You are on page 1of 66

4/27/2012

BSEEP Seminar Energy Efficiency in Non-Domestic Buildings


Presentation 1 : Energy Efficiency in New Buildings

KLIA 2

New JKR/Ministry of Works HQ

Mercu Mustapha Kamal

The Diamond Building

Poul E. Kristensen
BSEEP Chief Technical Adviser
IEN Consultants Sdn Bhd, MD

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

The Building Sector Energy Efficiency Program (BSEEP)


BSEEP Objectives :
To make energy efficient low carbon buildings state of the art by 2015
To have 55% Energy Efficiency implemented in the Building By-Laws by 2015
KLIA 2

To have a market for energy retrofit for existing buildings by 2015


To have a series of documented EE demonstration projects by 2015
To have a general acceptance of EE principles in the building industry by 2015
Poul E. Kristensen
BSEEP Chief Technical Adviser

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

4/27/2012

Energy Efficiency in Buildings in Europe


Case Germany
.
kWh/m2year

55% down over 20 years

0
New Buildings

Building stock before


1978

1978-95 1995-2002

2002

2008/09

2012

Efficient
Homes
dena

Passive Passive
New
House
House
Buildings
(new)
(new)
2020

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

Component 5 Building EE Demonstrations


List of demonstration projects in the pipeline
1. BSEEP Demo Office at JKR : the project office for the BSEEP team
2. Tune Hotels : a new Airport Hotel at KLIA 2
3. Ipoh Hospital : Energy Retrofit of the Main Hospital Complex
4. Mercu Mustpha Kamal : A new Corporate HQ in Damansara Perdana
5. Ken Holdings : A new office building in Taman Tun Dr, Ismail
6. Ken Rimba : a Link House Development in Shah Alam
7. KKR2 : the new Ministry of Works/JKR HQ in KL
8. Rafflesia @ the Peak : New Semi-D development in Damansara Perdana
9. National Aviation Academy : A new Aviation Training Centre in Subang
10. An office retrofit project ( yet to be identified )
NSC
meeting
NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29
29 March
March 2012
2012

4/27/2012

Component 4 Information and Awareness Enhancement


Design Strategies for New Office Buildings
CK Tang, Poul Kristensen and Steve Lojuntin
2004

2012 : Develop Guidebook on EE in Buildings


Significant advances have been made in
Availability of EE components and systems
Significant advances have been made in
understanding EE design of buildings
in the tropical climate
The New Design Guide, contents :
Energy Efficiency in Architecture ( passive design)
Energy Efficiency in Mechanical, and
Electrical Systems (active design )
Integrated Energy Design of Buildings

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

Component 2 Policy Development and Regulatory Framework


MS 1525:2007
Code of Practice on Energy Efficiency
and use of Renewable Energy
for Non-Residential Buildings
A voluntary standard
An office designed as per MS 1525:2007
may still have an energy index of
~ 200 kWh/m2year

BSEEP Objectives
To update MS 1525 to target an
Energy Index of 100 110 kWh/m2year
To develop an energy rating system
for buildings ( ~ Napers in Australia)
One Star Five Star
To Implement MS1525:2014
in the Unified Building By-Laws
NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

4/27/2012

Component 1 Institutional Capacity Development


Workshop on energy renovation of existing buildings
For Government agencies and private sector ESCOs

Planning of a comprehensive Building Energy Rating and Monitoring


(BERM) Program
Implementation of online monitoring in all BSEEP Demonstration Buildings

Implementation of online monitoring in additionally 10 selected buildings,


5 in the Government Sector and 5 in the private Sector

Implementation of 5 Training Programs on Building Energy Management


( Penang, KL, JB, KK and Kuching)

2012
Preparation of Scientific Energy Management Guidelines for Government
Institutions
Implementation of multiple Training Programs on Building Energy Management
Implement online monitoring in multiple buildings, public and private
NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

Energy Management : too cold is uncomfortable and expensive !

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Polar ice is melting

Sea Water Level is increasing

Droughts and heat waves

Violent weather and hurricanes

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

4/27/2012

Malaysias Commitment to Reduce CO2 Emissions

COP 15 Copenhagen, December 2009


Malaysia wish to reduce CO2 Intensity
by 40% in 2020 compared to 2005

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

A Green Building
Energy Efficiency, Water Efficiency, Reduction of Waste, Good Indoor Air Quality IAQ

Benefits for occupants in a green and energy efficient building


Good daylight conditions
Lower energy consumption ~ lower running cost
Good and healthy indoor climate
Enhanced productivity
Less medical leave
Green image for marketing
Water
Energy
Green technologies
are visible Waste
Efficiency

Efficiency

and state-of-the-art

Management

Indoor Air
Quality

Other Green
Features &
Innovation

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

A Green Rated Building, the Tangible Benefits

Energy CO2
Waste

Water

50%

50%

60%

65%

2~
16%

Productivity

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

4/27/2012

People, Performance and Health

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

The Route to Low Carbon Buildings


3. Cleaner Fuels

2. Improve Efficiency

1. Reduce Consumption

CO2 emissions ( invincible)

Warm water

COAL

( District
Cooling )

Biomass
Coal

Electricity

Solar
Gas
Solar PV
PV

Heat loss

Coal : 0.95 kg CO2/kWh


Gas : 0.59 kg CO2/kWh
Hydro :
0 kg CO2/kWh

Malaysian fuel mix :


0.65 kg CO2 is emitted / kWh electricity

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

4/27/2012

Saving GWs is Cheaper than Building GWs

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

10

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Energy Efficiency of Office Buildings 2011


Award Winner
2006

GEO Building
Super Low Energy office building
Malaysia, 2007

210

90%
80%

Cumulative percentile

LEO Building
Low energy office building
Malaysia, 2004

BSEEP 90

100%

70%
60%

Malaysia
(41 office
buildings)

50%
40%
30%

Singapore
(95 office
buildings)

20%
10%
0%
0

50

100

150

200

250

300

350

400

450

Energy Efficiency Index (kWh/m2/year)

Source: EAEF Project 64


Project leader: National University of Singapore, 2006
Diamond Building 2010
Energy Efficient Green Mark Platinum

Shell Building Cyberjaya 2010


Energy Efficient LEED Gold

11

4/27/2012

BSEEP Target 2015 : New Buildings have an energy index 50% lower than today
Possible by 2020 : New Buildings will be Zero Energy

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Reduction of Energy Consumption in Offices


Where can the savings be achieved?

Fan Energy

Lighting

Plug Loads

Cooling

Opportunities

50 80 % reduction

Obstacles

Lack of awareness on low pressure duct design


and efficient fan design management.

Use daylight and solar control glazing


50 90 % reduction
( EE fixtures and daylight use )

Lack of knowledge on daylight design in the


tropics ( heat and glare ).

Save 30 50 %
Using EE computers

Lack of awareness on the magnitude of IT


power consumption.

Save 50 80 %
Reducing the load,
Improve efficiency ( COP ) of chiller

Lack of knowledge on chiller sizing.


Lack of knowledge regarding what the heat
loads are.

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

12

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

13

4/27/2012

Reduce Static Ventilation Electricity Load


75% Fan Energy Reduction can
be achieved!
Reduces friction lost larger
duct size.
Reduces static pressure from
1000 Pa to 200 300 Pa

Increase efficiency of Fan.


20 years old Fan efficiency 30%
Typical efficiency today 50%
Energy Efficient Fan 70%

Increase efficiency of Motor

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

14

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Typical Office Lighting Load


Bad Design
Typical Design
MS1525
KeTTHA LEO Bldg
Greentech GEO BLDG

: 25 40 W/m2
: 15 25 W/m2
: 15 W/m2
: 12 W/m2
: 4.8 W/m2

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

15

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Low Carbon Buildings : How the architects can make it happen


Orientation : protect the faade, N and S is preferable
Faade : WW-ratio : 40 50% optimal
Glazing : Double Glazing with solar control film ( spectrally selective film)
Daylight Design : allow the light in without the heat, control glare !
Thermal insulation : 50 mm in the walls, 100 150 mm in the roof
Make the building airtight and keep it that way !
Green Roofs : good, but it does not make thermal insulation obsolete
Greenery around the building to reduce local Heat Island Effect
Design the lighting system to benefit from daylight use
Integrated Design of ventilation and cooling system to optimize the energy design
BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

16

4/27/2012

Glazing in Buildings : Must be balanced and not excessive

Pullman Hotel Lobby

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

17

4/27/2012

The Green Energy Office Building


GreenTech Malaysia

Energy Index 35 kWh/m2year


First GBI Certified Building

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

18

4/27/2012

The use of Daylight as the Main Light Source

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Facade Daylighting

Fixed daylighting blind


inside double pane window
a) Blind, top surface:
Specular reflective
b) Blind, low surface:
Mat white

Mirror Lightshelf
- direct sun not reflected inside
- diffuse light reflected inside
BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

19

4/27/2012

Let the light in without the heat and without glare


98 % Daylit During Daytime

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

20

4/27/2012

Daylight is Cool
Luminous Efficacy
200
200
180
160

Lumen/watt

140

130

120

100

100
80

65

60
40
20

15

18

Incandescent Low voltage


halogen

Fluroscent
lamp

Direct
Sunshine

Clear sky
daylight

"Cool
Daylight"

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Energy Commission of Malaysia Diamond Building


31 May 2010

Green Mark Platinum Certified


1st in Malaysia
GBI Platinum Certified

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

21

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Green Roof Feature 7 : R o o f/ F l o o r S l a b C o o l i n g

Section of Typical Roof/floor slab

Floor slab cooling pipes


laid before pouring of
concrete

Manifold riser for slab


cooling pipes (PERT pipes)

22

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

22

4/27/2012

The BSEEP Demonstration Program on Energy Efficient Buildings

Proof of Concept
Proof of Technical Feasibility
Proof of Economical Feasibility

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

The BSEEP Demonstration Program on Energy Efficient Buildings


Proof of Technical Feasibility

Proof of Economical Feasibility


Performance Targets :
New housing and existing housing : A
reduction of the energy consumption of at
least 50% to be achieved, including the
use of energy efficient appliances for the
kitchen.
New non-domestic buildings
( office buildings) : reduce the Energy
Index from typically 220 kWh/m2year to
90 kWh/m2year, a reduction of 60%.
Existing non-domestic buildings
( office buildings) : Reduce the energy
consumption by 40 - 50%, depending on the
actual building.

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

23

4/27/2012

Component 5 Building EE Demonstrations


List of demonstration projects in the pipeline
1. BSEEP Demo Office at JKR : the project office for the BSEEP team
2. Tune Hotels : a new Airport Hotel at KLIA 2
3. Ipoh Hospital : Energy Retrofit of the Main Hospital Complex
4. Mercu Mustpha Kamal : A new Corporate HQ in Damansara Perdana
5. Ken Holdings : A new office building in Taman Tun Dr, Ismail
6. Ken Rimba : a Link House Development in Shah Alam
7. KKR2 : the new Ministry of Works/JKR HQ in KL
8. Rafflesia @ the Peak : New Semi-D development in Damansara Perdana
9. National Aviation Academy : A new Aviation Training Centre in Subang
10. An office retrofit project ( yet to be identified )
NSC
meeting
NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29
29 March
March 2012
2012

2012
2012

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

24

4/27/2012

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

25

4/27/2012

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

26

4/27/2012

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

27

4/27/2012

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

SEB New Headquarter in Kuching

Architect : Jurubina

28

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

29

4/27/2012

Green Cost Premium (Singapore)


Certified

Gold

Goldplus

Platinum

50 - 74

75 - 84

85 - 89

90 - 100

Cost Premium

0.3 - 1%

1 - 2%

1 - 3%

2 - 8%

Payback
Period

2 - 5 yrs

2 - 6 yrs

2 - 6 yrs

2 - 8 yrs

Green Mark
Points

Source: BCA Singapore 2008


BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Energy Efficiency and GBI rating in Malaysian Office Buildings

24%

38%

5 10 %

10 20 %

Reference : Experiences from IEN with 10+ projects in Malaysia

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

30

4/27/2012

To make energy efficient low carbon buildings state of the art in Malaysia by 2015

Thanks for your attention

www.ien.com.my
BSEEP Seminars in Kota Kinabalu and Kuching
25 and 26 April 2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

31

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Where do the Carbon Emissions Come From ?


From Cars and Power Plants

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

32

4/27/2012

Green Building Certification

Green Mark Platinum

46% reduction in
energy consumption

Achieved

35% reduction in water


consumption

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

33

4/27/2012

Does Climate Protection Pay Off ?

34

4/27/2012

World Renewable Energy Sources


Earths
Energy Consumption

Solar Energy
=
2850 x World Energy

Source:
Energy [r]evolution
A sustainable World Energy
Outlook, January 2007

35

4/27/2012

Biomass and Biofuel in Malaysia : Where does it come from ?


Palm diesel or bio-ethanol ( 2nd Generation)

Empty Fruit Bunches

Oil

Shell HQ in KL
by

MRCB
and

Hijjas KastureI architects

Gold

36

4/27/2012

Ministry of Works HQ
by

Ahmad Zaki Sdn Bhd


and

GDP Arctitects

EI :100 kWh/m2year

Platinum

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

MK Business Centre IN KL
by

EMKAY Group
and

Architects 61

Gold

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

37

4/27/2012

KL Eco City by SP Setia


Phase 1 : 2010 - 2014

LEED and GBI Certification

Target LEED Gold

The new KLIA Low Cost Carrier Terminal


The most Green Airport Terminal in Asia

38

4/27/2012

Does GREEN pay off? (USA)


LEED
LEED POINTS
ENERGY SAVINGS
ANNUAL UTILITY
SAVINGS
PAYBACK PERIOD

CERTIFIED

SILVER

GOLD

PLATINUM

23 - 27

28 - 33

34 - 44

45 - 61

25 35%

35 50%

50 60%

> 60%

US$ 0.40 / sqft

US$ 0.60 / sqft

US$ 0.80 / sqft

US$ 1.00 / sqft

Under 3 yrs

3 5 yrs

5 10 yrs

10+ yrs

INCREMENTAL CONSTRUCTION COST


SMALL BUILDINGS

3%

7%

10%

15%

LARGE BUILDINGS

1%

3%

5%

8%

Source: Enermodal Engineering, Denver, USA

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

39

4/27/2012

Build Green
Because grey buildings will loose in
The property market of the future

If you do not build green, you build obsolete

Build Green
IEN Consultants Sdn Bhd
www.ien.com.my

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Global Warming is the Challenge


The building sector is the single most largest emitter
The building sector must deliver on reducing CO2 emissions

Source : IEA ECBCS

40

4/27/2012

We have only One Earth

Source : Global Footprint Network and WBCSD Vision 2050, 2010

No of Earth Required to Sustain Present Lifestyles in USA

41

4/27/2012

No of Earth Required to Sustain


Present LifeStyle in Malaysia

COP 17 in Durban, South Africa


The United Nations Climate Change Conference 2011
Science : the CO2 emission curve has to break by 2015 for the 2 oC target to be met
US and China is responsible for 40% of the worlds greenhouse gas emissions
The Durban Platform :
A working group will be formed in 2012 to develop a Roadmap for
developing a final agreement on combating climate change
- The agreement must be made by 2015
- Implementation starts by 2020
The European Union has committed to implementation
of a new Kyoto Agreement starting by January 2013
( US, Russia, Canada and Japan will not participate ! )
A Green Climate Fund to assist 3rd world countries to combat climate change
will be formed. Denmark, Norway and Germany has already committed to contribute.
The Durban Platform was signed by all nations after intense pressure from EU

42

4/27/2012

Reducing Carbon Emission from Buildings

650 gram CO2 /kWh

43

4/27/2012

BSEEP Context for the Demonstration Projects


The Demo projects are very important for the BSEEP program
The Demo Projects are
Proof of Concept,
Proof of Technical Feasibility
Proof of Economic Feasibility

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

BSEEP Energy Efficient Demonstration Project

Agreements with each Demonstration Host


will be signed during January February 2012
Mercu Mustapha Kamal
Damansara Perdana

Agreement between MK Land and BSEEP


February 12, 2012

BSEEP

44

4/27/2012

The BSEEP demonstration projects

Thanks for your attention


www.ien.com.my

Shell Shared Service Centre @ lot P125,cyberjaya

LEED Gold Certified


1st in Malaysia

45

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Presentation at NSC Meeting 29th March 2012 :


1. Overview of Low Carbon Buildings in an Overall Energy Context
2. Existing Low Carbon in Malaysia
3. Work program for the coming 12 months for Components 1 5
Component 1 Institutional Capacity Development
KLIA 2
Component
2 Policy Development and Regulatory Framework
Component 3 EE Financing Capacity Improvements
Component 4 Information and Awareness Enhancement
Component 5 Building EE Demonstrations

4. Economy, allocation of budget for hardware and computer software


5. Q&A
NSC meeting
29 March 2012

46

4/27/2012

Project Executive

Finance Assistant
Communication Assistant

47

4/27/2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

48

4/27/2012

Building Energy Index (without Solar PV)


LEO (2004)
100 kWh/m2 year
Mean ~ 210 kWh/m2year

100%

ST Diamond (2010)
65 kWh/m2 year

Cumulative percentile

90%
80%
70%
60%

Malaysia
(41 office
buildings)

50%
40%
30%

Singapore
(95 office
buildings)

20%
10%
0%

GEO (2007)
65 kWh/m2 year

50

100

150

200

250

300

350

400

450

Energy Efficiency Index (kWh/m2/year)


Source of chart: EAEF Project 64
Project leader: Energy Sustainabilty Unit, Singapore, 2006

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

Building Energy Index (with Solar PV)


LEO (2004)
100 kWh/m2 year
Mean ~ 210 kWh/m2year

100%

ST Diamond (2010)
55 kWh/m2 year

Cumulative percentile

90%
80%
70%
60%

Malaysia
(41 office
buildings)

50%
40%
30%

Singapore
(95 office
buildings)

20%
10%

GEO (2007)
30 kWh/m2 year

0%
0

50

100

150

200

250

300

350

400

450

Energy Efficiency Index (kWh/m2/year)


Source of chart: EAEF Project 64
Project leader: Energy Sustainabilty Unit, Singapore, 2006

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

49

4/27/2012

Advantages of Green Buildings

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

A LEED Gold Building, the Tangible Benefits

Energy CO2
Waste

Water

50%

50%

60%

65%

2~
16%

Productivity

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

50

4/27/2012

There is an urgent need to accelerate the uptake of low carbon buildings


Low Carbon/Zero Carbon Buildings can be built with Todays Technologies
BSEEP targets to make low carbon buildings standard in Malaysia by 2015
Kuala Lumpur

Jakarta

Bangkok

Manila

The objective with the BESEEP demonstration program is to


demonstrate that significant energy savings can be achieved with
projects that are technically and economically feasible

Design Feasibility : Buildings can be designed so that energy consumption is


reduced and indoor comfort is improved using appropriate design features in the
faade and the roof, and using appropriate building materials in the faade and
the roof. All necessary building materials are available locally, and most are
locally produced.

51

4/27/2012

Technical feasibility : The M&E systems of the building can be designed


and appropriate components can be selected to achieve significant
savings on energy consumption and significant improvements on indoor
comfort in the building. All necessary components and systems are
available locally, and some are locally produced.

Reduction of Energy Consumption in Offices


Where can the savings be achieved?

Fan Energy

Lighting

Plug Loads

Cooling

Opportunities

Obstacles

50 80 % reduction

Lack of awareness on low pressure duct design


and efficient fan design management.

Use daylight and solar control glazing


50 90 % reduction
( EE fixtures and daylight use )

Expensive glazing.
Lack of knowledge on daylight design in the
tropics ( heat and glare ).

Save 30 50 %
Using EE computers

Lack of awareness on the magnitude of IT


power consumption.

Save 50 80 %
Reducing the load,
Improve efficiency ( COP ) of chiller

Lack of knowledge on chiller sizing.


Lack of knowledge regarding what the heat
loads are.

52

4/27/2012

Economic feasibility : The extra costs for achieving a low carbon


footprint are low compared to the savings on energy consumption. The
economic payback period will be in the range of 5 10 years, based on
todays low subsidized electricity prices. At world market energy costs,
for the Government, the payback period is 3 5 years.
Significant increases in electricity costs are expected over the years
until 2015, where the Government has announced that natural gas for
electricity production will be sold at the world market price.

Life Cycle Energy Costs

The Target groups for the BSEEP Demonstration Program - 1


Developers and Quantity Surveyers
To demonstrate that energy efficient buildings
are commercially and technically viable,
and that energy efficient green buildings
is the better option compared to a grey building,
as green buildings are more attractive in the marketplace
and will retain a higher value than grey buildings.

53

4/27/2012

The Target groups for the BSEEP Demonstration Program - 2


Clients and tenants
To demonstrate that energy efficient green buildings are viable in the
marketplace, that such buildings and facilities can be requested, and that
the extra costs regarding purchase or lease are very minimal.
To demonstrate that energy efficient green buildings are more healthy and
that people working in low carbon buildings are more productive and happy
on their work.

MK Land on Study Tour in Freiburg Germany

The Target groups for the BSEEP Demonstration Program - 3


Architects and engineers
To demonstrate that the technologies and design strategies to achieve energy
efficient buildings are available in Malaysia. For architects the crucial value is to
demonstrate energy efficient architecture and to demonstrate what really makes the
architecture energy efficient and green.
For the M&E engineers to become familiar with what it takes to make a building low
carbon. For both architects and engineers to demonstrate that a successful and
feasible design can be achieved through integrated design development with a
relatively limited list of crucial design elements.

Two Office Buildings in Damansara Heights

54

4/27/2012

The Target groups for the BSEEP Demonstration Program - 4


Investors and bankers
To demonstrate that low carbon buildings are technically sound and
commercially viable, that green low carbon buildings are viable investment
objects that will prevail economically compared to grey buildings.

The Target groups for the BSEEP Demonstration Program - 5


Government and Legislation
To demonstrate that energy efficient buildings with a carbon footprint 40
60% lower than today are economically and technically feasible, and that
this building standard can be implemented as the standard in the Building
by Laws towards the end of BESEEP program in year 2015.

55

4/27/2012

The objectives of the BSEEP demonstration projects


Financially, Strategically and Technically

What is in it for me ?

Commitments from the Demo Host


Commitments from BSEEP

Whats in it for the Demonstration Hosts ?


To lead the way

To Walk the Talk

To provide the showcases


The KL Eco City

GoM buildings :To Demonstrate the commitment towards Green Buildings


Private Sector : To champion energy efficient green buildings in Malaysia

56

4/27/2012

Benefits for occupants in a green and energy efficient building

Good daylight conditions


Lower energy consumption ~ lower running cost
Good and healthy indoor climate
Enhanced productivity
Less medical leave
Green image for marketing
Green technologies are visible
and state-of-the-art

Documentation
Hard Copy
Soft Copy
Websites
Energy Efficient Green Buildings in Malaysia
Design - Performance - Economy

BSEEP

57

4/27/2012

Design targets regarding energy efficiency


The BSEEP program needs to push the standard for energy efficiency and low carbon
footprint in buildings in Malaysia significantly. The time for small steps has passed.
Malaysia has committed to a reduction in the Carbon Emission Intensity by 40% from
2005 until 2020, and the building sector has to deliver to achieve this target.
Based on experiences with finalized and ongoing projects at IEN Consultants,
we believe that the following performance targets for the BSEEP
Demonstration projects are appropriate and feasible :
New non-domestic buildings ( office buildings) : reduce the Energy Index
from typically 220 kWh/m2year to 90 kWh/m2year, a reduction of 60%.

Building Energy Index (without Solar PV)


LEO (2004)
100 kWh/m2 year
Mean ~ 220 kWh/m2year

100%

ST Diamond (2010)
65 kWh/m2 year

Cumulative percentile

90%
80%
70%
60%

Malaysia
(41 office
buildings)

50%
40%
30%

Singapore
(95 office
buildings)

20%
10%

GEO (2007)
65 kWh/m2 year

0%
0

50

100

150

200

250

300

350

400

450

Energy Efficiency Index (kWh/m2/year)


Source of chart: EAEF Project 64
Project leader: Energy Sustainabilty Unit, Singapore, 2006

58

4/27/2012

Existing non-domestic buildings ( office buildings) : Reduce the energy


consumption by 40 - 50%, depending on the actual building.

New housing and existing housing : A reduction of the energy


consumption of at least 50% to be achieved, including the use of energy
efficient appliances for the kitchen.
The target will be a Zero Carbon building if solar PV is applied for low rise
housing ( bungalows, semi-Ds and link houses) where there is enough
roof space for PV.

59

4/27/2012

Implementation schedule for a demonstration project


The implementation schedule for a BSEEP Demo Project :

2011 2012 : Design input during Concept Design and design development
- Assist in implementation of the design targets regarding energy efficiency
2012 2014 : Construction

2014 - 2015 : Monitoring , evaluation and documentation


- Document the energy performance and the Indoor Air Quality

Deliverables for a demonstration project


Design report for Concept Design
BSEEP Energy Efficient Demonstration Project

Design report for the building as built

Commissioning Report

Energy Performance of the Demonstration Project

Mercu Mustapha Kamal


Damansara Perdana

Brochure on the Showcase Demonstration Building


Design Report for the as built building
xxxxxx , 2014

BSEEP

60

4/27/2012

Commitments from BESEEP to the Demo project projects


Design input regarding energy efficiency Coaching of the Design Team
Design input during Concept Design and design development

Input regarding faade design, daylight design)


Provide check list for energy efficient equipment
Computer evaluation of energy consumption
Provide design input needed for BMS system for energy monitoring

Follow up during detailed design


Work with the M&E engineer during commissioning of the building
Implement a monitoring and evaluation program to document the actual
energy performance of the building
Cooling
Fans and pumps
Lighting
Small power
Other electricity loads

The client will be part of the promotion program for exemplar EE buildings.

Commitments from the Demo Project Hosts to BESEEP


Demonstrate an exemplar energy efficient building with ambitious energy targets
Present a design team that is capable and committed
to implement a showcase energy efficient building
Implement an exemplar building with a low energy index
Integrate the necessary energy monitoring and documentation systems
in the BMS system as per input from BSEEP
Provide access to the building for the monitoring and evaluation program
Provide access to the building for implementation of a Post Occupancy Survey

61

4/27/2012

Macro-economic evaluation on Energy Efficiency in Buildings


What is good for the country, what is cheapest for the country ?
When you invest in an energy efficient building, then
1. Energy Savings ( kWhs) are Achieved
2. Electricity Peak Load ( kWs) is Reduced

The Cost of 1 kW:


New Power Plant Investment:

Euro / kW = 800

Energy Efficient Building Investment:

Euro / kW = 200

NSC meeting
29 March 2012

Electricity Load Curve, Peninsular Malaysia

14 GW
12 GW
10 GW

8.00 am

6.00 pm
NSC meeting
29 March 2012

62

4/27/2012

Saving GWs is Cheaper than Building GWs

NSC meeting
29 March 2012

The Power of Energy Efficiency


Electricity Load Curve, Peninsular Malaysia, TNB 2010

14 GW
12 GW

30 billion RM not invested


Energy Efficiency 3GW

10 GW

NSC meeting
29 March 2012

63

4/27/2012

Component 4 Information and Awareness Enhancement


1. Develop Guidebook on EE in Buildings
Energy Efficiency in Architecture ( passive design
Energy Efficiency in Mechanical and Electrical Systems (active design
Integrated Energy Design of Buildings
2. Implement Capacity Building Courses on EE Building Design
Architects
Engineers
Developers
Civil Servants

2012

3. Develop a Simplified EE Design Tool


4. Energy Efficiency in Housing, design and user guide
NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

Component 3 EE Financing Capacity Improvements


Implement a Study on existing financing and subsidy mechanisms

Implement Awareness Seminars on existing financing and subsidy mechanisms

Implement a Study on the Macro-Economic Benefits of EE in Buildings


2012
Develop proposal for new incentives and financing schemes
Implement Awareness Seminars on existing financing and subsidy mechanisms
Including promotion of the ESCO financing model for energy retrofit

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

64

4/27/2012

Component 2 Policy Development and Regulatory Framework


Conduct a study on an improved MS 1525 regarding the key design criteria

Faade design, orientation, choice of materials


Airtightness of buildings, recuperation on ventilation air
Design of ventilation and cooling system
Design of lighting system, integration of daylight design

2012

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

Component 2 Policy Development and Regulatory Framework


Conduct a study on an improved MS 1525 regarding the key design criteria

Faade design, orientation, choice of materials


Airtightness of buildings, recuperation on ventilation air
Design of ventilation and cooling system
Design of lighting system, integration of daylight design

Training Courses on building energy codes : 5 courses


( Penang, KL, Johor, Sabah and Sarawak )
2012
Extensive training courses on EE Building Design
Development of MS1525:2014
with the Malaysian Building Industry and Regulatory Bodies

NSC
meeting
BSEEP Seminars in Kota Kinabalu and Kuching 25 and
26 April
2012
29 March 2012

65

4/27/2012

The road to Low Carbon Buildings

A low Carbon Building is a building that uses less electricity, because less electricity
consumption means less CO2 emissions at the power plant to produce electricity.
A coal fired power plant emits 1000 gram CO2 to produce one kWh of electricity
A gas fired power plant emits only 500 gram CO2 to produce one kWh of electricity
With the Malaysian fuel mix for power production, 650 gram CO 2 to produce one kWh of
electricity
If the electricity consumption of a building is reduced by 50%, then the carbon
emissions related to that building is also reduced by 50%. The carbon footprint is
reduced by 50%.

BSEEP Seminars in Kota Kinabalu and Kuching 25 and 26 April 2012

66

You might also like