Pigging Activites

Filters Element

Well Head Maintaince

Chemicals Stock

NWK1-1

main
Details

Date

6/9/2013

During monitoring of the well, Found shut in pressure 1700 PSI , made a trail to drain well to atmosphere but without success, closed well waiting for
pressure build up ( SIP =2100 PSI).

7/9/2013

During monitoring of the well, Found shut in pressure 2100 PSI , made a trail to open the well to production header succed to flow well ,well data of the well
( WHP =3350 PSI , CHOCK SIZE = 20 , FLP = 82 BAR , FLT =5 C).

31/1/2015

Stopped well for 4 hrs to set memory gauge by HLB Company

5/3/2015

Spotted and arranged HLB slick line equipment.

6/3/2015

R/U HLB S/L equipment, C/I well at 10:15 am ,RIH and retrieved IOD memory gauges ( C/I period 1.5 hrs ). R/D HLB S/L equipment connected well cap flange,
performed leak test and O/U well at 11:45 to production stream

NWK1-2

main
Details

Date

9/9/2013

Drained annulus pressure of NWK 1-2 from 90 bar to 50 bar , total quantity of liquid is 160 liter (sample is available)

10/11/2013 well showed bad performance (surging) @ 20:00 hrs , B/D gas CHK from 20/64'' to 15/64''.
11/11/2013 Well continued bad performance , B/U CHK to 30/64'' for 3 hrs , then B/D to 20/64'' and well back to normal.
19/11/2013 B/U CHK from 15/64'' to 18/64'' to optimize well production ( WHP=189 BAR , WHT= 51C , WHF =89 BAR)
20/11/2013 well showed surging performance @ CHK 20/64'' , B/D gas CHK 15/64'' ( WHP=189BAR , WHT= 41C , WHF=90BAR)
22/11/2013 Performed step rate test for NWK 1-2 as per program
09/12/2013 Well showed bad performance (surging) , B/D CHK from (17/64") to (15/64") , well back to normal (WHP = 189 BAR , CHK 15/64" , WHT=46 C).
During routine check found Annulus pressure increased from 152 bar to 188 bar
15/12/2013 Well showed fluctuation in P reading, swaped the barton chart of NWK1-1 & 1-2 and P readings back to normal, under close monitoring
18/12/2013 Installed two 2" ball valves in annulus (upper CGS) of well.
1/3/2015

Replaced the damage actuator wing valve and O/U the well at 20:00 hrs

filter element work activites


main
Date

Filter Type

No of elements

2/27/2015

MEG Cartige filters (N-5601A / B)

3/23/2015

Sales gas filter ( N-5401B )

5/11/2015

MEG Cartige filter (N-5601B)

5/17/2015

MEG Cartige filter (N-5601A)

6/3/2015

MEG Cartige filter (N-5601B)

chemicals stock

main

MEG

TEG

138 drum

Remain

Methanol

Corrosion inhiptor

63

Remain

Remain

RPF

43

CTP

15

76

Remain

stock

consumed

remain

unit

Date

Main stock

consumed

remain

stock

consumed

remain

stock

consumed

4/20/2015

4/12/2015

73

70

4/20/2015

68

68

drum

4/20/2015

44

44

DRUM

4/21/2015

5/21/2015

70

67

5/2/2015

68

66

drum

5/13/2015

44

40

DRUM

4/29/2015

6/8/2015

67

63

5/12/2015

66

27

39

TPF

5/25/2015

40

39

RPF

5/12/2015

5/17/2015

39

35

drum

8/10/2015

37

37

CTP

5/17/2015

litre

5/17/2015

35

litre

5/25/2015

32

6/1/2015

litre

6/9/2015

30

28*6*2015

26

6/28/2015

19

32
30
26
24
19

drum

5/30/2015

7
6
5

Date

Recived 160 Drum

6/5/2015
6/5/2015
6/14/2015
30/6/5/2015

8/10/2015

160 drum +5 M
5 M + 160 drum

0
5 M

160

160

10

150

12

Reamining

160 drum +5 M
160
drum
160
drum
150
drum
138
drum

138 drum

Remaining

63

Date

Reamining

43

unit

Date

remain

drum
drum
RPF
CTP

Remaining

76

unit