You are on page 1of 74

National Council for Hotel Management and

Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

SALIENT REQUIREMENT FOR AN INSTITUTE OF HOTEL MANAGEMENT WITH


AN INTAKE OF 120 STUDENTS IN 3 YEAR DEGREE AND 120 & 60 STUDENTS
IN DIFFERENT CRAFTS COURSES

Intake

120 in each year of the 3 year Degree in Hospitality and


Hotel Administration Program and intake of 30 each for
any four short courses i.e. Food Production, Food &
Beverage Services, Accommodation Operations,
Bakery & Confectionery, Front Office Operation, House
Keeping Operation etc offered by NCHMCT.

Total Strength of
Students

360 students in 3-Year Degree in Hospitality and Hotel


Administration Program with 120 students in Craft level.

Batch Sizes

Theory: 60-65

Total Strength of
Faculty

18 excluding Principal and part-time faculty for student


strength of 420. (2nd year only half strength counted)

Faculty
Ratio

to

Student :

Total Land Area

Practical: 20-22

Up to 1:25 (maximum)

Minimum land for Metro Cities - 0.5 acres


Minimum land for Other Cities - 2.5 acres
Minimum land for Rural areas - 5.0 acres

Note- Metro city classification will be as the existing classification providing by


Ministry of Urban Development, GOI. The Institute located in metros shall largely rely
on vertical structures to offset space constraints.

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

CLASSIFICATION OF CAMPUS BUILDING (AREA WISE AT A GLANCE)


S.No.

Area Requirement in Sq.Ft.


Carpet Area
Plinth Area

Area

1.

ACADEMIC AREA

24900

32370

2.

ADMINISTRATIVE AREA

3200

4160

3.

SUPPORT AREA

4200

5460

32300

41990

TOTAL AREA
Plinth area = Carpet area + 30%

1)

ACADEMIC AREA AT A GLANCE:

S.No.

AREA / LAB

Area
in Sq. Ft.

1.

FOOD PRODUCTION

5900

2.

FOOD & BEVERAGE

4200

3.

HOUSEKEEPING OPERATION

2200

4.

OTHER AREAS

12600

TOTAL ACADEMIC AREA

24900

Add 30% to Carpet Area = Plinth area of 1,2,3 & 4

32370

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

ACADEMIC AREA DEPARTMENT WISE

1.1) FOOD PRODUCTION

NUMBER

Area
Requirement
(in Sq Ft)

S.No.

AREA NAME

BASIC TRAINING KITCHEN

1000

QUANTITY TRAINING KITCHEN

1000

ADVANCE TRAINING KITCHEN

1200

LARDER

300

BAKERY

600

BAKERY & CONFECTIONARY

900

RECEIVING, PRE-WASH & STORAGE AREA

700

MICROBILOGY LAB (OPTIONAL)

200

GRAND TOTAL

5900

1.2) FOOD & BEVERAGE SERVICE


Area
Requirement
(in Sq Ft)

S.No.

AREA NAME

BASIC TRAINING RESTAURANT


60 COVERS x 24Sq.Fts.
ADVANCE TRAINING RESTAURANT
60 COVERS+ BAR
PANTRY

300

STUDENT DINING HALL

2500

F & B STORES/STEWARDING

NUMBER

GRAND TOTAL

1200

200
4200

BTR & ATR should have collapsible partition

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

1.3) HOUSE KEEPING OPERATION

S.No.

1
2
3

AREA NAME

H.K.PRACTICAL LAB
INCLUDING STORE & AC FLOWER ROOM
GUEST ROOMS / MOCKUP ROOMS
1 Single + 1 Double
LAUNDRY / LINEN ROOM

NUMBER

Area
Requirement
(in Sq.Ft.)

800

600

800

GRAND TOTAL

2200

1.4) OTHER LABS AND CLASS ROOM

NUMBER

Area
Requirement
(in Sq.Ft.)

FRONT OFFICE LAB

600

COMPUTER LAB (2 No. x 600 sft)

1200

LIBRARY & RESOURCE CENTRE

1600

3600

2000

3000

600

S.No.

AREA NAME

CLASS ROOM-LARGE
5 classrooms x 720 sq.ft. for 60 intake
CLASS ROOMS-MEDIUM
4 classrooms x 500 sq.ft. for 40 intake
MULTI PURPOSE HALL

COMMITTEE ROOM

4
5

GRAND TOTAL

12600

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

2)

ADMINISTRATIVE AREA
Area of requirement
in Sq. Ft.

S.No.

AREA NAME

PRINCIPAL OFFICE

300

P.A. OFFICE

150

ADM.OFFICER OFFICE

150

GUEST / VISITORS LOUNGE & LOBBY

200

5
6

TEACHER'S LOUNGE
(1 X 1000sft or 2 X 500 sft)
HOD 'S CABIN (2X100 sft)

ADM. OFFICE

600

RECORD / EXAMINATION ROOM

600

1000
200

3200
TOTAL ADMINISTRATIVE AREA

3.

SUPPORT AREAS
Area of requirement
in Sq. Ft.

S.No.

AREA NAME

1.

LOCKER ROOM -BOY'S (70% OF STRENGTH)

1000

2.

LOCKER ROOM -GIRL'S( 30% OF STRENGTH)

300

3.

STAFF LOCKER ROOM

600

4.

DOCTOR'S / FIRST-AID ROOM

200

5.

MAINTENANCE ROOM

900

6.

CANTEEN + KITCHEN (1000 sft + 200 sft)

GRAND TOTAL

1200
4200

Electric Sub-Station/Generator Room; STP/Garbage Decomposer and Pump


Room area should be as per site requirements.

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

BASIC TRAINING KITCHEN

Batch size:
Total desired area required
No. of Kitchen
Area required per student
Total No. of Work Station
Students per station
No. of faculty per lab
No. of Lab. Attendant
Duration of Practical

Sl.No.

:
:
:
:
:
:
:
:
:

24
1500 Sq. Ft
01
60 Sq. Ft.
12
2 students per station
01
01
04 Hours

Name of the Item

Quantity

HEAVY EQUIPMENTS
1. S.S.Work table 4 ft x2 ft x 34 inches + 18 with
Overhead shelves with drawer 1 under shelf at 15 cm ground clearance
2. S.S.Cooking range with low pressure 4 burners (Gas operated)
3. Stock Pot stove
4. S.S. Potable Tandoor
5. Stainless Steel Sink with Drain Board
6. Demonstration S.S. Table (6 ft x3 ft.)
7. S.S Salamander 24 x 14
8. Griller with Hotplate
24 x 24
9. Two deck oven (12 KW)
10. Commercial Mixer
up to 2 Kg
11. S.S two Door Vertical refrigerators 500 Lts.

Light equipments per station

(as per requirement)

1. S.S.Grater
2. SS.Round spoon
3. SSFlat spoon
4. S.S.Fish Slicer
5. S.S.Perforated round spoon (frying spoon)
6. SoupStrainer S.S.
7. Rolling pin (wooden)
8. S.S.Tongs
9. Chopping board ( Fiber with color codes)
10. Steak hammer
11. S.S.Measuring jug (1/2 Ltr)
12. Egg Slicer
6

12
12
01
01
12
01
02
01
01
02
02

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

13. Piping bag/nozzle


14. S.S. Lime squeezer
15. Potato masher SS
16. S.S. Mixing Bowl(10 dia)
17. S.S.Basin ( 15 dia )
18. Weighing machine (Electro-mechanical) 2 Kg.
19. Stock pot (20 Ltrs.) SS with handle and lid
20. Baking trays
Pots and Pans per station
1. S.S degchi with lid (sandwich bottom) 12 dia
2. S.S.degchi with lid (sandwich bottom) 10 dia
3. S.S.degchi with lid (sandwich bottom) 08 dia
4. SS Kadhai (sandwich bottom)
5. S.S Tray/ thal 16 dia
6. Non stick Frying pans 10 dia
7. S.S small Braising pan
8. Tava with handle
9. Collander SS 08 base
10. Pie dish Aluminum

(as per requirement)

Students should be advised to ensure kitchen tool kit consists of the following items:
(as per no. of students at a time in the lab)
i.
Chef knife - 01No,
ii.
Vegetable knife 1 No.
iii.
Vegetable and fruit carving knife _1 No.
iv.
Peeler- 1 NO
v.
Palate knife 1 No
vi.
Wooden spoon-1 No
vii.
Egg beater/ whisker -1 No
viii. Rubber/ plastic spatula- 1 No
Note:
1. Basic Training Kitchen should be properly well ventilated either by natural or
mechanical as per requirement.
2. Kitchen should be well illuminated preferably by using CFL Tubes.
3. All the walls should be tiled up to minimum 7 feet from the floor level.
4. Kitchen Flooring should be non slippery tiles/ kota.
5. Adequate number of portable fire extinguishers DPC should be provided.
6. First aid kit should be accessible.
7. Separate provision for hand wash for disinfectant and hand dryer to maintain highest
level of hygienic standards.
8. Adequate Insects-cutter should be provided at the door.
9. Air curtains should be provided at the door.
10. Stainless equipment should be of 304 SS (Food grade

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

QUANTITY FOOD KITCHEN


Batch size :
Total desired area required :
No. of Kitchen
:
Area required per student
:
Total No.of Work Station:
STUDENTS PER STATION:
No. of faculty per lab :
No. of Lab. Attendant:
Duration of Practical:

S.No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.

24
1500 Sq. Ft
01
60 Sq. Ft.
12
2 students per station
01
01
04 Hours

Name of the Item

Quantity

High pressure/ cooking range 2 burners (Low Height 26 )


Low pressure canteen 3 burner cooking range (Low Height 26)
Single burner cooking range high pressure (Low height 26)
Deep fat fryer (2 compartments.) (15 Ltrs.) Gas operated
Bratt pan (Tilting pan) 80 Ltrs.
Bulk fryer
Wet pulverize r
Wet Masala grinder 5 Liters.
Dough Kneader (25 Kg)
Potato peeler (heavy duty 10-15 Kg)
Food Processor (with 6 attachments)
Meat mince (heavy duty)
Hot plate with Chapatti puffer (Gas operated )
2 deck S.S. Oven
Sink with drain board
Work table 8 ft x 3ft (steel top)
Four door vertical refrigerator 1000 Liters./ 500 Liters
Four door vertical deep freezer 1000 Liters/500 Liters
Masala Rack 2 ft x1.0 ft x 5 ft
Weighing machine 0-10 Kg.
Tandoor (large) Gas
Storage boiler (35 liters)
Bussing trolley
Food Pick up trolley S.S Platform
S.S angle racks
Pot Racks
Three sink unit with drain board with jet spray
Shemawan Grill

03
03
02
01
02
02
01
02
01
01
02
01
01
01
06
03
01
01
01
01
02
02
02
02
04
04
01
01

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

2. LIGHT EQUIPMENT:
1. Perforated spoon (wire mesh type)
2. Barbeque Sigri
3. Mortar and Pestle
4. Potato masher
5. Egg slicer
6. Idly Steamer
7. Small Moulds (Assorted)
8. Lemon Squeezer
9. Non Stick Pan
10. Wooden Spatula
11. S.S Bhagona/ degchi copper/ sandwich bottom 24 dia
12. S.S Bhagona/degchi 30 dia
13. S.S degchi (thick bottom) 18 dia
14. S.S degchi (thick bottom) 20 dia
15. S.S degchi (thick bottom) 24 dia
16. S.S degchi (thick bottom) 28 dia
17. Kadai 18 dia MS
18. Kadai 24 dia MS
19. Kadai 26 dia MS
20. Khurpi 24 length including handle MS
21. Khurpi 42 length MS
22. Laddles (small) Brass
23. Laddles (medium) Brass
24. Laddles (large) Brass
25. Perforated spoons 5 dia SS
26. Perforated spoons 7 dia MS
27. Perforated spoons 9 dia MS
28. Collander (large SS)
29. Collender (small SS)
30. SS Trays 20x12x4
31. Stock pot (medium) S.S 14 dia
32. Stock pot (large) S.S. 20 dia
33. Knives all purpose
34. Cleavers SS
35. Grater SS
36. Chopping Board wooden
37. SS Masala Containers
38. Tongs S.S
39. Tandoor skewers SS
(Pot iron)
40. Baloon whisk SS
41. S.S Bhagona/ degchi copper/ sandwich bottom 24 dia
42. Parats Brass 24 dia
43. Parats Brass 20 dia
44. Plastic storage trays (L)
45. Racks (slotted angle) SS
46. Butchers block
9

(as per requirement)

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

Students should be advised to ensure kitchen tool kit consists of the following items:
i.
Chef knife - 01No,
ii.
Vegetable knife 1 No.
iii.
Vegetable and fruit carving knife _1 No.
iv.
Peeler- 1 NO
v.
Palate knife 1 No
vi.
Wooden spoon-1 No
vii.
Egg beater/ whisker -1 No
viii. Rubber / plastic spatula- 1 No

Note:
1. Quantity Training Kitchen should be provided with adequate exhaust hood and fresh air
supply system.
2. Kitchen should be well illuminated preferably by using CFL Tubes.
3. All the walls should be tiled up to minimum 7 feet from the floor level.
4. Kitchen Flooring should be non slippery tiles/ kota.
5. Adequate number of portable fire extinguishers (DPC ) should be provided.
6. First aid kit should be accessible.
7. Separate provision for hand wash for disinfectant and hand dryer to maintain highest
level of hygienic standards.
8. Adequate Insects-cutter should be provided at the door.
9. Air curtains should be provided at the door.
10. Stainless steel equipment should be of 304 SS (Food grade).
11. Quality food kitchen should be directly linked to students dining hall.

10

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

ADVANCE TRAINING KITCHEN


Batch size
Total desired area required
No. of Kitchen
Area required per student
Total No. of Work Station
Students per work station
No. of faculty per lab
No. of Lab. Attendant
Duration of Practical

Sl.No.

:
:
:
:
:
:
:
:
:

24
1500 Sq. Ft
01
60 Sq. Ft.
12
2 students per station
01
01
04 Hours

Name of the Item

Quantity

1. S.S. Work table 4 ft x2 ft x 34 inches + 18


with overhead shelves with
2. S.S. drawer 1 under shelf at 15 cm ground clearance
3. Cooking range 4 burners (Gas operated)
4. Stock Pot stove
5. S.S. Potable Tandoor
6. Stainless Steel Sink with Drain Board
7. S.S Salamander
8. Griller with Hotplate
9. Two deck oven S.S.Body
10. Heavy Duty Mixer
11. S.S two Door Vertical refrigerator 500 Lts.
12. Chinese range withhigh pressure blower
13. Deep fat fryer table top
14. Wet pulverizer
15. Food Processor (with 6 attachments)
16. Meat mincer (heavy duty)
17. Microwave oven
18. Gyser
19. Multi Temperature combi oven
20. SS Demonstration table 6ft x 3 ft fitted with camera and screen
21. Combi cooking range
22. Sushi counter with refrigerator
23. Induction Hot plate
24. Toaster with conveyer belt
25. Drop in induction range

11

24
24
01
01
24
02
01
01
02
02
01
01
01
01
01
01
01
01
01
01
01
01
01
01

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

Light Equipments

(As per requirement)

1. S.S.Grater
2. SS.Round spoon
3. SSFlat spoon
4. S.S.Fish Slicer
5. S.S.Perforated round spoon (frying spoon)
6. SoupStrainer S.S.
7. Rolling pin (wooden)
8. S.S.Tongs
9. Chopping board ( Fiber with color codes)
10. Steak hammer
11. S.S.Measuring jug (1/2 Ltr)
12. Egg Slicer
13. Piping bag/nozzle
14. S.S. Lime squeezer
15. Potato masher SS
16. S.S. Mixing Bowl(10 dia)
17. S.S.Basin ( 15 dia )
18. Weighing machine (Electro-mechanical) 2 Kg.
19. Stock pot (20 Ltrs.) SS with handle and lid
20. Baking trays
Pots and Pans per work table:

(As per requirement)

1. S.S degchi with lid (sandwich bottom) 12 dia


2. S.S.degchi with lid (sandwich bottom) 10 dia
3. S.S.degchi with lid (sandwich bottom) 08 dia
4. SS Kadhai (sandwich bottom)
5. Pressure Cooker (15 lts)
6. S.S Tray/ thal 16 dia
7. Non stick Frying pans 10 dia
8. S.S small Braising pan
9. Tava with handle
10. Collander SS 08 base
11. Pie dish oven proof
Wash up:
1.
2.
3.
4.
5.

Dish washer (60 plates per cycle)


Storage cupboards
SS Three sink unit
SS Soil table with Garbage chute
Work table 4 ft x 2 ft

01
02
01
01
02

12

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

Larder Section
300 Sq Ft
Sl.No.

Name of the Item

Quantity

Equipment : - Instructors S.S. table with accessories.


- S.S. Table- 4 large for group activity.
1.
2.
3.
4.
5.
6.
7.
8.
9.

Electric blender
Meat mince/cutter
Vegetable slicer
Refrigerated counter
Gas range with overhead hoods 2 burner LP
Water storage boiler (35 ltrs)
SS sink with Drain Board with hot & cold water spout
Weighing scale electronic
(0-1 kg)
Butchers block

Equipment:

01
01
01
01
01
01
04
01
01
(As per requirement)

1. Boning knife
2. French knife
3. Fillet knife
4. Paring knife
5. Garnishing knife
6. Carving knife
7. Fruit knife
8. Citrous fruit knife
9. Sharpening grinds hollow, rol, flat, concave
10. Butter curler
11. Metal cutter
12. Can and wine opener
13. Aspic cutters
14. Mandoline
15. Mould various shapes & sizes
16. Parisienne scoops 4 sizes
17. Piping bag with nozzle
18. Patty pan
19. Pastry brush
20. Spatula SS
21. Tweezer
22. Peeler
23. Grater SS
24. Vegetable scorer
25. Ice pick
26. Ice crusher
13

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

27. Concentric circle cutter


28. Chinese flower cutter
29. Chinese cleaver
30. Chinese sculpting tools
31. Bamboo skewers
32. Grape scissors
33. Scissors
34. Needle nose pliers
35. Pate mould
36. Terrine mould
37. Food mirror (various sizes)
38. Rolling pin wooden
39. SS degchi 12 dia
40. SS degchi 10 dia
41. Fish poacher
Students should be advised to ensure kitchen tool kit consists of the following items:
i. Chef knife - 01No,
ii. vegetable knife 1 No.
iii. Vegetable and fruit carving knife _1 No.
iv. Peeler- 1 No
v. Palate knife 1 No
vi. Wooden spoon-1 No
vii. Egg beater/ whisker -1 No
viii. Rubber/ plastic spatula- 1 No
Note:
1. Larder Training Kitchen should be air-conditioned.
2. Kitchen should be well illuminated preferably by using CFL Tubes.
3. All the walls should be tiled up to minimum 7 feet from the floor level.
4. Kitchen Flooring should be non slippery tiles/ kota.
5. Adequate number of portable fire extinguishers (DCP dry powder) should be provided.
6. First aid kit should be accessible.
7. Separate provision for hand wash for disinfectant and hand dryer to maintain highest
level of hygienic standards.
8. Adequate Insects-cutter should be provided at the door.
9. Air curtains should be provided at the door.
10. Stainless steel equipment should be of 304 SS (Food grade).
12. Quantity Training Kitchen should be provided with adequate exhaust hood and fresh air
supply system.
13. Exhaust (as other kitchen)

14

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

BAKERY
Batch size
Total desired area required
No. of Kitchen
Area required per student
Total No.of Work Station
STUDENTS PER STATION
No. of faculty per lab
No. of Lab. Attendant
Duration of Practical
Sl.No.

:
:
:
:
:
:
:
:
:

24
1200 Sq. Ft
01
60 Sq. Ft.
12
2 students per station
01
01
04 Hours

Name of the Item

Quantity

Heavy Equipment:
1. SS Work table 3 x 3 ft
2. (With granite / marble top with drawer and cabinet)
3. Three deck oven SS Body (18 KW)
4. Convection oven (10 KW)
5. Planetary mixture 25 kg
6. Planetary mixture Table top model (5 Lit)
7. Proffing cabinet with humidity control size to match with oven
8. Bread slicing machine table top
9. Dough sheeter table top
10. Refrigerator four door vertical 1000 Ltrs
11. Refrigerator 300 Ltrs
12. Cooking range 4 burners LP
13. S.S.Cooling racks 4ft x 2 ft x5 ft with castors
14. Stools for students (stackable)
15. Demonstration table with granite/ marble top 4 ft x 2 ft x 34
16. SS Sink with Drain Board with hot and cold water supply
Light equipment:
1.
2.
3.

4.
5.

6.

12
01
01
01
01
01
01
01
01
01
02
02
30
01
06
(As per requirement)

Baking trays large 22x14 MS


Baking trays small 11x6 MS
Bread tins (400 gms)
Cake tins round various sizes:
7 dia
9 dia
11 dia
Underlining tray
Cake tin Rectangular:
5x5 / 7x7
9x9 / 11x11
14x 14
Barquette mould 3 length
15

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.

Small whisk SS
Tartlet mould oven proof
Savarin mould oven proof
Muffin trays oven proof
Brioche mould oven proof
Fancy mould assorted oven proof
Doughnut cutter SS
Vol-au-vent cutter
Quiche mould
Chocolate mould assorted
Egg Slicer
Lemon squeezer
Can opener Heavy duty
Small brass kadai 6 dia
Precision scale electronic
Round laddle SS
Grater
Saute pan (small) Brass
Saute pan (medium) Brass
SS Measuring jug
Knives all purpose
Croquenmouche cone
Large cast iron halwai kadai
Jellebi thawa
Large frying spoon
Long handled wooden spoon
Large low level cooking stove
SS bowl (small) 8 dia
SS bowl (large) 12 dia
SS Parats 18 dia
SS Mug
Rolling pin wooden
Egg beater
Wooden spoon
Plastic scraper
Table spoon SS
Fork SS
Measuring Jug Steel
SS Tea Spoon
Measuring spoon set
SS Sink with drain board
SS degchi with flat bottom 12 dia
Wire Whisk
Comb for decoration
SS strainer
SS sieve (full set)
Piping bag with nozzle

16

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

Students should be advised to ensure kitchen tool kit consists of the following items:
i. Chef knife - 01No,
ii. Vegetable knife 1 No.
iii. Vegetable and fruit carving knife _1 No.
iv. Peeler- 1 NO
v. Palate knife 1 No
vi. Wooden spoon-1 No
vii. Egg beater/ whisker -1 No
viii. Rubber/ plastic spatula- 1 No
Note:
1. Bakery should be provided with adequate exhaust hood and fresh air supply system.
2. Kitchen should be well illuminated preferably by using CFL Tubes.
3. All the walls should be tiled up to minimum 7 feet from the floor level.
4. Kitchen Flooring should be PVC or equivalent.
5. Adequate number of portable fire extinguishers (DCP dry powder) should be provided.
6. First aid kit should be accessible.
7. Separate provision for hand wash for disinfectant and hand dryer to maintain highest
level of hygienic standards.
8. Adequate Insectocuter should be provided at the door.
9. Air curtains should be provided at the door.
10. Stainless steel equipment should be of 304 SS (Food grade).

17

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

BAKERY CUM AIRCONDITIONED CONFECTIONERY


Batch size
Total desired area required
No. of Kitchen
Area required per student
Total No. of Work Station
Students per work station
No. of faculty per lab
No. of Lab. Attendant
Duration of Practical

:
:
:
:
:
:
:
:
:

24
1200 Sq. Ft
01
50 Sq. Ft.
12
2 students per station
01
01
04 Hours

Sl.No.
Name of the Item
Heavy Equipment:

Quantity

1. SS Work table 3 x 3 ft
2. (With granite / marble top and cabinet with drawer)
3. Three deck oven SS Body
4. Planetary mixture 25 Lit.
5. Planetary mixture Table top model 5 Lit
6. Proofing cabinet matching with size of oven
7. Refrigerator four door vertical 1000 Ltrs
8. Refrigerator 300 Ltrs
9. Cooking range 4 burners LP
10. S.S.Cooling racks with castors 4ft x 2 ft x5 ft
Stools for students (stackable)
11. Demonstration table with granite/ marble top 4 ft x 2 ft x 34
12. SS Sink with Drain Board with hot and cold water
13. Ice cream cum sorbet machine (top loading)
14. Marble top refrigerated under counter machine
15. Weighing Scale (0-5 KG)
16. Sugar grinding machine
17. Decoration spray gun
Light equipment:
1.
2.
3.
4.
5.
6.
7.
8.

12
01
01
01
01
01
01
02
02
30
01
06
01
01
02
01
01
(as per requirement)

Baking trays large 22x14 MS


Baking trays small 11x6 MS
Bread tins (400 gm)
Cake tins round various sizes: (7 dia /9 dia /11 dia)
Underlining tray
Cake tin Rectangular :( 5x5/ 7x7/9x9/11x11/ 14x 14
Barquette mould 3 length
Small whisk SS

18

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

9. Tartlet mould
10. Savarin mould
11. Muffin trays
12. Brioche mould
13. Fancy mould assorted
14. Doughnut cutter SS
15. Vol-au-vent cutter
16. Quiche mould
17. Chocolate mould assorted
18. Egg Slicer
19. Lemon squeezer
20. Can opener Heavy duty
21. Small brass kadai 6 dia
22. Precision scale electronic
23. Round laddle SS
24. Grater
25. Saute pan (small) Brass
26. Saute pan (medium) Brass
27. SS Measuring jug
28. Knives all purpose
29. Croquenmouche cone
30. Large cast iron halwai kadai
31. Jellebi thawa
32. Large frying spoon
33. Long handled wooden spoon
34. Large low level cooking stove
35. SS bowl (small) 8 dia
36. SS bowl (large) 12 dia
37. SS Parats 18 dia
38. SS Mug
39. Rolling pin wooden
40. Egg beater
41. Wooden spoon
42. Plastic scraper
43. Table spoon SS
44. Fork SS
45. Measuring Jug Enamel
46. SS Tea Spoon
47. Measuring spoon set
48. SS Sink with drain board
49. SS degchi with flat bottom 12 dia
50. Wire Whisk
51. Comb for decoration
52. SS strainer
53. SS sieve (full set)
54. Piping bag with nozzle
55. Electrical egg beater

19

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

56. Mixer
57. Decoration table
58. Silpat
59. Sugar thermometer
Students should be advised to ensure kitchen tool kit consists of the following items:
i. Chef knife - 01No,
ii. Vegetable knife 1 No.
iii. Vegetable and fruit carving knife _1 No.
iv. Peeler- 1 NO
v. Palate knife 1 No
vi. Wooden spoon-1 No
vii. Egg beater/ whisker -1 No
viii. Rubber/ plastic spatula- 1 No

Note:
1. Bakery and confectionary should be provided with adequate exhaust hood and fresh air
supply system.
2. Kitchen should be well illuminated preferably by using CFL Tubes.
3. All the walls should be tiled up to minimum 7 feet from the floor level.
4. Kitchen Flooring should be non slippery tiles/ kota.
5. Adequate number of portable fire extinguishers (DCP dry powder) should be provided.
6. First aid kit should be accessible.
7. Separate provision for hand wash for disinfectant and hand dryer to maintain highest
level of hygienic standards.
8. Adequate Insects-cutter should be provided at the door.
9. Air curtains should be provided at the door.
10. Stainless steel equipment should be of 304 SS (Food grade).

20

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

COLD & DRY FOOD STORE


OVERALL SIZE

1000 Sq.Ft.

Sl.No.
Name of the Item
Cold Storage equipment:
Four door vertical refrigerator 1000 ltrs
Vertical two door deep freezer 500 ltrs
SS Storage Rack 3 ft x 1.5 ft x 6 ft (to be used from both side)
SS Storage container (Bins)5 Kg/10 Kg/ 15 Kg
SS Masala rack with 36 SS containers
SS Onion potato rack
Platforms scale 0-500 Kg.
Electronic scale 5 Kg
SS Sink with DB
SS/ MS Trolley platform type
Steel cup board
Filing cabinet 4 drawer
Store keeper table
Chair
Issue counter with under shelves
File rack
Pallet platform PVC 5 ft / 6 ft length
Computer table
PC with printer
Printer table
Ladder with 4 steps

Quantity
2 No.
2 No
15 No

The receiving area should be separated from facilitates washing and wiping before
storage (approx. 200 sq ft.)

21

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

EQUIPMENT FOR MICROBIOLOGY LABROTARY REQUIREMENTS FOR 24


STUDENTS IN A GROUP
Microbiology Lab should be of 600 square feet in case of 120 with most modern equipments.
WORK STATIONS REQUIRED FOR 24 STUDENTS:

6 work stations for a group of 4 students for 120 intake and 4 work stations for a group of 4
students for 60 intakes.
EQUIPMENT

NO. OF UNITS

1. Centrifuge Machine
2. Binocular Research microscope
3. Digital Balance (Metler)
4. Cubic colony counter (Digital)
5. pH meter (Digital)
6. Research Microscope
7. Micropipettes
8. Laminar Air Flow
9. Refrigerator
10. Auto clave
11. Wortex Mixture
12. Spectrophotometer
13. Incubator
14. Water Bath
15. Camera Lucida
16. Photo micrographic Camera
17. Membrane Filter Assembly
18. Chemicals
19. Glassware

02
05
01
03
03
10
10
01
01
02
02
02
02
02
01
01
01

List of glassware:

Conical flask (Big and Small)


Pipettes
Petridish
Beakers
Droppers
Indicator bottles
Glass bottles
Glass rods
Measuring flasks (big and small)

22

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

TRAINING RESTAURANT - I

Sl.No.

Dining area

1920 (1440 + 480 Sq Ft for pantry)

No. of Covers

48

No. of Students

24

Faculty required

01

Name of the Item

Quantity

Heavy equipment
FURNITURE:
Table (wooden 3 ft x3 ft x 2 ft H)
Instructors Table
Chairs (dining) wooden upholstered 18x 18 x36
Side Boards 4x1.5x 42 H
White Boards 5x3
Tripod stand

12
01
48+5 extra
6
1
1

LINEN:
Table cloth
Baize cloth
Napkins
Runners for sideboard (optional)
Naprons
Salver cloth
Tray cloth
Cold towels
T Cozy
Buffet cloth
Frills

As per requirement

CUTLERY (STAINLESS STEEL) :


Side knives
Large knives
Service forks
Service spoons
Dessert spoons
Dessert forks
Dessert knives
Fish knives
Fish forks
Soup spoons

As per requirement

23

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

Butter knife
Tea spoons
Coffee spoons
Ice cream spoons
Fruit knives
Fruit forks
Pastry forks
Steak knives
Jam spoo
Crockery:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

Large plates (full plates) 10


Half plates 9
B&B plates
Soup cups with saucers
Cereal bowl 5 dia
Breakfast cups/saucers 8 floz
Tea cups/saucers 6 floz
Demitasse/saucers 3 floz
Consomme cups/saucers 8 floz
Egg cups
Ash trays
Budvases
Cruet sets

As per requirement

Hollowware and Flatware (Stainless Steel) :


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

(As per requirement)

Wager jugs
Tea pot (2 portions)
Tea pot (4 portions)
Milk pot
Hot water jugs
Coffee pots (2 portions)
Coffee pots (4 portions)
Creamer
Sugar bowls
Butter dishes
Ice creams cups
Finger bowls
Menu stands
Sauce boats with ladles
Tea strainer/slop basin
Ash trays
Straw holder
Toothpick holder
Candle holder
Entre dishes single compt. (2 portions)
Entre dishes single compt. (2 portions)
24

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.

Entre dishes single compt. (2 portions)


Entre dishes double compt. (4 portions)
Platter 2 portions (oval)
Platter 4 portions (oval)
Platter small (round)
Platter medium (round)
Restaurant trays (small)
Restaurant trays (medium)
Sugar tongs
Ice bucket
Ice tongs
Toast racks
Chill cups with stands
Restaurant salvers
Mustard spoons
Food covers

Glassware:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.

(as per requirement)

Water tumbler (high ball)


Water goblets
Juice glasses / pony tumblers
Tom collins
Jam & mustard pots / chutney bowls
Glass bowls
Beer goblets
Draught beer glass
White wine glass
Red wine glass
Parisian goblets
Claret glass
Sherry elgin
Sherry copita
Port wine glass
Hock glasses
Moselle glass
Champagne tulip
Champagne flute
Champagne saucer
Cocktail glass
Brandy balloon
Liqueur glass (straight)
Liqueur glass (standard)
Old fashioned
On the rocks glass
Roly poly
Parfait glass
Decanter
25

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

30.
31.
32.

Coffee carafe
Martini glass
Sour glass

Special Equipments:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.

(As per requirement)

Soup tureens (single portion)


Horsdoeuvre tray
Wine bucket stand
Pastry tongs
Nut cracker
Gateaux slicer
Pepper mill
Nutmeg grater
Cigar cutter
Cocktail shaker
Hawthorne strainer
Bar spoon
Ice picks
Peg measure
Optic measure
Check-flow pourer
Push up measure pourer
Ice cream scoop
Bottle stand
Wine rack
Hydrometer
Avocado dish
Asparagus plate
Asparagus tongs
Egg dish (round ear)
Fish dish (oval eared)
Oyster dish/plate
Oyster fork
Snail dish
Snail fork
Snail tong
Parfait spoon
Salad dish
Cheese knife
Grape fruit knife
Grape fruit spoon
Lobster cracker
Lobster pick
Corn on the cob holder
Grape scissors
Caviar knife
Fondue fork/dish
Carving set
26

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.

Cheese board
Skewers (stainless steel with wooden handle)
Oil & vinegar cruet
Sugar dredger EPNS
Rechauffe battery
Fruit basket
Gateaux stand
Chopping board
Table numbers
Waiters friend SS
Angelss wings
Crown cap opener
Can opener
Wine craddle
Ice shaver
Broken cork extractor
Corking machine
Citrus squeezer SS
Funnel SS
Bar mixing glass SS
Swizzle stick
Muddler
Cocktail sticks

27

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

TRAINING RESTAURANT WITH BAR


Dining area (1440 + 200 Sq.Ft. for Bar + 540 Sq.Ft. for Pantry)
No. of Covers
No. of Students
Faculty required

:
:
:
:

2180
48
24
01

-----------------------------------------------------------------------------------------------------------Sl.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------FURNITURE :
1.

2.
3.
4.
5.
6.
7.
8.

Table wooden-

Square 4 seater
3 ft
Square 2 seater
2.5 ft
Rectangular 6 seater 6 ft x 3 ft
Round 6 seater 5 ft dia
(Selection to based on dcor & lay out)
Dining Chair wooden upholstered (as per dcor)
Side boards 4x1.5x4 (depending on dcor and layout)
Tripod stand
White boards on stand
Hostess desk
Podium/lectern
Bar stools

LINEN:
1. Table cloth
2. Baize cloth
3. Napkins
4. Runners for sideboard (optional)
5. Naprons
6. Salver cloth
7. Tray cloth
8. Cold towels
9. T Cozy
10. Buffet cloth
11. Frills

48 +5 Nos.
6 Nos.
01
01
01
08
As per requirement

Cutlery :
1.
2.
3.
4.
5.
6.
7.
8.
9.

10
04
02
02

Small knife/fork
Large knife
Fish knife/fork
Large fork
Service spoon/fork
Dessert spoon
Dessert fork
Soup spoons
Small fork
28

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.

Butter knife
Tea spoons
Coffee spoons
Ice cream spoons
Fruit knife
Fruit fork
Pastry fork
Steak knife
Pastry tongs
Gateaux slicer
B&B knife

As per requirement

Crockery
1.
Large plate (full plates) 10
2.
Half plate 9
3.
Quarter plate 7
4.
Soup cups with saucer
5.
Show plates
6.
Tea cups/saucers
7.
Demitasse/saucers
8.
Ash trays
9.
Budvases
10.
Cruet sets
11.
Chutney bowls
12.
Salad dishes

As per requirement

Hollowware & Flatware


1.
Water jugs
2.
Tea pot (2 portions)
3.
Tea pot (4 portions)
4.
Milk pot (2 portions)
5.
Coffee pot (2 portions)
6.
Coffee pot (4 portions)
7.
Creamer
8.
Sugar bowls with tongs
9.
Butter dishes
10.
Ice cream cups
11.
Finger bowls
12.
Menu stands
13.
Tent card holder
14.
Table numbers (brass)
15.
Sauce boat with ladles (small)
16.
Sauce boat with ladles (large)
17.
Tea strainer slop basin
18.
Candle holder
19.
Ash trays
20.
Straw holder
21.
Toothpick holder
22.
Entre dishes with lid (2 portions) single compartment
29

As per requirement

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.

Entre dishes with lid (4 portions)


-doEntre dishes with lid (6 portions)
-doEntre dishes with lid (4 portions) double compartment
Platter oval (2 portions)
Platter oval (4 portions)
Platter oval (6 portions)
Platter round (small)
Platter round (medium)
Ice bucket with tongs
Chill cups
Finger bowls
Supreme bowls with inserts
Napkin rings

GLASSWARE:
1.
High Ball
2.
Water Goblets
3.
Pony tumbler
4.
Glass bowls
5.
Decanter
6.
Coffee caraffe
7.
Fancy glasses
8.
Parfait glass

As per requirement

Heavy Equipment:
As per requirement
1.
Soup dispenser different sizes
2.
Coffee making machine (cona)
3.
Flamb trolly
4.
Flamb pan (oval & round)
5.
Rechauffe battery
6.
Juice chiller/dispenser
7.
Juice extractor
8.
Water cooler 80 ltrs.
9.
Plate warmer & dispenser (Glass case50 plates capacity)
10.
Wine /liqueur trolley
11.
Dessert trolley
12.
Horsdoeuvre trolley
13.
Carving trolley
14.
Cheese Trolley
15.
Salad trolley
16.
Large restaurant trays (SS)
17.
Restaurant trays (SS) medium
18.
Restaurant trays (SS) small
19.
Beverage round (SS) medium
20.
Beverage round (SS) small
21.
Bread baskets
22.
Plate covers
23.
Mirrors buffet displays

30

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

BAR COUNTER WITH 8 BAR STOOLS


-----------------------------------------------------------------------------------------------------------Sl.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------FURNITURE:
1.
2.
3.
4.

Bar counter (size, shape etc. as per requirement)


Back bar with display
(-do-)
Bar stools
Dry storage area

01
01
08
As per requirement

EQUIPMENT:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.

Ice cube machine


Bottle cooler
Ice chest (crushed ice)
Cocktail blender
High speed mixer blender
Juice extractor
Cocktail shaker
Hawthorn strainer
Ice bucket with tongs
Bottle stands
Peg measure
SS Sink with drain board
Citrus squeezer
Cigar cutter
Chopping board
Knife
Paring knife
Zester
Wine cooler
Wine craddle
Cigar box
Ice flake machine
Glass chilling cabinet

01
01
01
01
01
01
02
02
06
02
02
01
06
02
04
01
01
02
02
02
02
01
01

GLASSWARE:
1.
2.
3.
4.
5.
6.
7.

(As per requirement)

Brandy balloons 23-28 CL


Champagne flute 18-23 CL
Champagne Saucer 18-23 CL
Tom collins 25 CL
Beer mugs & tankard 25, 50 CL
White wine glasses 14 CL
Red wine glass 14-18 CL
31

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

Cocktail glass 14-18 CL


Liqueur glass 4,7 CL
Old fashioned glass
On the rocks flass
Martini glass
Wine caraffe
Soda carafe
Water caraffe
Rolly polly
Sherry glass 4,7 cl
Port glass
Hock glass
Mosselle glass
Pool gloves

As per requirement

32

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

FAST FOOD RESTAURANT


Overall size
No. of students expected at a time

:
:

500 Sq Ft.
60-65

-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------Tables (wooden/steel)
Chairs (wooden/steel)
Hot case
Cash register
Service counter
Tea/coffee dispenser
Assorted water dispenser
Juice dispenser
Cooking range heavy duty with 4 burners
Deep fat dryer
Grinding plate
Work table with under shelves (SS 3 sides covered)
Deep fat dryer
Sink with DB
Refrigerator
Deep freezer
Assembly table SS large
Ice cream display counter
Salamander
Microwave oven
Menu display board

12
65
02
as per requirement

--------------------------------------------------------------------------------------------------------

33

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

STUDENTS DINING HALL


Total Area
Dining area
Pantry area
Duration of meal time
Maximum seating capacity

:
:
:
:
:

Max. 2300 Sq Ft.


2160 sq ft
540 sq ft
1 Hour
200

-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------1.
2.
3.

4.
5.
6.
7.
8.
9.

Dining Tables 6x3 built in bench


OR
Dining chairs
SS Service Counter 8 ft x 3 ft with 6 compartments
a) Hot case
b) Display counter
c) Dispenser counter for plates & cutlery
d) Tray slide for the entire length

25

Compartmental trays (Thalis 304 SS Salem Steel 16SWG)


Dessert spoons
SS water tumbler
SS water jugs
Water cooler with Aqua Guard (large industrial model)
Large round service spoons SS 16 SWG

225
225
225
15
02
24

200
02
02
02
02

SCULLERY AREA:
1.
2.
3.
4.

Cupboards for storage of cutlery/trays etc.


As per requirement
Dish landing table
Pulverize
Conveyor type large dish washing machine
With drying zone with trays
5.
Trolleys (for carrying food from QFK to Dining Hall)
6.
Trolleys for stacking dirty plates for washing
7.
Waste bins
8.
Music system (Optional)
--------------------------------------------------------------------------------------------------------------

34

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

HOUSEKEEPING LAB
Laundry
:
1200 Sq.Ft.
Linen Room
:
400 Sq.Ft.
Housekeeping display and Lab (including Florist Room) :
1200 Sq.Ft
Guest Room / Mockup Room
:
1500 Sq. Ft
No. of students per session
:
24
No. of guest rooms
:
01
Uniformed staff : All teaching + Practical + Admn. Staff should be uniformed.
HEAVY CLEANING EQUIPMENT:
-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------Vacuum Cleaner (straight suction dry pickup industrial model)
Vacuum cleaner (upright cleaner)
Portable vacuum cleaner
Vacuum Cleaner (wet & Dries pickup indl. Model)
Compact floor Polishing machine
Floor Scrubber dryer
Foam Generator for carpet shampooing
Spray extraction machine
Geyser/ Storage boiler
Telescope poles for glass cleaning system
Spot cleaning equipment with accessories
Wringer trolley Janitorial trolley
Mechanical sweepers
Vacuum table stain removal machine
Machine for cleaning and iron
Hot and cold water Jets
CLEANING EQUIPMENT:
1.
Brooms :
a) Soft
b) Hard
c) Yard broom
2.

}
}
}

01
01
01
01
01
01
01
01
01
01
01
03
01
01
01
01

As per requirement

Brushes : (all are to be made of nylon bristles)


a) Carpet brush
}
b) Hand scrubber
}
c) T-scrubber
}
d) WC brush
}
e) Upholstery brush
}
f) Ceiling broom
}
g) Washbasin brush
}

35

As per requirement

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

3.
4.
5.
6.

Mops :
With detachable/fixed heads
Squeegees
Box sweeper
Containers :
a) Buckets 25 Ltr. Capacity
b) Mugs
c) Bowls
d) Dust bins
e) Polish trays
f) Chamber maids box
g) Maids trolley
-

As per requirement
As per requirement
01
}
}
}
}
}
}

01
01

Dimensions in mm 1540 x575 x1385


Light weight frame
Average load capacity
Adjustable shelves
With compartmentalized top section
Linen hamper canvas
Garbage hamper
Castor size 250 mm / 2 fixed and 2 swivel with breaks
Bumpers wheel type (horizontal)

g) Mop wringer trolley


h) Cleaning trolley
7.

8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

As per requirement

---

Floor signs
-- 24 Ht. Caution-Wet Floor
- Caution-Work Area
- Yellow colored board with black lettering
Drying rack
Demonstration table WITH CABINETS 8ftx 3 ft 33
Ceramic Sink
Storage trolley 3 ft x2 ft x 33
Perforated display board to hang equipment (large size)
Cleaning agents
Step ladder long size 7 ft
Step ladder medium size 4 ft
Teachers table
Teachers chairs
Computer table
PC with printer
Cupboards
Rack
Side table
Stools (stackable)
First aid kit
Screw driver multipurpose
36

As per requirement
-do-do-

02
01
02
04
02
As per requirement
02
02
01
02
01
01
01
01
01
24
01
02

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

25.
26.
27.

Plier
Khurpa
Hammer

02
04
02

Display sample section / Models / Material Boards


1. Floorings different types and finishes 1 ft x 1 ft
(Various types of stones: kota, dholpuri,marble, granite)
(Tiles: vitrified, ceramic, anti-slippery,texturized, )
(Cement based surfaces: terrazzo, mosaic, granolithic)
(Wood: block, strip, mosaic)
(Linoleum, cork, rubber)
2. Floor coverings : matting, carpets
Types of weaving and construction
Types of materials
3. Wall coverings : types of wall papers, tiles, upholstery
4. Fabrics :
a. types of linen,
b. upholstery fabrics
c. furnishings
d. draperies materials
e. uniform materials
5. Window treatment
a. pelmets
b. balances
c. blinds
d. shutters and shades
6. Types of windows
a. French
b. Casement
c. Revolving and others
7. Curtains
a. Hanging system
b. Stitching styles
8. Furniture
a. Materials
b. Finishes
c. Construction (joints and finishes)
9. Lighting
a. Types of lighting system
b. Types of lighting fixtures
10. Paints (types and finishes)
11. False-ceilings
12. Glass and mirror surfaces
13. Bed room displays (furniture and furnishing/supplies Beds linen and bedding for
demonstration)
14. Bathroom fittings, finishes and supplies.
15. cleaning agents and chemicals
37

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

Requirement for Florist room


16. Work table 4ft x 2.5 ft
17. Flower vases assorted
18. Plastic Containers for holding flowers and foliage
19. Racks
20. Pin point holders
21. Scissors
22. Clippers
23. Spray bottle
24. Water mugs

38

01
25
08
02
12
06
02
06
06

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

LAUNDRY EQUIPMENT
Area

1000 Sq Ft

-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------1.

Washer extractor (10 kg.)

02

(5 kg. Cap one, top loading-fully automatic agitator type with temp. control)
(10kg. Cap one, front loading with thermostat. Control)

2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

16.
17.
18.
19.
20.

Laundry washer (25 kg)


Spin Dryer
(25 kg)
Tumble dryer (25 kg)
Calendaring machine standard (with one roller width 100)
Steam press (with cuff & collar press hand operated)
Iron (light weight one & heavy duty- one)
Ironing Table
Sinks (stainless steel with drain board)
Deep SS Sink mobile
Weighing scale (with a holding basket to weigh upto 25 kg)
Linen basket trolley (stainless steel with draining facility
820mm Ht.x 65mm W x 740 mm L - 4 swivel castors)
Shelf (for storing chemicals with lockable doors, Particle
Board laminate finish dimensions 1200mm H x 900 mm L
x 600 mm D - 3 shelves adjustable)
Exhaust Fan (one above dryer and one above steam press) Shelves (for storing linen & uniforms, wood laminated with
Sliding lockable ventilated doors)
-

01
01
01
01
01
02
02
02
02
01
03
01
As per requirement
-do-

a) Dimensions 2100mm H x 600mm D x 2100mm W


adjustable shelves 4 Nos.
b) Dimensions 2100mm x 600mm x 2100mm
Shelves 2 with rods for hanging uniforms

02

Ladder (aluminum A type 1200 mm height)


Inspection table (2100mm x 1200mm wood laminate with
storage facility underneath with 2 shelves on either side of 600 mm depth)
Water boiler/ geyser 35 ltrs
Two burner gas range with Gas cylinder
Laundry cleaning agents

01
01

39

01

01
01

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

LINEN ROOM
(adjacent to Laundry).
Area

400 Sq Ft

-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------1.
2.
3.
4.
5.
6.
7.
8.
9.

Linen room in-charge table


Chairs
Linen storage trolleys
Linen storage shelves
Mobile hanger
Soil linen bins
Linen trolleys
Sewing machine
Linen exchange counter

01
02
02
03
02
02
02
01
01

40

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

GUESTROOMS / MOCK-UP ROOM


Area :
1500 Sq Ft. (set of 1 suite + 2 standard rooms)
-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
--------------------------------------------------------------------------------------------------------------FURNITURE PER ROOM:
Bed with side tables
Single sofa chair with upholstery or small size two seat sofa
Glass top tea table/coffee table
Study table
Study chairs
Mirror with dressing table & drawers
}
Luggage rack
}
Wardrobe
}
Shelf over fridge for glasses & thermos
}

2 Nos.
1 No.
1 No.
1 No.
2 Nos.
1 No.

LIGHT ELECTRICAL EQUIPMENT & PAINTING :


1.
2.
3.
4.
5.
6.
7.
8.

Geyser (20 ltrs.)


Table lamp
Pedestal lamp
Color TV with remote
Music system
Mini fridge
2x1 painting/wall hangings
Thermos flask

1 No.
3 Nos.
1 No.
1 No.
1 No.
1 No.
3 Nos.
1 No.

FURNISHING & LINEN:


1.
2.
3.
4.
5.
6.
7.
8.
9.

Shear curtain
Heavy curtain
Cushions for sofa chair
Double bed sheet
Pillow covers
Bed cover
Bath towel
Hand towel
Bath mat

1 No.
1 No.
4 Nos.
2 Nos.
4 Nos.
1 No.
2 Nos.
2 Nos.
1 Nos.

OTHER ITEMS:
1.
2.
3.
4.
5.
6.

Shower curtain
Towel rack with pull up type cloth lining
Energy saving device system
Electronic locking device on main door
Telephone (electronic & light weight)
Door bell & Indicator for DND

41

}
}
}
}
}
}

1 No.

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

FRONT OFFICE REQUIREMENT


Area
Batch size

:
:

600 Sq Ft
24

-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------FURNITURE:
1.

Front Office Counter

01

6L x 1B x 3H with drawer 3 Nos.


Cabinets 3 Nos., Top & Sides - laminated
Reception, Cash & Information sigh boards
Registration card holder recessed with 28 slots with
Facility for recessed monitors & sliding key board
recessed message & key rack at the centre teak wood.

2.

a) Lobby Desk (3L x 2B x 2H with drawer 1 no., cabinet 1 no.

01

on right side, top & sides laminated teak wood)

3.

b) Chair (upholstered teak wood)

03

Bell Desk (4 H semi circular, with drawers 2 nos. cabinets 2 nos. teak wood)

02

EQUIPMENT:
Computer linked by LAN with multimedia facility And latest PMS Software
Bulletin Board (3L x 2.5B with baize cover)
Public Address System (standard specification)
Printer (80 column)
Exchange Rates Board (2L x 2B Presto sign type)
Safe Deposit locker (standard specification)
Board (1L x B with handle & bells attached,

01
01
01
01
01
01
01

RESERVATION OFFICE:
1.

Table
3L x 2B x 26H with drawer-1 No., Cabinet 1 No. on
Right side Top & Sides laminated, with facility for
Recessed monitors and sliding key board, teak wood.

01

2.

Chair Swivel type

01

3.

01

4.

Space Availability Board (3L x 2.5 with pegs for


Indicating availability - Particle board)
Luggage Trolley (standard )

Note:

Lab should be air-conditioned.


42

02

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

Equipment of computer lab with specification


Hardware
description

Configuration /specification

Server

Processor
Processor
Family

Intel R Xeon R 5500 series


Intel R Xeon R 5600 series

No. of
Processors

02

Processor
Core available

6 or 4 or 2

Memory
Maximum
Memory

192 GB

Memory slots

18 DIMM slots

Memory type

DDR3 RDIMM or UDIMM

I/O
Expansion
Slots

Network
Controller

(1) 1GbE NC326i 2 Ports

Storage
Maximum
Drive bays

(16) SFF SAS/SATA or


LFF SAS/SATA

Supported
Drives

Hot plug 2.5-inch SAS


Hot plug 2.5-inch SATA
Hot plug 3.5-inch SAS
Hot plug 3.5-inch SATA

Storage
controller

(1) Smart Array P4 10i


integrated
(1) Smart Array P4 10i/256 MBBBWC
(1) Smart Array P4 10i/512MB BBWC

43

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

Workstation

Intel Pentium 42.8 GHz


Cache memory L2cache
Cache per processor 512 KB
Main board
Chipset type Intel 865 G
Data bus speed 533.0 MHz
RAM
Installed Size 256.0 MB/2.0 GB (max)
Technology DDR SDRAM
Memory speed 333.0 MHz
Memory specification Compliance PC2700
Hard drive 1.0 x 40.0 GB-Standard-ATA-100-7200rpm
Optical storage
Type CD-ROM-IDE
CD/DVD read speed 24x
Graphic controller
Type AGP-Integrated
Graphic processor /vendor Intel Extreme graphic 2 shared video
(UMA)
Video Memory 64.0 MB/64.0 MB (max)
Audio output
Sound card Integrated
Max sample rate 48.0 KHz
Audio output compliant standard AC97, Sound Blaster
Operating system/Software
OS Provider Microsoft window XP Professional SP1
Software Altiris eXpress (Trial), Drivers & Utilities, Altiris PC
Transplant Pro (Trial)
Microsoft Internet Explore
Keyboard and Mouse

Monitor

19 LCD Monitor

Network

Standard make

Laser
Printer

Standard make

Scanner
1

44

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

LCD Projector

Optical
Projection System 3LCD panels, 1 lens projection system
Panel 0.63 (1.6 cm) X GA pane
2,359,296(1024 x 768 x 3) pixels
Projection lens 1.2 times zoom lens,
F=18.63 to 22.36 mm, F 1.65 to 1.80
Lamp 200W Ultra High Pressure Lamp
Signal
Colour System NTSC3.58, PAL, SECAM, NTSC4.43, PAL-M,
PAL-N, PAL60
Resolution RGB 1024 x 768 pixels
Acceptable Input Signals Computer fH: 19 to 80 kHz, fV: 48 to 92
Hz (Up to SXGA + (fV 60 Hz)
Acceptable Input Signals Video 15 kHz RGB/Component 50/60
Hz, DTV(480/60i, 480/60p, 575/50i, 575/50p, 720/60p, 720/50p,
1080/60i, 1080/50i)
General
Dimensions ( WxHxD) 295 x 74 x204 mm
Input/Outputs
Input a( analog RGB) Analog
RGB/Component, HD D-Sub 15-pin
Video Input composite Video, RCA phono jack x 1
Audio Input Stereo mini jack (Share) x 1
USB Type A connector x 1
Network RJ-45,IEEE 802.11a/b/g

45

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

LCD Projector Screen Coverage 40(101.6 cm) to 300(762 cm)


(Viewable area measured diagonally)
screen

UPS

0.5 kVA

24

Online UPS

As per load

Whiteboard

Furniture

As per work station

26

AC

2 Tons x2

Electric work

As per requirement

LCD display
1 No.
5 KVA UPS with battery backup of minimum 30 minutes
2 Nos.
Local Area Network areas: Cat-5 / Wi Fi, structured / Non-structured as desired for full
institute.
----------------------------------------------------------------------------------------------------------GENERAL COMPUTER SOFTWARE SPECIFICATION:
Microsoft office latest version for server and office.
Window NT Server with Clint for 30 users (CD).
MS Windows 95 or higher & Micro Software Office (CD) professional version.
Note :
1-Main server shall be located in the Computer Lab and computers in Stores, Labs,
Administration, etc. shall be linked by LAN.
2-Language software for example words worth should be loaded in place of language lab and
same can be utilized after regular teaching hours.
3-Property management software for practice to the students of front office.
4-Campus preferably should have Wi Fi connectivity.

46

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

AUDIO-VISUAL AND REPRODUCTION EQUIPMENT


-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------Overhead Projector

01

LCD projector

04 (for use)

Laptop

04

Projection Screen

01+ (04)

Colour TV / Monitor 48

01

Printer with photocopier

01

Flip Board Portable - for slip charts

02

Flannel Board Portable

01

47

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

LIBRARY

Area

1600 Sq Ft

-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------Books with 250 titles

1000 Nos.

Periodicals & Journals (International/National)

10

Video Cassettes /Video / CD ROMS


Furniture for sitting of 60 scholars at a time
Store-wells / Book Racks

Library Equipment:
- Computer (with Library Management System)
- TV
- Printer
- Cutter
- Catalogue Systems
- Librarian Chair & Table
- Asst. Librarian Chair / Table
-----------------------------------------------------------------------------------------------------------Note : 1- Every year min. 200 books with minimum 50 new titles should be added to Library
and International/National Journals should be subscribed.
2- Desirable 5 cabins fitted with computer terminal and Multimedia with head phones
for reading / viewing books available in CD forms.

48

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

HOTEL ENGINEERING MAINTENANCE DEPARTMENT


Area

900 Sq Ft

-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------1.
Multimeter
1 No.
2.
Tong-tester
2 Nos.
3.
Hydrometer
1 No.
4.
Test lamp
2 Nos.
5.
Hydraulic pump
1 No.
6.
Meager insulation & Earth meager
1 Each
TOOLS:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.

Screw driver (flat type)


As required
Screw driver (Star)
Screw driver
Spanner (double and open)
Ring spanner
Box spanner
Hack saw
Wood saw
Pipe wrench
Adjustable spanner
Combination pliers
Nose pliers
Wire cutter
Skipper or insulation
Files (flat, Rough, Round , Smooth, Triangular )
Hammer
Chisel (cold)
Carpenter chisel
Carpenter plainer
Poker
Punch
Drilling machine electric with drill bit set
Drilling machine (hand drill)
Bench vice
Thread making machine with full set with Different size of die
Bearing puller small
Lubricating oil can
Oil pump (manual)

49

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

OFFICE AUTOMATION/COMMUNICATION EQUIPMENT


-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------1.
2.
3.
4.
5.
6.
7.
8.
9.

E-Mail facility and Internet connection


Fax
Photocopier
Public address system
Scanner / Printer
Computers System through LAN
EPABX
Fast Printers (with 120 copies/minute)
Software :
a) Accounting & Management Software
b) Inventory & Stores Management Software
c) Library Software
d) Teaching software

------------------------------------------------------------------------------------------------------------

50

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

EQUIPMENT FOR EACH CLASS / TUTORIAL ROOM


-----------------------------------------------------------------------------------------------------------S.No.
Name of the Item
Quantity
-----------------------------------------------------------------------------------------------------------1.

White Board

01

2.

Lecterns stand

01

3.

Teachers table and chair

01

4.

Students chairs with writing pad

5.

Over head Led project or in each class room (Fixed)

60/30
01

-------------------------------------------------------------------------------------------------------------

51

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

Gas Bank:
Well laid out distribution lines from gas bank as per the conditions laid down by local
Chief Fire Officer and supplying agency or natural gas line as per the specifications of
supplying agency. (Canopied cover and wire meshed sides to households)
Fire Fighting and security equipments
It is desirable that Institute should have proper fire fighting equipments and produce
no objection certificate from the department of Fire safety.(Displayed in the main
building/Hostel)
Electricity connection
Stand by heavy duty Generator:

= 125 KVA (for campus with hostel only for 120 intakes)
6

In areas where electricity is in short supply, the appropriate heavy duty Gen set of
minimum 625 KVA is recommended for installation.
OTHER REQUIREMENTS:
S.T.P.

Sewage Treatment Plant

Water Harvesting

As per standard Norms

Vermipost

for garbage disposal

Alternate energy resources

Biogas / or solar panels

Green campus

Lots of green and energy saving devices.

Security pills

as per Architect master plan

Water storage

60,000 Galan for 120 Intakes


(Underground with over head tank)

Air curtain

for entry at every Lab area

Portable water

Through reserve 05 mosis System


As per requirement fitted in labs, and
Other designed areas, with water cooler

52

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

PREFERRED AREA ALLOCATION AND LINKAGE OF DIFFERENT


LABS/ AREAS
At Ground floor it is advisable to have following academic and administrative areas:

Principal s office
Administrative office
Accommodation operations Laboratories
Multipurpose hall/ auditorium
Gas bank
Store
Generator room
Computer room
Front office lab.
Engineering and Maintenance department
Security

Advance training kitchen should be along with the training restaurant.


Students dining room and cafeteria should be along with Quantity food kitchen.
Basic training kitchen should be near the basic bakery and bakery and confectionary.
All kitchens can be connected with the store by food lift.
Every floor should have students toilet separately for boys and girls.
Separate toilets for academic and administrative staff.
Provision of water cooler should be on every floor.
Provision of CCTV in common area or as per requirement of the Institute and monitoring
system of the same should be located in the Principal/ Administration office.
Adequate fire protection in every lab and the general area as per the norms of local authority.
Recreational facilities should be provided to the students.
Front office and training rest ants should have flooring of designer tiles/ wooden/ verified
tiles.
Computers labs should have flooring of PVC/tiles.

53

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

FACULTY&
STAFFNORMS

54

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

STAFF NORMS
The staff salaries account for about 60% of the recurring expenditure of an Institute of Hotel
Management. The effective and efficient deployment of faculty and staff will improve the quality of
instruction and ensure quality output, growth and development of the Institutions.
Depending on the nature of the work, the members of the staff are grouped as follows:
Principal and Teaching Staff
Supporting Staff (skilled & non-skilled)
Administrative and Ministerial Staff
ACADEMIC NORMS FOR STAFF REQUIREMENTS
While developing the norms for staff requirements, the factors like students intake, program
offered, use of teaching methods, contact hours, (practical and theory inputs) as per curriculum
extracurricular activities involved have been considered. The semester system, continuous assessment
scheme, exams evaluation project work has increased the work load of the teachers and this fact has
also been taken into consideration.
STRENGTH OF TEACHING STAFF:
The strength of the teaching staff may be worked out on the following basis:
1.

i)

The number of contact hours are taken as 35 clock hours per week.

ii)

Strength of students is taken as 50-60 lecture/theory classes and 24 in


tutorial/laboratory/workshop.

iii)

The average teaching load of 16-22 Contact hours per week is used as basis for
calculating the staff strength with corresponding changes.

iv)

The strength of the teaching staff so worked out would come to a staff students ratio
for practical classes is 1:24 for 120 intake.

55

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

2.

WORKLOAD DISTRIBUTION:

Teachers will be required to spend 35 clock hours per week in Institutional activities. Total
contact hours (teaching load) are worked out considering the curriculum requirements. The work load
distribution for all Institutional activities is suggested below:

S.No.

Activity

Hours per Week


For HODs
For
Sr. Lecturers

For Lecturers /
Asst. Lecturers

1.

Contact Hours (Teaching Load)

16

22

22

2.

05

07

08

3.

Preparation, Assessment and


Evaluation Work
Administrative Work

05

02

01

4.

Counseling & Guidance

04

02

02

5.

Development Activities and


Community Services/R&D

05

02

02

35

35

35

Total

4.

STAFF POSITION

S.No.

Category of Staff

Pay Scale

1.

Principal

Rs.37400 - 67000 (grade pay Rs. 8700)

2.

HOD

Rs.15600 39,100 (grade pay Rs. 6600)

3.

Sr. Lecturer cum Sr. Instructor

Rs. 15600-- 39,100 (grade pay Rs.5400)

4.

Lecturer cum Instructor

Rs. 930034800 (grade pay Rs. 4600)

5.

Asst. Lecturer cum Asst. Instructor

Rs. 930034800 (grade pay Rs. 4200)

NOTE

Grade pay and allowances should be not less than the provisions respective State government where
affiliated Institute is located.

56

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

ACADEMIC STAFF ORGANIZATIONAL STRUCTURE FOR 460 INTAKE :

PRINCIPAL
|
|
|
|
HODs
|
|
--------------------------------------------------------------------------------------|
|
|
Sr. Lecturers
Lecturers
Asst .Lecturers
Cum Sr. Instructor
cum Instructor
cum Asst. Instructor

However, wherever in any specialization, the teaching hours work out less than 20 teaching hours per
week, no regular faculty should be employed and efforts should be made to utilize the services of part
time faculty on hourly basis except in the case of engineering subjects where the concerned faculty
could also be responsible for the maintenance work of the building and all equipments. Any faculty
member who conducts only theory classes should not in any case have a work load of less than 15
teaching hours per week. Not more than 20% of the faculty resources should be faculty appointed on
regular basis.
Principal and faculty should eventually be qualified as given in the staff norms.

57

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

ACADEMIC STAFF STRENGTH


Student Strength:
Program

120 Intake

3-Year B.Sc. HHA Program (half strength of 2nd year)

300

Craft/Diploma Courses (4 Courses)

120

Total Student Strength

420

Academic Staff Strength other than Principal:


Faculty Strength

Post

120 Intake +
Craft/Diploma Intake

Head of the Department (HOD)

02

Senior Lecturer-cum-Senor Instructor

03

Lecturer-cum-Instructor

05

Assistant Lecturer-cum-Assistant Instructor


Regular
Contract
Total

06
02
18

Base of Calculation:

Faculty Ratio:

LIBRARIAN

Faculty : Student =

HOD

Sr. Lecturer
2

01

58

1 : 25

: Lecturer

Asstt. Lecturer

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

PRINCIPAL
SCALE OF PAY:

Rs. 37400-67000 (grade pay 8700)

AGE

Not exceeding 52 years (appreciable to Central & State


IHMs)
(Relaxable upto upper age limit by a period not exceeding 5
years for SCs and STs, departmental candidates and other
categories as specified by Govt. of India from time to time.
Under no circumstances the age should exceed 57 years.)
(Appreciable to Central & State IHMs)

QUALIFICATIONS:

(i) Graduation from a recognized University.


(ii) Degree / 3 year Diploma in Hotel Management awarded
by State Board of Technical Education / National Council
for Hotel Management and Catering Technology /
Recognized University. The candidate must have secured at
least 50% marks in degree / diploma in Hotel Management.
For Graduates in Hotel Management, item No. (i) is not
necessary.

EXPERIENCE

At out of 20 years of the total teaching/ experience least 3 years experience in hotel related
subject(s)* as Head of Department in an Institute of Hotel Management affiliated to National Council
for Hotel Management and Catering Technology.
OR
At least 20 years of experience in teaching and / or hotel industry including minimum 3 years in
Hotel Operations related subject(s)* as Head of Department in an Institute of Hotel Management
affiliated to State Board of Technical Education / Recognized University.
OR
At least 20 years of experience in teaching and / or hotel industry including minimum 3 years as
Principal in a Food Craft Institute affiliated to National Council for Hotel Management and Catering
Technology.
OR
Minimum 20 years Hotel industry experience including minimum 5 years in Managerial capacity in 4
star/Heritage or above category approved hotel.

59

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

HEAD OF DEPARTMENT
SCALE OF PAY

Rs.15600 39,100 (grade pay Rs. 6600)

AGE

not exceeding 45 years


(Relax able upto upper age limit by a period not exceeding 5 years
for SCs and STs, departmental candidates and other categories as
specified by Govt. of India from time to time.)

QUALIFICATION

(i) Graduation from a recognized University.


(ii) Degree / 3 year Diploma in Hotel Management awarded by
State Board of Technical Education / National Council for Hotel
Management and Catering Technology / Recognized University.
The candidate must have secured at least 55% marks in degree /
diploma in Hotel Management. For Graduates in Hotel
Management, item No. (i) is not necessary.

EXPERIENCE :
At least 5 years experience as Sr. Lecturer- cum- Sr. Instructor in an Institute of Hotel Management
affiliated to National Council for Hotel Management and Catering Technology.
OR
At least 17 years of experience in teaching and / or hotel industry including minimum 5 years as Sr.
Lecturer cum Sr. Instructor in an Institute of Hotel Management affiliated to State Board of Technical
Education / National Council Recognized University.
OR
At least 17 years of experience in teaching and / or hotel industry including 5 years as teaching
experience as Sr. Lecturer cum Sr. Instructor in a Food Craft Institute affiliated to National Council
for Hotel Management and Catering Technology.
OR
Minimum 17 years Hotel industry experience including minimum 5 years in Managerial capacity in 4
star/Heritage or above category approved hotel.

60

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

SENIOR LECTURER CUM SENIOR INSTRUCTOR


SCALE OF PAY

Rs. 15600-- 39,100 (grade pay Rs.5400)

AGE

not exceeding 40 years


(Relax able upto upper age limit by a period not exceeding 5 years
for SCs and STs, departmental candidates and other categories as
specified by Govt. of India from time to time.)

QUALIFICATION

Degree / 3 year Diploma in Hotel Management awarded by State


Board of Technical Education / National Council for Hotel
Management and Catering Technology / Recognized University. The
candidate must have secured at least 55% marks in degree / diploma
in Hotel Management.

EXPERIENCE :
At least 5 years experience as Lecturer- cum- Instructor in an Institute of Hotel Management affiliated
to National Council for Hotel Management and Catering Technology.
OR
At least 12 years of experience in teaching and / or hotel industry including minimum 5 years as
Lecturer cum Instructor in an Institute of Hotel Management affiliated to State Board of Technical
Education National Council for Hotel Management / Recognized University.
OR
At least 12 years of experience in teaching and / or hotel industry including 5 years as teaching
experience as Lecturer cum. Instructor in a Food Craft Institute affiliated to National Council for
Hotel Management and Catering Technology.
OR
Minimum 12 years Hotel industry experience including minimum 5 years in Supervisory capacity in 3
star/Heritage or above category approved hotel.

61

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

LECTURER CUM INSTRUCTOR

SCALE OF PAY

Rs. 930034800 (grade pay Rs. 4600)

AGE

Not exceeding 35 years


(Relax able upto upper age limit by a period not exceeding 5 years
for SCs and STs, departmental candidates and other categories as
specified by Govt. of India from time to time.)

QUALIFICATION

Degree / 3 year Diploma in Hotel Management awarded by State


Board of Technical Education / National Council for Hotel
Management and Catering Technology / Recognized University.
The candidate must have secured at least 55% marks in degree /
diploma in Hotel Management.

EXPERIENCE :
At least 5 years experience as Assistant Lecturer- cum- Assistant Instructor in an Institute of Hotel
Management affiliated to National Council for Hotel Management and Catering Technology.
OR
At least 7 years of experience in teaching and / or hotel industry including minimum 5 years as
Assistant Lecturer cum Assistant Instructor in an Institute of Hotel Management affiliated to State
Board of Technical Education National Council for Hotel Management / Recognized University.
OR
At least 7 years of experience in teaching and / or hotel industry including 5 years as teaching
experience as Assistant Lecturer cum. Assistant Instructor in a Food Craft Institute affiliated to
National Council for Hotel Management and Catering Technology.
OR
Minimum 7 years Hotel industry experience including minimum 3 years in Supervisory capacity in 3
star/Heritage or above category approved hotel.

62

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

ASSISTANT LECTURER cum ASSISTANT INSTRUCTOR


SCALE OF PAY

Rs. 930034800 (grade pay Rs. 4200)

AGE

not exceeding 30 years


(Relax able upto upper age limit by a period not exceeding 5 years
for SCs and STs, departmental candidates and other categories as
specified by Govt. of India from time to time.)

QUALIFICATION

Degree / 3 year Diploma in Hotel Management awarded by State


Board of Technical Education / National Council for Hotel
Management and Catering Technology / Recognized University.
The candidate must have secured at least 60 % marks in degree /
diploma in Hotel Management.

EXPERIENCE

At least 3 years practical experience in Hotel industry


OR
At least 2 years of experience in teaching in an Institute affiliated to
State Board of Technical Education National Council for Hotel
Management / Recognized University.

ADMINSTRATIVE & SUPPORT STAFF


Administrative and Support staff members are to be engaged as per the requirement of the Institute.
The position could be administrative officer, accountant, office subordinate, cashier and Assistant in
office, store keeper.
There should be a placement cell, with placement officer and an Assistant.

63

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

SCHEME FOR
AFFILIATION
(Old Scheme is placed, which is under revision)

64

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

TEACHING &
EXAMINATION SCHEME
FOR
B.Sc. DEGREE PROGRAM

65

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

1ST, 2ND, 3RD, 4TH, 5TH & 6TH SEMESTER


UNDER FINALIZATION

66

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

TEACHING &
EXAMINATION SCHEME
FOR
DIPLOMA COURSES

67

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

TEACHING AND EXAMINATION SCHEME FOR DIPLOMA IN


FOOD PRODUCTION

Eligibility

Senior Secondary (10+2) or equivalent with


Knowledge of English.

Title

Diploma

Duration

One Year + six months in industry

Teaching hours per week

35

No. of weeks of effective teaching :

36

Industrial training

24 weeks after the annual examinations.

Sl.
No.

Subject

1.

Cookery

Distribution of Time
Hours per Week
Th
Pr
Total
3
16
19

Distribution of Marks
Councils Exam
Th
Hrs
Pr
100
3
125

Hrs
6

Th
20

Pr
20

2.

Larder

10

50

125

10

20

3.

Hygiene and Nutrition

100

10

4.

Commodities and
Costing
Computer Awareness

100

20

01

01

10

25

35

350

250

60

40

5.

Total

Pass (Theory)
Pass (Practical)
Aggregate

35%
40%
40

Grand Total :

Councils Examination:
TH
:
PR
:
MTS :

Marks for Council Exam, for theory marks


Marks for external Practical
Midterm sessionals.

68

700

MTS

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

TEACHING AND EXAMINATION SCHEME FOR DIPLOMA IN


FOOD & BEVERAGE SERVICE
Eligibility

Senior Secondary (10+2) or equivalent with


knowledge of English.

Title

Diploma

Duration

One Year + six months industrial release

Teaching hours per week

35

No. of weeks of effective teaching

36

Industrial training

24 weeks

Sl.
No.

Subject

Distribution of Time
Hours per Week
T
P
Total

Distribution of Marks
Councils Exam
Th
Hrs
Pr
Hrs

MTS
Th

Pr

1.

F & B Service I

10

16

100

150

20

20

2.

F&B Service II

14

100

150

20

20

3.

Business Communication

50

10

4.

Hygiene & Sanitation

50

10

5.

Computer Awareness

01

01

16

19

35

300

300

60

40

Total

Pass (Theory)
Pass (Practical)
Aggregate

35%
40%
40%

Grand Total

Councils Examination :
TH :
PR :
MTS :

Marks for Council Exam, for


theory marks
Marks for external Practical
Mid term sessionals

69

700

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

TEACHING AND EXAMINATION SCHEME FOR DIPLOMA IN


DIPLOMA IN HOUSE KEEPING
Eligibility

10+2 (H.S.C) / S.S.C. or equivalent

Title

Diploma

Duration

One Year + six months in industry

Teaching hours per week

35

No. of weeks of effective teaching

36

Industrial Training

24 weeks

Sl.
No.

Teaching Scheme
Subject
Th.

Pr.

EXAMINATION SCHEME
THEORY
PRACTICAL
Total Pr.
Total
TTh.

MTS
Th.
Pr.

o
t
a
l
1.
2.
3.

House
Oper.

Keeping

Interior
Decoration
Hygiene and
Hotel Maint.

06

10

16

1 (3 Hrs)

100

06

200

20

40

05

05

1 (3 Hrs)

100

10

05

04

09

1 (3 Hrs)

100

02

50

10

10

10

250

50

4.

Communication

03

03

2 Hrs

50

5.

Computer
Awareness

02

02

19

16

35

350

Total

Total Hours per Week : 35 Hours


Pass (Theory)
Pass (Practical)

35%
40%

Aggregate

40%

50

Grand Total : 700 Marks

Councils Examination :
TH :
PR :
MTS :

Marks for Council Exam, for theory marks


Marks for external Practical
Mid term sessionals

70

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

TEACHING AND EXAMINATION SCHEME FOR DIPLOMA IN


FRONT OFFICE OPERATIONS
Eligibility

Senior Secondary (10+2) or equivalent with


knowledge of English.

Title

Diploma

Duration

One Year and six months industrial training

Teaching hours per week

35

No. of weeks of effective teaching

36

Industrial Training

24 weeks

Sl.
No.

1.
2.
3.
4.

5.

Subject

Distribution of Time
Hours per Week
T
P
Total

Distribution of Marks
Councils Exam
Th
Hrs
Pr

Hrs

Th

Pr

05

10

15

100

03

100

03

20

04

04

100

03

20

Hotel Accounts
Business
Communication
& Office Orgn.

03

03

100

03

20

03

02

05

50

02

50

02

10

10

Application of
Computers

02

06

08

50

02

50

01

20

17

18

35

400

13

200

06

90

10

Front
Office
Operation
Principles
of
Accounts

MTS

Total

Pass (Theory)
Pass (Practical)
Aggregate

35%
40%
40%

Grand Total

Councils Examination:
TH :
Marks for Council Exam, for theory marks
PR : Marks for external Practical
MTS : Mid term sessionals

71

700

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

TEACHING AND EXAMINATION SCHEME FOR DIPLOMA IN


BAKERY & CONFECTIONARY
Eligibility

10+2 (H.S.C.) / S.S.C or equivalent

Title

Diploma

Duration

One Year + six months industrial release

Teaching hours per week

35

No. of weeks of effective teaching

36

Industrial training

24 weeks

Sl.
No.

Subject

1.
2.
3.

Bakery
Confectionery
Hygiene and
Sanitation
Commodities and
Costing
Computer
Awareness

4.
5.
Total

Pass (Theory)
Pass (Practical)
Aggregate

Distribution of Marks
Hours per Week
Th
Pr
Total
04
12
16
04
12
16
01
01

Distribution of Marks
Councils Exam
Th
Hrs
Pr
Hrs
100
3
150
6
100
3
150
6
50
2
-

Th.
20
20
10

Pr.
20
20
-

01

01

50

10

10

01
25

01
35

300

300

60

40

35%
40%
40%

Grand Total

Councils Examination:
TH :
PR :
MTS :

Marks for Council Exam, for


theory marks
Marks for external Practical
Mid term sessionals

72

MTS

700

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

TEACHING &
EXAMINATION SCHEME
FOR
CRAFT COURSES
(TO BE ADDED)

73

National Council for Hotel Management and


Catering Technology,

Norms for Hospitality Institutes with 120 intake


(Updated in March 2012)

A-34, Sector 62, NOIDA

Draft
- Norm & standards for Hospitality Institute for affiliation
with NCHMCT.
- Committee
Director (A&F) - NCHMCT
Principal IHM Pusa (New Delhi)
Principal IHM Lucknow (U.P.)
Principal IHM Kurushetra (Haryana)
Principal IHM Srinagar (J & K)
Other inputs for:
Faculty teaching, facility planning in
IHMs Mumbai, Lucknow & Pusa also
contributed.
11.10.2011

74

You might also like