Temporary Repair
It is a permanent change
It includes all the modifications to the
plant facilities.(examples given below)
Any change in already approved
process specification, pipe isometrics,
change in P&IDs or drawings of a
project also falls under this catagory
It is a temporary change.
It includes all the changes carried out
in emergency situations.
It is for a limited period of time.
Debox date is mentioned on the
temporary repair form and repair
should be reverted before that date
Document Change
It is a permanent change.
It includes all the changes which are not
replacement in kind.
Any permanent change in process
specifications, change in P&IDs) and
safety critical equipment is not covered
in subtle change
Applicable to
Subtle Change
Examples
Examples
Examples
Box up of leaks
Temporary Modifications
For example: Temporary
modification required on P-3001
A/B nitrogen vent line
Temporary arrangement for oil
make up at scrapper gear box at
H-01 A/B
Equipment replacement or repair
using non-documented spares
Replacement of any spares with
another spare which is not
recommended by Original
Equipment Manufacturer.
For example: Wear ring material
change from cast iron to SS410 at
11-P-553 B
Flushing of lines with a fluid not
specified in the procedures because
of unavailability.
Final Approval By
Sub-HSE (M) Chairman
Final Approval By
Final Approval By
Sub HSE (M) Chairman
Maintenance GL & Operations GL
Final Approval By
Sub HSE (M) Chairman
(Maintenance Department)
Controlled Documents
Mechanical Administrative
Procedures
Mechanical Work Procedures
Area Maintenance Management
Manuals
Job Plans
Area Specific Standard
Operating Procedures
Centralized maintenance
management system (CMMS)
technical database (SAP)
Equipment specification
document/data sheet
Fixed equipment and machinery
reliability
hprogramme documentation
Final Approval By
Maintenance Manager