Professional Documents
Culture Documents
LAP SPLICE
TM
2 & 2.5
3&4
Bar Color
Silver
Gold
Bar Size
3
C
FFI
TRA W
O
FL
SLIP SAFE
U-Channel Field
Installation
Manual
(1) RIB-BAK
U-CHANNEL
SIGNPOST
CURB
BASE POST TO BE
SAME WEIGHT PER
FOOT AS TOP POST
(3' 6" LENGTH)
3.0#/Ft
2.5#/Ft
2.0#/Ft
10
11
12
13
14
15
16
NOTE:
(2) RIB-BAK
U-CHANNEL
SIGNPOSTS
10
11
12
13
14
15
In triple post
LAP SPLICE
installations in
weak soil (using
4 lbs./ft. posts), a
12" w x 6" h soil
plate is required.
3.0#/Ft
x =11 - 0
x =9 - 0
x =7 - 0
4.0#/Ft
01
x =11 0
x =9 0
x =7 0
4.0#/Ft
2.5#/Ft
2.0#/Ft
01
4.0#/Ft
3.0#/Ft
2.5#/Ft
2.0#/Ft
x =11 0
x =9 0
x =7 0
(3) RIB-BAK
U-CHANNEL
SIGNPOSTS
CURB
ROADWAY
BASE POSTS
TO BE SAME
WEIGHT PER
FOOT AS TOP
POSTS (3' 6"
LENGTH)
BASE POSTS
TO BE SAME
WEIGHT PER
FOOT AS TOP
POSTS (3' 6"
LENGTH)
16