Professional Documents
Culture Documents
Work Instruction
Trigger
Perform this procedure when no further asset transactions are to be posted for a fiscal year.
Prerequisites
All asset transactions have been posted for the fiscal year to be closed.
The Periodic Asset Posting transaction (ASKB) has been run for the last time for the fiscal
year.
The Depreciation Posting transaction (AFAB) has been run for the last time for the fiscal year.
Menu Path
N/A
Transaction Code
AJAB
Helpful Hints
7/27/20118:54 PM
Page 1 of 14
AJAB
Work Instruction
Start the transaction using the menu path or transaction code. The Year-end closing Asset
Accounting screen displays.
2.
R/O/C
R
Description
Company code represents an independent accounting
entity. There is only one Company code for the City of
Portland: "COP1."
Example:
COP1
7/27/20118:54 PM
Page 2 of 14
AJAB
Work Instruction
R/O/C
Description
Closes the fiscal year rendering it unavailable for posting or
changes to depreciation and asset values.
Example:
2007
3.
4.
Limitation online
5.
Click Yes
displays.
7/27/20118:54 PM
. The Year-end closing Asset Accounting for fiscal year XXXX screen
Page 3 of 14
AJAB
Work Instruction
6.
7/27/20118:54 PM
Page 4 of 14
AJAB
Work Instruction
7.
R/O/C
R
Description
Company code represents an independent accounting
entity. There is only one Company code for the City of
Portland: "COP1."
Example:
COP1
7/27/20118:54 PM
Page 5 of 14
AJAB
Work Instruction
R/O/C
Description
Closes the fiscal year rendering it unavailable for posting or
changes to depreciation and asset values.
Example:
2007
8.
9.
. The
R/O/C
Output Device
Description
Program or machine that produces documents (e.g., LOCL
- Local printer).
Example:
LOCL
7/27/20118:54 PM
Page 6 of 14
AJAB
Work Instruction
displays.
Information
. The dialog box closes, with the printing format defaulted to 65 lines by
132 columns.
Background Print Parameters
7/27/20118:54 PM
Page 7 of 14
AJAB
Work Instruction
A date/time every year could automatically open the new fiscal year and carry forward all
asset values.
The system displays the message, Background job was scheduled for program XXXX.
7/27/20118:54 PM
Page 8 of 14
AJAB
Work Instruction
7/27/20118:54 PM
Page 9 of 14
AJAB
Work Instruction
7/27/20118:54 PM
Page 10 of 14
AJAB
Work Instruction
7/27/20118:54 PM
check box .
Page 11 of 14
AJAB
Work Instruction
displays.
7/27/20118:54 PM
Page 12 of 14
AJAB
Work Instruction
7/27/20118:54 PM
Page 13 of 14
AJAB
Work Instruction
7/27/20118:54 PM
Page 14 of 14