You are on page 1of 34

ELECTRICAL INSPECTION AND TEST PLAN

NO. R1111-PRC-EL-00-001
Rev. 0
PAGE: 2 / 34

Revisions report:
Revision No
0A
0

002/AR 11/11

Revision Description
Issued For Approval
Final Issue

04/10

ELECTRICAL INSPECTION AND TEST PLAN

NO. R1111-PRC-EL-00-001
Rev. 0
PAGE: 3 / 34

TABLE OF CONTENTS
1

SCOPE .......................................................................................................................................4

DEFINITIONS .........................................................................................................................4

INVOLVEMENT LEGEND AND DEFINITIONS ...............................................................4

MATRIX OF INSPECTIONS ACTIVITIES............................................................................4

ITP LIST ....................................................................................................................................5

ATTACHMENT ...................................................................................................................... 12

002/AR 11/11

04/10

ELECTRICAL INSPECTION AND TEST PLAN


1

NO. R1111-PRC-EL-00-001
Rev. 0
PAGE: 4 / 34

SCOPE

The scope of this Quality Control Plan (QCP) is to define the Electrical Installation ,Testing Activities in
accordance with KHARTOUM-MADANI 12"PIPELINE Project.
2

DEFINITIONS

For the purpose of this document the following definitions shall apply:
Client / Owner

Sudanese Petroleum Pipelines Company (SPPC)

Engineering Company

Engineering Procurement & Project Management (EPPM)

Contractor

PCC Contractor

Project

12 NPS Multi Product Pipeline from Khartoum to Madani State

Vendor / Supplier

The party(s) which manufactures and/or supplies equipment,


materials, technical Documents/drawings and services to
perform the duties specified

INVOLVEMENT LEGEND AND DEFINITIONS


H - Mandatory Hold Point For Inspection by full witness of activities .the activities cannot
proceed without witness
W - Witness: Company to be notified in advance prior to starting activity .If company does not
attend activity can proceed
S Surveillance Inspection of activities, random check to verify compliance with Project specs.
R Review: Verification of compliance with specifications by review of documentations.

MATRIX OF INSPECTIONS ACTIVITIES


Activity N
Process Description
Quality Inspection Activities
Specification/ Procedure Reference
Involvements
Report Forms

002/AR 11/11

04/10

ELECTRICAL INSPECTION AND TEST PLAN


5

ITP LIST

EL 01 :

Electrical Cables

EL 02 :

Earthing & Lightning

EL 03 :

Cathodic Protection

EL 04 :

Lighting

EL 05 :

Electrical Equipements

EL 06 :

Electrical Motors

002/AR 11/11

NO. R1111-PRC-EL-00-001
Rev. 0
PAGE: 5 / 34

04/10

NO. R1111-PRC-EL-00-001
Rev.
0
PAGE: 6 / 34

ELECTRICAL INSPECTION AND TEST PLAN

ITP N EL 01
TITLE: Electrical Cables

Activity
No
1

Process Description

Trench

Quality Inspection Activity

Survey and check the trench depth and soft sand


bedding

Specification/ Procedure
Reference
Electrical Standard Details

Inspection and Acceptance

Quality

Subcontractor Contractor Owner Records


W

EL 01-01

EL 01-02

EL 01-03

S/R

EL 01-04

Gable dressing and marking, check for physical


2

Cable verification during/after


laying

damage after laying

Gheck cable size and rating

Electrical Standard Details

Gable installation, glanding, earthing,


identification of termination

Hi-pot test on MV cables

Megger test for MV cables

Gable tray installation

Gheck installation details and layout drawings

002/AR 11/11

As per electrical standard


details
As per electrical standard
details

04/10

ELECTRICAL INSPECTION AND TEST PLAN

NO. R1111-PRC-EL-00-001
Rev.
0
PAGE: 7 / 34

ITP N EL 02
TITLE: Earthing & Lightning

Activity
No

Process Description

Installation inspection
for earthing

Quality Inspection Activity

Installation of Earthing Electrodes & Bus bar

Check correctness of cable size and of the depth

Lightning protection installation checked

Specification/ Procedure
Reference

Inspection and Acceptance

Quality

Subcontractor Contractor Owner Records

Electrical Standard Details

EL 02-01

Electrical Standard Details

EL 02-02

Earth resistance for


2

earth electrodes and

Earth resistance testing

grid checked

002/AR 11/11

04/10

NO. R1111-PRC-EL-00-001
Rev.
0
PAGE: 8 / 34

ELECTRICAL INSPECTION AND TEST PLAN

ITP N EL 03
TITLE: Cathodic Protection

Activity
N

Process Description

Installation of anodes

Installation of anode
2

junction box/Test
Points

002/AR 11/11

Quality Inspection Activity

Visual inspection

Visual inspection

Testing

Specification/ Procedure
Reference

Electrical Standard Details

Electrical Standard Details

Inspection and Acceptance

Quality

Subcontractor

Contractor

Owner

Records

EL 03-01

S/R

EL 03-02

04/10

NO. R1111-PRC-EL-00-001
Rev.
0
PAGE: 9 / 34

ELECTRICAL INSPECTION AND TEST PLAN

ITP N EL 04
TITLE: Lighting

Activity
N

002/AR 11/11

Process Description

Lighting & Area lighting


System

Quality Inspection Activity

Earthing connections completed

Base plates, fixings, support fixed as per detailed


drawing

Installation of lighting poles and fixtures

Orientation and alignment correct

Flood, road and column light, installation

Specification/ Procedure
Reference

Inspection and Acceptance


Subcontractor Contractor

Quality

Owner

Records

EL 04-01

Electrical Standard
Details

04/10

ELECTRICAL INSPECTION AND TEST PLAN

NO. R1111-PRC-EL-00-001
Rev.
0
PAGE: 10 / 34

ITP N EL 05
TITLE: Electrical Equipements

Activity
N
1

Process Description

Power Transformers

Quality Inspection Activity

Specification/ Procedure
Reference

Inspection and Acceptance

Quality

Subcontractor

Contractor

Owner

Records

Installation Inspection

Electrical Standard Details

EL 05-01

Generator

Installation Inspection

Electrical Standard Details

EL 05-02

Switchgear

Installation Inspection

Electrical Standard Details

EL 05-03

Distribution Boards

Installation Inspection

Electrical Standard Details

EL 05-04

UPS & DC Power Supply

Installation Inspection

Electrical Standard Details

EL 05-05

002/AR 11/11

04/10

NO. R1111-PRC-EL-00-001
Rev.
0
PAGE: 11 / 34

ELECTRICAL INSPECTION AND TEST PLAN

ITP N EL 06
TITLE: Electrical motors

Activity
N

Process Description

Quality Inspection Activity

Specification/ Procedure

Inspection and Acceptance

Quality

Reference

Subcontractor

Contractor

Owner

Records

Electrical Standard Details

EL 06-01

Name plate, equipment classification


and IP rating check

Motors Installation

Earthing completed and checked against


design requirements

Gland completed, spare entries plugged


cable termination are correct

002/AR 11/11

04/10

ELECTRICAL INSPECTION AND TEST PLAN

NO. R1111-PRC-EL-00-001
Rev. 0
PAGE: 12 / 34

ATTACHMENT
EL 01-01 :

Trench Release For Cables Installation

EL 01-02 :

Cables Installation Report

EL 01-03 :

MV Pressure Test Report

EL 01-04 :

Cables Tray Installation Report

EL 02-01 :

Earthing System Inspection Report

EL 02-02 :

Earth resistance Test Report

EL 03-01 :

Anode Installation Inspection Report

EL 03-02 :

Junction boxes & Test Points Installation Inspection Report

EL 04-01 :

Lighting & Small Power Socket Installation Report

EL 05-01 :

Transformer Installation Inspection Report

EL 05-02 :

Generator Installation Inspection Report

EL 05-03 :

Switchgear Installation Inspection Report

EL 05-04 :

Distribution Boards Installation Inspection Report

EL 05-05 :

Batteries & UPS Installation Inspection Report

EL 06-01 :

Electrical Motor Installation Inspection Report

002/AR 11/11

04/10

Trench Release For Cables Installation


EL 01-01
Location/System
Description
Trench/Line No
Drawing No

No

Items to be Checked

Location Of Trench As per Drawing.

Trench Depth As Per Drawing.

Trench Depth As Per Drawing.

Soil Compaction ( If Applicable).

5
6

Results

Cleanliness ( Free Of Stone, Debris, Sharp edge,


Foreign Materials..)
Sand-bed as Required

Note:

Date
Name
Company
Visa

Inspection Performed
by

Date
Name
Compan
y
Visa

Inspection Accepted by

Remarks

Cbles Installation Report


EL 01-02
Item

Description of check

Results

01

Cable is the correct type and size. As per the drawings

02

Cable glands/constant force springs are the correct type, and correctly fitted.

03

Ensure IP sealing washers & serrated washers are fitted to gland, where required

04

On single core cables, ensure that cables are earthed as shown on the contract
electrical drawings & ensure correct type of glands are fitted

05

Ensure bending radius is within the manufacturers recommendations

06

Confirm cable route and segregation are correct including verification of destination

07

Inspect cable markers throughout length, transit and end


Inspect there are no damage to cores, termination chamber layout is satisfactory,

08

core identification marker is correct and crimped satisfactory cable terminated as per
latest revision of drawing

09

Confirm spare cores and screens are terminated as per drawings

10

Inspect earth bonding is correct to design drawing

11

Ensure protective measures (Kick Plates) are fitted correctly

12

Inspect continuity and IR test of the cables

Cable N

From

To

Core to
Core

Core to
Screen

Core to
Armour

Continuity

Sub System
N

Cable N

From

To

Core to
Core

Core to
Screen

Core to
Armour

Continuity Sub System


N

TEST EQUIPMENT DETAILS:


MANUFACTURER

MODEL N.

Inspection Performed by
Date
Name
Company
Visa

SERIAL N.

Inspection Accepted by
Date
Name
Company
Visa

MV Pressure Test Report


EL 01-03
A.

INDENT/CONTRACT N:

LOCATION:

SYSTEM/DUTY:

MANUFACTURER:
N OF CORES:

SIZE:

N OF RUNS:

CONSTRUCTION:

RATING:

COLOUR:

Sl. N

Description of check sheet

Cable is correct type & size as per cable schedule.

Cable glands are correct type and installed correctly.

Ensure IP sealing washers are fitted to gland where required.

Check earth bonding is correct to design drawings.

5.

Confirm cable route and segregation are correct.

Check cable bending radius is within the

manufacturers recommendation.
Check cable markers are correct through transits and each end.

Confirm the mechanical protection is fitted as required.

Carry out HV pressure test and record the results.

10

Reconnect all cores and confirm correct phasing.

11

Confirm correct termination and fit of terminal box cover.

Remarks/Comments:

Status

Initial/Sign.

MV Pressure Test Report


EL 01-03
MV Pressure Test Results
Insulation Resistance (IR) Test (before J-IV pressure test) use 5000V Megger DC.
Between conductors

L1 - L2, L3, E Screen

L1 - L2, L3, E Screen

L1 - L2, L3, E Screen

IR - M
J-IV Pressure Test (DC voltage applied) = (

kV) Refer to manufacturer's specification for cable.

Record leakage current on page 3


Between conductors

L1 - L2, L3, E Screen

L1 - L2, L3, E Screen

L1 - L2, L3, E Screen

Leakage mA (maximum)
Duration Mins
Insulation Resistance (IR) Test (after J-IV pressure test) use 5000V Megger DC.
Between conductors

L1 - L2, L3, E Screen

L1 - L2, L3, E Screen

L1 - L2, L3, E Screen

IR - M
Note: Ensure after completing J-IV Pressure tests all cores are discharged to earth for a minimum of 1 5 minutes.
Test Equipments Used
Manufacturer/Tag N

Remarks/Comments:

Model N

Serial N

Calibration Due Date

MV Pressure Test Report


EL 01-03
Test Duration

Leakage Current (Micro-Ampere)


L1 - L2, L3, G

L2 - L3, L1, G

L3 - L1, L2, G

30 sec.
1 min.
2 min.
3 min.
4 min.
5 min.
6 min.
7 min.
8 min.
9 min.
10 min.
11 min.
12 min.
13 min.
14 min.
15 min.

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa

Remarks

Cables Tray Installation Report


EL 01-04
Equipment Tag N:
Manufacturer:
Location:
Report N:
Item
1

Inspection Activities
Tray/rack conduits and fittings are checked for quality and
conformance to specification

All cable tray supports secured

Fabrication cuts will be painted as specification

Acc.

Sharp edge of cable tray rack/conduits to be file and painted to protect the
cable

Expansion joints fitted where specified

Earth installation and continuity satisfactory

Gables tray supported at correct intervals

No excess pressure on cable tray supports

Entry points to building and field end made good

10

Gable tray/rack/conduits installed as per design and layout drawing

11

Pull ropes are installed to facilitate cable pulling where applicable

12

Gable tray/ladder labelled in accordance with contract drawings

Remarks:

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa

Rej.

Earthing System Inspection Report


EL 02-01
Equipment Tag N:
Manufacturer:
Location:
Report N:

Item
1
2

Inspection Activities

Acc.

Buried conductors and earth rods are located in accordance with the design
Conductors installed without protection are sheathed (yellow/green)
The continuity of the protective conductors (PE), equipotential conductors

and other conductors which form part of the earthing system has been
verified

5
6

Conductors rising from the floor or ground are protected by means of a


conduit section
Buries joints of conductors are protected against damp with a bitumen of
similar compound
Air terminations and down conductors for lighting protection comply with
the design

Transformer neutrals are correctly earthed

Terminals and earth bus-bars are correctly installed

Metal sheets and cable armouring are earthed

10

Bus-bar joints or conductor fixing bolts are well tightened

11

Protection against corrosion has been provided and is complete or made


good where necessary

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa

Rej.

Earth resistance Test Report


EL 02-02
Equipment Tag N:
Manufacturer:
Location:
Report N:
Earth Pit N/Ref.

Earth Resistance (Ohms)

Remarks

Earth Grid Ref.

Earth Resistance (Ohms)

Remarks

Details of Test Instrument Used:


Instrument

Manufacturer

Material/Serial Number

Inspection Performed by
Date
Name
Company
Visa

Certificate Number

Inspection Accepted by
Date
Name
Company
Visa

Anode Installation Inspection Report


EL 03-01
Equipment Tag N:
Manufacturer:
Location:
Type:

Type of Check

S.N

Yes

Check Equipment is De-Energised condition

Check the Anode bed is levelled and compact

Check Anode is installed as per drawing.

Check Anode cable is properly connected.

5
6

Date
Name
Company
Visa

No

Cable testing completed before sand filling the cable trenches/tank


foundation
After back filling put the Anode Marker at the designated place.

Inspection Performed
by

Inspection Accepted by
Date
Name
Company
Visa

Remarks

Junction boxes & Test Points Installation Inspection Report


EL 03-02
Equipment Tag N:
Manufacturer:
Location:
Type:

S.N

N J.B & T.P

Type

External Visual
Inspection

Internal Visual
Inspection

Above Ground
Cables &
Termintion

1
2
3
4
5
6
7
8
9
10
11
12

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa

Remarks

Lighting & Small Power Socket Installation Report


EL 04-01
Equipment Tag N:
Manufacturer:
Location:
Type:

Item

Description of check

Verify equipment is suitable for IP rating

Verify name plate ratings etc. are correct against design data sheet or design documents

Visually inspect equipment for external damage

Check equipment fixings and mountings are secure

Check interior for damage, cleanliness and remove packing

Check earthing conforms to project specifications

Check all connections are correct, tight and cable markings are fitted

Check all equipment carries the correct circuit identification

Confirm there is no internal damage to the equipment

10

Confirm equipment has been installed in a maintainable position

11

Confirm correct lamp rating where fitted

12

Confirm glasses or covers are not cracked or broken

13

Confirm correct location and height against layout drawings

14

Confirm covers can be removed easily

15

Confirm outlet cannot be energized whilst the plug is removed

Results

Item

Description of check

Results

16

Flood, road and column light, installation orientation and alignment correct

17

Confirm all cables have been glanded correctly and to manufactures requirements

Remarks/Observations:

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa

Transformer Installation Inspection Report


EL 05-01
Equipment Tag N:
Manufacturer:
Location:
Type:
Serial N:

Item

Description of check

Inspect the transformer for mechanical damage

Verify name plate ratings etc. are correct against design data sheet or design documents

Inspect foundation fixing details and plinth level

Check transformer assembly as per General Arrangement Drawing

Check interior for damage, cleanliness and remove packing

Check earthing conforms to project specifications

Inspect all bushings, radiator fins, joints for leakage

Inspect and ensure cleanliness of all marshalling boxes, junction boxes, etc.

Confirm there is no internal damage to the equipment

10

Confirm equipment has been installed in a maintainable position

11

Check polarity of transformer terminals

12

Inspect bolting and gaskets, and that weatherproofing of all marshalling boxes, junction boxes,
etc and ensure that requirements of relevant specifications are met

13

Operation check of protective devices

14

Buchholz rely

15

Pressure relief device

Results

Item

Description of check

16

Oil level gauge

17

Oil temperature indicator

Results

Remarks/Observations:

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa

Generator Installation Inspection Report


EL 05-02
Equipment Tag N:
Manufacturer:
Location:
Type:
Serial N:

Item

Description of check

Confirm that the equipment is supplied in accordance with the data sheet

Orientation and alignment correct

Auxilliary item installed

Fuel oil system charged

Lube oil system charged

Check earthing conforms to project specifications

Control panel installed

System free from leak and spillages.

Confirm there is no internal damage to the equipment

10

Confirm equipment has been installed in a maintainable position

11

Ensure direction of rotation is clearly marked

12

Operation check of protective devices

13

Generator stator coil

14
15

Generator rotor winding and rotary rectifier coil


Generator AC armature winding

Results

Item
16

Description of check

Results

armature winding

Remarks/Observations:

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa

Switchgear Installation Inspection Report


EL 05-03
Equipment Tag N:
Manufacturer:
Location:
Type:
Serial N:

Item

Description of check

Results

Ensure that pre-commissioning checks have been carried out and the relevant Construction
Test sheet completed

Manufacturer's Test Sheets are available

Current Transformer test satisfactory

Voltage Transformer test satisfactory

Circuit Breaker test satisfactory

Busbar ducter test satisfactory

Check all trip signals to the LV Switchgear

Close Bus-section switches and check outputs.

Confirm there is no internal damage to the equipment

10

Confirm equipment has been installed in a maintainable position

11

Armature winding

Remarks/Observations:

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa

Distribution Boards Installation Inspection Report


EL 05-04
Equipment Tag N:
Manufacturer:
Location:
Type:

Item

Description of check

Results

Inspect DB for mechanical damage

Check DB nameplate details

Inspect DB for cleanliness and to ensure correct connections

Check safety features like separation sheets, door, isolator and padlock operations

Inspect to ensure that the weatherproofing is in accordance with the relevant specifications

Check wiring and ferruling in accordance with wiring/schematic diagrams

Check rating of MCCBs, MCBs, ELCB and fuse

Check operation of ELCB

Check earthing connections inside the DBs

10

Inspect cable gland for suitability and tightness

Remarks/Observations:

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa

Batteries & UPS Installation Inspection Report


EL 05-05
Equipment Tag N:
Manufacturer:
Location:
Type:

Item

Description of check

Check all equipment is suitable for area

Verify equipment is suitable for IP rating & is supplied as per the data sheet

Verify name plate details against data sheet

Visually inspect equipment for external damage

Check equipment fixings and mountings are secure

Check inside of the equipment is clean, dry and silica gel etc. has been removed

Check all doors can be opened and are not obstructed

Internally inspect the Inverter for damage

Check outgoing distribution is complete and correctly identified

10

Ensure outgoing isolators / MCB s are isolated

11

Confirm main isolator is lockable

12

Check all equipment carries the correct circuit identification

13

On completion of all cable glanding confirm spare entries are correctly plugged

14

Check gaskets and seals are not damaged

15

Check all bolts are correct and none are missing

16

Verify nameplate details against data sheet..

Results

Item

Description of check

17

Visual inspect equipment for external damage.

18

Check equipment fixings and mountings are secure.

19

Inspect for alignment and secure fixings.

20

Check all terminals and links are secured identified. And clean.

21

Check all bolts are correct and none are missing.

Results

Remarks/Observations:

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa

Electrical Motor Installation Inspection Report


EL 06-01
Equipment Tag N:
Manufacturer:
Location:
Type:

Item

Description of check

Results

Inspect motor for mechanical damage.

Ensure that name plate details conform to design data.

Inspect terminal box fixing bolts.

Rotate rotor by hand and check free movement.

Ensure all control and aux. wiring connection done as per IFC drawing.

Check the cable earth wire or armour earth connections inside the terminal box.

Ensure earthing of motor done and connected to main grounding system.

Ensure all cable glands are secured.

Ensure that all cables identify correctly and terminated as per drawing.

10

Check the motor coupling is tight

11

Check that spare cable entries are plugged

Remarks/Observations:

Inspection Performed by
Date
Name
Company
Visa

Inspection Accepted by
Date
Name
Company
Visa