BASIC PRICES
Materials
Cement
Sand
Metal 3/4 "
Metal 1 "
Metal 2 "
Water
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
590.00
6,600.00
4,500.00
4,300.00
4,300.00
0.75
bag.
cube.
cube.
cube.
cube.
gal.
Rs.
Rs.
Rs.
650.00
450.00
650.00
per day
per day
per day
Rs.
650.00
per day
Rs.
Rs.
2,000.00
1,000.00
per day
per day
Labour
Skilled Labour
Un Skilled Labour
Vibrator Operator
Concrete Mixer
operator
10.00
B
B. 01
CONCRETE WORK
Cement concrete 1 : 3 : 6 with 2" metal
cube.
Rs.
22,758.91
( grade 10 )
B. 02
cube.
Rs.
22,758.91
B. 03
cube.
Rs.
23,407.91
B. 04
cube.
Rs.
31,765.62
B. 05
cube.
Rs.
29,468.91
B. 06
sqr.
Rs.
4,369.91
sqr.
Rs.
4,369.91
sqr.
Rs.
6,093.42
sqr.
Rs.
8,399.57
B. 07
B. 08
B. 09
B. 10
B. 11
B. 12
B. 13
B. 14
B. 15
B. 16
B. 17
l.ft.
Rs.
152.53
l.ft.
Rs.
233.93
l.ft.
Rs.
338.25
l.ft.
Rs.
427.61
l.ft.
Rs.
363.13
l.ft.
Rs.
469.29
l.ft.
Rs.
515.18
l.ft.
Rs.
107.81
B. 18
B. 19
B. 20
B. 21
B. 22
B. 23
B. 24
B. 25
B. 26
B. 27
B. 28
B. 29
B. 30
B. 31
B. 32
B. 33
cube
Rs.
34,426.78
cube
Rs.
34,921.78
cube
Rs.
35,169.28
cube
Rs.
35,416.78
cube
Rs.
33,918.09
cube
Rs.
34,413.09
cube
Rs.
34,660.59
cube
Rs.
34,908.09
cube
Rs.
34,610.11
cube
Rs.
35,105.11
cube
Rs.
35,352.61
cube
Rs.
35,600.11
cube
Rs.
34,083.09
cube
Rs.
34,578.09
cube
Rs.
34,825.59
cube
Rs.
35,073.09
cube
Rs.
34,083.09
cube
Rs.
34,578.09
cube
Rs.
34,825.59
cube
Rs.
35,073.09
B. 38
sqr.
Rs.
11,786.46
B. 39
sqr.
Rs.
12,116.46
B. 40
sqr.
Rs.
12,528.96
B. 41
sqr.
Rs.
15,504.69
B. 42
sqr.
Rs.
15,999.69
B. 43
sqr.
Rs.
16,247.19
B. 44
sqr.
Rs.
17,749.58
B. 45
sqr.
Rs.
18,244.58
B. 46
sqr.
Rs.
18,492.08
B. 34
B. 35
B. 36
B. 37
B. 47
B. 48
B. 49
B. 50
B. 51
B. 52
B. 53
B. 54
B. 55
B. 56
l.ft.
Rs.
148.29
l.ft.
Rs.
240.44
l.ft.
Rs.
325.32
l.ft.
Rs.
380.14
l.ft.
Rs.
335.14
l.ft.
Rs.
450.00
l.ft.
Rs.
489.46
l.ft.
Rs.
104.66
cube
Rs.
32,697.07
cube
Rs.
33,192.07
B. 57
B. 58
B. 59
B. 60
B. 61
B. 62
B. 63
B. 64
B. 65
B. 66
B. 67
B. 68
B. 69
B. 70
cube
Rs.
33,439.57
cube
Rs.
33,687.07
cube
Rs.
32,188.38
cube
Rs.
32,683.38
cube
Rs.
32,930.88
cube
Rs.
33,178.38
cube
Rs.
32,880.40
cube
Rs.
33,375.40
cube
Rs.
33,622.90
cube
Rs.
33,870.40
cube
Rs.
32,353.38
cube
Rs.
32,848.38
cube
Rs.
33,095.88
cube
Rs.
33,343.38
B. 71
cube
Rs.
32,353.38
cube
Rs.
32,848.38
cube
Rs.
33,095.88
cube
Rs.
33,343.38
B. 75
sqr.
Rs.
10,774.93
B. 76
sqr.
Rs.
11,104.93
B. 77
sqr.
Rs.
11,269.93
B. 78
sqr.
Rs.
14,730.44
B. 79
sqr.
Rs.
15,060.44
B. 80
sqr.
Rs.
15,225.44
B. 81
sqr.
Rs.
16,884.72
B. 82
sqr.
Rs.
17,214.72
B. 83
sqr.
Rs.
17,379.72
B. 72
B. 73
B. 74
B. 01
Per Cube
MIXING COST
Materials
13.00
0.60
1.00
125
bags
cube
cube
gal.
Cement
Sand
Metal ( 2" )
Water
at.
at.
at.
at.
Rs.
Rs.
Rs.
Rs.
590.00
6,600.00
4,300.00
0.75
Rs.
Rs.
Rs.
Rs.
7,670.00
3,960.00
4,300.00
93.75
Rs.
16,023.75
Rs.
1,114.50
Rs.
666.67
Rs.
17,804.92
Rs.
2,000.00
Rs.
500.00
Rs.
160.00
Rs.
225.00
20,689.92
Labour
1 Mixer operator
1/3 day
6 Uunskilled labour 1/3 day
at.
at.
Rs,
Rs,
650.00 Rs.
450.00 Rs.
214.50
900.00
day
at.
Rs,
2,000.00
Mason
Vibrator Operator
6 unskilled labour
at
at
at
at
Rs.
Rs.
Rs.
Rs.
650.00 Rs.
650.00 Rs.
450.00 Rs.
325.00
325.00
1,350.00
1,000.00
Add
3 % of labour cost for tools
5 % of labour cost for scaffolding
Rs.
Rs.
60.00
100.00
Curing
100 gal.
0.33 day
Water
Unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
75.00
150.00
2,068.99
B. 02
22,758.91
Per Cube
MIXING COST
Materials
13.00
0.60
1.00
125
bags
cube
cube
gal.
Cement
Sand
Metal ( 2" )
Water
at.
at.
at.
at.
Rs.
Rs.
Rs.
Rs.
590.00
6,600.00
4,300.00
0.75
Rs.
Rs.
Rs.
Rs.
7,670.00
3,960.00
4,300.00
93.75
Rs.
16,023.75
Rs.
1,114.50
Rs.
666.67
Rs.
17,804.92
Rs.
2,000.00
Rs.
500.00
Rs.
160.00
Rs.
225.00
Labour
1 Mixer operator
1/3 day
6 Unskilled labour 1/3 day
at.
at.
Rs,
Rs,
650.00 Rs.
450.00 Rs.
214.50
900.00
day
at.
Rs,
2,000.00
mason
Vibrator Operator
6 unskilled labour
at
at
at
at
Rs.
Rs.
Rs.
Rs.
650.00 Rs.
650.00 Rs.
450.00 Rs.
325.00
325.00
1,350.00
1,000.00
Add
3 % of labour cost for tools
5 % of labour cost for scaffolding
Rs.
Rs.
60.00
100.00
Curing
100 gal.
1/3
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
75.00
150.00
B. 03
Rs.
Rs.
20,689.92
2,068.99
Rs.
22,758.91
Rs.
16,613.75
Rs.
1,114.50
Rs.
666.67
Rs.
18,394.92
Rs.
2,000.00
Rs.
500.00
Per Cube
MIXING COST
Materials
14.00
0.60
1.00
125
bags
cube
cube
gal.
Cement
Sand
Metal ( 2" )
Water
at.
at.
at.
at.
Rs.
Rs.
Rs.
Rs.
590.00
6,600.00
4,300.00
0.75
Rs.
Rs.
Rs.
Rs.
8,260.00
3,960.00
4,300.00
93.75
Labour
1 Mixer operator
1/3 day
6 unskilled labour 1/3 day
at.
at.
Rs,
Rs,
650.00 Rs.
450.00 Rs.
214.50
900.00
day
at.
Rs,
2,000.00
mason
skilled labour for
vibrator
6 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
1,350.00
at
Rs.
1,000.00
Add
3 % of labour cost for tools
5 % of labour cost for scaffolding
Rs.
Rs.
60.00
100.00
160.00
Curing
1/3
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
75.00
150.00
225.00 Rs.
225.00
B. 04
Rs.
Rs.
21,279.92
2,127.99
Rs.
23,407.91
Rs.
23,055.00
Rs.
1,347.50
Rs.
1,000.00
Rs.
25,402.50
Rs.
2,400.00
Rs.
600.00
Per Cube
MIXING COST
Materials
18.00
0.60
1.00
125
bags
cube
cube
gal.
Cement
Sand
Metal ( 2" )
Water
at.
at.
at.
at.
Rs.
Rs.
Rs.
Rs.
745.00
7,200.00
5,200.00
1.00
Rs.
Rs.
Rs.
Rs.
13,410.00
4,320.00
5,200.00
125.00
Labour
1 mixer operator
1/3 day
6 unskilled labour 1/3 day
at.
at.
Rs,
Rs,
750.00 Rs.
550.00 Rs.
247.50
1,100.00
day
at.
Rs,
3,000.00
mason
skilled labour for
vibrator
6 unskilled labour
at
Rs.
750.00 Rs.
375.00
at
at
Rs.
Rs.
750.00 Rs.
550.00 Rs.
375.00
1,650.00
at
Rs.
1,200.00
Add
3 % of labour cost for tools
5 % of labour cost for scaffolding
Rs.
Rs.
72.00
120.00
192.00
Curing
100 gal.
1/3
day
water
unskilled labour
at
at
Rs.
Rs.
1.00 Rs.
550.00 Rs.
100.00
183.33
Rs.
283.33
28,877.83
2,887.78
B. 05
31,765.62
Per Cube
MIXING COST
Materials
23.00
0.60
1.00
125
bags
cube
cube
gal.
Cement
Sand
Metal ( 2" )
Water
at.
at.
at.
at.
Rs.
Rs.
Rs.
Rs.
590.00
6,600.00
4,500.00
0.75
Rs.
Rs.
Rs.
Rs.
13,570.00
3,960.00
4,500.00
93.75
Rs.
22,123.75
Rs.
1,114.50
Rs.
666.67
Rs.
23,904.92
Rs.
2,000.00
Rs.
500.00
Rs.
160.00
Rs.
Rs.
Rs.
225.00
26,789.92
2,678.99
Labour
1 mixer operator
1/3 day
6 unskilled labour 1/3 day
at.
at.
Rs,
Rs,
650.00 Rs.
450.00 Rs.
214.50
900.00
day
at.
Rs,
2,000.00
mason
Vibrator Operator
6 unskilled labour
at
at
at
at
Rs.
Rs.
Rs.
Rs.
650.00 Rs.
650.00 Rs.
450.00 Rs.
325.00
325.00
1,350.00
1,000.00
Add
3 % of labour cost for tools
5 % of labour cost for scaffolding
Rs.
Rs.
60.00
100.00
Curing
1/3
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
75.00
150.00
Rs.
29,468.91
Rs.
26,843.75
Rs.
1,114.50
Rs.
666.67
Rs.
28,624.92
325.00
1,350.00
2,000.00 Rs.
2,000.00
Rs.
500.00
Rs.
160.00
Rs.
Rs.
Rs.
225.00
31,509.92
3,150.99
Rs.
34,660.91
Per Cube
MIXING COST
Materials
31.00
0.60
1.00
125
bags
cube
cube
gal.
Cement
Sand
Metal ( 2" )
Water
at.
at.
at.
at.
Rs.
Rs.
Rs.
Rs.
590.00
6,600.00
4,500.00
0.75
Rs.
Rs.
Rs.
Rs.
18,290.00
3,960.00
4,500.00
93.75
Labour
1 mixer operator
1/3 day
6 unskilled labour 1/3 day
at.
at.
Rs,
Rs,
650.00 Rs.
450.00 Rs.
214.50
900.00
day
at.
Rs,
2,000.00
mason
skilled labour for
vibrator
6 unskilled labour
at
Rs.
650.00 Rs.
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
at
Rs.
325.00
1,000.00
Add
3 % of labour cost for tools
5 % of labour cost for scaffolding
Rs.
Rs.
60.00
100.00
Curing
1/3
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
75.00
150.00
B. 06
(1:3:6-2")
Per sqr.
Materials
0.17 cube
Add
mixed concrete
( as per item B. 01 )
10 % for wastage
at.
at.
at.
Rs.
17,804.92 Rs.
3,026.84
Rs.
302.68 Rs.
3,329.52
650.00 Rs.
450.00 Rs.
162.50
450.00 Rs.
612.50
Rs.
Rs.
30.63
3,972.64
Rs.
397.26
Rs.
4,369.91
Labour
1.00
4.00
Tools
Rs.
Rs.
5 % of labour cost
Add
B. 07
(1:3:6-1")
Per sqr.
Materials
0.17 cube
mixed concrete
( as per item B. 02 )
10 % for wastage
at.
at.
Rs.
650.00 Rs.
162.50
at.
Rs.
450.00 Rs.
450.00 Rs.
612.50
Rs.
30.63
3,972.64
Rs.
397.26
Rs.
4,369.91
Add
Rs.
17,804.92 Rs.
Rs.
3,026.84
302.68 Rs.
3,329.52
Labour
Tools
5 % of labour cost
Add
B. 08
mixed concrete
( as per item B. 02 )
at.
Rs.
10 % for wastage
17,804.92 Rs.
Rs.
4,451.23
445.12
4,896.35 Rs.
4,896.35
162.50
450.00
612.50 Rs.
612.50
Labour
1
4
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Tools
5 % cost of labour cost
Rs.
30.63
5,539.48
Rs.
553.95
Rs.
6,093.42
Add
Overheads & profits
Cost for one sqr. With overheads & profit
note
For laying concrete at depths more than 5 ' 0 " add 1/4 extra day unskilled labour
B. 09
1")
Per sqr.
Materials
0.33 cube
Add
mixed concrete
( as per item B. 02 )
at.
Rs.
17,804.92 Rs.
5,934.97
Rs.
593.50
10 % for wastage
Rs.
6,528.47
Rs.
816.67
Rs.
250.00
Rs.
40.83
7,635.97
Rs.
763.60
Rs.
8,399.57
Labour
1.00 skilled labour 1/3 day
4.00 unskilled labour 1/3 day
Plant and equipment
0.25 day
vibrator
at.
at.
at.
Rs.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
1,000.00
216.67
600.00
Add
Tools
5 % of of labour cost
Add
B. 10
Concrete ( B 04 )
Sawn formwork
at.
at.
Rs.
Rs.
31,765.62 Rs.
5,740.35 Rs.
587.66
786.43
Rs.
1,374.09
Rs.
Rs.
151.25
1,525.34
Rs.
2,339.28
Add
Extra cost of labour
1/8
1/8
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
81.25
56.25
137.50
Rs.
13.75
B. 11
Rs.
152.53
Concrete ( B 04 )
Sawn formwork
at.
at.
Rs.
Rs.
31,765.62 Rs.
5,740.35 Rs.
1,191.21
1,148.07
Add
Extra cost of labour
1/8
1/8
day
day
Skilled labour
Un skilled labour
Overheads & profit
cost for 10.0 l. ft.
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
81.25
56.25
137.50
13.75
151.25
2,339.28
B. 12
Rs.
233.93
Concrete ( B 04 )
Sawn formwork
at.
at.
Rs.
Rs.
31,765.62 Rs.
5,740.35 Rs.
1,788.40
1,291.58
Rs.
3,079.98
Rs.
Rs.
302.50
3,382.48
Rs.
3,973.65
Rs.
Rs.
302.50
4,276.15
Add
Extra cost of labour
1/4
1/4
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
162.50
112.50
275.00
27.50
B. 13
Rs.
338.25
Concrete ( B 04 )
Sawn formwork
at.
at.
Rs.
Rs.
31,765.62 Rs.
5,740.35 Rs.
2,382.42
1,591.23
Add
Extra cost of labour
1/4
1/4
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
162.50
112.50
Rs.
Rs.
275.00
27.50
Rs.
427.61
B. 14
Cement concrete 1:2:4 ( 3/4 " ) lintol size 6" x 13 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
5.6 c. ft.
27 s. ft.
Concrete ( B 04 )
Sawn formwork
at.
at.
Rs.
Rs.
31,765.62 Rs.
5,740.35 Rs.
1,778.87
1,549.89
Rs.
3,328.77
Rs.
Rs.
302.50
3,631.27
Rs.
4,390.42
Rs.
Rs.
302.50
4,692.92
Add
Extra cost of labour
1/4
1/4
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
162.50
112.50
275.00
Rs.
27.50
B. 15
Rs.
363.13
Concrete ( B 04 )
Sawn formwork
at.
at.
Rs.
Rs.
31,765.62 Rs.
5,740.35 Rs.
2,668.31
1,722.11
Add
Extra cost of labour
1/4
1/4
day
day
Skilled labour
Un skilled labour
Overheads & profit
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
162.50
112.50
275.00
27.50
Rs.
469.29
B. 16
Cement concrete 1:2:4 ( 3/4 " ) lintol size 12" x 13 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
11.2 c. ft.
22.5 s. ft.
Concrete ( B 04 )
Sawn formwork
at.
at.
Rs.
Rs.
31,765.62 Rs.
5,740.35 Rs.
3,557.75
1,291.58
Rs.
4,849.33
Rs.
Rs.
302.50
5,151.83
Rs.
1,078.11
Rs.
Rs.
151.25
1,078.11
Add
Extra cost of labour
1/4
1/4
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
162.50
112.50
275.00
27.50
B. 17
Rs.
515.18
Cement concrete 1:2:4 ( 3/4 " ) lintol size 4 1/2" x 4 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
1.37 c. ft.
11.2 s. ft.
Concrete ( B 04 )
Sawn formwork
at.
at.
Rs.
Rs.
31,765.62 Rs.
5,740.35 Rs.
435.19
642.92
Add
Extra cost of labour
1/8
1/8
day
day
Skilled labour
Un skilled labour
Overheads & profit
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
81.25
56.25
137.50
13.75
Rs.
107.81
B. 18
( 80.00 l. ft. )
mixed concrete
( as per item B. 04 )
at
Rs.
25,402.50 Rs.
11,431.13
Rs.
571.56
Add
5 % wastage
Rs.
12,002.68
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
150.00
14,083.68
Labour
1/2
day
1/2
day
1/2
day
mason
skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00 Rs.
Add
3 % of labour cost for tools
5 % of labour cost for scaffolding
Rs.
Rs.
39.75
66.25
Curing
1/4
50 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
37.50
112.50
1,408.37
15,492.05
34,426.78
B. 19
Rs.
34,426.78
Rs.
495.00
Rs.
34,921.78
Add
2 Un skilled labour 1/2 day
overheads and profits
at.
Rs.
450.00 Rs.
Rs.
450.00
45.00
B. 20
34,426.78
Add
3 Un skilled labour 1/2 day
overheads and profits
at.
Rs.
450.00 Rs.
Rs.
675.00
67.50
Rs.
B. 21
742.50
35,169.28
34,426.78
Add
4 Un skilled labour 1/2 day
overheads and profits
at.
Rs.
450.00 Rs.
Rs.
900.00
90.00
990.00
35,416.78
B. 22
( 50.00 l. ft. )
mixed concrete
( as per item B. 04 )
at
Rs.
25,402.50 Rs.
12,701.25
Rs.
635.06
Add
5 % wastage
Rs.
13,336.31
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
Rs.
Rs.
150.00
15,417.31
1,541.73
16,959.04
Labour
0.50 day
day
0.50
0.50 day
mason
skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00
Add
3 % of labour cost for tools
5 % of labour cost for scaffolding
Rs.
Rs.
39.75
66.25
Curing
1/4
50 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
37.50
112.50
33,918.09
B. 23
Rs.
33,918.09
Rs.
495.00
Rs.
34,413.09
Rs.
33,918.09
Rs.
742.50
Rs.
34,660.59
Add
2 Un skilled labour 1/2 day
overheads and profits
at.
Rs.
450.00 Rs.
Rs.
450.00
45.00
B. 24
at.
Rs.
450.00 Rs.
Rs.
675.00
67.50
B. 25
33,918.09
33,918.09
Add
4 Un skilled labour 1/2 day
overheads and profits
at.
Rs.
450.00 Rs.
Rs.
900.00
90.00
990.00
34,908.09
B. 26
( 80.00 l. ft. )
mixed concrete
( as per item B. 04 )
at
Rs.
25,402.50 Rs.
11,431.13
Rs.
571.56
Add
5 % wastage
Labour
1/2
day
day
1/2
1/2
day
mason
skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00
Rs.
12,002.68
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
Rs.
Rs.
225.00
14,158.68
1,415.87
15,574.55
Rs.
34,610.11
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Curing
100 gal.
1/3
day
water
unskilled labour
Rs.
Rs.
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
For one cube 9 " x 9 " beam with overheads & profits
B. 27
66.25
39.75
75.00
150.00
1 cube
Cost of 9 " X 9 " beam
Rs.
34,610.11
Rs.
495.00
Rs.
35,105.11
Rs.
34,610.11
Rs.
742.50
Rs.
35,352.61
34,610.11 Rs.
34,610.11
Add
2 Un skilled labour 1/2 day
overheads and profits
Rs.
450.00 Rs.
Rs.
450.00
45.00
B. 28
Rs.
Rs.
450.00 Rs.
Rs.
675.00
67.50
B. 29
Rs.
Add
4 Un skilled labour 1/2 day
overheads and profits
Rs.
450.00 Rs.
Rs.
900.00
90.00
Rs.
990.00
Rs.
35,600.11
B. 30
( 60.00 l. ft. )
mixed concrete
( as per item B. 04 )
at
Rs.
25,402.50 Rs.
12,701.25
Rs.
635.06
Add
5 % wastage
Labour
1/2
day
day
1/2
1/2
day
mason
skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
Rs.
13,336.31
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
Rs.
Rs.
225.00
15,492.31
1,549.23
17,041.54
day
vibrator
at
Rs.
1,000.00
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Rs.
Rs.
66.25
39.75
Curing
1/3
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
Cost for one cube 9 " x 12 " beam with overheads & profits
B. 31
75.00
150.00
34,083.09
1 cube
Cost of 9 " X 12 " beam
Rs.
34,083.09
Rs.
495.00
Rs.
34,578.09
Rs.
34,083.09
Rs.
742.50
Rs.
34,825.59
Rs.
34,083.09
Rs.
990.00
Rs.
35,073.09
Add
2 Un skilled labour 1/2 day
overheads and profits
Rs.
450.00 Rs.
Rs.
450.00
45.00
B. 32
Rs.
450.00 Rs.
Rs.
675.00
67.50
B. 33
Rs.
450.00 Rs.
Rs.
900.00
90.00
B. 34
( 50 l. ft. )
mixed concrete
( as per item B. 04 )
at
Rs.
25,402.50 Rs.
12,701.25
Rs.
635.06
Add
5 % wastage
Labour
1/2
day
day
1/2
1/2
day
mason
skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00
Rs.
13,336.31
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
Rs.
Rs.
225.00
15,492.31
1,549.23
17,041.54
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Rs.
Rs.
66.25
39.75
Curing
1/3
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
Cost for one cube 12 " x 12 " beam with overheads & provits
B. 35
75.00
150.00
34,083.09
1 cube
Cost of 12 " X 12 " beam in ground floor
Rs.
34,083.09
Rs.
495.00
Rs.
34,578.09
Rs.
34,083.09
Rs.
742.50
Rs.
34,825.59
Rs.
34,083.09
Rs.
990.00
Rs.
35,073.09
Add
2 Un skilled labour 1/2 day
overheads and profits
Rs.
450.00 Rs.
Rs.
450.00
45.00
B. 36
Rs.
450.00 Rs.
Rs.
675.00
67.50
B. 37
Rs.
B. 38
450.00 Rs.
Rs.
900.00
90.00
Per sqr
0.33 cube
Materials
0.33 cube
( 100.00 s. ft. )
mixed concrete
( as per item B. 04 )
at
Rs.
25,402.50 Rs.
8,382.83
Rs.
419.14
Add
5 % wastage
Rs.
8,801.97
Rs.
1,100.00
Rs.
500.00
Rs.
88.00
75.00
150.00
225.00 Rs.
Rs.
Rs.
Rs.
225.00
10,714.97
1,071.50
11,786.46
Labour
1/2
day
day
1/2
1/2
day
mason
skilled labour for
vibrator
2 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
450.00
at
Rs.
1,000.00 Rs.
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Rs.
Rs.
55.00
33.00
Curing
100 gal.
1/3
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
B. 39
1 sqr.
day
2 un skilled labour
Overheads & profits
Rs.
450.00 Rs.
Rs.
11,786.46
Rs.
330.00
Rs.
12,116.46
Rs.
11,786.46
Rs.
742.50
Rs.
12,528.96
300.00
30.00
B. 40
Rs.
day
3 un skilled labour
Overheads & profits
Rs.
450.00 Rs.
Rs.
675.00
67.50
B. 41
Per sqr
MIXING COST
0.42 cube
Materials
0.42 cube
( 100.00 s. ft. )
mixed concrete
( as per item B. 04 )
at
Rs.
25,402.50 Rs.
10,669.05
Rs.
1,270.13
Add
5 % wastage
Rs.
11,939.18
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
Rs.
Rs.
225.00
14,095.18
1,409.52
15,504.69
LAYING COST
Labour
1/2
day
day
1/2
1/2
day
mason
skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Rs.
Rs.
66.25
39.75
Curing
1/3
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
B. 42
75.00
150.00
1/2
day
2 un skilled labour
Overheads & profits
Rs.
450.00 Rs.
Rs.
Rs.
495.00
Rs.
15,999.69
Rs.
15,504.69
Rs.
742.50
Rs.
16,247.19
1/2
day
Rs.
450.00 Rs.
Rs.
675.00
67.50
B. 44
15,504.69
450.00
45.00
B. 43
Rs.
Per sqr
MIXING COST
0.50 cube
Materials
0.5 cube
( 100.00 s. ft. )
mixed concrete
( as per item B. 04 )
at
Rs.
25,402.50 Rs.
12,701.25
Rs.
635.06
Add
5 % wastage
Rs.
13,336.31
Rs.
1,766.67
Rs.
666.67
Rs.
141.33
Rs.
Rs.
Rs.
Rs.
225.00
16,135.98
1,613.60
17,749.58
Labour
2/3
2/3
2/3
day
day
day
mason
Vibrator Operator
3 unskilled labour
at
at
at
at
Rs.
Rs.
Rs.
Rs.
650.00 Rs.
650.00 Rs.
450.00 Rs.
433.33
433.33
900.00
1,000.00
Rs.
Rs.
88.33
53.00
Curing
1/3
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
75.00
150.00
B. 45
Rs.
17,749.58
Rs.
495.00
Rs.
18,244.58
Rs.
17,749.58
Rs.
742.50
Rs.
18,492.08
1/2
day
2 un skilled labour
Rs.
B. 46
1/2
day
Rs.
450.00 Rs.
450.00
Rs.
45.00
450.00 Rs.
Rs.
675.00
67.50
B. 47
Concrete ( B 05 )
Sawn formwork
at.
at.
Rs.
Rs.
29,468.91 Rs.
5,740.35 Rs.
545.17
786.43
Rs.
1,331.60
Rs.
Rs.
151.25
1,482.85
Add
Extra cost of labour
1/8
1/8
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
81.25
56.25
137.50
Rs.
13.75
B. 48
Rs.
148.29
Materials
3.75 c. ft.
20.00 s. ft.
Concrete ( B 05 )
Sawn formwork
at.
at.
Rs.
Rs.
29,468.91 Rs.
5,740.35 Rs.
1,105.08
1,148.07
Rs.
2,253.15
Add
Extra cost of labour
1/8
1/8
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
81.25
56.25
137.50
13.75
151.25
2,404.40
B. 49
Rs.
240.44
Concrete ( B 05 )
Sawn formwork
at.
at.
Rs.
Rs.
29,468.91 Rs.
5,740.35 Rs.
1,659.10
1,291.58
Rs.
2,950.68
Rs.
Rs.
302.50
3,253.18
Add
Extra cost of labour
1/4
1/4
day
day
Skilled labour
Un skilled labour
Overheads & profit
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
162.50
112.50
275.00
27.50
B. 50
Rs.
325.32
7.50 c. ft.
27.72 s. ft.
Concrete ( B 05 )
Sawn formwork
at.
at.
Rs.
Rs.
29,468.91 Rs.
5,740.35 Rs.
2,210.17
1,591.23
Rs.
3,801.39
Rs.
Rs.
302.50
3,801.39
Rs.
3,200.15
Rs.
Rs.
151.25
3,351.40
Add
Extra cost of labour
1/4
1/4
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
162.50
112.50
275.00
27.50
B. 51
Rs.
380.14
Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 6" x 13 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
5.6 c. ft.
27 s. ft.
Concrete ( B 05 )
Sawn formwork
at.
at.
Rs.
Rs.
29,468.91 Rs.
5,740.35 Rs.
1,650.26
1,549.89
Add
Extra cost of labour
1/4
1/4
day
day
Skilled labour
Un skilled labour
Overheads & profit
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
81.25
56.25
137.50
13.75
B. 52
Rs.
335.14
8.4 c. ft.
30 s. ft.
Concrete ( B 05 )
Sawn formwork
at.
at.
Rs.
Rs.
29,468.91 Rs.
5,740.35 Rs.
2,475.39
1,722.11
Rs.
4,197.49
Rs.
Rs.
302.50
4,499.99
Rs.
4,592.10
Rs.
Rs.
302.50
4,894.60
Add
Extra cost of labour
1/4
1/4
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
162.50
112.50
275.00
27.50
B. 53
Rs.
450.00
Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 12" x 13 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
11.2 c. ft.
22.5 s. ft.
Concrete ( B 05 )
Sawn formwork
at.
at.
Rs.
Rs.
29,468.91 Rs.
5,740.35 Rs.
3,300.52
1,291.58
Add
Extra cost of labour
1/4
1/4
day
day
Skilled labour
Un skilled labour
Overheads & profit
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
162.50
112.50
275.00
27.50
B. 54
Rs.
Cement concrete 1:11/2:3 ( 3/4 " ) lintol size 4 1/2" x 4 1/2 "
with and including formwork ( reinforcement paid separately )
10 l. ft.
Materials
489.46
1.37 c. ft.
11.2 s. ft.
Concrete ( B 05 )
Sawn formwork
at.
at.
Rs.
Rs.
29,468.91 Rs.
5,740.35 Rs.
403.72
642.92
Rs.
1,046.64
Rs.
Rs.
151.25
1,046.64
Add
Extra cost of labour
1/8
1/8
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
81.25
56.25
137.50
13.75
B. 55
( 80.00 l. ft. )
Rs.
104.66
Materials
0.45 cube
mixed concrete
( as per item B. 05 )
at
Rs.
23,904.92 Rs.
10,757.21
Rs.
537.86
Add
5 % wastage
Rs.
11,295.07
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
150.00
13,376.07
Labour
1/2
day
1/2
day
1/2
day
mason
skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00 Rs.
Add
3 % of labour cost for tools
5 % of labour cost for scaffolding
Rs.
Rs.
39.75
66.25
Curing
1/4
50 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
37.50
112.50
1,337.61
14,713.68
B. 56
32,697.07
Rs.
32,697.07
Add
2 Un skilled labour 1/2day
overheads and profits
at.
Rs.
450.00 Rs.
Rs.
450.00
45.00
B. 57
Rs.
495.00
Rs.
33,192.07
32,697.07
Add
3 Un skilled labour 1/2day
overheads and profits
at.
Rs.
450.00 Rs.
Rs.
675.00
67.50
Rs.
B. 58
742.50
33,439.57
32,697.07
Add
4 Un skilled labour 1/2day
overheads and profits
at.
Rs.
450.00 Rs.
Rs.
900.00
90.00
990.00
B. 59
( 50.00 l. ft. )
33,687.07
Materials
0.50 cube
Mixed concrete
( as per item B. 05 )
at
Rs.
23,904.92 Rs.
11,952.46
Rs.
597.62
Add
5 % wastage
Rs.
12,550.08
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
Rs.
Rs.
150.00
14,631.08
1,463.11
16,094.19
Labour
0.50 day
day
0.50
0.50 day
Mason
Skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00
Add
3 % of labour cost for tools
5 % of labour cost for scaffolding
Rs.
Rs.
39.75
66.25
Curing
1/4
50 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
37.50
112.50
B. 60
32,188.38
Rs.
Add
2 Un skilled labour 1/2day
at.
Rs.
450.00 Rs.
450.00
32,188.38
Rs.
45.00
B. 61
Rs.
495.00
Rs.
32,683.38
Rs.
32,188.38
Rs.
742.50
Rs.
32,930.88
Add
3 Un skilled labour 1/2 day
overheads and profits
at.
Rs.
450.00 Rs.
Rs.
675.00
67.50
B. 62
32,188.38
32,188.38
Add
4 Un skilled labour 1/2 day
overheads and profits
at.
Rs.
450.00 Rs.
Rs.
900.00
90.00
990.00
B. 63
( 80.00 l. ft. )
33,178.38
0.45 cube
mixed concrete
( as per item B. 05 )
at
Rs.
23,904.92 Rs.
10,757.21
Rs.
537.86
Add
5 % wastage
Labour
1/2
day
day
1/2
1/2
day
mason
skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00
Rs.
11,295.07
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
Rs.
Rs.
225.00
13,451.07
1,345.11
14,796.18
Rs.
32,880.40
Rs.
32,880.40
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Curing
100 gal.
1/3
day
water
unskilled labour
Rs.
Rs.
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
66.25
39.75
75.00
150.00
For one cube 9 " x 9 " beam with overheads & profits
B. 64
at.
Rs.
450.00 Rs.
450.00
Rs.
45.00
B. 65
Rs.
495.00
Rs.
33,375.40
Rs.
32,880.40
Rs.
742.50
Rs.
33,622.90
Rs.
32,880.40
Rs.
990.00
Rs.
33,870.40
at.
Rs.
450.00 Rs.
Rs.
675.00
67.50
B. 66
at.
Rs.
450.00 Rs.
Rs.
900.00
90.00
B. 67
( 60.00 l. ft. )
Materials
0.50 cube
mixed concrete
at
Rs.
23,904.92 Rs.
11,952.46
( as per item B. 04 )
Add
5 % wastage
Labour
1/2
day
day
1/2
1/2
day
mason
skilled labour for
vibrator
3 unskilled labour
Rs.
597.62
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00
Rs.
12,550.08
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
Rs.
Rs.
225.00
14,706.08
1,470.61
16,176.69
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Rs.
Rs.
66.25
39.75
Curing
1/3
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
75.00
150.00
Cost for one cube 9 " x 12 " beam with overheads & profits
B. 68
32,353.38
at.
Rs.
450.00 Rs.
Rs.
Rs.
32,353.38
Rs.
495.00
450.00
45.00
B. 69
Rs.
32,848.38
at.
32,353.38
Rs.
450.00 Rs.
Rs.
675.00
67.50
B. 70
Rs.
742.50
Rs.
33,095.88
Rs.
32,353.38
Rs.
990.00
Rs.
33,343.38
at.
Rs.
450.00 Rs.
Rs.
900.00
90.00
B. 71
( 50 l. ft. )
mixed concrete
( as per item B. 05 )
at
Rs.
23,904.92 Rs.
11,952.46
Add
5 % wastage
Labour
1/2
day
day
1/2
1/2
day
mason
skilled labour for
vibrator
3 unskilled labour
Rs.
597.62
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00
Rs.
12,550.08
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
Rs.
Rs.
225.00
14,706.08
1,470.61
16,176.69
Rs.
32,353.38
Rs.
32,353.38
Rs.
495.00
Rs.
32,848.38
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Rs.
Rs.
66.25
39.75
Curing
1/3
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
75.00
150.00
Cost for one cube 12 " x 12 " beam with overheads & provits
B. 72
at.
Rs.
450.00 Rs.
Rs.
450.00
45.00
B. 73
at.
Rs.
450.00 Rs.
Rs.
32,353.38
Rs.
742.50
Rs.
33,095.88
675.00
67.50
B. 74
Rs.
at.
Rs.
32,353.38
450.00 Rs.
Rs.
900.00
90.00
B. 75
Rs.
990.00
Rs.
33,343.38
Rs.
8,283.05
( 100.00 s. ft. )
mixed concrete
( as per item B. 05 )
at
Rs.
23,904.92 Rs.
7,888.62
Rs.
394.43
Add
5 % wastage
Labour
1/3
day
day
1/3
1/3
day
mason
skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
216.67
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
216.67
450.00
Rs.
883.33
Rs.
333.33
Rs.
70.67
75.00
150.00
225.00 Rs.
Rs.
225.00
9,795.39
Rs.
979.54
Rs.
10,774.93
Rs.
10,774.93
Rs.
330.00
at
Rs.
1,000.00 Rs.
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Rs.
Rs.
44.17
26.50
Curing
1/3
B. 76
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
day
2 un skilled labour
Overheads & profits
Rs.
450.00 Rs.
Rs.
300.00
30.00
B. 77
11,104.93
Rs.
10,774.93
Rs.
495.00
Rs.
11,269.93
day
3 un skilled labour
Overheads & profits
Rs.
450.00 Rs.
Rs.
450.00
45.00
B. 78
Rs.
Per 1 sqr
MIXING COST
0.42 cube
Materials
0.42 cube
( 100.00 s. ft. )
mixed concrete
( as per item B. 05 )
at
Rs.
23,904.92 Rs.
10,040.07
Rs.
1,195.25
Add
5 % wastage
Rs.
11,235.31
Rs.
1,325.00
Rs.
500.00
Rs.
106.00
Rs.
Rs.
225.00
13,391.31
Rs.
1,339.13
Rs.
14,730.44
Rs.
14,730.44
Rs.
330.00
Rs.
15,060.44
LAYING COST
Labour
1/2
day
day
1/2
1/2
day
mason
skilled labour for
vibrator
3 unskilled labour
at
Rs.
650.00 Rs.
325.00
at
at
Rs.
Rs.
650.00 Rs.
450.00 Rs.
325.00
675.00
at
Rs.
1,000.00
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Rs.
Rs.
66.25
39.75
Curing
1/3
B. 79
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
75.00
150.00
day
2 un skilled labour
Overheads & profits
Rs.
450.00 Rs.
Rs.
300.00
30.00
B. 80
day
3 un skilled labour
Overheads & profits
Rs.
450.00 Rs.
Rs.
Per sqr
MIXING COST
0.50 cube
Materials
0.5 cube
Add
( 100.00 s. ft. )
mixed concrete
( as per item B. 05 )
at
Rs.
23,904.92 Rs.
14,730.44
Rs.
495.00
Rs.
15,225.44
450.00
45.00
B. 81
Rs.
11,952.46
5 % wastage
Rs.
597.62
Rs.
12,550.08
Rs.
1,766.67
Rs.
666.67
Rs.
141.33
Rs.
Rs.
225.00
15,349.75
Rs.
1,534.97
Rs.
16,884.72
Rs.
16,884.72
Rs.
330.00
Rs.
17,214.72
Labour
2/3
2/3
2/3
day
day
day
mason
Vibrator Operator
3 unskilled labour
at
at
at
at
Rs.
Rs.
Rs.
Rs.
650.00 Rs.
650.00 Rs.
450.00 Rs.
433.33
433.33
900.00
1,000.00
Rs.
Rs.
88.33
53.00
Curing
1/3
B. 82
100 gal.
day
water
unskilled labour
at
at
Rs.
Rs.
0.75 Rs.
450.00 Rs.
75.00
150.00
day
2 un skilled labour
Overheads & profits
Rs.
450.00 Rs.
Rs.
300.00
30.00
B. 83
day
3 un skilled labour
Overheads & profits
Rs.
450.00 Rs.
Rs.
Rs.
16,884.72
Rs.
495.00
Rs.
17,379.72
450.00
45.00
Concrete
FWK
R/f
8671.9269
5200.00
10000.000
23871.93
18000.00
41871.93
45
BASIC PRICES
Materials
1" thick plank class 11
2 " x 4 " class 11
2 " x 2 " class 11
2 " x 1 " class 11
Wire nails
Mould oil
16mm bolt
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
60.00
40.00
15.00
8.00
65.00
15.00
55.00
Rs.
Rs.
650.00
450.00
s. ft.
l. ft.
l. ft.
l. ft.
kg.
liter
no
Labour
Skilled Labour
Un Skilled Labour
0.00
per day
per day
FORM WORK
Form work to have basic finish as general specification
B. 84
sqr.
7,605.81
B. 85
sqr.
7,605.81
B. 86
sqr.
8,987.04
sqr.
9,256.65
sqr.
9,346.52
B. 89
sqr.
7,567.08
B. 90
sqr.
7,794.10
B. 91
sqr.
7,869.77
B. 92
sqr.
7,945.44
B. 93
sqr.
5,500.63
B. 94
sqr.
5,720.65
B. 95
sqr.
5,775.66
B. 87
B. 88
FORMWORK
Sown form work in 9" x 9" column in ground floor up to 5 ' 0 " high
15 s. ft.
Making mould
Materials
18.00 s. ft.
9.00 l. ft.
0.50 kg.
at. Rs.
at. Rs.
at. Rs.
60.00 Rs.
8.00 Rs.
65.00 Rs.
Rs.
1,080.00
72.00
32.50
1,184.50 Rs.
Rs.
1,184.50
59.23
650.00 Rs.
450.00 Rs.
Rs.
325.00
225.00
550.00 Rs.
Rs.
550.00
16.50
Rs.
1,810.23
Rs.
452.56
192.00
66.00
7.50
301.50 Rs.
301.50
162.50
112.50
275.00 Rs.
Rs.
275.00
8.25
Rs.
13.75
Rs.
598.50
add wastege 5 %
Labour
0.50 day
0.50 day
add
day
day
Add
at. Rs.
at. Rs.
Skilled labour
Un skilled labour
Skilled labour
Un skilled labour
Tools 3% of labour cost
5% of labour cost for
scaffolding
Assembling cost
at. Rs.
40.00 Rs.
at. Rs.
at. Rs.
at. Rs.
40.00
55.00 Rs.
15.00 Rs.
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
36.00
1/4
1/4
day
day
Skilled labour
Un skilled labour
Add
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
162.50
112.50
275.00 Rs.
Rs.
275.00
8.25
Rs.
13.75
297.00
A+B+C
1,348.06
Add
Overheads & profits
0.00
1,348.06
8,987.04
per sqr.
Rs.
Rs.
8,987.04
269.61
Rs.
9,256.65
per sqr.
Rs.
Rs.
8,987.04
359.48
Rs.
9,346.52
per sqr.
Rs.
8,987.04
Rs.
449.35
Rs.
9,436.39
Sown form work in 9" x 12" beam in ground floor 20 ' 0 " long
55 s. ft.
A
Making mould
Materials
60.00 s. ft.
25.00 l. ft.
1.00 kg.
at. Rs.
at. Rs.
at. Rs.
60.00 Rs.
8.00 Rs.
65.00 Rs.
Rs.
3,600.00
200.00
65.00
3,865.00 Rs.
Rs.
3,865.00
193.25
650.00 Rs.
450.00 Rs.
Rs.
975.00
675.00
1,650.00 Rs.
Rs.
1,650.00
49.50
Rs.
82.50
Rs.
5,840.25
Rs.
1,460.06
293.33
88.00
7.50
388.83 Rs.
388.83
650.00
1,125.00
1,775.00 Rs.
Rs.
1,775.00
53.25
Rs.
88.75
Rs.
2,305.83
add wastege 5 %
Labour
1.50 day
1.50 day
add
Skilled labour
Un skilled labour
tools 3% of labour cost
5% of labour cost for
scaffolding
Skilled labour
Un skilled labour
Tools 3% of labour cost
at. Rs.
at. Rs.
Assembling cost
at. Rs.
at. Rs.
40.00 Rs.
40.00 Rs.
15.00 Rs.
650.00 Rs.
450.00 Rs.
0.33 day
0.33 day
Add
Skilled labour
Un skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
216.67
150.00
366.67
A+B+C
Rs.
366.67
11.00
Rs.
18.33
Rs.
396.00
Rs.
4,161.90
Rs.
0.00
Rs.
4,161.90
Rs.
7,567.08
Add
Overheads & profits
per sqr.
Rs.
Rs.
7,567.08
227.01
Rs.
7,794.10
per sqr.
Rs.
Rs.
7,567.08
302.68
Rs.
7,869.77
per sqr.
Rs.
Rs.
7,567.08
378.35
Rs.
7,945.44
A Making mould
Materials
100.00 s. ft.
55.00 l. ft.
2.00 kg.
at. Rs.
at. Rs.
at. Rs.
60.00 Rs.
40.00 Rs.
65.00 Rs.
Rs.
6,000.00
2,200.00
130.00
8,330.00 Rs.
Rs.
8,330.00
416.50
650.00 Rs.
450.00 Rs.
Rs.
1,950.00
1,350.00
3,300.00 Rs.
Rs.
3,300.00
99.00
Rs.
165.00
Rs.
12,310.50
Rs.
3,077.63
1,000.00
40.00
120.00
7.50
1,167.50 Rs.
1,167.50
325.00
450.00
775.00 Rs.
Rs.
775.00
23.25
Rs.
38.75
Rs.
2,004.50
add wastege 5 %
Labour
3.00 day
3.00 day
add
Skilled labour
Un skilled labour
tools 3% of labour cost
5% of labour cost
forscaffolding
at. Rs.
at. Rs.
Skilled labour
2 Un skilled labour
Tools 3% of labour cost
5% of labour cost
forscaffolding
Assembling cost
at.
at.
at.
at.
Rs.
Rs.
Rs.
Rs.
at. Rs.
at. Rs.
40.00 Rs.
8.00 Rs.
60.00 Rs.
15.00
650.00 Rs.
450.00 Rs.
day
day
Add
Skilled labour
2 Un skilled labour
Tools 3% of labour cost
Add
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
162.50
225.00
387.50 Rs.
387.50
Rs.
11.63
Rs.
19.38
Rs.
418.50
Rs.
5,500.63
Rs.
0.00
Rs.
5,500.63
Rs.
5,500.63
Rs.
220.03
Rs.
5,720.65
Rs.
5,500.63
Rs.
275.03
Rs.
5,775.66
s. ft.
l. ft.
l. ft.
kg.
add
for wastege 5%
Cost for four uses
4.00 liter
at.
at.
at.
at.
Rs.
Rs.
Rs.
Rs.
at. Rs.
Skilled labour
Un skilled labour
at. Rs.
at. Rs.
60.00
8.00
15.00
65.00
Rs.
Rs.
Rs.
Rs.
6,000.00
800.00
300.00
65.00
Rs.
Rs.
Rs.
7,165.00
358.25
7,523.25
Rs.
Rs.
1,880.81
60.00
3,250.00
2,250.00
5,500.00 Rs.
5,500.00
Rs.
165.00
Rs.
7,605.81
Rs.
0.00
Rs.
7,605.81
15.00
Labour
5.00 day
5.00 day
add
650.00 Rs.
450.00 Rs.
Add
( 80.00 l. ft. )
Materials
0.45 cube
mixed concat
( as per item B. 04 )
Rs.
#REF! Rs.
#REF!
Rs.
#REF!
Add
5 % wastage
Rs.
Labour
1/2
1/2
1/2
day
mason
at
Rs.
#REF! Rs.
#REF!
day
skilled
labour for
vibrator
at
3 unskille at
Rs.
Rs.
#REF! Rs.
#REF! Rs.
#REF!
#REF!
day
Rs.
Plant and equipment
1/2
day
vibrator
at
Rs.
#REF!
Rs.
Add
5 % of labour cost for scaffolding
3 % of labour cost for tools
Rs.
Rs.
#REF!
#REF!
Rs.
Curing
1/3
100 gal.
day
water
at
unskilled l at
Rs.
Rs.
#REF! Rs.
#REF! Rs.
For one cube 9 " x 9 " beam with overheads & profits
#REF!
#REF!
Rs.
Rs.
Rs.
Rs.
Rs.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
BASIC PRICES
Steel
Tor steel
25mm
20mm
16mm
12mm
10mm
binding wire
70.00
70.00
70.00
70.00
70.00
65.00
kg.
kg.
kg.
kg.
kg.
kg.
70.00
70.00
kg.
kg.
650.00
450.00
day
day
M.S. bars
10mm
6mm
Skilled labour
Un skilled labour
0.00
Reinforcement
Cold worked yield steel bar reinforcement
including bends, tying wire and spacer bar.
Up to D.P.C. level
B. 96
kg.
84.04
B. 97
kg.
84.04
B. 98
kg.
85.93
B. 99
kg.
86.53
B. 100
kg.
86.53
kg.
84.04
B. 102
kg.
84.04
B. 103
kg.
85.93
B. 104
kg.
86.53
B. 105
kg.
86.53
kg.
84.04
B. 107
kg.
84.04
B. 108
kg.
85.93
B. 109
kg.
86.53
B. 110
kg.
86.53
kg.
84.88
B. 112
kg.
84.88
B. 113
kg.
86.79
B. 114
kg.
87.40
B. 115
kg.
87.40
kg.
98.51
B. 117
kg.
98.51
kg.
98.51
B. 119
kg.
98.51
kg.
98.51
B. 121
kg.
98.51
kg.
100.48
B. 123
kg.
100.48
25 dia. Bars
at.
Rs.
70.00 Rs.
3,500.00
Binding wire
at.
Rs.
65.00 Rs.
16.25
Wastage 10%
Spacers & chairs
1.5%
at.
Rs.
Rs.
350.00
at.
Rs.
Rs.
Rs.
52.50
3,918.75 Rs.
3,918.75
650.00 Rs.
450.00 Rs.
Rs.
162.50
112.50
275.00 Rs.
275.00
Rs.
8.25
Rs.
4,202.00
Rs.
Rs.
0.00
4,202.00
Labour
0.25 day
0.25 day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
84.04
84.04
16 dia. Bars
at.
Rs.
70.00 Rs.
3,500.00
Binding wire
at.
Rs.
65.00 Rs.
16.25
Wastage 10%
Spacers & chairs
1.5%
at.
Rs.
Rs.
350.00
at.
Rs.
Rs.
Rs.
52.50
3,918.75 Rs.
3,918.75
650.00 Rs.
450.00 Rs.
Rs.
216.67
150.00
366.67 Rs.
366.67
Rs.
11.00
Rs.
4,296.42
Rs.
Rs.
0.00
4,296.42
Labour
1/3
1/3
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
85.93
12 & 10 mm dia.
Bars
at.
Rs.
70.00 Rs.
3,500.00
Binding wire
at.
Rs.
65.00 Rs.
32.50
Wastage 5 %
Spacers & chairs
1.5%
at.
Rs.
Rs.
175.00
at.
Rs.
Rs.
Rs.
52.50
3,760.00 Rs.
3,760.00
650.00 Rs.
450.00 Rs.
Rs.
325.00
225.00
550.00 Rs.
550.00
Rs.
16.50
Rs.
4,326.50
Rs.
Rs.
0.00
4,326.50
Labour
1/2
1/2
day
day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
86.53
12 & 10 mm dia.
Bars
at.
Rs.
70.00 Rs.
3,500.00
Binding wire
at.
Rs.
65.00 Rs.
32.50
Wastage 5 %
Spacers & chairs
1.5%
at.
Rs.
Rs.
175.00
at.
Rs.
Rs.
Rs.
52.50
3,760.00 Rs.
3,760.00
650.00 Rs.
450.00 Rs.
Rs.
325.00
225.00
550.00 Rs.
550.00
Rs.
16.50
Rs.
4,326.50
Rs.
Rs.
0.00
4,326.50
Labour
0.75 day
0.75 day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
86.53
10mm dia and 6mm dia mild steel reinforcement up to second floor
level
50 kg.
Materials
50.00 kg.
1.00
Add
10 dia. Bars
at.
Rs.
70.00 Rs.
3,500.00
Binding wire
at.
Rs.
65.00 Rs.
65.00
Wastage 5%
Spacers & chairs
1.5%
at.
Rs.
Rs.
175.00
at.
Rs.
Rs.
Rs.
52.50
3,792.50 Rs.
3,792.50
650.00 Rs.
450.00 Rs.
Rs.
650.00
450.00
1,100.00 Rs.
1,100.00
Rs.
33.00
Rs.
4,925.50
Rs.
Rs.
0.00
4,925.50
Labour
1.00 day
1.00 day
Skilled labour
Un skilled labour
at.
at.
Rs.
Rs.
98.51
25mm & 20mm dia tor steel reinforcement above second floor
level
50 kg.
ground floor rate
Add
Rs.
84.04
Rs.
0.84
84.88
Rs.
85.93
Rs.
Rs.
0.86
86.79
12mm & 10mm dia tor steel reinforcement above second floor
level
50 kg.
ground floor rate
Add
Rs.
86.53
Rs.
Rs.
0.87
87.40
Rs.
98.51
Rs.
1.97
Rs.
100.48