1. Introduction
2. Description of ATS
SWITCHING:
Main supply
available
Main supply
missing
Generator
start-up
Emergency
supply
available
Supply
from an
emergency line
Absence of generator
BACK-SWITCHING:
Main supply
returns
Opening
of CB on
emergency line
Supply
from
the main line
Generator
switch-off
(if present)
* this analysis must be performed according to the type of load and the type of installation considered
** in the case of ATS022, you can decide whether to remain on the switched emergency line once the initial conditions have been restored by activating the dedicated function (no priority line set to on).
2. Description of ATS
UL2
UL3
thermal stress
With ATS021:
MIN/MAX: +/-10%, +/-15%,
+/-20%, +/-30%
With ATS022:
MIN: -30%-5% di Un,
MAX: +5% +30% Un
with step 1% Un
Voltage imbalance
U
UL1
UL2
UL3
No adjustment required
With ATS022:
MIN: -10% -1% di fn
MAX: +1% +10% di fn
with step 1%
Phase loss
U
UL1
UL2
UL3
IL3
No adjustment required
t
The following table shows the connections to the power supply source for both the main and emergency lines.
ATS021
ATS022
Settings
Measurements
Settings
ON
1
DIP
3
X12
4 3 2 1
X12
4 3 2 1
Edit
LINE 1
L1 N
X12
4 3 2 1
Measurements
S24
X14
2 1
Single-phase
system
L
N
Supply
2 1
X13
L
N
L1
L2
LN2 L3
N
Supply
4 3 2 1
X11
Connections
Measurements
Cancel
LINE 2
L1 N
LN1
2 1
X41
3 phases without N
LINE 1
L1 N
L1
L2
L3
N
L
N
Number of phases
DIP
L1
L2
L3
N
LN1 LN2
LINE 2
L1 N
L1
L2
L3
N
L
N
LN1 LN2
L1
L2
L3
N
X12
4 3 2 1
ON
L1
L2
L3
N
Measurements
X12
4 3 2 1
S24
LINE 2
L1 L2 L3
LINE 1
L1 L2 L3
Measurements
Measurements
L
N
(*)
X14
2 1
2 1
X13
Supply
L
N
L1
L2
LN2 L3
N
Supply
Three-phase
system with
neutral
conductor
Measurements
(*)
4 3 2 1
X11
Connections
LN1
Edit
Measurements
LINE 2
L1 L2 L3
LINE 1
L1 L2 L3
L1
L2
L3
N
Measurements
4 3 2 1
X11
X12
4 3 2 1
Cancel
Supply
Measurements
3 phases with N
Supply
Number of phases
DIP
4 3 2 1
X11
Settings
L1
L2
L3
N
LN1 LN2
L
N
4 3 2 1
X11
2 1
X13
S24
ON
L1
L2
L3
N
2 1
X41
L
N
Supply
L
N
LINE 2
L1 L2 L3 N
LINE 1
L1 L2 L3 N
2 1
X41
Three-phase
system with
neutral
conductor
L1
L2
LN2 L3
N
X14
2 1
Connections
LN1
Supply
4 3 2 1
X11
L1
L2
L3
N
Measurements
Measurements
LINE 2
L1 L2 L3 N
Supply
LINE 1
L1 L2 L3 N
Number of phases
1 phase
Cancel
Edit
* The characteristics of the external transformer for sole supply of ATS021 are:
- transformer (from network voltage to phase voltage)
- isolation transformer or insulator
- the Sn of the transformer must be 40VA.
NOTE: ATS022 allows the main and emergency networks to be set as two different types of network (e.g. main line 3P+N and emergency line PN).
2. Description of ATS
Switching logics
Since the ATS can control different plant engineering configurations, the following pages describe the sequences of operations carried out by this unit. Special attention is given to the
most common plant engineering configurations that the ATS
can manage. These configurations are:
a transformer for the main line and a generator for the emergency line
Setting range
Time delays
TS
Description
ATS021
ATS022
Remarks
0...30s
ATS021
TF
ATS022
3.5s
fixed
0..60s
0...30s
o
300s
0...59s
1,2,3...
30min
3.5s
fixed
0..60s
The time delay before the circuit-breaker on the main line closes, after the circuit-breaker on the emergency side has opened,
must be as short as possible so as to reduce the time in which
the loads are not supplied to the minimum.
TCE
TBS
ATS021
TF
ATS022
TCN
TC
TGoff
0...30s
o
300s
0...59s
1,2,3...
30min
The time delay before the generator (if installed) switches off
should be long enough to ensure that it is still running should a
further power failure occur in the main network.
Time delays
TS
TS
TCE
TS
TCE
TS
TBS
TCE
TS
TBS
TCE
TCN
TBS
TCE
TCN
TBS
TGoff
TCN
TBS
TGoff
TCN
TGoff
TCN
TGoff
TGoff
Description
Time delay before the
switching procedure
starts with generator
start-up.
Setting
range
Setting
examples
030s
5s
Transformer for the main line and generator for the emergency line
According to the operating logic, under standard operating
conditions, the network is powered by transformer TR1 and, if
a failure occurs, the loads are supplied by the emergency line
through the GS1 (generator able to deliver the same current
as the transformer).
Wiring diagram
TR1
normal
line
060s
1s
Switching logic
G GS1
stand by
QF1
QF2
QF3
059s,
1,2,330min
45s
060s
1s
Generator switch-off
time.
0...59s,
1,2,3...30min
5 min
QF1
QF2
Normal
Emergency
line
ATS
to the loads
O = circuit-breaker open
I = circuit-breaker closed
2. Description of ATS
GS1
G stand-by
normal
line
TR1
QF1
(open)
QF1
TR1
TCN
stand-by line
ATS
TBS
QF2
TS
normal
line
QF1
(open)
TCN
to the loads
TGoff
normal
line
QF1
(open)
ATS
GS1
stand-by
line
QF2
(open)
QF1
(open)
TCN
(open)
TGoff
TCEATS
normal
line
QF1
(closed)
GS1
stand-by
line
QF2
TC
TBS
(open)
to the loads
TCN
The ATS waits for set delay TCE
(TF for ATS021) to elapse.
TCE
ATS
QF2
TGoff
TCE
TR1
to the loads
TS
normal
line
stand-by
line
TCN
TS
TC
TBS
TR1
ATS
GS1
TC
to the loads
TBS
(open)
TR1
TBS
TS
(closed)
(closed)
to the loads
(open)
to the loads
QF1
QF2
TS
TCE
QF2
(closed)
normal
line
line
ATS
line
ATS
TR1
TCE
GS1
G stand-by
normal
line
GS1
stand-by
line
QF2
(closed)
TGoff
to the loads
TC
TGoff
normal
line
QF1
GS1
TC
TR1
stand-by
line
ATS
(closed)
V
QF2
(open)
to the loads
LINE 2
ATS 021
L1 L2 L3 N
LN2
L1
L2
L3
N
X12
4 3 2 1
LN1
Measurements
L1
L2
L3
N
Measurements
4 3 2 1
X11
L1 L2 L3 N
X14
2 1
L
N
Output to control
Gen Start/Stop
Logic
enabled/disabled
DI3
DI1
DI2
DI
Supply
4 3 2 1
X31
YO
COM
D07
D08
X23
3 2 1
X61
YC
Alarm
signaling
X24
3 2 1
COM D06
D03 COM
D04 D06
X25
3 2 1
COM D05
D01 COM
D02 D05
3 2 1
X21
+
YC
L
N
3 2 1
X22
Supply
X13
Supply
2 1
YO
State QF1-QF2
Logic
enabled/
disabled
input
COM
2. Description of ATS
The following figures give an overall view of the connections between ATS022 and all the components involved in transfer
switching (three-phase system + neutral conductor).
LINE 1
LINE 2
9 8 7 6 5 4 3 2 1
X32
YC
X31
1 Logic enabled/disabled input
2 State QF1
3 State QF2
4 COM
X12
4 33 2 1
X24
3 2 1
X23
3 2 1
D011
COM
D011
D06
D07
D08
D09
D010
D012
COM
X29
7 6 5 4 3 2 1
DI13
DI11
DI12
DI
Supply
L1
L2
L3
N
DI11
DI10
DATA B
DI9
DATA A
DI8
CND
DI7
DI6
DI5 Earth
DI4 connection X61
DI
Supply
Output to control
Gen Start/Stop
Modbus
X51
3 2 1
YO
COM
D03
D04
L1 L2 L3 N
3 2 1
X21
YC
COM
D03
D04
3 2 1
X22
D005 Start
COM
D005 Stop
4 3 2 1
X31
2 1
X41
Measurements
CP-E 24/0.75
Supply
YO
L1
L2
L3
N
LN1 LN2
Measurements
AUX*
ATS 022
4 3 2 1
X11
L1 L2 L3 N
X32
X29
1 Alarm signaling
2 Programmable input
2 Not used
3 Not used
4 Generator alarm
4 CB alarm signaling
5 QF2 inserted
6 QF1 inserted
7 QF2 tripped
7 COM
8 QF1 tripped
9 COM
* External AUX power supply only if:
- Modbus communication is required
- 16 2/3 Hz rated frequency
- use in single-phase systems with Un=57.5.109Vac
Network settings
Network specification:
transformer line: 400Vac, three-phase+N
generator line: 400Vac, three-phase +N
frequency: 50Hz
System configuration
with ATS021
S24
ON
DIP
Generator in use
1
Electrical system
3F+N
DIP
3
DIP
3
ON
Rated frequency
50Hz
DIP
3
Rated voltage
Rated frequency
Number of phases line 1
Rated frequency
Number of phases line 1
Number of phases line 2
Rated voltage
Rated frequency
Number of phases
Number of phases
3 phases with N
Edit
Number of phases
3 phases with N
Edit
Rated frequency
50 Hz
Cancel
No settings
to be carried out
Edit
Cancel
Generator in use
Cancel
S23
Generator usage
Cancel
S24
ON
S24
ON
System configuration
with ATS022
Edit
Protection devices
Protection devices
Line priority
Generator usage
2 CBs
Cancel
S23
ON
DIP
Network voltage
Edit
Rated voltage
400/230 V
Cancel
Edit
2. Description of ATS
Wiring diagram
TR1
normal
line
QF1
stand-by
line
QF2
QF3
TR1
normal
line
TR2
ATS
QF1
stand-by
line
(open)
to the loads
The ATS waits for set delay TS
to elapse
TS
QF1
QF2
Normal
Emergency
TR1
TCE
QF1
(open)
ATS
TBS
stand-by
line
QF2
(open)
I = circuit-breaker closed
TCE
TGoff
to the loads
TR1
QF1
(open)
TR2
TBS
TC ATS
stand-by
line
TCN
(closed)
normal
line
QF2
to the loads
TGoff
V
QF1
(open)
TR2
normal
line
O = circuit-breaker open
The ATS monitors the main network and when a fault occurs
it waits for set TS time to elapse, after which it transmits an
opening command to circuit-breaker QF1 (main circuit-breaker of the main supply). If an emergency power supply is available, once the TCE time setting (TF for ATS021) has elapsed,
the ATS transmits a closing command to circuit-breaker (QF2)
on the emergency line.
In these conditions, the installation is supplied by transformer
TR2 and circuit-breaker QF2 becomes the circuit-breaker on
the supply side of all the outgoing feeders.
QF2
(closed)
Switching logic
TR2
ATS
TR2
normal
line
ATS
TS
stand-by
line
QF2
(closed)
to the loads
TCE
The ATS waits for set delay TBS
to elapse
TBS
TR1
TS
QF1
(open)
TR2
TCN
stand-by
line
TCE
TGoff
(open)
normal
line
ATS
QF2
to the loads
TBS
TC
The ATS waits for set delay TCN
(TF for ATS021) to elapse
TCN
TR1
TGoff
normal
line
QF1
(closed)
ATS
TC
to the loads
TR2
stand-by
line
QF2
(open)
LI NE 1
LINE 2
ATS 021
L1
L2
L3
N
L
N
LN2
X12
4 3 2 1
LN1
Measurements
L1 L2 L3 N
Supply
L1
L2
L3
N
Measurements
4 3 2 1
X11
L1 L2 L3 N
X23
3 2 1
X24
3 2 1
Logic
enabled/disabled
DI3
DI1
DI2
DI
Supply
4 3 2 1
X31
YO
COM D06
D03 COM
D04 D06
+
YC
COM
D07
D08
X25
3 2 1
COM D05
D01 COM
D02 D05
X61
YC
3 2 1
X21
3 2 1
X22
L
N
X14
2 1
X13
Supply
2 1
YO
Alarm
signaling
X31
1 Logic enabled/disabled input
2 State QF1
3 State QF2
4 COM
2. Description of ATS
The following figures give an overall view of the connections between ATS022 and all the components involved in transfer
switching.
LINE 1
LINE 2
9 8 7 6 5 4 3 2 1
X32
YC
X31
1 Logic enabled/disabled input
2 State QF1
3 State QF2
4 COM
2 Programmable input
3 Command to force transfer switching
6 QF1 inserted
7 QF2 tripped
8 QF1 tripped
9 COM
X12
4 33 2 1
X23
3 2 1
Supply
4 Generator alarm
D06
D07
D08
D09
D010
D012
COM
DI11
DI10
DATA B
DI9
DATA A
DI8
CND
DI7
DI6
DI5 Earth
DI4 connection X61
DI
Supply
X32
5 QF2 inserted
* External AUX power supply only if:
- Modbus communication is required
- 16 2/3 Hz rated frequency
- use in single-phase systems with Un=57.5.109Vac
DI13
DI11
DI12
DI
Supply
X24
3 2 1
YO
COM
D03
D04
D011
COM
D011
X29
7 6 5 4 3 2 1
COM
D03
D04
L1
L2
L3
N
Modbus
X51
3 2 1
YC
3 2 1
X21
3 2 1
X22
D005 Start
COM
D005 Stop
4 3 2 1
X31
2 1
X41
L1 L2 L3 N
CP-E 24/0.75
Measurements
YO
L1
L2
L3
N
LN1 LN2
Measurements
AUX*
ATS 022
4 3 2 1
X11
L1 L2 L3 N
X29
1 Alarm signaling
2 Not used
3 Not used
4 CB alarm signaling
5 Manual mode signaling
6 Logic enabled/disabled signaling
7 COM
Network settings
Network specification:
transformer line 1: 400Vac, three-phase+N
transformer line 2: 400Vac, three-phase+N
frequency: 50Hz
System configuration
with ATS021
S24
ON
DIP
3
1
Electrical system
3F+N
DIP
3
DIP
3
ON
Rated frequency
50Hz
DIP
3
Rated voltage
Rated frequency
Number of phases line 1
Rated frequency
Number of phases line 1
Number of phases line 2
Rated voltage
Rated frequency
Number of phases
Number of phases
3 phases with N
Edit
Number of phases
3 phases with N
Edit
Rated frequency
50 Hz
Cancel
Edit
Cancel
No settings
to be carried out
No generator
Cancel
S23
Generator usage
Cancel
S24
ON
S24
ON
System configuration
with ATS022
Edit
Protection devices
Protection devices
Line priority
Generator usage
2 CBs
Cancel
Edit
S23
ON
DIP
Network voltage
Rated voltage
400/230 V
Cancel
Edit
2. Description of ATS
Switching logic
GS1
G stand by
TR1
normal
line
line
QF1
QF2
QF3
Normal
Emergency
O = circuit-breaker open
non-priority loads
prority loads
I = circuit-breaker closed
The 022 version of the ATS must be used for this type of
configuration.
The operating sequences are the same as the previous ones
(depending on whether a generator or a transformer are
installed).
The only difference is that if the CB+NPL Bus Tie function is
enabled via the display and there is a line voltage failure, besides transmitting the opening command to the main circuitbreaker, the ATS also transmits an opening command to the
bus-tie (after time delay TC has elapsed).
When the network conditions return within the rated parameters, the ATS starts the back-switching procedures to allow
the installation to return to its initial conditions (main circuitbreaker and bus-tie closed).
G GS1
stand-by
normal
line
TR1
line
QF1
QF1
QF2
(open)
(closed)
normal
line
line
ATS
QF1
TR1
TCN
normal
G GS1
stand-by
TBS
(closed)
TBS
priority
loads
TS
V
priority
loads
TCE
QF3
TR1
TCE
(open)
non-priority
loads
(closed)
non-priority
loads
QF3
TS
QF2
(open)
line
QF 2
(open)
G GS1
stand-by
line
line
TGoff
TS
QF1
(open)
TC
QF2
(open)
QF3
TCE(open)
priority
loads
TBS
QF3
(closed)
non-priority TGoff
loads
TC
TR1
normal
line
line
ATS
QF1
TGoff
TR1
TS
TC
(closed)
(open)
G GS1
stand-by
TCN
(open)
TCN
TGoff
TR1
TC
normal
line
line
GS1
stand-by
line
ATS
QF2
(closed)
QF1
QF2
(closed)
QF3
non-priorityTC
loads
TGoff
ATS
QF1
priority
loads
non-priority
loads
TCE
normal
line
QF2
(open)
(closed)
TBS
priority
loads
TBS
TR1
ATS
QF3
QF3
TS
line
TCE
(open)
non-priority
loads
G GS1
stand-by
normal
line
QF1
QF2
(open)
TCN
priority
loads
GS1
G stand-by
ATS
non-priority
loads
TCN
ATS
ATS
(closed)
G GS1
stand-by
normal
line
(open)
QF3
(open)
(closed)
priority
loads
non-priority
loads
priority
loads
2. Description of ATS
The following figures give an overall view of the connections between ATS022 and all the components involved in transfer
switching.
LINE 1
LINE 2
YO
9 8 7 6 5 4 3 2 1
X32
YC
X31
1 Logic enabled/disabled input
2 State QF1
3 State QF2
4 COM
DI13
DI11
DI12
DI
Supply
X12
4 33 2 1
X23
3 2 1
X24
3 2 1
Output to control
Gen Start/Stop
D06
D07
D08
D09
D010
D012
COM
DI11
DI10
DATA B
DI9
DATA A
DI8
CND
DI7
DI6
DI5 Earth
DI4 connection X61
DI
Supply
2 Programmable input
3 Command to force transfer switching
4 Generator alarm
5 QF2 inserted
6 QF1 inserted
7 QF2 tripped
8 QF1 tripped
9 COM
* External AUX power supply only if:
- Modbus communication is required
- 16 2/3 Hz rated frequency
- use in single-phase systems with Un=57.5.109Vac
Modbus
X32
1 State QF3
YO
X29
7 6 5 4 3 2 1
COM
D03
D04
D011
COM
D011
L1
L2
L3
N
X51
3 2 1
YC
3 2 1
X22
COM
D03
D04
4 3 2 1
X31
3 2 1
X21
D005 Start
COM
D005 Stop
L1 L2 L3 N
2 1
X41
Measurements
CP-E 24/0.75
Supply
YO
L1
L2
L3
N
LN1 LN2
Measurements
AUX*
ATS 022
4 3 2 1
X11
L1 L2 L3 N
X29
1 Alarm signaling
2 Not used
3 Not used
4 CB alarm signaling
5 Manual mode signaling
6 Logic enabled/disabled signaling
7 COM
Network settings
Network specification:
transformer line 1: 400Vac, three-phase+N
generator line 2: 400Vac, three-phase+N
frequency: 50Hz
System configuration
with ATS022
Protection devices
Generator usage
Line priority
Generator usage
Generator in use
Cancel
Rated voltage
Rated frequency
Number of phases line 1
Edit
Number of phases
3 phases with N
Cancel
Edit
Electrical system
3F+N
Rated frequency
Number of phases line 1
Number of phases line 2
Number of phases
3 phases with N
Edit
Cancel
Rated frequency
50Hz
Rated voltage
Rated frequency
Number of phases
Rated frequency
50 Hz
Cancel
Protection devices
Line priority
Generator usage
Protection devices
3 CBs NPL-BUS TIE
Cancel
Rated voltage
Rated frequency
Number of phases
Edit
Edit
Rated voltage
400/230 V
Cancel
Edit
2. Description of ATS
Switching logic
TR2
normal
line
normal
line
QF 1
QF 2
QF3
Normal
Failure TR1
Failure TR2
O = circuit-breaker open
I = circuit-breaker closed
The ATS monitors the networks (both TR1 and TR2) and, if a
fault occurs in one of the two transformers, the ATS022 starts
to time according to set delay TS, after which it transits an
opening command to the circuit-breaker on the secondary of
the transformer affected by the fault. After time delay TC has
elapsed, the ATS closes bus-tie QF3. Thus, all the loads are
supplied by the line (transformer) without faults.
When the electrical parameters of the faulty line return within
acceptable limits (according to the settings made) and once
time delay TBS has elapsed, the ATS starts the back-switching procedure. It opens bus-tie QF3 and then, after time
delay TCN has elapsed, commands the circuit-breaker on the
secondary of the faulty line to close.
TR2
normal
line
normal
line
QF1
QF2
(open)
(closed)
ATS
QF1
QF3
(closed)
QF2
(closed)
non-priority
TS
loads
(closed)
QF3
(open)
non-priority
loads
TS
TR2
line
QF1
(open)
TCE ATS
TBS
TBS
TCN
QF1
(open)
QF2
TR2
normal
line
normal
line
ATS
QF1
QF2
QF2
(closed)
(closed)
(closed)
QF3
(open)
QF3
(closed)
non-priority
loads
priority
loads
TC to elapse.
ATS
(open)
(closed)
non-priority
loads
priority
loads
stand by
line
QF1
QF2
TC
QF3
TR2
normal
line
normal
line
(open)
TC
TR1
TR2
normal
ATS
(open)
TGoff
TC
TR1
line
TGoff
stand-by
line
QF3
TCN
TCN
(closed)
non-priority
TGoff
loads
TBS
The ATS waits for set delay TS to
elapse.
TS
priority
loads
TCE
priority
loads
TR1
TCE
normal
normal
line
ATS
TR2
normal
line
priority
loads
non-priority
loads
priority
loads
2. Description of ATS
Fault in line 2
TR2
normal
line
normal
line
line N
ATS
QF1
QF2
(open)
(closed)
QF2
(closed)
TR2
line N
ATS
QF1
TR1
(closed)
QF3
(closed)
QF3
(open)
non-priority
loads
priority
loads
TS
TCE
TS
TR1
QF1
TBSATS
TCE
TCN
TBS
TS
TBS
TCN
TR1
line N
stand-by
line
TGoff
QF1
QF2
(closed)
(open)
TC
TGoff
QF2
(open)
QF3
(closed)
priority
loads
TCE
TBS
TR1
line N
TR2
line N
TCNATS
ATS
non-priority
loads
priority
loads
TS
stand-by
line
QF1
(open)
non-priority
loads
priority
loads
TR2
(closed)
line N
QF3
normal
line
TR2
(open)
TC
TR1
QF2
TC
QF3
TGoff
TCN
ATS
(open)
non-priority
loads
priority
loads
TCE
TR2
normal
line
(closed)
non-priority
loads
QF1
(closed)
TGoff
TC
non-priority
loads
QF2
(closed)
QF3
(open)
priority
loads
The following figures give an overall view of the connections between ATS022 and all the components involved in transfer
switching.
LINE 1
LINE 2
DI13
DI11
DI12
DI
Supply
9 8 7 6 5 4 3 2 1
X32
COM
D03
D04
YC
X12
4 33 2 1
X23
3 2 1
X24
3 2 1
D011
COM
D011
D06
D07
D08
D09
D010
D012
COM
DI11
DI10
DATA B
DI9
DATA A
DI8
CND
DI7
DI6
DI5 Earth
DI4 connection X61
DI
Supply
Modbus
X29
X32
X31
YO
X29
7 6 5 4 3 2 1
YC
3 2 1
X22
COM
D03
D04
4 3 2 1
X31
3 2 1
X21
D005 Start
COM
D005 Stop
X51
3 2 1
2 1
X41
L1
L2
L3
N
CP-E 24/0.75
L1 L2 L3 N
Measurements
YO
L1
L2
L3
N
LN1 LN2
Supply
Measurements
AUX*
ATS 022
4 3 2 1
X11
L1 L2 L3 N
1 State QF3
1 Alarm signaling
2 State QF1
2 Programmable input
2 Not used
3 State QF2
3 Not used
4 COM
4 Generator alarm
4 CB alarm signaling
5 QF2 inserted
6 QF1 inserted
7 QF2 tripped
7 COM
8 QF1 tripped
2. Description of ATS
Network settings
Network specification:
transformer line 1: 400Vac, threephase+N
transformer line 2: 400Vac, threephase+N
frequency: 50Hz
System configuration
with ATS022
Protection devices
Generator usage
Line priority
Generator usage
No generator
Cancel
Rated voltage
Rated frequency
Number of phases line 1
Edit
Number of phases
3 phases with N
Cancel
Edit
Electrical system
3F+N
Rated frequency
Number of phases line 1
Number of phases line 2
Number of phases
3 phases with N
Edit
Cancel
Rated frequency
50Hz
Rated voltage
Rated frequency
Number of phases
Rated frequency
50 Hz
Cancel
Protection devices
Line priority
Generator usage
Protection devices
3 CBs BUS TIE
Cancel
Rated voltage
Rated frequency
Number of phases
Edit
Rated voltage
400/230 V
Cancel
Edit
Edit
3. Field of application
Time delays
Setting
range
Setting example
0...30s
1s
0...60s
(TF=3.5s)
1s
(with TF=3.5s)
total
2s
(4.5s with ATS021)
Description
TS
ATS021
TF
ATS022
TCE
3. Field of application
S gen = SStrafo
Network
380 V 50Hz
ATS
Generator
non-priority loads
Network
380 V 50Hz
ATS
Generator
non-priority loads
UPS
priority loads
UPS
priority loads
4. Application example
In this case, we wish to describe a 400Vac industrial application in a three-phase system with distributed neutral, consisting of a transformer for the main line and a generator for the
emergency one. The installation includes non-priority loads
TRAFO
GEN
QF1
QF2
T5D 400
QF3
non-priority loads
priority loads
4. Application example
The following table shows the complete bill of materials, considering the choice of withdrawable circuit-breakers and all the
components required for connection to the ATS022 (220 Vac supply phase-neutral):
Q.ty
PRODUCT
ATS 022
T5 630 W FP EF
KIT W MP T5 630
T4 W FP EF 4p
KIT W MP T4
T5D 400
T5 400 W FP EF
KIT W MP T5 400
DESCRIPTION
Automatic switching device
Circuit-breaker QF1
ABBREVIATION
CODE
ATS 022
1SDA065524R1
QF1
1SDA054403R1
1SDA054771R1
Kit for converting a fixed circuit-breaker into the moving part of a withdrawable one
(QF1)
1SDA054850R1
Circuit-breaker QF2
QF2
1SDA054124R1
1SDA054746R1
Kit for converting a fixed circuit-breaker into the moving part of a withdrawable
one (QF2)
1SDA054842R1
Switch-disconnector QF3
QF3
1SDA054600R1
1SDA054758R1
Kit for converting a fixed circuit-breaker CB into the moving part of a withdrawable
one (QF3)
1SDA054846R1
ADP
1SDA054924R1
ADP
1SDA054923R1
ADP
1SDA054922R1
MOE
Stored energy motor operator T4-T5 (for circuit-breakers QF1-QF2 and bus-tie QF3)
1SDA054897R1
MOL-M
Key lock against manual operation for MOE for T4-T5 (for circuit-breaker QF2 and
bus-tie QF3)
1SDA054909R1
Q/1
1SDA054910R1
AUX SA 250V AC
AUP-I
1SDA054946R1
1SDA054950R1
Q61/1
Q61/2
2CDS284001R0064
K1
K2
KO3
KC3
MIR-P plates
S204P C6
NF22E-13
CT-AWE
S51
1SDA055050R1
S75I/1
1SDA054918R1
Q/1
Q/2
1SDA054911R1
The following connections concern the measuring and motor operator supply part of the installation:
Normal supply
from transformer
Emergency supply
from generator
N L1 L2 L3
N L1 L2 L3 Q61/2
Q61/1
5
QF1
QF2
22
A1
K1
A2
K1
21
22
XAB 5
A1
K2
A2
S2
43
K1
44
K2
44
XAB 5
3
A17
S1
S1
S3
QF1 XAB
A17
43
S2
YC
1
2
3
1
2
3
YC
X12
X11
1
2
X41
21
14
X21
K2
K2
14
1
2
3
4
13
X22
K1
13
X61
1
2
3
4
001
002
003
004
ATS022
S3
1
QF2 XAB
4. Application example
These INPUTs and OUTPUTs of the ATS must also be wired in order to complete the connection.
X12
2
3
1
2
3
Q/1
1
1
X2/XA2
S51
7
X2/XA2
X2/XA2
S51
X2/XA2
X23
D08
D09
1 QF3 command
D07
002
D010
3 Not used
D012
4 CB alarm signaling
5 Manual mode signaling
6 Logic enabled/disabled signaling
7
1
2
3
8
9
* the following functions can be associated with this input via the display menu:
forced generator start-up
activation of the automatic switching logic
remote reset
emergency lock
D06
XV S751/1 XV
001
XV S751/1 XV
D011
S15
002
S14
S13
Programmable input *
X2/XA2
001
X51
X31
X2/XA2
X32
X22
X21
D05
X24
X29
3
4
X41
4
Safety auxiliary power supply is obligatory with:
- Modbus RS485 communication
- use in systems with 16 2/3 Hz rated frequency
- use in single-phase systems with Un= 57.5.109 Vac
modbus
X11
X61
ATS022
S11
X2/XA2
Q/1
5
X2/XA2
Logic enabled
X2/XA2
Q/1
X2/XA2
Switching
contact QF1
Switching
contact QF2
Besides, the ATS must be wired as follows to command the switch-disconnector used as bus-tie:
A
16
X24
1
2
3
ATS022
18
KO3
XA2
X2
XV
21
Q2
QF3
XAB
16
Impulse-OFF
15
3
Impulse-OFF
15
XV
A17
XV
24
22
X2
XA2
S1
S2
YC
18
KC3
A1 Y2
kO3 *
A2
Once the connections have been made and the ATS has
been given the main settings regarding the network (voltage,
system, presence of generator, bus-tie, etc.), the time delays
settings must be entered accurately in order to ensure correct
switching.
Indicative time delays are given in the table below:
As it can be seen, and assuming that the generator starts
within 10 seconds from the moment the fault in the main
network occurs, the power supply becomes available for the
priority loads in about 13 seconds ( TS+10s+TCE).
S3
A1 Y2
XV
kC3 *
A2
QF3
XAB
Time delays
TS
TS
TCE
TS
TCE
TBS
TS
TCE
TBS
TCN
TS
TCE
TBS
TCN
TGoff
TCE
TBS
TCN
TGoff
TC
TBS
TCN
TGoff
TC
Setting
range
Setting
example
030s
2s
060s
1s
059s
1,2,3...
30 min.
15s
060s
1s
059s
1,2,3...
30 min.
5min.
Description
TCN
TGoff
TC
TGoff
TC
TC
ABB SACE
A division of ABB S.p.A.
L.V. Breakers
Via Baioni, 35
24123 Bergamo - Italy
Phone: +39 035 395 111
Fax: +39 035 395 306-433
www.abb.com
1SDC007408G0201 - 07/2012
Contact us