You are on page 1of 7

A

REPORT
ON

MODELING AND OPTIMIZATION OF GRID INTERCONNECTED ELECTRICAL ENERGY SYSTEMS FOR


FULFILMENT OF POWER DEMAND WITH ECONOMIC
COST THROUGH TRANSMISSION NETWORK

BY

KATKAR ABHISHEK BAJIRAO


M. Tech-II
Yashwantrao Chavan School of Rural Development ,
Shivaji University, Kolhapur.

UNDER THE GUIDANCE OF

MR. S. B. DESAI
Department of Rural Technology
Shivaji University Kolhapur.

Department of Rural Technology


Shivaji University, Kolhapur.

CERTIFICATE
This is to certify that the report entitled Modeling and Optimization of Grid Interconnected Electrical Energy Systems for Fulfilment of power demand with Economic Cost
through Transmission Network, which is being submitted herewith for the award of degree of
the Master of Technology in Rural Technology in Shivaji University, Kolhapur is the result of
original research work completed by Katkar Abhishek Bajirao, student of M. Tech Rural
technology, part II, under my supervision and guidance for the academic submission of year
2015-16.

Guide

Mr. S. B. Desai
Department Of Rural Technology
Shivaji University, Kolhapur

Co-ordinator

Mr. M. S. Salunkhe
Department Of Rural Technology
Shivaji University, Kolhapur

M. Tech-II (Rural Technology), YCSRD, Shivaji University, Kolhapur

Page II

Department of Rural Technology


Shivaji University, Kolhapur.

DECLARATION
I hereby declare that the project report entitled Modeling and Optimization of Grid
Inter-connected Electrical Energy Systems for Fulfilment of power demand with
Economic Cost through Transmission Network completed and written by me has not
previously formed for the award of diploma, degree or similar title of this or any other
University or examination body.

Date:
Place: Kolhapur

Signature
Mr. Abhishek Bajirao Katkar

M. Tech-II (Rural Technology), YCSRD, Shivaji University, Kolhapur

Page III

ACKNOWLEDGEMENT
I present my project report on Modeling and Optimization of Grid Inter-connected
Electrical Energy Systems for Fulfilment of power demand with Economic Cost through
Transmission Network in our college as part of academic activity. I would like to express our
deep sense of gratitude to our guide Mr. S. B. Desai for his valuable guidance, encouragement
and kind co-operation throughout the dissertation work. I feel glad to present my research work
under his guidance, also for providing all necessary facilities to carry out this project work and
whose encouraging part has been a perpetual source of inspiration.
I am also thankful to Mr. M. M. Wagh for their encouragement and support. I would
like thanks to all the teaching and non-teaching staff for their co-operation to complete our
dissertation work. We would like to express our sincere thanks to all our friends and my family
members for giving us moral support during our project work.

M. Tech-II (Rural Technology), YCSRD, Shivaji University, Kolhapur

Page IV

INDEX
Sr. No.

Name of the Topic

Page
No.

Introduction

Power Scenario of Kolhapur District & Karveer

Generation Sources Interconnected to Grid System

Architecture of Optimal Dispatch Model

13

Modeling and Optimization Of Mudshingi 110 kV Grid Connected

27

Cogeneration
6

Conclusion

44

References

45

M. Tech-II (Rural Technology), YCSRD, Shivaji University, Kolhapur

Page V

List of Figures
Figures

Figures Name

Page No.

No.
1.

Monthly Load curve of Kolhapur District in 2014-15 year

03

2.

Map of Kolhapur

04

3.

Single Line Diagram of Transmission Network of Karveer taluka

05

4.

Monthly Average load curve of study area concern in 2014-15

08

5.

Block Functional Diagram of CHP Plant

09

6.

Process Flow diagram of Optimal Dispatch Model

13

7.

Bus i connected n number of feeder in radial power network

16

8.

Characteristics of Thermal Generation System

22

9.

Algorithm Flow Chart of Optimal Economic Dispatch Model

26

10.

SLD of Mudshingi 110 kV Grid

27

M. Tech-II (Rural Technology), YCSRD, Shivaji University, Kolhapur

Page VI

List of Tables
Table. No.

Name of table

Page No.

1.

Power Scenario of Kolhapur District

02

2.

HV Transmission substation and Cogeneration plant of Karveer

04

3.

Bus Data of Transmission Network of Karveer Taluka in 2014-15

06

4.

Power Loading Data of Substations of Karveer Taluka in 2014-15

07

5.

Details about Biomass CHP Plants existed in Karveer taluka

11

6.

Power outlay of Biomass CHP Plants existed in Karveer in 2014-15

12

7.

Power Flow Models

15

8.

Optimization Models

21

9.

Bus Data of Mudshingi 110 kV Grid

27

10.

Line Data of Mudshingi 110 kV Grid

28

11.

Annual Cost account of cogeneration plant connected to Mudshingi


110 kV grid

40

M. Tech-II (Rural Technology), YCSRD, Shivaji University, Kolhapur