA
KA/AA
KA/AA
KA/AA
KA/AA

18.12.15
18.12.15
18.12.15
23.10.15
18.12.15

100%
100%
100%
100%
100%

LL
LL
LL
LL/JR
LL

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

KA/AA
KA/AA
KA/AA
KA/AA
KT

19.10.15
19.10.15
19.10.15

100%
100%
100%

28.10.15

100%

LL/JR
LL/JR
LL/JR
LL
LL

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

JP/KT
RR/JP
RR/JP
RR/JP
JP
JP
MS/JP
MS/JP
RR/JP
RR/JP

Monolithic pier
reinforcement
markup

18.12.15
18.12.15
18.12.15
18.12.15
18.12.15

100%
100%
100%
100%
100%

90%
90%
90%
90%
90%

May not be required depending on design actions

27.10.15
06.11.15
17.11.15
08.12.15
08.12.15
08.12.15
14.12.15
30.10.15
08.12.15
08.12.15

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

Spreadsheet
Spreadsheet
Spreadsheet
ASBD

LL
LL/JR
LL/JR
LL/JR
LL/JR
LL/JR
LL
LL/JR
LL
LL

80%
80%
80%
28.10.15
27.10.15
10.12.15

14.12.15
05.11.15

100%
100%
100%
75%
50%
75%
75%
100%
100%

LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA

Abutment
reinforcement
markup
Check if abutment 2 needs to be designed for collision after relocation

27.10.15

58%

46%

100%
90%

Foundation concrete
reinforcement
markup

90%
90%

Refer to Std Design Calculations

TOTAL COMPLETED

Bearing pier
reinforcement
markup

Generate parapet std design calculation

36%

KT/LL
LA
28.09.15 28.09.15

Project Number:
Design Items/Task list
Item
0.0
1 0.1
2 0.2
3 0.3
4 0.4
1.0
1.1
5 1.1.1
6 1.1.2
7 1.1.3
8 1.1.4
9 1.1.5
1.2
10 1.2.1
11 1.2.2
12 1.2.3
13 1.2.4
14 1.2.5
15 1.2.6
16 1.2.7
17 1.2.8
18 1.2.9
19 1.2.10
20 1.2.11
21 1.2.12
22 1.2.13
2.0
2.1
23 2.1.1
24 2.1.2
25 2.1.3
26 2.1.4
27 2.1.5
28 2.1.6
29 2.1.7
2.2
30 2.2.1
2.3
31 2.3.1
32 2.3.2
33 2.3.3
34 2.3.4
2.4
35 2.4.1
36 2.4.2
37 2.4.3
38 2.4.4
39 2.4.5
40 2.4.6
41 2.4.7
3.0
3.1
42 3.1.1
43 3.1.2
44 3.1.3
45 3.1.4
46 3.1.5
47 3.1.6
3.2
48 3.2.1
49 3.2.2
50 3.2.3
51 3.2.4
52 3.2.6
3.2.7
3.3
53 3.3.1
54 3.3.2
55 3.3.3
3.3.4
56 3.3.5
3.4
57 3.4.1
58 3.4.2
59 3.4.3
60 3.4.4
61 3.4.5
62 3.4.6
63 3.4.7
64 3.4.8
65 3.4.9
66 3.4.10
67 3.4.11
4.0
68 4.1
4.3
69 4.4
70 4.5

Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
CAD Model generation
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Collision Load generation
Seismic Static load generation
Model Generation (RB01A,B&C)
RB01 Construction staging model (Satges 1 to 3)
RB01 Composite SLS space frame model (considering gross uncracked properties) - for live load influencing
RB01 Centrifugal model
RB01 Composite ULS space frame model (considering cracked torsional stiffness) - for live load influecing
RB01 Collision model (uls)
RB01 Foundation Loads/Stabliity Models
RB01 Refined Pier Foundation Model (for foundation reinforcement design)
RB01 Pier 8A Foundation Model (for foundation reinforcement design)
RB01 Pier 1-3 Pile Cap & Bored Pile Foundation Model (for pilecap reinforcement design)
RB01 Pier 11 Foundation Model (for foundation reinforcement design)
Girder Beam Design Models
Girder line model for hog estimation
RB01 Seismic space frame models
SUPERSTRUCTURE
Precast Girders
Girder Design Actions Summary
Non-composite Girder SLS section checks at transfer
Composite Girder SLS section checks (flexure)
Composite Girder ULS section checks (shear & torsion)
Composite Girder continuity calcs
Composite Girder continuity - bearing replacement assessment
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Deck
Transverse Deck Analysis
Mechanical Bearings
Preliminary Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Early thermal cracking
Diaphragm ULS seismic design
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Bearing Friction Assessment
Column ULS seismic section checks
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Abutment 2 wall collision (TBC)
Abutment ULS seismic shear block
Foundations
Foundation loads
Foundation stability checks
Abutment spread foundation design
Pier 7 & 8 spread foundation design
Bearing Pier spread foundation design
Monolithic Pier spread foundation design
Monolithic Pier 11 spread foundation design
Pier 1, 2 & 3 pile cap design
Pier 1, 2 & 3 bored pile design
Monolithic Pier spread foundation ULS seismic design
Pier 7 & 8 spread foundation ULS seismic design
MISCELLANEOUS
EJ movements
Parapet (type 2) design
Approach slabs
Parapet impact effect on Girders & global structure

5.0
71 5.1
72 5.2
6.0

REPORTS
Substructure Calculation workbook
Superstructure Calculation workbook
SKETCHES

Detailed Design - Rev C


Methodology

Resource

Date

% Status Resource

Design Checker
Date

Verifier
% Status Resource

Date

Design Issues:
% Status
Refer to 23RB01 GEC RFI Register

CAD
CAD
Spreadsheet
CAD
To do
In Progress
Complete

Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet

Rev A Rev B -

In accordance with preliminary design P1A


Updated RB01C geometry
Updated foundation rotational stiffness (E=90mpa) for weathered Simsima
In accordance with preliminary design P01
Rev C Additional span added to RB01A
Abutment 1 relocated
New Pier 1 foundation to bored piles
Pier 2 (old pier 1) foundation change to bored piles
Pier 3 (old pier 2) foundation change to bored piles
Removal of cladding
Pier 7 foundation offset to avoid existing water main
Pier 6 & 7 column thickness increased to 2m
Rev C.1 - RB01C geometry updates included
Pier 10 relocation and foundation offset to avoid existing water main
Abutment 2 relocation to avoid existing sewer
Span 11 to Span 15 girder layout updated

ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
MIDAS
STAAD
STAAD
ASBD
STAAD
ASBD

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD

DELIVERABLES:

Spreadsheet/MIDAS
Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet
ASBD

TOTAL COMPLETED

0%

0%

0%

SUBSTRUCTURE D1A
(Drawings & Calculations)

5-Feb

SUPERSTRUCTURE D1A
(Drawings & Calculations)

26-Feb

DXW - 23RB01 Detailed Design


Design Items/Task list
Item
0.0
1 0.1
2 0.2
3 0.3
1.0
1.1
4 1.1.1
5 1.2.3
6 1.2.4
1.3
7 1.3.1
8 1.3.2
9 1.3.3
10 1.3.4
11 1.3.5
12 1.3.6
13 1.3.7
14 1.3.8
2.0
2.1
15 2.1.1
16 2.1.2
17 2.1.3
18 2.1.4
19 2.1.5
20 2.1.6
21 2.1.7
22 2.1.8
23 2.1.9
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.3
24 2.3.1
25 2.3.2
26 2.3.3
27 2.3.4
2.4
28 2.4.1
29 2.4.2
30 2.4.3
31 2.4.4
32 2.4.5
33 2.4.6
34 2.4.7
35 2.4.8
36 2.4.9
37 2.4.10
3.0
3.1
38 3.1.1
39 3.1.2
40 3.1.3
41 3.1.4
42 3.1.5
43 3.1.6
3.2
44 3.2.1
45 3.2.2
46 3.2.3
47 3.2.4
48 3.2.6
3.3
49 3.3.1
50 3.3.2
51 3.3.3
52 3.3.4
3.4
53 3.4.1
54 3.4.2
55 3.4.3
56 3.4.4
57 3.4.5
4.0
58 4.1
59 4.2
60 4.3
61 4.4
62 4.5
63 4.6
5.0
64 5.1
6.0

Description
GEOMETRY
CAD setout
CAD girder layout
Estimation of levels
MODELLING
Properties & Loading
Development of properties summary (include all model inputs ie section, materials, boundary conditions, loads etc)
Creep & Shrinkage spreadsheet
Differential settlement sketches
Model Generation
Girder line model for hog estimation
RB01 Construction staging model
RB01 Composite Long Term space frame model (considering long term concrete modulus)
RB01 Composite SLS space frame model (considering gross uncracked properties)
RB01 Composite ULS space frame model (considering cracked torsional stiffness)
RB01 Foundation Loads Model
RB01 Pier Foundation FE Model
RB01 Abutment Foundation FE Model
RB01 Seismic space frame model
SUPERSTRUCTURE
Precast Girders
Girder section checks at transfer
Section checks at non-composite
Composite Girder SLS section checks (transfer & flexure)
Composite Girder ULS section checks (shear & torsion)
Composite Girder continuity calcs
Composite Girder continuity - bearing replacement assessment
Determination of Girder hogs (non-composite & composite DL deflections + residual hogs)
Girder Design Actions Summary
Girder Max Shear Assessment
Deck
Deck SLS section checks
Deck ULS section checks
Deck cantilever SLS section checks
Deck cantilever ULS section checks
Mechanical Bearings
Bearing/Pedestal sizing
Bearing reactions summary
Bearing movement summary
Bearing rotation summary
Diaphragms
Diaphragm Design Actions Summary
Abt Diaphragm SLS section checks
Abt Diaphragm ULS section checks
Pier Diaphragm SLS section checks
Pier Diaphragm ULS section checks
Pier 6 & 7 Diaphragm SLS section checks
Pier 6 & 7 Diaphragm ULS section checks
Piers 6 & 7 deflection
Bearing Replacement Assessment
Early thermal cracking
SUBSTRUCTURE
Monolithic Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Monolithic Pier Seismic Assessment (AASHTO)
Column ULS seismic section checks
Bearing Piers
Column Design Actions Summary (BD37)
Column SLS section checks
Column ULS section checks
Column Collision
Bearing Friction Assessment
Abutments
Abutment wall SLS section checks
Abutment wall ULS section checks
Early thermal cracking
Abutment 1 wall collision
Foundations
Abutment spread foundation design
Pier spread foundation design
Foundation loads
Foundation stability checks
Early thermal cracking
MISCELLANEOUS
MJ Installation data
Parapet/deck connection design
Parapet design
Approach slabs
Parapet impact effect on Girders & global structure
Cladding Details
REPORTS
Calculation workbook
SKETCHES

Detailed Design - Rev B


Methodology

Resource

CAD
CAD
Spreadsheet

Design Checker

% Status

FP
FP
KT/JP

19.05.15
19.05.15

100%
100%

LL
LL
JAC

LA
LA

90%
90%

Spreadsheet
Spreadsheet
Spreadsheet

GC
GC
GC

25.03.15
25.03.15
25.03.15

100%
100%
100%

LL
LL
LL

LA
LA
LA

90%
90%
90%

STAAD
ASBD
ASBD
ASBD
ASBD
ASBD
ASBD
STAAD
ASBD

JP
JAC/JP
JAC/JP
JAC/JP
JAC/JP
JP/JAC
JP
JP
LL

06.07.15
15.06.15
24.07.15
15.06.15
15.06.15
26.06.15

100%
100%
100%
100%
100%
100%

LL
LL
LL
LL
LL
LL
LL

75%

JP

LA

75%

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/STAAD
Spreadsheet
Spreadsheet/ASBD

LL/JP
LL/JP
LL/JP
JAC
JP
JP
JP
LL/JP
JAC

24.06.15
24.06.15
24.06.15
24.06.15
19.06.15
05.08.15
06.07.15
24.06.15
24.06.15

JAC
JAC
JAC
LL
LL
LL
JAC
JAC
LL

LA
LA
LA
LA
LA
LA
LA
LA
LA

90%
90%
90%
75%
90%

Spreadsheet
Spreadsheet
Spreadsheet
Spreadsheet

DECK ASSESSED QUALITATIVELY AND B16-150 T/B TRANSVERSE REINFORCEMENT BELIEVED TO BE SUFFICIENT AS IS TYPICALLY
USED FOR OTHER EXW PACKAGES (P25).

Spreadsheet/Catalogues
Spreadsheet
Spreadsheet
Spreadsheet

JP
JP
JP
JP

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

JAC/LL
JAC
JAC
JAC
JAC
LL
LL
LL
JAC/LL
JAC/LL

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet/ASBD

RR
RR
RR
LL
LL
LL

Spreadsheet
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

JAC/RR
JAC/RR
JAC/RR
JAC/RR
JAC/RR

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet/ASBD

LL
LL
RR
RR

Spreadsheet/ASBD
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
Spreadsheet/ASBD

JP
JP
JAC
JP
RR

Spreadsheet
Spreadsheet/ASBD
Spreadsheet
Spreadsheet
ASBD
Spreadsheet

KT
LL/JAC

100%
100%
100%
100%
100%
100%
100%
100%
100%

04.08.15
04.08.15
06.08.15

100%
100%
100%

31.07.15
31.07.15
31.07.15

100%
100%
100%
75%
75%
75%

Resource

Date

Verifier

Date

15.06.15
24.07.15
15.06.15
15.06.15

% Status Resource

100%
100%
100%
100%

Date

LA
LA
LA
LA
LA
LA
LA

90%
90%
90%
90%

90%
90%

50%
50%
50%

80%
50%
80%
80%
90%

24.07.15

100%

29.06.15
27.07.15

100%
100%

80%

Refer to Std Design Calculations


LL/JAC
JP

TOTAL COMPLETED

56%

% Status

6%

27%