CONCRETE WORK

Rates for Concrete Work shall include for :


a.
Mixing, depositing, handling, hoisting and plasing in position and
packing around reinforcement.
b.

Vibrating, curing as directed.

BASIC PRICES
Materials
Cement
Sand
Metal 3/4 "
Metal 1 "
Metal 2 "
Water

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

590.00
6,600.00
4,500.00
4,300.00
4,300.00
0.75

bag.
cube.
cube.
cube.
cube.
gal.

Rs.
Rs.
Rs.

650.00
450.00
650.00

per day
per day
per day

Rs.

650.00

per day

Rs.
Rs.

2,000.00
1,000.00

per day
per day

Labour
Skilled Labour
Un Skilled Labour
Vibrator Operator
Concrete Mixer
operator

Plant and Equipment


Concrete Mixer
Vibrator

Overheads & profits

10.00

B
B. 01

CONCRETE WORK
Cement concrete 1 : 3 : 6 with 2" metal

cube.

Rs.

22,758.91

( grade 10 )
B. 02

Cement concrete 1 : 3 : 6 with 1" metal


( grade 10 )

cube.

Rs.

22,758.91

B. 03

Cement concrete 1 : 21/2 : 5 with 1" metal


( grade 15 )

cube.

Rs.

23,407.91

B. 04

Cement concrete 1 : 2 :4 ( 3/4" metal )


( grade 20 )

cube.

Rs.

31,765.62

B. 05

Cement concrete 1 : 11/2 :3 ( 3/4" metal )


( grade 25 )

cube.

Rs.

29,468.91

B. 06

2" thick blinding layer under column or


wall foundation in concrete 1:3:6 ( 2 " )

sqr.

Rs.

4,369.91

2" thick blinding layer under column or


wall foundation in concrete 1:3:6 ( 1 " )

sqr.

Rs.

4,369.91

3" thick blinding layer under column or


wall foundation in concrete 1:3:6 ( 1 " )

sqr.

Rs.

6,093.42

4" thick ground floor slab in concrete


1:3:6 ( 1 " )

sqr.

Rs.

8,399.57

B. 07

B. 08

B. 09

Cement concrete 1 : 2 : 4 - 3/4 " metal


( grade 20 )

B. 10

B. 11

B. 12

B. 13

B. 14

B. 15

B. 16

B. 17

Cement concrete 1 : 2 : 4 : ( 3/4 " ) lintol


size 41/2" x 6" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

152.53

Cement concrete 1 : 2 : 4 : ( 3/4 " ) lintol


size 6" x 9" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

233.93

Cement concrete 1 : 2 : 4 : ( 3/4 " ) lintol


size 9" x9" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

338.25

Cement concrete 1 : 2 : 4 : ( 3/4 " ) lintol


size 9" x 12" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

427.61

Cement concrete 1 : 2 : 4 : ( 3/4 " ) lintol


size 6" x 13 1/2" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

363.13

Cement concrete 1 : 2 : 4 : ( 3/4 " ) lintol


size 9" x 13 1/2" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

469.29

Cement concrete 1 : 2 : 4 : ( 3/4 " ) lintol


size 12" x 13 1/2" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

515.18

Cement concrete 1 : 2 : 4 : ( 3/4 " ) lintol


size 41/2" x 41/2" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

107.81

B. 18
B. 19
B. 20
B. 21
B. 22
B. 23

B. 24
B. 25
B. 26
B. 27
B. 28
B. 29

B. 30
B. 31

B. 32

B. 33

9" x 9 " column in ground floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,426.78

9" x 9 " column in first floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,921.78

9" x 9 " column in second floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

35,169.28

9" x 9 " column in thired floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

35,416.78

12" x 12 " column in ground floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

33,918.09

12" x 12 " column in first floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,413.09

12" x 12 " column in second floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,660.59

12" x 12 " column in thired floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,908.09

9" x 9 " beam in ground floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,610.11

9" x 9 " beam in first floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

35,105.11

9" x 9 " beam in second floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

35,352.61

9" x 9 " beam in thired floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

35,600.11

9" x 12 " beam in ground floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,083.09

9" x 12 " beam in first floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,578.09

9" x 12 " beam in second floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,825.59

9" x 12 " beam in thired floor in

concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

35,073.09

12 " x 12 " beam in ground floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,083.09

12 " x 12 " beam in first floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,578.09

12 " x 12 " beam in second floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

34,825.59

12 " x 12 " beam in thired floor in


concrete 1 : 2 : 4 ( 3/4 " )

cube

Rs.

35,073.09

B. 38

4" thick slab in first floor ( 1: 2: 4 3/4 " )

sqr.

Rs.

11,786.46

B. 39

4" thick slab in second floor ( 1: 2: 4 3/4 " )

sqr.

Rs.

12,116.46

B. 40

4" thick slab in thired floor ( 1: 2: 4 3/4 " )

sqr.

Rs.

12,528.96

B. 41

5" thick slab in first floor ( 1: 2: 4 3/4 " )

sqr.

Rs.

15,504.69

B. 42

5" thick slab in second floor ( 1: 2: 4 3/4 " )

sqr.

Rs.

15,999.69

B. 43

5" thick slab in thired floor ( 1: 2: 4 3/4 " )

sqr.

Rs.

16,247.19

B. 44

6" thick slab in first floor ( 1: 2: 4 3/4 " )

sqr.

Rs.

17,749.58

B. 45

6" thick slab in second floor ( 1: 2: 4 3/4 " )

sqr.

Rs.

18,244.58

B. 46

6" thick slab in thired floor ( 1: 2: 4 3/4 " )

sqr.

Rs.

18,492.08

B. 34

B. 35

B. 36

B. 37

Cement concrete 1 : 11/2 : 3 - 3/4 " metal


( grade 25 )

B. 47

B. 48

B. 49

B. 50

B. 51

B. 52

B. 53

B. 54

B. 55

B. 56

Cement concrete 1 : 11/2 : 3 : ( 3/4 " ) lintol


size 41/2" x 6" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

148.29

Cement concrete 1 : 11/2 : 3 : ( 3/4 " ) lintol


size 6" x 9" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

240.44

Cement concrete 1 : 11/2 : 3 : ( 3/4 " ) lintol


size 9" x9" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

325.32

Cement concrete 1 : 11/2 : 3 : ( 3/4 " ) lintol


size 9" x 12" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

380.14

Cement concrete 1 : 11/2 : 3 : ( 3/4 " ) lintol


size 6" x 13 1/2" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

335.14

Cement concrete 1 : 11/2 : 3 : ( 3/4 " ) lintol


size 9" x 13 1/2" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

450.00

Cement concrete 1 : 11/2 : 3 : ( 3/4 " ) lintol


size 12" x 13 1/2" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

489.46

Cement concrete 1 : 11/2 : 3 : ( 3/4 " ) lintol


size 41/2" x 41/2" with and including formwork.
( reinforcement paid separately. )

l.ft.

Rs.

104.66

9" x 9 " column in ground floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

32,697.07

9" x 9 " column in first floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,192.07

B. 57

B. 58

B. 59

B. 60

B. 61

B. 62

B. 63

B. 64

B. 65

B. 66

B. 67

B. 68

B. 69

B. 70

9" x 9 " column in second floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,439.57

9" x 9 " column in thired floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,687.07

12" x 12 " column in ground floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

32,188.38

12" x 12 " column in first floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

32,683.38

12" x 12 " column in second floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

32,930.88

12" x 12 " column in thired floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,178.38

9" x 9 " beam in ground floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

32,880.40

9" x 9 " beam in first floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,375.40

9" x 9 " beam in second floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,622.90

9" x 9 " beam in thired floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,870.40

9" x 12 " beam in ground floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

32,353.38

9" x 12 " beam in first floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

32,848.38

9" x 12 " beam in second floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,095.88

9" x 12 " beam in thired floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,343.38

B. 71

12 " x 12 " beam in ground floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

32,353.38

12 " x 12 " beam in first floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

32,848.38

12 " x 12 " beam in second floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,095.88

12 " x 12 " beam in thired floor in


concrete 1 : 11/2 : 3 ( 3/4 " )

cube

Rs.

33,343.38

B. 75

4" thick slab in first floor ( 1: 11/2: 3 -3/4 " )

sqr.

Rs.

10,774.93

B. 76

4" thick slab in second floor ( 1: 11/2: 3 -3/4 " )

sqr.

Rs.

11,104.93

B. 77

4" thick slab in thired floor ( 1: 11/2: 3 - 3/4 " )

sqr.

Rs.

11,269.93

B. 78

5" thick slab in first floor ( 1: 11/2: 3 - 3/4 " )

sqr.

Rs.

14,730.44

B. 79

5" thick slab in second floor ( 1: 11/2: 3 3/4 " )

sqr.

Rs.

15,060.44

B. 80

5" thick slab in thired floor ( 1: 11/2: 3 3/4 " )

sqr.

Rs.

15,225.44

B. 81

6" thick slab in first floor ( 1: 11/2: 3 3/4 " )

sqr.

Rs.

16,884.72

B. 82

6" thick slab in second floor ( 1: 11/2: 3 3/4 " )

sqr.

Rs.

17,214.72

B. 83

6" thick slab in thired floor ( 1: 11/2: 3 3/4 " )

sqr.

Rs.

17,379.72

B. 72

B. 73

B. 74

B. 01

Concrete 1 : 3 : 6 ( 2 " ) grade 10

Per Cube

MIXING COST
Materials
13.00
0.60
1.00
125

bags
cube
cube
gal.

Cement
Sand
Metal ( 2" )
Water

at.
at.
at.
at.

Rs.
Rs.
Rs.
Rs.

590.00
6,600.00
4,300.00
0.75

Rs.
Rs.
Rs.
Rs.

7,670.00
3,960.00
4,300.00
93.75
Rs.

16,023.75

Rs.

1,114.50

Rs.

666.67

Rs.

17,804.92

Rs.

2,000.00

Rs.

500.00

Rs.

160.00

Rs.

225.00
20,689.92

Labour
1 Mixer operator
1/3 day
6 Uunskilled labour 1/3 day

at.
at.

Rs,
Rs,

650.00 Rs.
450.00 Rs.

214.50
900.00

Plant and equipment


1/3

day

Concrete mixer 14/10

at.

Rs,

2,000.00

Cost for one cube ( mixing cost only )


LAYING COST
Labour
0.50 day
0.50 day
0.50 day

Mason
Vibrator Operator
6 unskilled labour

Plant and equipment


0.50 day
Vibrator

at
at
at

at

Rs.
Rs.
Rs.

Rs.

650.00 Rs.
650.00 Rs.
450.00 Rs.

325.00
325.00
1,350.00

1,000.00

Add
3 % of labour cost for tools
5 % of labour cost for scaffolding

Rs.
Rs.

60.00
100.00

Curing
100 gal.
0.33 day

Water
Unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

75.00
150.00

Overheads & profits

2,068.99

Cost for one cube with overheads & profits

B. 02

22,758.91

Concrete 1 : 3 : 6 ( 1 " ) grade 10

Per Cube

MIXING COST
Materials
13.00
0.60
1.00
125

bags
cube
cube
gal.

Cement
Sand
Metal ( 2" )
Water

at.
at.
at.
at.

Rs.
Rs.
Rs.
Rs.

590.00
6,600.00
4,300.00
0.75

Rs.
Rs.
Rs.
Rs.

7,670.00
3,960.00
4,300.00
93.75
Rs.

16,023.75

Rs.

1,114.50

Rs.

666.67

Rs.

17,804.92

Rs.

2,000.00

Rs.

500.00

Rs.

160.00

Rs.

225.00

Labour
1 Mixer operator
1/3 day
6 Unskilled labour 1/3 day

at.
at.

Rs,
Rs,

650.00 Rs.
450.00 Rs.

214.50
900.00

Plant and equipment


1/3

day

Concrete mixer 14/10

at.

Rs,

2,000.00

Cost for one cube ( mixing cost only )


LAYING COST
Labour
0.50 day
0.50 day
0.50 day

mason
Vibrator Operator
6 unskilled labour

Plant and equipment


0.50 day
vibrator

at
at
at

at

Rs.
Rs.
Rs.

Rs.

650.00 Rs.
650.00 Rs.
450.00 Rs.

325.00
325.00
1,350.00

1,000.00

Add
3 % of labour cost for tools
5 % of labour cost for scaffolding

Rs.
Rs.

60.00
100.00

Curing
100 gal.
1/3
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

75.00
150.00

B. 03

Overheads & profits

Rs.
Rs.

20,689.92
2,068.99

Cost for one cube with overheads & profits

Rs.

22,758.91

Rs.

16,613.75

Rs.

1,114.50

Rs.

666.67

Rs.

18,394.92

Rs.

2,000.00

Rs.

500.00

Concrete 1 : 21/2 : 5 ( 1 " ) grade 15

Per Cube

MIXING COST
Materials
14.00
0.60
1.00
125

bags
cube
cube
gal.

Cement
Sand
Metal ( 2" )
Water

at.
at.
at.
at.

Rs.
Rs.
Rs.
Rs.

590.00
6,600.00
4,300.00
0.75

Rs.
Rs.
Rs.
Rs.

8,260.00
3,960.00
4,300.00
93.75

Labour
1 Mixer operator
1/3 day
6 unskilled labour 1/3 day

at.
at.

Rs,
Rs,

650.00 Rs.
450.00 Rs.

214.50
900.00

Plant and equipment


1/3

day

concrete mixer 14/10

at.

Rs,

2,000.00

Cost for one cube ( mixing cost only )


LAYING COST
Labour
0.50 day
0.50 day
0.50 day

mason
skilled labour for
vibrator
6 unskilled labour

Plant and equipment


0.50 day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
1,350.00

at

Rs.

1,000.00

Add
3 % of labour cost for tools
5 % of labour cost for scaffolding

Rs.
Rs.

60.00
100.00
160.00

Curing
1/3

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

75.00
150.00
225.00 Rs.

225.00

B. 04

Overheads & profits

Rs.
Rs.

21,279.92
2,127.99

Cost for one cube with overheads & profits

Rs.

23,407.91

Rs.

23,055.00

Rs.

1,347.50

Rs.

1,000.00

Rs.

25,402.50

Rs.

2,400.00

Rs.

600.00

Concrete 1 : 2 : 4 ( 3/4 " ) grade 20

Per Cube

MIXING COST
Materials
18.00
0.60
1.00
125

bags
cube
cube
gal.

Cement
Sand
Metal ( 2" )
Water

at.
at.
at.
at.

Rs.
Rs.
Rs.
Rs.

745.00
7,200.00
5,200.00
1.00

Rs.
Rs.
Rs.
Rs.

13,410.00
4,320.00
5,200.00
125.00

Labour
1 mixer operator
1/3 day
6 unskilled labour 1/3 day

at.
at.

Rs,
Rs,

750.00 Rs.
550.00 Rs.

247.50
1,100.00

Plant and equipment


1/3

day

concrete mixer 14/10

at.

Rs,

3,000.00

Cost for one cube ( mixing cost only )


LAYING COST
Labour
0.50 day
0.50 day
0.50 day

mason
skilled labour for
vibrator
6 unskilled labour

Plant and equipment


0.50 day
vibrator

at

Rs.

750.00 Rs.

375.00

at
at

Rs.
Rs.

750.00 Rs.
550.00 Rs.

375.00
1,650.00

at

Rs.

1,200.00

Add
3 % of labour cost for tools
5 % of labour cost for scaffolding

Rs.
Rs.

72.00
120.00
192.00

Curing
100 gal.
1/3
day

water
unskilled labour

at
at

Rs.
Rs.

1.00 Rs.
550.00 Rs.

100.00
183.33
Rs.

283.33
28,877.83

Overheads & profits

2,887.78

Cost for one cube with overheads & profits

B. 05

31,765.62

Concrete 1 : 11/2 : 3 ( 3/4 " ) grade 25

Per Cube

MIXING COST
Materials
23.00
0.60
1.00
125

bags
cube
cube
gal.

Cement
Sand
Metal ( 2" )
Water

at.
at.
at.
at.

Rs.
Rs.
Rs.
Rs.

590.00
6,600.00
4,500.00
0.75

Rs.
Rs.
Rs.
Rs.

13,570.00
3,960.00
4,500.00
93.75
Rs.

22,123.75

Rs.

1,114.50

Rs.

666.67

Rs.

23,904.92

Rs.

2,000.00

Rs.

500.00

Rs.

160.00

Rs.
Rs.
Rs.

225.00
26,789.92
2,678.99

Labour
1 mixer operator
1/3 day
6 unskilled labour 1/3 day

at.
at.

Rs,
Rs,

650.00 Rs.
450.00 Rs.

214.50
900.00

Plant and equipment


1/3

day

concrete mixer 14/10

at.

Rs,

2,000.00

Cost for one cube ( mixing cost only )


LAYING COST
Labour
0.50 day
0.50 day
0.50 day

mason
Vibrator Operator
6 unskilled labour

Plant and equipment


0.50 day
vibrator

at
at
at

at

Rs.
Rs.
Rs.

Rs.

650.00 Rs.
650.00 Rs.
450.00 Rs.

325.00
325.00
1,350.00

1,000.00

Add
3 % of labour cost for tools
5 % of labour cost for scaffolding

Rs.
Rs.

60.00
100.00

Curing
1/3

100 gal.
day

water
unskilled labour

Overheads & profits

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

75.00
150.00

Cost for one cube with overheads & profits

Rs.

29,468.91

Rs.

26,843.75

Rs.

1,114.50

Rs.

666.67

Rs.

28,624.92

325.00
1,350.00
2,000.00 Rs.

2,000.00

Rs.

500.00

Rs.

160.00

Overheads & profits

Rs.
Rs.
Rs.

225.00
31,509.92
3,150.99

Cost for one cube with overheads & profits

Rs.

34,660.91

B. 05a Concrete 1 : 1 : 2 ( 3/4 " ) grade 30

Per Cube

MIXING COST
Materials
31.00
0.60
1.00
125

bags
cube
cube
gal.

Cement
Sand
Metal ( 2" )
Water

at.
at.
at.
at.

Rs.
Rs.
Rs.
Rs.

590.00
6,600.00
4,500.00
0.75

Rs.
Rs.
Rs.
Rs.

18,290.00
3,960.00
4,500.00
93.75

Labour
1 mixer operator
1/3 day
6 unskilled labour 1/3 day

at.
at.

Rs,
Rs,

650.00 Rs.
450.00 Rs.

214.50
900.00

Plant and equipment


1/3

day

concrete mixer 14/10

at.

Rs,

2,000.00

Cost for one cube ( mixing cost only )


LAYING COST
Labour
0.50 day
0.50 day
0.50 day

mason
skilled labour for
vibrator
6 unskilled labour

Plant and equipment


0.50 day
vibrator

at

Rs.

650.00 Rs.

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

at

Rs.

325.00

1,000.00

Add
3 % of labour cost for tools
5 % of labour cost for scaffolding

Rs.
Rs.

60.00
100.00

Curing
1/3

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

75.00
150.00

B. 06

2" thick blinding layer under wall / column foundation

(1:3:6-2")

Per sqr.
Materials
0.17 cube
Add

mixed concrete
( as per item B. 01 )
10 % for wastage

at.

Skilled labour 1/ 4 day


Unskilled labour 1/ 4 day

at.
at.

Rs.

17,804.92 Rs.

3,026.84

Rs.

302.68 Rs.

3,329.52

650.00 Rs.
450.00 Rs.

162.50
450.00 Rs.

612.50

Rs.
Rs.

30.63
3,972.64

Overheads & profits

Rs.

397.26

Cost for one sqr. with overheads & profit

Rs.

4,369.91

Labour
1.00
4.00

Tools

Rs.
Rs.

5 % of labour cost

Add

B. 07

2" thick blinding layer under wall / column foundation

(1:3:6-1")

Per sqr.
Materials
0.17 cube

mixed concrete
( as per item B. 02 )
10 % for wastage

at.

Skilled labour 1/ 4 day

at.

Rs.

650.00 Rs.

162.50

Unskilled labour 1/ 4 day

at.

Rs.

450.00 Rs.

450.00 Rs.

612.50

Rs.

30.63
3,972.64

Overheads & profits

Rs.

397.26

Cost for one sqr. with overheads & profit

Rs.

4,369.91

Add

Rs.

17,804.92 Rs.
Rs.

3,026.84
302.68 Rs.

3,329.52

Labour

Tools
5 % of labour cost
Add

B. 08

3" thick blinding layer under wall / column foundation ( 1 : 3 : 6 - 1" )


Per sqr.
Materials
0.25 cube
Add

mixed concrete
( as per item B. 02 )

at.

Rs.

10 % for wastage

17,804.92 Rs.
Rs.

4,451.23
445.12
4,896.35 Rs.

4,896.35

162.50
450.00
612.50 Rs.

612.50

Labour
1
4

skilled labour 1/4 day


unskilled labour 1/4 day

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.

Tools
5 % cost of labour cost

Rs.

30.63
5,539.48

Rs.

553.95

Rs.

6,093.42

Add
Overheads & profits
Cost for one sqr. With overheads & profit
note
For laying concrete at depths more than 5 ' 0 " add 1/4 extra day unskilled labour

B. 09

4 " thick ground floor slab. ( 1 : 3 : 6

1")

Per sqr.
Materials
0.33 cube

Add

mixed concrete
( as per item B. 02 )

at.

Rs.

17,804.92 Rs.

5,934.97

Rs.

593.50

10 % for wastage

Rs.

6,528.47

Rs.

816.67

Rs.

250.00

Rs.

40.83
7,635.97

Overheads & profits

Rs.

763.60

Cost for one sqr. with overheads & profit

Rs.

8,399.57

Labour
1.00 skilled labour 1/3 day
4.00 unskilled labour 1/3 day
Plant and equipment
0.25 day
vibrator

at.
at.

at.

Rs.
Rs.

Rs.

650.00 Rs.
450.00 Rs.

1,000.00

216.67
600.00

Add
Tools

5 % of of labour cost

Add

B. 10

Cement concrete 1:2:4 ( 3/4 " ) lintol size 4 1/2" x 6"


with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
1.85 c. ft.
13.7 s. ft.

Concrete ( B 04 )
Sawn formwork

at.
at.

Rs.
Rs.

31,765.62 Rs.
5,740.35 Rs.

587.66
786.43
Rs.

1,374.09

Rs.
Rs.

151.25
1,525.34

Rs.

2,339.28

Add
Extra cost of labour
1/8
1/8

day
day

Skilled labour
Un skilled labour

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.

81.25
56.25
137.50

Rs.

13.75

Overheads & profit


cost for 10.0 l. ft.

Cost for one foot with overheads & profits

B. 11

Rs.

152.53

Cement concrete 1:2:4 ( 3/4 " ) lintol size 6" x 9"


with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
3.75 c. ft.
20.00 s. ft.

Concrete ( B 04 )
Sawn formwork

at.
at.

Rs.
Rs.

31,765.62 Rs.
5,740.35 Rs.

1,191.21
1,148.07

Add
Extra cost of labour
1/8
1/8

day
day

Skilled labour
Un skilled labour
Overheads & profit
cost for 10.0 l. ft.

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.

81.25
56.25
137.50
13.75
151.25
2,339.28

Cost foCost for one foot with overheads & profits

B. 12

Rs.

233.93

Cement concrete 1:2:4 ( 3/4 " ) lintol size 9" x 9 "


with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
5.63 c. ft.
22.5 s. ft.

Concrete ( B 04 )
Sawn formwork

at.
at.

Rs.
Rs.

31,765.62 Rs.
5,740.35 Rs.

1,788.40
1,291.58
Rs.

3,079.98

Rs.
Rs.

302.50
3,382.48

Rs.

3,973.65

Rs.
Rs.

302.50
4,276.15

Add
Extra cost of labour
1/4
1/4

day
day

Skilled labour
Un skilled labour

at.
at.

Rs.
Rs.

Overheads & profit

650.00 Rs.
450.00 Rs.
Rs.
Rs.

162.50
112.50
275.00
27.50

cost for 10.0 l. ft.


Cost for one foot with overheads & profits

B. 13

Rs.

338.25

Cement concrete 1:2:4 ( 3/4 " ) lintol size 9" x 12 "


with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
7.50 c. ft.
27.72 s. ft.

Concrete ( B 04 )
Sawn formwork

at.
at.

Rs.
Rs.

31,765.62 Rs.
5,740.35 Rs.

2,382.42
1,591.23

Add
Extra cost of labour
1/4
1/4

day
day

Skilled labour
Un skilled labour

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.

162.50
112.50

Rs.
Rs.

275.00
27.50

Overheads & profit


cost for 10.0 l. ft.
Cost for one foot with overheads & profits

Rs.

427.61

B. 14

Cement concrete 1:2:4 ( 3/4 " ) lintol size 6" x 13 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
5.6 c. ft.
27 s. ft.

Concrete ( B 04 )
Sawn formwork

at.
at.

Rs.
Rs.

31,765.62 Rs.
5,740.35 Rs.

1,778.87
1,549.89
Rs.

3,328.77

Rs.
Rs.

302.50
3,631.27

Rs.

4,390.42

Rs.
Rs.

302.50
4,692.92

Add
Extra cost of labour
1/4
1/4

day
day

Skilled labour
Un skilled labour

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.
Rs.

162.50
112.50
275.00

Rs.

27.50

Overheads & profit


cost for 10.0 l. ft.

Cost for one foot with overheads & profits

B. 15

Rs.

363.13

Cement concrete 1:2:4 ( 3/4 " ) lintol size 9" x 131/2"


with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
8.4 c. ft.
30 s. ft.

Concrete ( B 04 )
Sawn formwork

at.
at.

Rs.
Rs.

31,765.62 Rs.
5,740.35 Rs.

2,668.31
1,722.11

Add
Extra cost of labour
1/4
1/4

day
day

Skilled labour
Un skilled labour
Overheads & profit

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.
Rs.
Rs.

162.50
112.50
275.00
27.50

cost for 10.0 l. ft.


Cost for one foot with overheads & profits

Rs.

469.29

B. 16

Cement concrete 1:2:4 ( 3/4 " ) lintol size 12" x 13 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
11.2 c. ft.
22.5 s. ft.

Concrete ( B 04 )
Sawn formwork

at.
at.

Rs.
Rs.

31,765.62 Rs.
5,740.35 Rs.

3,557.75
1,291.58
Rs.

4,849.33

Rs.
Rs.

302.50
5,151.83

Rs.

1,078.11

Rs.
Rs.

151.25
1,078.11

Add
Extra cost of labour
1/4
1/4

day
day

Skilled labour
Un skilled labour

at.
at.

Rs.
Rs.

Overheads & profit

650.00 Rs.
450.00 Rs.
Rs.
Rs.

162.50
112.50
275.00
27.50

cost for 10.0 l. ft.

Cost for one foot with overheads & profits

B. 17

Rs.

515.18

Cement concrete 1:2:4 ( 3/4 " ) lintol size 4 1/2" x 4 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
1.37 c. ft.
11.2 s. ft.

Concrete ( B 04 )
Sawn formwork

at.
at.

Rs.
Rs.

31,765.62 Rs.
5,740.35 Rs.

435.19
642.92

Add
Extra cost of labour
1/8
1/8

day
day

Skilled labour
Un skilled labour
Overheads & profit

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.
Rs.
Rs.

81.25
56.25
137.50
13.75

cost for 10.0 l. ft.


Cost for one foot with overheads & profits

Rs.

107.81

B. 18

Concrete columns in ground floor ( 1 : 2 : 4 3/4 " )


16 no 9 " X 9 " columns each 5 ' 0 " high
0.45 cube
Materials
0.45 cube

( 80.00 l. ft. )

mixed concrete
( as per item B. 04 )

at

Rs.

25,402.50 Rs.

11,431.13

Rs.

571.56

Add
5 % wastage

Rs.

12,002.68

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.

150.00
14,083.68

Labour
1/2

day

1/2

day

1/2

day

mason
skilled labour for
vibrator
3 unskilled labour

Plant and equipment


1/2
day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00 Rs.

Add
3 % of labour cost for tools
5 % of labour cost for scaffolding

Rs.
Rs.

39.75
66.25

Curing
1/4

50 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

Cost for 0.45 cubes


Overheads & profits

37.50
112.50

1,408.37
15,492.05

For one cube with overheads & profits

34,426.78

B. 19

9 " x 9" Concrete columns in first floor

Cost for 9 " X 9 " columns


in ground floor

Rs.

34,426.78

Rs.

495.00

Rs.

34,921.78

Add
2 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

450.00
45.00

For one cube with overheads & profits.

B. 20

9 " x 9 " Concrete columns in second floor


Cost of 9 " X 9 " columns

34,426.78

Add
3 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

675.00
67.50
Rs.

For one cube with overheads & profits.

B. 21

742.50

35,169.28

9 " x 9 " Concrete columns in third floor


Cost of 9 " X 9 " columns

34,426.78

Add
4 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

900.00
90.00
990.00

For one cube with overheads & profits.

35,416.78

B. 22

Concrete columns in ground floor


10 no 12 " x 12 " columns each 5 ' 0 " high
0.50 cube
Materials
0.50 cube

( 50.00 l. ft. )

mixed concrete
( as per item B. 04 )

at

Rs.

25,402.50 Rs.

12,701.25

Rs.

635.06

Add
5 % wastage

Rs.

13,336.31

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.
Rs.
Rs.

150.00
15,417.31
1,541.73
16,959.04

Labour
0.50 day
day
0.50
0.50 day

mason
skilled labour for
vibrator
3 unskilled labour

Plant and equipment


0.50 day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00

Add
3 % of labour cost for tools
5 % of labour cost for scaffolding

Rs.
Rs.

39.75
66.25

Curing
1/4

50 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

37.50
112.50

Overheads & profits


cost for .50 cube coloumn
For one cube 12 " x 12 " columns with overheads & profits

33,918.09

B. 23

12 " x 12 " Concrete columns in first floor


Cost of 12 " X 12 " columns

Rs.

33,918.09

Rs.

495.00

Rs.

34,413.09

Rs.

33,918.09

Rs.

742.50

Rs.

34,660.59

Add
2 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

450.00
45.00

For one cube 12 " x 12 " columns with overheads &


profit

B. 24

12 " x 12 " Concrete columns in second floor


Cost of 12 " X 12 " columns
Add
3 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

675.00
67.50

For one cube 12 " x 12 " columns with overheads &


profit

B. 25

12 " x 12 " Concrete columns in third floor


Cost of 12 " X 12 " columns

33,918.09

33,918.09

Add
4 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

900.00
90.00
990.00

For one cube 12 " x 12 " columns with overheads &


profit

34,908.09

B. 26

9 " x 9 " Concrete beams in ground floor level


8 no 9 " X 9 " beam 10' 0" ft long
0.45 cube
Materials
0.45 cube

( 80.00 l. ft. )

mixed concrete
( as per item B. 04 )

at

Rs.

25,402.50 Rs.

11,431.13

Rs.

571.56

Add
5 % wastage
Labour
1/2
day
day

1/2
1/2

day

mason
skilled labour for
vibrator
3 unskilled labour

Plant and equipment


1/2
day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00

Rs.

12,002.68

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.
Rs.
Rs.

225.00
14,158.68
1,415.87
15,574.55

Rs.

34,610.11

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Curing
100 gal.
1/3
day

water
unskilled labour

Rs.
Rs.

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

Overheads & profits

For one cube 9 " x 9 " beam with overheads & profits

B. 27

9 " x 9" Concrete beam in first floor

66.25
39.75

75.00
150.00

1 cube
Cost of 9 " X 9 " beam

Rs.

34,610.11

Rs.

495.00

Rs.

35,105.11

Rs.

34,610.11

Rs.

742.50

Rs.

35,352.61

34,610.11 Rs.

34,610.11

Add
2 Un skilled labour 1/2 day
overheads and profits

Rs.

450.00 Rs.
Rs.

450.00
45.00

Cost for one cube 9 " x 9 " beam in first floor


with overheads & profits

B. 28

9 " x 9 " Concrete beam in second floor


1 cube
Cost of 9 " X 9 " beam
Add
3 Un skilled labour 1/2 day
overheads and profits

Rs.
Rs.

450.00 Rs.
Rs.

675.00
67.50

Cost for one cube 9 " x 9 " beam in second floor


with overheads & profits

B. 29

9 " x 9 " Concrete beam in third floor


1 cube
Cost of 9 " X 9 " beam

Rs.

Add
4 Un skilled labour 1/2 day
overheads and profits

For one cube 9 " x 9 " beam in third floor


with overheads & profits

Rs.

450.00 Rs.
Rs.

900.00
90.00
Rs.

990.00

Rs.

35,600.11

B. 30

Concrete beams in ground floor level


6 no 9 " X 12 " beam 10' 0" ft long
0.50 cube
Materials
0.5 cube

( 60.00 l. ft. )

mixed concrete
( as per item B. 04 )

at

Rs.

25,402.50 Rs.

12,701.25

Rs.

635.06

Add
5 % wastage
Labour
1/2
day
day

1/2
1/2

day

mason
skilled labour for
vibrator
3 unskilled labour

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

Rs.

13,336.31

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.
Rs.
Rs.

225.00
15,492.31
1,549.23
17,041.54

Plant and equipment


1/2

day

vibrator

at

Rs.

1,000.00

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools

Rs.
Rs.

66.25
39.75

Curing

1/3

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

Overheads & profits

Cost for one cube 9 " x 12 " beam with overheads & profits

B. 31

Concrete beam in first floor

75.00
150.00

34,083.09

1 cube
Cost of 9 " X 12 " beam

Rs.

34,083.09

Rs.

495.00

Rs.

34,578.09

Rs.

34,083.09

Rs.

742.50

Rs.

34,825.59

Rs.

34,083.09

Rs.

990.00

Rs.

35,073.09

Add
2 Un skilled labour 1/2 day
overheads and profits

Rs.

450.00 Rs.
Rs.

450.00
45.00

For one cube 9 " x 12 " beam in first floor

B. 32

Concrete beam in second floor


1 cube
Cost of 9 " X 12 " beam
Add
3 Un skilled labour 1/2 day
overheads and profits

Rs.

450.00 Rs.
Rs.

675.00
67.50

For one cube 9 " x 12 " beam in second floor

B. 33

Concrete beam in third floor


1 cube
Cost of 9 " X 12 " beam
Add
4 Un skilled labour 1/2 day
overheads and profits

Rs.

For one cube 9 " x 12 " beam in thired floor

450.00 Rs.
Rs.

900.00
90.00

B. 34

Concrete beams in ground floor level


5 no 12 " X 12 " beam 10' 0" ft long
0.50cube
Materials
0.5 cube

( 50 l. ft. )

mixed concrete
( as per item B. 04 )

at

Rs.

25,402.50 Rs.

12,701.25

Rs.

635.06

Add
5 % wastage
Labour
1/2
day
day

1/2
1/2

day

mason
skilled labour for
vibrator
3 unskilled labour

Plant and equipment


1/2
day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00

Rs.

13,336.31

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.
Rs.
Rs.

225.00
15,492.31
1,549.23
17,041.54

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools

Rs.
Rs.

66.25
39.75

Curing

1/3

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

Overheads & profits

Cost for one cube 12 " x 12 " beam with overheads & provits

B. 35

Concrete beam in first floor

75.00
150.00

34,083.09

1 cube
Cost of 12 " X 12 " beam in ground floor

Rs.

34,083.09

Rs.

495.00

Rs.

34,578.09

Rs.

34,083.09

Rs.

742.50

Rs.

34,825.59

Rs.

34,083.09

Rs.

990.00

Rs.

35,073.09

Add
2 Un skilled labour 1/2 day
overheads and profits

Rs.

450.00 Rs.
Rs.

450.00
45.00

For one cube 12 " x 12 " beam in first floor

B. 36

Concrete beam in second floor


1 cube
Cost of 12 " X 12 " beam in ground floor
Add
3 Un skilled labour 1/2 day
overheads and profits

Rs.

450.00 Rs.
Rs.

675.00
67.50

For one cube 12 " x 12 " beam in second floor

B. 37

Concrete beam in thired floor


1 cube
Cost of 12 " X 12 " beam in ground floor
Add
4 Un skilled labour 1/2 day
overheads and profits

Rs.

For one cube 12 " x 12 " beam in thired floor

B. 38

4 " thick concrete slab in first floor

450.00 Rs.
Rs.

900.00
90.00

Per sqr
0.33 cube
Materials
0.33 cube

( 100.00 s. ft. )

mixed concrete
( as per item B. 04 )

at

Rs.

25,402.50 Rs.

8,382.83

Rs.

419.14

Add
5 % wastage

Rs.

8,801.97

Rs.

1,100.00

Rs.

500.00

Rs.

88.00

75.00
150.00
225.00 Rs.
Rs.
Rs.
Rs.

225.00
10,714.97
1,071.50
11,786.46

Labour
1/2

day
day

1/2
1/2

day

mason
skilled labour for
vibrator
2 unskilled labour

Plant and equipment


1/2
day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
450.00

at

Rs.

1,000.00 Rs.

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools

Rs.
Rs.

55.00
33.00

Curing
100 gal.
1/3
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

Overheads & profits


Cost for one sqr. with overheads & profits

B. 39

4 " thick concrete slab in second floor

1 sqr.

Cost for 4 " thick concrete slab in ground floor


1/3

day

2 un skilled labour
Overheads & profits

Rs.

450.00 Rs.
Rs.

11,786.46

Rs.

330.00

Rs.

12,116.46

Rs.

11,786.46

Rs.

742.50

Rs.

12,528.96

300.00
30.00

Cost for one sqr. with overheads & profits

B. 40

Rs.

4 " thick concrete slab in third floor


Cost for 4 " thick concrete slab in ground floor
1/2

day

3 un skilled labour
Overheads & profits

Cost for one sqr. with overheads & profits

Rs.

450.00 Rs.
Rs.

675.00
67.50

B. 41

5 " thick concrete slab in first floor

Per sqr

MIXING COST
0.42 cube
Materials
0.42 cube

( 100.00 s. ft. )

mixed concrete
( as per item B. 04 )

at

Rs.

25,402.50 Rs.

10,669.05

Rs.

1,270.13

Add
5 % wastage

Rs.

11,939.18

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.
Rs.
Rs.

225.00
14,095.18
1,409.52
15,504.69

LAYING COST
Labour
1/2

day
day

1/2
1/2

day

mason
skilled labour for
vibrator
3 unskilled labour

Plant and equipment


1/2
day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools

Rs.
Rs.

66.25
39.75

Curing

1/3

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

Overheads & profits


Cost for one sqr. with overheads & profits

B. 42

5 " thick concrete slab in second floor

75.00
150.00

Cost for 5 " thick concrete slab in ground floor

1/2

day

2 un skilled labour
Overheads & profits

Rs.

450.00 Rs.
Rs.

Rs.

495.00

Rs.

15,999.69

Rs.

15,504.69

Rs.

742.50

Rs.

16,247.19

5 " thick concrete slab in third floor


Cost for 5" thick concrete slab in ground floor

1/2

day

3un skilled labour


Overheads & profits

Rs.

450.00 Rs.
Rs.

675.00
67.50

Cost for one sqr. with overheads & profits

B. 44

15,504.69

450.00
45.00

Cost for one sqr. with overheads & profits

B. 43

Rs.

6 " thick concrete slab in first floor

Per sqr

MIXING COST
0.50 cube
Materials
0.5 cube

( 100.00 s. ft. )

mixed concrete
( as per item B. 04 )

at

Rs.

25,402.50 Rs.

12,701.25

Rs.

635.06

Add
5 % wastage

Rs.

13,336.31

Rs.

1,766.67

Rs.

666.67

Rs.

141.33

Rs.
Rs.
Rs.
Rs.

225.00
16,135.98
1,613.60
17,749.58

Labour
2/3
2/3
2/3

day
day
day

mason
Vibrator Operator
3 unskilled labour

Plant and equipment


2/3
day
vibrator

at
at
at

at

Rs.
Rs.
Rs.

Rs.

650.00 Rs.
650.00 Rs.
450.00 Rs.

433.33
433.33
900.00

1,000.00

5 % of labour cost for scaffolding


3 % of labour cost for tools

Rs.
Rs.

88.33
53.00

Curing

1/3

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

Overheads & profits


Cost for one sqr. with overheads & profits

75.00
150.00

B. 45

6 " thick concrete slab in second floor


Cost for 6 " thick concrete slab in first floor

Rs.

17,749.58

Rs.

495.00

Cost for one sqr. with overheads & profits

Rs.

18,244.58

6 " thick concrete slab in third floor

Rs.

17,749.58

Rs.

742.50

Rs.

18,492.08

1/2

day

2 un skilled labour

Rs.

Overheads & profits

B. 46

1/2

day

3un skilled labour


Overheads & profits

Rs.

Cost for one sqr. with overheads & profits

Cement concrete 1 : 11/2 : 3 - ( 3/4 )


( grade 25 )

450.00 Rs.

450.00

Rs.

45.00

450.00 Rs.
Rs.

675.00
67.50

B. 47

Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 4 1/2" x 6"


with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
1.85 c. ft.
13.7 s. ft.

Concrete ( B 05 )
Sawn formwork

at.
at.

Rs.
Rs.

29,468.91 Rs.
5,740.35 Rs.

545.17
786.43
Rs.

1,331.60

Rs.
Rs.

151.25
1,482.85

Add
Extra cost of labour
1/8
1/8

day
day

Skilled labour
Un skilled labour

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.

81.25
56.25
137.50

Rs.

13.75

Overheads & profit


cost for 10.0 l. ft.

Cost for one foot with overheads & profits

B. 48

Rs.

Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 6" x 9"


with and including formwork ( reinforcement paid separately )
10 l. ft.

148.29

Materials
3.75 c. ft.
20.00 s. ft.

Concrete ( B 05 )
Sawn formwork

at.
at.

Rs.
Rs.

29,468.91 Rs.
5,740.35 Rs.

1,105.08
1,148.07
Rs.

2,253.15

Add
Extra cost of labour
1/8
1/8

day
day

Skilled labour
Un skilled labour

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.

Overheads & profit

81.25
56.25
137.50
13.75
151.25
2,404.40

cost for 10.0 l. ft.

Cost for one foot with overheads & profits

B. 49

Rs.

240.44

Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 9" x 9 "


with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
5.63 c. ft.
22.5 s. ft.

Concrete ( B 05 )
Sawn formwork

at.
at.

Rs.
Rs.

29,468.91 Rs.
5,740.35 Rs.

1,659.10
1,291.58
Rs.

2,950.68

Rs.
Rs.

302.50
3,253.18

Add
Extra cost of labour
1/4
1/4

day
day

Skilled labour
Un skilled labour
Overheads & profit

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.
Rs.
Rs.

162.50
112.50
275.00
27.50

cost for 10.0 l. ft.


Cost for one foot with overheads & profits

B. 50

Rs.

Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 9" x 12 "


with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials

325.32

7.50 c. ft.
27.72 s. ft.

Concrete ( B 05 )
Sawn formwork

at.
at.

Rs.
Rs.

29,468.91 Rs.
5,740.35 Rs.

2,210.17
1,591.23
Rs.

3,801.39

Rs.
Rs.

302.50
3,801.39

Rs.

3,200.15

Rs.
Rs.

151.25
3,351.40

Add
Extra cost of labour
1/4
1/4

day
day

Skilled labour
Un skilled labour

at.
at.

Rs.
Rs.

Overheads & profit

650.00 Rs.
450.00 Rs.
Rs.
Rs.

162.50
112.50
275.00
27.50

cost for 10.0 l. ft.


Cost for one foot with overheads & profits

B. 51

Rs.

380.14

Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 6" x 13 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
5.6 c. ft.
27 s. ft.

Concrete ( B 05 )
Sawn formwork

at.
at.

Rs.
Rs.

29,468.91 Rs.
5,740.35 Rs.

1,650.26
1,549.89

Add
Extra cost of labour
1/4
1/4

day
day

Skilled labour
Un skilled labour
Overheads & profit

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.
Rs.
Rs.

81.25
56.25
137.50
13.75

cost for 10.0 l. ft.


Cost for one foot with overheads & profits

B. 52

Rs.

Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 9" x 131/2"


with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials

335.14

8.4 c. ft.
30 s. ft.

Concrete ( B 05 )
Sawn formwork

at.
at.

Rs.
Rs.

29,468.91 Rs.
5,740.35 Rs.

2,475.39
1,722.11
Rs.

4,197.49

Rs.
Rs.

302.50
4,499.99

Rs.

4,592.10

Rs.
Rs.

302.50
4,894.60

Add
Extra cost of labour
1/4
1/4

day
day

Skilled labour
Un skilled labour

at.
at.

Rs.
Rs.

Overheads & profit

650.00 Rs.
450.00 Rs.
Rs.
Rs.

162.50
112.50
275.00
27.50

cost for 10.0 l. ft.


Cost for one foot with overheads & profits

B. 53

Rs.

450.00

Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 12" x 13 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
11.2 c. ft.
22.5 s. ft.

Concrete ( B 05 )
Sawn formwork

at.
at.

Rs.
Rs.

29,468.91 Rs.
5,740.35 Rs.

3,300.52
1,291.58

Add
Extra cost of labour
1/4
1/4

day
day

Skilled labour
Un skilled labour
Overheads & profit

at.
at.

Rs.
Rs.

650.00 Rs.
450.00 Rs.
Rs.
Rs.

162.50
112.50
275.00
27.50

cost for 10.0 l. ft.


Cost for one foot with overheads & profits

B. 54

Rs.

Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 4 1/2" x 4 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials

489.46

1.37 c. ft.
11.2 s. ft.

Concrete ( B 05 )
Sawn formwork

at.
at.

Rs.
Rs.

29,468.91 Rs.
5,740.35 Rs.

403.72
642.92
Rs.

1,046.64

Rs.
Rs.

151.25
1,046.64

Add
Extra cost of labour
1/8
1/8

day
day

Skilled labour
Un skilled labour

at.
at.

Overheads & profit

Rs.
Rs.

650.00 Rs.
450.00 Rs.
Rs.
Rs.

81.25
56.25
137.50
13.75

cost for 10.0 l. ft.


Cost for one foot with overheads & profits

B. 55

Concrete columns in ground floor ( 1 : 11/2 : 3 3/4 " )


16 no 9 " X 9 " columns each 5 ' 0 " high
0.45 cube

( 80.00 l. ft. )

Rs.

104.66

Materials
0.45 cube

mixed concrete
( as per item B. 05 )

at

Rs.

23,904.92 Rs.

10,757.21

Rs.

537.86

Add
5 % wastage

Rs.

11,295.07

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.

150.00
13,376.07

Labour
1/2

day

1/2

day

1/2

day

mason
skilled labour for
vibrator
3 unskilled labour

Plant and equipment


1/2
day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00 Rs.

Add
3 % of labour cost for tools
5 % of labour cost for scaffolding

Rs.
Rs.

39.75
66.25

Curing

1/4

50 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

Cost for 0.45 cubes

37.50
112.50

Overheads & profits

1,337.61
14,713.68

For one cube with overheads & profits

B. 56

32,697.07

9 " x 9" Concrete columns in first floor

Cost for one cube 9 " X 9 " columns


in ground floor

Rs.

32,697.07

Add
2 Un skilled labour 1/2day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

450.00
45.00

For one cube with overheads & profits.

B. 57

Rs.

495.00

Rs.

33,192.07

9 " x 9 " Concrete columns in second floor


Cost for one cube 9 " X 9 " columns

32,697.07

Add
3 Un skilled labour 1/2day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

675.00
67.50
Rs.

For one cube with overheads & profits.

B. 58

742.50

33,439.57

9 " x 9 " Concrete columns in third floor


Cost for one cube 9 " X 9 " columns

32,697.07

Add
4 Un skilled labour 1/2day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

900.00
90.00
990.00

For one cube with overheads & profits.

B. 59

Concrete columns in ground floor


10 no 12 " x 12 " columns each 5 ' 0 " high
0.50 cube

( 50.00 l. ft. )

33,687.07

Materials
0.50 cube

Mixed concrete
( as per item B. 05 )

at

Rs.

23,904.92 Rs.

11,952.46

Rs.

597.62

Add
5 % wastage

Rs.

12,550.08

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.
Rs.
Rs.

150.00
14,631.08
1,463.11
16,094.19

Labour
0.50 day
day
0.50
0.50 day

Mason
Skilled labour for
vibrator
3 unskilled labour

Plant and equipment


0.50 day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00

Add
3 % of labour cost for tools
5 % of labour cost for scaffolding

Rs.
Rs.

39.75
66.25

Curing

1/4

50 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

37.50
112.50

Overheads & profits


cost for .50 cube coloumn
For one cube 12 " x 12 " columns with overheads & profits

B. 60

32,188.38

12 " x 12 " Concrete columns in first floor


Cost for one cube 12 " X 12 " columns

Rs.

Add
2 Un skilled labour 1/2day

at.

Rs.

450.00 Rs.

450.00

32,188.38

overheads and profits

Rs.

45.00

For one cube 12 " x 12 " columns with overheads &


profit

B. 61

Rs.

495.00

Rs.

32,683.38

Rs.

32,188.38

Rs.

742.50

Rs.

32,930.88

12 " x 12 " Concrete columns in second floor


Cost for one cube 12 " X 12 " columns

Add
3 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

675.00
67.50

For one cube 12 " x 12 " columns with overheads &


profit

B. 62

12 " x 12 " Concrete columns in third floor


Cost for one cube 12 " X 12 " columns

32,188.38

32,188.38

Add
4 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

900.00
90.00
990.00

For one cube 12 " x 12 " columns with overheads &


profit

B. 63

9 " x 9 " Concrete beams in ground floor level


8 no 9 " X 9 " beam 10' 0" ft long
0.45 cube
Materials

( 80.00 l. ft. )

33,178.38

0.45 cube

mixed concrete
( as per item B. 05 )

at

Rs.

23,904.92 Rs.

10,757.21

Rs.

537.86

Add
5 % wastage
Labour
1/2
day
day

1/2
1/2

day

mason
skilled labour for
vibrator
3 unskilled labour

Plant and equipment


1/2
day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00

Rs.

11,295.07

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.
Rs.
Rs.

225.00
13,451.07
1,345.11
14,796.18

Rs.

32,880.40

Rs.

32,880.40

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Curing
100 gal.
1/3
day

water
unskilled labour

Rs.
Rs.

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

66.25
39.75

75.00
150.00

Overheads & profits

For one cube 9 " x 9 " beam with overheads & profits

B. 64

9 " x 9" Concrete beam in first floor


1 cube
Cost of one cube in 9 " X 9 " beam in ground floor.
Add
2 Un skilled labour 1/2 day

at.

Rs.

450.00 Rs.

450.00

overheads and profits

Rs.

45.00

Cost for one cube 9 " x 9 " beam in first floor


with overheads & profits

B. 65

Rs.

495.00

Rs.

33,375.40

Rs.

32,880.40

Rs.

742.50

Rs.

33,622.90

Rs.

32,880.40

Rs.

990.00

Rs.

33,870.40

9 " x 9 " Concrete beam in second floor


Cost of one cube in 9 " X 9 " beam in ground floor.
Add
3 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

675.00
67.50

Cost for one cube 9 " x 9 " beam in second floor


with overheads & profits

B. 66

9 " x 9 " Concrete beam in third floor


Cost of one cube in 9 " X 9 " beam in ground floor.
Add
4 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

900.00
90.00

For one cube 9 " x 9 " beam in third floor


with overheads & profits

B. 67

Concrete beams in ground floor level 9" x 12"


6 no 9 " X 12 " beam 10' 0" ft long
0.50 cube

( 60.00 l. ft. )

Materials
0.50 cube

mixed concrete

at

Rs.

23,904.92 Rs.

11,952.46

( as per item B. 04 )
Add
5 % wastage
Labour
1/2
day
day

1/2
1/2

day

mason
skilled labour for
vibrator
3 unskilled labour

Plant and equipment


1/2
day
vibrator

Rs.

597.62

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00

Rs.

12,550.08

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.
Rs.
Rs.

225.00
14,706.08
1,470.61
16,176.69

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools

Rs.
Rs.

66.25
39.75

Curing

1/3

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

75.00
150.00

Overheads & profits

Cost for one cube 9 " x 12 " beam with overheads & profits

B. 68

32,353.38

Concrete beam in first floor 9" x 12"


1 cube
For one cube 9 " x 12 " beam in ground floor
2 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

Rs.

32,353.38

Rs.

495.00

450.00
45.00

Cost for one cube 9 " x 12 " beam in first floor


with overheads & profits

B. 69

Rs.

32,848.38

Concrete beam in second floor 9" x 12"


1 cube
For one cube 9 " x 12 " beam in ground floor
3 Un skilled labour 1/2 day
overheads and profits

at.

32,353.38

Rs.

450.00 Rs.
Rs.

675.00
67.50

Cost for one cube 9 " x 12 " beam in second floor


with overheads & profits

B. 70

Rs.

742.50

Rs.

33,095.88

Rs.

32,353.38

Rs.

990.00

Rs.

33,343.38

Concrete beam in third floor 9" x 12"


1 cube
6 no 9 " X 12 " beam each 10 ' 0 " long
4 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

900.00
90.00

Cost for one cube 9 " x 12 " beam in first floor


with overheads & profits

B. 71

Concrete beams in ground floor level 12" x 12"


5 no 12 " X 12 " beam 10' 0" ft long
0.50cube
Materials
0.5 cube

( 50 l. ft. )

mixed concrete
( as per item B. 05 )

at

Rs.

23,904.92 Rs.

11,952.46

Add
5 % wastage
Labour
1/2
day
day

1/2
1/2

day

mason
skilled labour for
vibrator
3 unskilled labour

Plant and equipment


1/2
day
vibrator

Rs.

597.62

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00

Rs.

12,550.08

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.
Rs.
Rs.

225.00
14,706.08
1,470.61
16,176.69

Rs.

32,353.38

Rs.

32,353.38

Rs.

495.00

Rs.

32,848.38

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools

Rs.
Rs.

66.25
39.75

Curing

1/3

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

75.00
150.00

Overheads & profits

Cost for one cube 12 " x 12 " beam with overheads & provits

B. 72

Concrete beam in first floor 12" x 12"


For one cube 12 " x 12 " beam in ground floor
2 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

Cost for one cube 12 " x 12 " beam in first floor


with overheads & profits

450.00 Rs.
Rs.

450.00
45.00

B. 73

Concrete beam in second floor 12" x 12"


For one cube 12 " x 12 " beam in ground floor
3 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

450.00 Rs.
Rs.

32,353.38

Rs.

742.50

Rs.

33,095.88

675.00
67.50

Cost for one cube 12 " x 12 " beam in second floor


with overheads & profits

B. 74

Rs.

Concrete beam in thired floor 12" x 12"


For one cube 12 " x 12 " beam in ground floor
4 Un skilled labour 1/2 day
overheads and profits

at.

Rs.

32,353.38
450.00 Rs.
Rs.

900.00
90.00

Cost for one cube 12 " x 12 " beam in thired floor


with overheads & profits

B. 75

Rs.

990.00

Rs.

33,343.38

Rs.

8,283.05

4 " thick concrete slab in first floor


Per sqr
0.33 cube
Materials
0.33 cube

( 100.00 s. ft. )
mixed concrete
( as per item B. 05 )

at

Rs.

23,904.92 Rs.

7,888.62

Rs.

394.43

Add
5 % wastage

Labour
1/3
day
day

1/3
1/3

day

mason
skilled labour for
vibrator
3 unskilled labour

at

Rs.

650.00 Rs.

216.67

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

216.67
450.00
Rs.

883.33

Rs.

333.33

Rs.

70.67

75.00
150.00
225.00 Rs.
Rs.

225.00
9,795.39

Overheads & profits

Rs.

979.54

Cost for one sqr. with overheads & profits

Rs.

10,774.93

Rs.

10,774.93

Rs.

330.00

Plant and equipment


1/3
day
vibrator

at

Rs.

1,000.00 Rs.

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools

Rs.
Rs.

44.17
26.50

Curing
1/3

B. 76

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

4 " thick concrete slab in second floor


Cost for 4 " thick concrete slab in ground floor
1/3

day

2 un skilled labour
Overheads & profits

Rs.

450.00 Rs.
Rs.

300.00
30.00

Cost for one sqr. with overheads & profits

B. 77

11,104.93

Rs.

10,774.93

Rs.

495.00

Rs.

11,269.93

4 " thick concrete slab in third floor


Cost for 4 " thick concrete slab in ground floor
1/3

day

3 un skilled labour
Overheads & profits

Rs.

450.00 Rs.
Rs.

450.00
45.00

Cost for one sqr. with overheads & profits

B. 78

Rs.

5 " thick concrete slab in first floor

Per 1 sqr

MIXING COST
0.42 cube
Materials
0.42 cube

( 100.00 s. ft. )

mixed concrete
( as per item B. 05 )

at

Rs.

23,904.92 Rs.

10,040.07

Rs.

1,195.25

Add
5 % wastage

Rs.

11,235.31

Rs.

1,325.00

Rs.

500.00

Rs.

106.00

Rs.
Rs.

225.00
13,391.31

Overheads & profits

Rs.

1,339.13

Cost for one sqr. with overheads & profits

Rs.

14,730.44

Rs.

14,730.44

Rs.

330.00

Rs.

15,060.44

LAYING COST
Labour
1/2

day
day

1/2
1/2

day

mason
skilled labour for
vibrator
3 unskilled labour

Plant and equipment


1/2
day
vibrator

at

Rs.

650.00 Rs.

325.00

at
at

Rs.
Rs.

650.00 Rs.
450.00 Rs.

325.00
675.00

at

Rs.

1,000.00

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools

Rs.
Rs.

66.25
39.75

Curing

1/3

B. 79

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

75.00
150.00

5 " thick concrete slab in second floor


Cost for 5 " thick concrete slab in ground floor
1/3

day

2 un skilled labour
Overheads & profits

Cost for one sqr. with overheads & profits

Rs.

450.00 Rs.
Rs.

300.00
30.00

B. 80

5 " thick concrete slab in third floor


Cost for 5" thick concrete slab in ground floor
1/3

day

3 un skilled labour
Overheads & profits

Rs.

450.00 Rs.
Rs.

6 " thick concrete slab in first floor

Per sqr

MIXING COST
0.50 cube
Materials
0.5 cube
Add

( 100.00 s. ft. )

mixed concrete
( as per item B. 05 )

at

Rs.

23,904.92 Rs.

14,730.44

Rs.

495.00

Rs.

15,225.44

450.00
45.00

Cost for one sqr. with overheads & profits

B. 81

Rs.

11,952.46

5 % wastage

Rs.

597.62
Rs.

12,550.08

Rs.

1,766.67

Rs.

666.67

Rs.

141.33

Rs.
Rs.

225.00
15,349.75

Overheads & profits

Rs.

1,534.97

Cost for one sqr. with overheads & profits

Rs.

16,884.72

Rs.

16,884.72

Rs.

330.00

Rs.

17,214.72

Labour
2/3
2/3
2/3

day
day
day

mason
Vibrator Operator
3 unskilled labour

Plant and equipment


2/3
day
vibrator

at
at
at

at

Rs.
Rs.
Rs.

Rs.

650.00 Rs.
650.00 Rs.
450.00 Rs.

433.33
433.33
900.00

1,000.00

5 % of labour cost for scaffolding


3 % of labour cost for tools

Rs.
Rs.

88.33
53.00

Curing

1/3

B. 82

100 gal.
day

water
unskilled labour

at
at

Rs.
Rs.

0.75 Rs.
450.00 Rs.

75.00
150.00

6 " thick concrete slab in second floor


Cost for 6 " thick concrete slab in ground floor
1/3

day

2 un skilled labour
Overheads & profits

Cost for one sqr. with overheads & profits

Rs.

450.00 Rs.
Rs.

300.00
30.00

B. 83

6 " thick concrete slab in third floor


Cost for 6 " thick concrete slab in ground floor
1/3

day

3 un skilled labour
Overheads & profits

Cost for one sqr. with overheads & profits

Rs.

450.00 Rs.
Rs.

Rs.

16,884.72

Rs.

495.00

Rs.

17,379.72

450.00
45.00

Rate for the staircase

Concrete
FWK
R/f

8671.9269
5200.00
10000.000

23871.93
18000.00
41871.93

45

BASIC PRICES
Materials
1" thick plank class 11
2 " x 4 " class 11
2 " x 2 " class 11
2 " x 1 " class 11
Wire nails
Mould oil
16mm bolt

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

60.00
40.00
15.00
8.00
65.00
15.00
55.00

Rs.
Rs.

650.00
450.00

s. ft.
l. ft.
l. ft.
l. ft.
kg.
liter
no

Labour
Skilled Labour
Un Skilled Labour

Overheads & profits

0.00

per day
per day

FORM WORK
Form work to have basic finish as general specification
B. 84

To sides of column footing

sqr.

7,605.81

B. 85

To sides of column up to D.P.C. level

sqr.

7,605.81

B. 86

To sides of column from D.P.C. level to first


floor level.

sqr.

8,987.04

To sides of column from first floor level to


second floor level

sqr.

9,256.65

To sides of column from second floor level to


thired floor level

sqr.

9,346.52

B. 89

To sides and soffit of beam in plnith level

sqr.

7,567.08

B. 90

To sides and soffit of beam at first floor level

sqr.

7,794.10

B. 91

To sides and soffit of beam at second floor level

sqr.

7,869.77

B. 92

To sides and soffit of beam at thired floor level

sqr.

7,945.44

B. 93

To soffit of slab at first floor level

sqr.

5,500.63

B. 94

To soffit of slab at second floor level

sqr.

5,720.65

B. 95

To soffit of slab at thired floor level

sqr.

5,775.66

B. 87

B. 88

FORMWORK
Sown form work in 9" x 9" column in ground floor up to 5 ' 0 " high
15 s. ft.
Making mould
Materials
18.00 s. ft.
9.00 l. ft.
0.50 kg.

1" thick plank class 11


2" x 1"
wire nails

at. Rs.
at. Rs.
at. Rs.

60.00 Rs.
8.00 Rs.
65.00 Rs.
Rs.

1,080.00
72.00
32.50
1,184.50 Rs.
Rs.

1,184.50
59.23

650.00 Rs.
450.00 Rs.
Rs.

325.00
225.00
550.00 Rs.
Rs.

550.00
16.50

Moulding cost for four uses

Rs.

1,810.23

Moulding cost for one use

Rs.

452.56

192.00
66.00
7.50
301.50 Rs.

301.50

162.50
112.50
275.00 Rs.
Rs.

275.00
8.25

Rs.

13.75

Rs.

598.50

add wastege 5 %
Labour
0.50 day
0.50 day
add

day
day
Add

at. Rs.
at. Rs.

tools 3% of labour cost

Assembling ( Per use )


Materials
9.00 l. ft.
4" x 2" timber ( 10 uses )
4" x 2" timber for props
48.00 l. ft.
( 10 uses )
6.00 no
16mm bolt ( 20 uses )
0.50 Litre
Mould oil
Labour
1/4
1/4

Skilled labour
Un skilled labour

Skilled labour
Un skilled labour
Tools 3% of labour cost
5% of labour cost for
scaffolding

Assembling cost

Dismantling, cleaning & repairing cost

at. Rs.

40.00 Rs.

at. Rs.
at. Rs.
at. Rs.

40.00
55.00 Rs.
15.00 Rs.

at. Rs.
at. Rs.

650.00 Rs.
450.00 Rs.

36.00

1/4
1/4

day
day

Skilled labour
Un skilled labour

Add

Tools 3% of labour cost


5% of labour cost for
scaffolding

at. Rs.
at. Rs.

650.00 Rs.
450.00 Rs.

162.50
112.50
275.00 Rs.
Rs.

275.00
8.25

Rs.

13.75

Dismantling, cleaning & repairing cost


Total cost per use 15.0 s. ft.

297.00
A+B+C

1,348.06

Add
Overheads & profits

0.00
1,348.06

Cost per one sqr with overheads and profit.

8,987.04

Sawn formwork in 9 " x 9 " column in first floor

Cost for ground floor


For column in first floor add 3 % to ground floor rate

per sqr.

Rs.
Rs.

8,987.04
269.61

Rs.

9,256.65

Sawn formwork in 9 " x 9 " column in second floor


Cost for ground floor
For column in second floor add 4 % to ground floor rate

per sqr.
Rs.
Rs.

8,987.04
359.48

Rs.

9,346.52

Sawn formwork in 9 " x 9 " column in thired floor

per sqr.

Cost for ground floor

Rs.

8,987.04

For column in second floor add 5 % to ground floor rate

Rs.

449.35

Rs.

9,436.39

Sown form work in 9" x 12" beam in ground floor 20 ' 0 " long

55 s. ft.
A

Making mould
Materials
60.00 s. ft.
25.00 l. ft.
1.00 kg.

1" thick plank class 11


2" x 1"
wire nails

at. Rs.
at. Rs.
at. Rs.

60.00 Rs.
8.00 Rs.
65.00 Rs.
Rs.

3,600.00
200.00
65.00
3,865.00 Rs.
Rs.

3,865.00
193.25

650.00 Rs.
450.00 Rs.
Rs.

975.00
675.00
1,650.00 Rs.
Rs.

1,650.00
49.50

Rs.

82.50

Moulding cost for four uses

Rs.

5,840.25

Moulding cost for one use

Rs.

1,460.06

293.33
88.00
7.50
388.83 Rs.

388.83

650.00
1,125.00
1,775.00 Rs.
Rs.

1,775.00
53.25

Rs.

88.75

Rs.

2,305.83

add wastege 5 %
Labour
1.50 day
1.50 day
add

Skilled labour
Un skilled labour
tools 3% of labour cost
5% of labour cost for
scaffolding

Assembling ( Per use )


Materials
110.00 l. ft.
4" x 2" props ( 15 uses ) at. Rs.
22.00 l. ft.
4" x 2" bearers(10 uses ) at. Rs.
0.50 Litre
Mould oil
at. Rs.
Labour
1.00 day
2.50 day
Add

Skilled labour
Un skilled labour
Tools 3% of labour cost

5% of labour cost for


scaffolding
B

at. Rs.
at. Rs.

Assembling cost

Dismantling, cleaning & repairing cost

at. Rs.
at. Rs.

40.00 Rs.
40.00 Rs.
15.00 Rs.

650.00 Rs.
450.00 Rs.

0.33 day
0.33 day
Add

Skilled labour
Un skilled labour

at. Rs.
at. Rs.

650.00 Rs.
450.00 Rs.

216.67
150.00
366.67

Tools 3% of labour cost


5% of labour cost
forscaffolding

Dismantling, cleaning & repairing cost

Total cost per use 55.0 s. ft.

A+B+C

Rs.

366.67
11.00

Rs.

18.33

Rs.

396.00

Rs.

4,161.90

Rs.

0.00

Rs.

4,161.90

Rs.

7,567.08

Add
Overheads & profits

Cost per one sqr with overheads and profit.

Sawn formwork in 9 " x 12 " beam in first floor

per sqr.

Cost for ground floor


For beam in first floor add 3 % to ground floor rate

Rs.
Rs.

7,567.08
227.01

Rs.

7,794.10

Sawn formwork in 9 " x 12 " beam in second floor

per sqr.

Cost for ground floor


For beam in second floor add 4 % to ground floor rate

Rs.
Rs.

7,567.08
302.68

Rs.

7,869.77

Sawn formwork in 9 " x 12 " beam in thired floor

per sqr.

Cost for ground floor


For beam in second floor add 5 % to ground floor rate

Sown form work in soffit of first floor slab


1 sqr

Rs.
Rs.

7,567.08
378.35

Rs.

7,945.44

A Making mould

Materials
100.00 s. ft.
55.00 l. ft.
2.00 kg.

1" thick plank class 11


2" x 4"
wire nails

at. Rs.
at. Rs.
at. Rs.

60.00 Rs.
40.00 Rs.
65.00 Rs.
Rs.

6,000.00
2,200.00
130.00
8,330.00 Rs.
Rs.

8,330.00
416.50

650.00 Rs.
450.00 Rs.
Rs.

1,950.00
1,350.00
3,300.00 Rs.
Rs.

3,300.00
99.00

Rs.

165.00

Moulding cost for four uses

Rs.

12,310.50

Moulding cost for one use

Rs.

3,077.63

1,000.00
40.00
120.00
7.50
1,167.50 Rs.

1,167.50

325.00
450.00
775.00 Rs.
Rs.

775.00
23.25

Rs.

38.75

Rs.

2,004.50

add wastege 5 %
Labour
3.00 day
3.00 day
add

Skilled labour
Un skilled labour
tools 3% of labour cost
5% of labour cost
forscaffolding

B Assembling ( Per use )


Materials
4" x 2" timber props
250.00 l. ft.
( 10 uses )
50.00 l. ft.
2" x 1" bracing ( 10 uses)
20.00 s. ft.
base plate ( 10 uses)
0.50 liter
mould oil
Labour
0.50 day
0.50 day
Add

at. Rs.
at. Rs.

Skilled labour
2 Un skilled labour
Tools 3% of labour cost
5% of labour cost
forscaffolding

Assembling cost

at.
at.
at.
at.

Rs.
Rs.
Rs.
Rs.

at. Rs.
at. Rs.

40.00 Rs.
8.00 Rs.
60.00 Rs.
15.00

650.00 Rs.
450.00 Rs.

Dismantling, cleaning & repairing cost


1/4
1/4

day
day
Add

Skilled labour
2 Un skilled labour
Tools 3% of labour cost

Add

Tools 3% of labour cost


5% of labour cost
forscaffolding

at. Rs.
at. Rs.

650.00 Rs.
450.00 Rs.

162.50
225.00
387.50 Rs.

387.50

Rs.

11.63

Rs.

19.38

Rs.

418.50

Rs.

5,500.63

Overheads & profits

Rs.

0.00

Cost per one sqr with overheads and profit.

Rs.

5,500.63

Dismantling, cleaning & repairing cost


Cost per sqr.
A+B+C
Add

Sawn formwork in soffit of slab second floor


per sqr.

Cost for ground floor

Rs.

5,500.63

For beam in second floor add 5 % to ground floor rate

Rs.

220.03

Rs.

5,720.65

Cost for ground floor

Rs.

5,500.63

For beam in second floor add 5 % to ground floor rate

Rs.

275.03

Rs.

5,775.66

Sawn formwork in soffit of slab thired floor


per sqr.

Sawn formwork in sides of column foundation up to D.P.C. level.


1 sqr.
Materials
100.00
100.00
20.00
1.00

s. ft.
l. ft.
l. ft.
kg.

1" thick plank


2" x 1"
2" x 2"
Wire nails

add

for wastege 5%
Cost for four uses

4.00 liter

at.
at.
at.
at.

Rs.
Rs.
Rs.
Rs.

Cst for one use


Mould oil

at. Rs.

Skilled labour
Un skilled labour

at. Rs.
at. Rs.

60.00
8.00
15.00
65.00

Rs.
Rs.
Rs.
Rs.

6,000.00
800.00
300.00
65.00

Rs.
Rs.
Rs.

7,165.00
358.25
7,523.25
Rs.
Rs.

1,880.81
60.00

3,250.00
2,250.00
5,500.00 Rs.

5,500.00

tools for 3% of labour cost

Rs.

165.00

Cost for one sqr.

Rs.

7,605.81

Overheads & profits

Rs.

0.00

Cost per one sqr with overheads and profit.

Rs.

7,605.81

15.00

Labour
5.00 day
5.00 day

add

650.00 Rs.
450.00 Rs.

Add

9 " x 9 " Concrete beams in ground floor level


8 no 9 " X 9 " beam 10' 0" ft long
0.45 cube

( 80.00 l. ft. )

Materials
0.45 cube

mixed concat
( as per item B. 04 )

Rs.

#REF! Rs.

#REF!

Rs.

#REF!

Add
5 % wastage

Rs.
Labour
1/2

1/2
1/2

day

mason

at

Rs.

#REF! Rs.

#REF!

day

skilled
labour for
vibrator
at
3 unskille at

Rs.
Rs.

#REF! Rs.
#REF! Rs.

#REF!
#REF!

day

Rs.
Plant and equipment
1/2
day
vibrator

at

Rs.

#REF!

Rs.

Add
5 % of labour cost for scaffolding
3 % of labour cost for tools

Rs.
Rs.

#REF!
#REF!
Rs.

Curing
1/3

100 gal.
day

water
at
unskilled l at

Rs.
Rs.

#REF! Rs.
#REF! Rs.

Overheads & profits

For one cube 9 " x 9 " beam with overheads & profits

#REF!
#REF!
Rs.
Rs.
Rs.
Rs.
Rs.

#REF!

#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

BASIC PRICES
Steel
Tor steel
25mm
20mm
16mm
12mm
10mm
binding wire

70.00
70.00
70.00
70.00
70.00
65.00

kg.
kg.
kg.
kg.
kg.
kg.

70.00
70.00

kg.
kg.

650.00
450.00

day
day

M.S. bars
10mm
6mm

Skilled labour
Un skilled labour

Overheads & profits

0.00

Reinforcement
Cold worked yield steel bar reinforcement
including bends, tying wire and spacer bar.
Up to D.P.C. level
B. 96

25mm. Dia bars.

kg.

84.04

B. 97

20mm. Dia bars.

kg.

84.04

B. 98

16mm. Dia bars.

kg.

85.93

B. 99

12mm. Dia bars.

kg.

86.53

B. 100

10mm. Dia bars.

kg.

86.53

From D.P.C. level to first floor level


B. 101

25mm. Dia bars.

kg.

84.04

B. 102

20mm. Dia bars.

kg.

84.04

B. 103

16mm. Dia bars.

kg.

85.93

B. 104

12mm. Dia bars.

kg.

86.53

B. 105

10mm. Dia bars.

kg.

86.53

From first floor level to second floor level


B. 106

25mm. Dia bars.

kg.

84.04

B. 107

20mm. Dia bars.

kg.

84.04

B. 108

16mm. Dia bars.

kg.

85.93

B. 109

12mm. Dia bars.

kg.

86.53

B. 110

10mm. Dia bars.

kg.

86.53

From second floor level to thired floor level


B. 111

25mm. Dia bars.

kg.

84.88

B. 112

20mm. Dia bars.

kg.

84.88

B. 113

16mm. Dia bars.

kg.

86.79

B. 114

12mm. Dia bars.

kg.

87.40

B. 115

10mm. Dia bars.

kg.

87.40

M.S. bars up to D.P.C.level


B. 116

10mm. Dia bars.

kg.

98.51

B. 117

6mm. Dia bars.

kg.

98.51

From D.P.C. level to first floor level


B. 118

10mm. Dia bars.

kg.

98.51

B. 119

6mm. Dia bars.

kg.

98.51

From first floor level to second floor level


B. 120

10mm. Dia bars.

kg.

98.51

B. 121

6mm. Dia bars.

kg.

98.51

From second floor level to thired floor level


B. 122

10mm. Dia bars.

kg.

100.48

B. 123

6mm. Dia bars.

kg.

100.48

25mm dia tor steel reinforcement up to second floor


level
50 kg.
Materials
50.00 kg.
0.25
Add

25 dia. Bars

at.

Rs.

70.00 Rs.

3,500.00

Binding wire

at.

Rs.

65.00 Rs.

16.25

Wastage 10%
Spacers & chairs
1.5%

at.

Rs.

Rs.

350.00

at.

Rs.

Rs.
Rs.

52.50
3,918.75 Rs.

3,918.75

650.00 Rs.
450.00 Rs.
Rs.

162.50
112.50
275.00 Rs.

275.00

Rs.

8.25

Rs.

4,202.00

Rs.
Rs.

0.00
4,202.00

Labour
0.25 day
0.25 day

Skilled labour
Un skilled labour

at.
at.

Rs.
Rs.

Add for tools 3% of labour cost

Overheads & profits


cost for 50 kg.

per one kg with overheads and profit.

84.04

20mm dia bars

Same as 25mm dia bars


Rs.

84.04

16mm dia tor steel reinforcement up to second floor


level
50 kg.
Materials
50.00 kg.
0.25
Add

16 dia. Bars

at.

Rs.

70.00 Rs.

3,500.00

Binding wire

at.

Rs.

65.00 Rs.

16.25

Wastage 10%
Spacers & chairs
1.5%

at.

Rs.

Rs.

350.00

at.

Rs.

Rs.
Rs.

52.50
3,918.75 Rs.

3,918.75

650.00 Rs.
450.00 Rs.
Rs.

216.67
150.00
366.67 Rs.

366.67

Rs.

11.00

Rs.

4,296.42

Rs.
Rs.

0.00
4,296.42

Labour
1/3
1/3

day
day

Skilled labour
Un skilled labour

Add for tools 3% of labour cost

Overheads & profits


cost for 50 kg.

per one kg.

at.
at.

Rs.
Rs.

85.93

12mm dia tor steel reinforcement up to second floor


level
50 kg.
Materials
50.00 kg.
0.50
Add

12 & 10 mm dia.
Bars

at.

Rs.

70.00 Rs.

3,500.00

Binding wire

at.

Rs.

65.00 Rs.

32.50

Wastage 5 %
Spacers & chairs
1.5%

at.

Rs.

Rs.

175.00

at.

Rs.

Rs.
Rs.

52.50
3,760.00 Rs.

3,760.00

650.00 Rs.
450.00 Rs.
Rs.

325.00
225.00
550.00 Rs.

550.00

Rs.

16.50

Rs.

4,326.50

Rs.
Rs.

0.00
4,326.50

Labour
1/2
1/2

day
day

Skilled labour
Un skilled labour

Add for tools 3% of labour cost

Overheads & profits


cost for 50 kg.

per one kg.

at.
at.

Rs.
Rs.

86.53

10mm dia tor steel reinforcement up to second floor


level
50 kg.
Materials
50.00 kg.
0.50
Add

12 & 10 mm dia.
Bars

at.

Rs.

70.00 Rs.

3,500.00

Binding wire

at.

Rs.

65.00 Rs.

32.50

Wastage 5 %
Spacers & chairs
1.5%

at.

Rs.

Rs.

175.00

at.

Rs.

Rs.
Rs.

52.50
3,760.00 Rs.

3,760.00

650.00 Rs.
450.00 Rs.
Rs.

325.00
225.00
550.00 Rs.

550.00

Rs.

16.50

Rs.

4,326.50

Rs.
Rs.

0.00
4,326.50

Labour
0.75 day
0.75 day

Skilled labour
Un skilled labour

Add for tools 3% of labour cost

Overheads & profits


cost for 50 kg.

per one kg.

at.
at.

Rs.
Rs.

86.53

10mm dia and 6mm dia mild steel reinforcement up to second floor
level
50 kg.
Materials
50.00 kg.
1.00
Add

10 dia. Bars

at.

Rs.

70.00 Rs.

3,500.00

Binding wire

at.

Rs.

65.00 Rs.

65.00

Wastage 5%
Spacers & chairs
1.5%

at.

Rs.

Rs.

175.00

at.

Rs.

Rs.
Rs.

52.50
3,792.50 Rs.

3,792.50

650.00 Rs.
450.00 Rs.
Rs.

650.00
450.00
1,100.00 Rs.

1,100.00

Rs.

33.00

Rs.

4,925.50

Rs.
Rs.

0.00
4,925.50

Labour
1.00 day
1.00 day

Skilled labour
Un skilled labour

Add for tools 3% of labour cost

Overheads & profits


cost for 50 kg.

per one kg.

at.
at.

Rs.
Rs.

98.51

25mm & 20mm dia tor steel reinforcement above second floor
level
50 kg.
ground floor rate
Add

1% of ground floor rate

Rs.

84.04

Rs.

0.84
84.88

16m dia tor steel reinforcement above second floor


level
50 kg.
ground floor rate
Add

1% of ground floor rate

Rs.

85.93

Rs.
Rs.

0.86
86.79

12mm & 10mm dia tor steel reinforcement above second floor
level
50 kg.
ground floor rate
Add

1% of ground floor rate

Rs.

86.53

Rs.
Rs.

0.87
87.40

10mm &6mm dia mild steel reinforcement above second floor


level
50 kg.
ground floor rate
Add

2% of ground floor rate

Rs.

98.51

Rs.

1.97

Rs.

100.48