CONSTRUCTION OF CHECK DAM GOVERNMENT HALLA NEAR EJ BASAPURA ,

PAGADADINNI VILLAGE IN SINDHANUR TALUK, RAICHUR DISTRICT.

DESIGN DETAILS OF CHECK DAM


I) Calculation for maximum flood discharge by Ryvey's formula
Q = CM2/3
Where, Q = Discharge in cumecs.

M = Catchment area in Km2=


6 Sq.km

Q
Say

C = Ryves Constant =
=
=
Q=

9.75
32.19
33.00

9.75
x

Sq.km
( Pg No.23 of Minor Irrigation Manual ).
6

^ 2/3

Cumecs

II) Calculation for maximum flood discharge by Area- Velosity Method:Q=AV


Where, Q = Discharge in cumecs.
A = Area in Sq mt
V =Velosity in mt/sec
n = Co efficent of roughness= 0.033
R = Hydraulic Radian = A/P
A= C/s
30.00 Sqm
A= Average cross section
Depth of flow

P= Wetted Perimeter=
S=
U/S Nala Bed Level
D/S Nala Bed Level

0.65
60.100
99.434
98.783
0.651
280
0.00232

Difference Length
Existing Bed Slope =
R = Hydraulic Radian = A/P
R=
0.499
V= (1/0.033)
x
0.852
x
0.048
V=
30.30
x
0.852
x
0.048
V=
1.25 Mtr/sec
Q=
30.00
x
1.25
Q=
37.36 Cumecs
Say QSay Q=92
37.00
Cumecs
Cumecs
Compare with above two cases , consider Maximum Discharge Q=

37.00 Cumecs

III) To Find Length of check Dam


Discharge over weir when top width is < 1.00m.
Q =1.84 L H3/2
Where,Q = Discharge in cumecs.
L = Length of Check Dam in mtrs
H = Spillage over weir=

1.00 mts

1.84 x L x1
37.00
L=
20.1087
Say L=
21.00 mtr
3/2

As per site condition consider Length of weir L=

IV) Design of Weir Wall


Discharge over weir when top width is < 1.00m.
Q =1.84 L H3/2
Where,Q = Discharge in cumecs.
L = Length of Check Dam in mtrs=
H = Spillage over weir in mtrs
H =.
0.97

21.00 mt

21.00 Mtr

V)
Maximum Flood Discharge :Check Dam considered as a Submerged Type , Accordingly Maximum Discharge as
shown below
Q = 2/3 XCd1 X L X Squrt (2g) X (h1- h2) 3/2 + Cd2 X L X h2 X Sqrt (2g(h1-h2))
Where

h1 = Height of Water Upstream side above crest


0.97
h2 = Height of Water Downstream side above crest
0.3
L = Length of Weir
Cd1 = 0.577 (As per Civil Engineer HANDBOOK By Sri Vazarani Page NO 437)
Cd2 = 0.80

=(
+
Q=

0.67
x
0.577
X
21.00 X
4.429 X
0.8
x
21.00
X
0.300 X
3.63 )
38.08
Cumecs is >
37.00 Cumecs
There fore design structure is safe
V) Calculation of maximum Scour depth
Regime Scour Depth, Ds =
0.473 (Q/ Ksf) 1/3
Where, Q = Flood Discharge =

0.55

37.00 Cumecs.

Ksf = Lacys Silt factor = 1.00 ( for Medium sand as the type of Bed material, Pg No.197 of
EngineersHand book)
Therefore, Ds = 0.473 x [ 37.00 / 1.00 ] 1/3
Ds

1.56 Mt

Maximum Scour depth = 1.5 x Scour depth ( For Moderate Bend - Pg No.197 of Engineers Hand Book ).

Dm

Dm

Dm

1.5

1.5

2.34 Mt

X
X

Actual Foundation Level = HFL Dm

= 101.07
=
98.74
99.70

Ds.

1.56
-

2.34

Crest Level of Check Dam


Which is below the lowest Nala Bed Level
98.674
So Provide 1.80 Mt Foundation below Nala Bed
Required Foundation Level =
98.674
1.80
=
96.87 Provide @ 1.8m below NBL i.e.
There Fore the required foundation levelis below than the Nala bed level, Hence OK.
Height of check dam =
3.00 m
V) Design of Bodywall:Top Width of the Weir m( Assumed ).
0.80 m
Bottom width of Weir = 0.80 x h + Top width.
3.20 mts

Surface area for steel=


Steel required=

693.00 kgs

3.00

3.60

C) Abut ments :
Height of Abutment=
Surface area for steel=
Steel required=
F) U/S Cutoff Wall

2.44 mtr

Height of Cutoff Wall =

101.07

G) D/S Cutoff Wall

U/S Scour Depth =2.00 d =

3.25 mtr

Height of Cutoff Wall =

101.07

Where as we provide 1.70mts


VI) Design of Stilling Basin and Aprons:Calculation of Creep Length:
Creep Length L= C*HL
Where,

96.7

6.60

4.87 M

2.77
2671.13 kgs

U/S Scour Depth =1.5 d =

1.8

1.97

5.85

2.44

98.63

3.25

97.82

10.60

0.04 Provide

0.85 Provide

1.20 m

1.70 m

= Bligh's Creep Co-efficent , For Coarse sand (south Indian rivers)=12

HL =Maximum Head Loss, i.e Height of weir above low water

The Length of creep required including creep along cutt-off


L= C*HL
= 12.00
x
0.97
L= 11.658 m
Length of downstream floor is
L2= 2.21* C *Sqrty (HL/13)
= 2.21
x
12
x
= 7.25 m
But actually we provide 5.00 mt Length Solid cushion
To calculate Head over the weir when High Flood discharge is passing

0.2734

q= 1.70 (H) 3/2


Where, q = Flood Discharge =
37.00 Cumecs.
L= Length of Weir=
21.00 m
q= Q/L
= 1.76

H 3/2
1.76
=
1.8
x
H= 0.99 m
Head over the crest 0.99 mt
Crest level=
99.7
U/S HFL (assuming Nala Bed Level is 99.225 and crest level
100.69
Total Height
=
4.89
m
Then

Ksf = Lacys Silt factor = 1.35 ( for Medium sand as the type of Bed material, Pg No.197 of
EngineersHand book)
2
Therefore, Ds = 1.35 x [q / f ] 1/3
( from Text Book of Irrigation and Hydraulic structures by S.K Garge
Where,
f=1
page 554)
Ds = 1.35 x [q2 / f ] 1/3

Ds

=
=

1.35
1.63

x
mt

(=/1)^0.33

=
1.63
Mt
Maximum Scour depth = 1.5 x Scour depth ( For Moderate Bend - Pg No.197 of Engineers Hand Book ).
Dm
=
1.5
X
Ds.
Dm

Dm

1.5

=
2.44 Mt
Level of Bottom of U/s cut off wall = 100.69
=
98.24
mt

1.63

2.44

Now, Total Creep Length except U/S floor


= 10.31 Mtr
L1= Creep Length -Total Creep Length provided except U/S floor
=
11.658
10.31
L1=
1.35
mt
So provide
0.67 mt
Total Creep Length provided = 10.31
+
0.67
= 10.98 mt
Provide Length is More Than Creep Length
L2+L3= 18 *C* SQRT( (HL/13)*(Q/75))
Where L3

Length of Loose Talus in D/S

L2+L3= 18 x 12 sqrt ((1.24/13)*(2.425/75))


=
9.12
But L2 7.25
mt
L3
L3

9.12

=
1.87
mt
AS Per site codition the solid apron is
And Provide Loose talus in U/s
say
Total Length of creep provided= L1+L2 +L3 +L4
= 13.92

7.25
3.5 m
2.5 m

mt

VII)Thickness of Apron:Rate of Change of Uplift Pressure = =


0.36 kscm
(a)Uplift Pressure at A =
1.86
Thickness of Concrete Required =
0.39 m
However Provide
0.45 m
However 0.25 mtr. th. M15 and 0.20mtr. th. M20 for cushion bed.
(b)Uplift Pressure at B =
Thickness of Concrete Required = .
However Provide
Provide 0.25 m thick M-15cc and 0.20m thick M-20cc

0.93

0.97
0.48
0.20
0.25 m

Section officer
Assistant Executive Engineer
P.R.E. Sub Division
SINDHANUR

Executive Engineer
P.R.E.DIVISION
RAICHUR