Project : 765 kV D/C Jabalpur Pooling
- Orai
Line (PKG : TE
03)
Name of Contractor : M/s Bajaj Electricals Limited, Mumbai
PIT MARKING
Location No.:..
i)
Tower Type :
..
..
YES / NO
a) Angle of deviation
b) Bisection found
ix) Position of all four pits are on leveled ground and safe
YES / NO
xi)
YES / NO
YES / NO
..Cu.m.
FOR POWERGRID
Signature
: ___________________
Signature
: ___________________
Name
: ___________________
Name
: ___________________
Designation : ___________________
Designation
: (E1 / E2 / E3)
Date
Date
: ___________________
: ___________________
EXCAVATION
Location No.:..
Sl. No.
Tower Type :
DESCRIPTION
FOR CONTRACTOR
FOR POWERGRID
Signature
: ___________________
Signature
: ___________________
Name
: ___________________
Name
: ___________________
Designation : ___________________
Designation
: (E1 / E2 / E3)
Date
Date
: ___________________
: ___________________
FOUNDATION CLASSIFICATION
Location No.:..
Tower Type :
(Orai)
RECEIVING END
STRATA DEPTH
STRATA DEPTH
PIT C
PIT B
STRATA DEPTH
STRATA DEPTH
Trial Pit details /
Bore leg details
PIT D
SENDING END
PIT A
(Jabalpur)
Note : Classification may also be given on trial pit or one pit excavation basis.
a) Predominant soil
ii) Sub soil water table details as on date :
PIT A
PIT B
PIT C
PIT D
.mtrs
iv) Max. Subsoil water table in monsoon season after thorough local enquiry
.mtrs
YES / NO
..mtrs
vii) Whether soil investigation carried out at this location or nearby location
Page 3 of 12
Loc. No.
viii) If this location strata details are comparable with above soil
investigation reports or any other location of this line
Loc. No.
mtrs
.kg/m2
d) Angle of Repose ()
degrees
Actual
Remarks / Reasons :
FOR CONTRACTOR
FOR POWERGRID
Signature
: ___________________
Signature
: ___________________
Name
: ___________________
Name
: ___________________
Designation : ___________________
Designation
: (E1 / E2 / E3)
Date
Date
: ___________________
: ___________________
Approval
Site visited on ..and details verified.
The classification of foundation is approved as ..
FOR POWERGRID
Signature
: ___________________
Name
: ___________________
Page 4 of 12
Date
Page 5 of 12
: ___________________
STUB SETTING
Location No.:..
Tower Type :
Ground Level
= Angle of Deviation
PQ = Line of Bisection
YES / NO
YES / NO
YES / NO
YES / NO
.degrees
YES / NO
AC
.m
BD
.m
YES / NO
OK / NOT OK
Leg A cm
Leg B cm
Leg C cm
Leg D cm
YES / NO
FOR POWERGRID
Signature
: ___________________
Signature
: ___________________
Name
: ___________________
Name
: ___________________
Designation : ___________________
Designation
: (E1 / E2 / E3)
Date
Date
: ___________________
: ___________________
CONSTRUCTION MATERIALS
Location No.:
Tower Type :
Type of Foundation :
Sl. No.
Description
1
Quality / Quantity of sand as per approved drawings and specifications
Quantity Required
Quantity Available
Approved Source
2
Size
Acceptability
OK / NOT OK
Quality
Quality
20 mm
40 mm
3
Dimensions of Measuring box (30 cm x 30 cm x 39 cm Height)
OK / NOT OK
4
Proportions of nominal mix
Grade of
Quantity of Coarse Aggregate Quantity of Fine Aggregate
Quantity of Cement
Quantity of Water
Concrete
M-10
M-20
5
6
Dia
OK / NOT OK
Approved Source
Quality (OK/NOT
OK)
6 mm
8 mm
10 mm
12 mm
16 mm
20 mm
25 mm
32 mm
7
a)
b)
8
Form Boxes
Dimensions are as per approved drawings
Oiling of inner wall of Form Boxes
T & P and man power as per requirement are available at aite
Certificate : Material and T&P cleared for lean concreting
OK / NOT OK
OK / NOT OK
YES / NO
FOR CONTRACTOR
FOR POWERGRID
Signature
: ___________________
Signature
: ___________________
Name
: ___________________
Name
: ___________________
Designation : ___________________
Designation
: (E1 / E2 / E3)
Date
Date
: ___________________
: ___________________
LEAN CONCRETING
Location No.:
Sl. No.
Tower Type :
Type of Foundation :
Acceptability
Description
YES / NO
YES / NO
YES / NO
YES / NO
OK / NOT OK
De-watering done
Lean concreting done upto specified level and area in all the four pits
1
2
Actual
a) Make
b) Batch / Week No.
9
.Cu.m
FOR CONTRACTOR
FOR POWERGRID
Signature
: ___________________
Signature
: ___________________
Name
: ___________________
Name
: ___________________
Designation : ___________________
Designation
: (E1 / E2 / E3)
Date
Date
: ___________________
: ___________________
Tower Type :
Type of Foundation :
ACCEPTABILITY
DESCRIPTION
Reinforcement Steel
a) Quality / Quantity as per Specifications
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
f) Steel is clean & free from loose rust or any other foreign materials
YES / NO
OK / NOT OK
Form Boxes
a) Dimensions as per approved drawing
OK / NOT OK
OK / NOT OK
YES / NO
YES / NO
YES / NO
FOR CONTRACTOR
FOR POWERGRID
Signature
: ___________________
Signature
: ___________________
Name
: ___________________
Name
: ___________________
Designation : ___________________
Designation
: (E1 / E2 / E3)
Date
Date
: ___________________
: ___________________
Type of Foundation :
Acceptability
Description
Mix Ratio
Tower Type :
YES / NO
YES / NO
YES / NO
Mixing done by
a) Mixer (Running time - 2 min.)
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO
OK / NOT OK
YES / NO
As per Design
Actual
a) Make
b) Batch / Week No.
9
YES / NO
Tower Leg
No. of Cubes
A
10
C
D
Page11 of 12
Sl. No.
Acceptability
Description
11
YES / NO
12
YES / NO
13
14
YES / NO
YES / NO
YES / NO
YES / NO
15
16
17
18
19
20
YES / NO
YES / NO
YES / NO
YES / NO
Curing of backfilled earth & chimney carried out for period as per
specification (Minimum period of curing 14 days after concreting
both in morning & evening)
a) Availability of water pump with storing arrangement for curing
purpose
YES / NO
YES / NO
YES / NO
Certificate : Foundation is cleared for Tower Erection subject to fulfilment of Part-I before
Erection and Part-II in due course as per planning
Part-I
Part-II
FOR CONTRACTOR
FOR POWERGRID
Signature
: ___________________
Signature
: ___________________
Name
: ___________________
Name
: ___________________
Designation : ___________________
Date
Date
: ___________________
Page12 of 12
: ___________________