Professional Documents
Culture Documents
LUZON
POWER PLANT
FACILITY NAME
GRID-CONNECTED
COAL
PAGBILAO
CALACA
MASINLOC
SUAL
QUEZON POWER
APEC
SUBTYPE
CAPACITY, MW
INSTALLED DEPENDABLE
13,356.8
11,729.3
4,775.6
4,490.0
764.0
764.0
600.0
513.0
630.0
630.0
1,294.0
1,294.0
511.0
460.0
50.0
42.0
Number of
Unit/s
2
2
2
2
1
1
LOCATION
MUN/PROV
Pagbilao, Quezon
Calaca, Batangas
Masinloc, Zambales
Sual, Pangasinan
Mauban, Quezon
Mabalacat, Pampanga
OWNER
OWNER TYPE
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
TYPE OF
CONTRACT
BOT-ECA
BOT-ECA
DATE COMMISSIONED/
COMMERCIAL OPERATION
3/7/1996
9/5/1984
6/18/1998
10/23/1999
5/1/2000
7/1/2006
MARIVELES COAL
651.6
604.0
Mariveles, Bataan
NON-NPC/IPP
PETRON RSFFB
140.0
60.0
Limay, Bataan
NON-NPC/IPP
May 2013
135.0
123.0
Calaca, Batangas
NON-NPC/IPP
4/17/2015
OIL-BASED
Diesel
SUBIC DPP
TMO
BAUANG DPP
TRANS ASIA POWER
CIP II
LAFARGE
Oil Thermal
679.2
571.3
116.0
110.0
Olongapo, Zambales
NON-NPC/IPP
2/22/1994
242.0
200.0
NON-NPC/IPP
Nov 2013
235.2
180.0
21
Bauang, La Union
NON-NPC/IPP
8/30/1994
52.0
48.0
Norzagaray, Bulacan
NON-NPC/IPP
1997
21.3
21.3
Bacnotan, La Union
NON-NPC/IPP
17 Jan 2013
Taysan, Batangas
Lafarge Cement
NON-NPC/IPP
Jul 2014
12.7
12.0
320.0
320.0
620.0
80.0
Pililla, Rizal
NON-NPC/IPP
Limay, Bataan
NON-NPC/IPP
5/14/1993 , 12/10/1994
6/2000
Gas Turbine
MILLENNIUM GTPP
650.0
650.0
720.0
100.0
LIMAY CCGT
620.0
540.0
MALAYA
NATURAL GAS
NPC-IPP
2,861.0
2,759.4
STA RITA
1,060.0
1,036.0
NON-NPC/IPP
ILIJAN
1,271.0
1,200.0
NON-NPC/IPP
SAN LORENZO
530.0
523.4
NON-NPC/IPP
ROM-ECA
BOT-ECA/GSPA
9/15/1995
6/5/2002
9/1/2002
10/2001
POWER PLANT
FACILITY NAME
GEOTHERMAL
SUBTYPE
MAKBAN
BACMAN
TIWI
MAKBAN-Binary
MANITO-Lowland
MAIBARARA
HYDRO
Large Hydroelectric Plants
SAN ROQUE
HEDCOR
KALAYAAN PSPP
MAGAT
CALIRAYA
BOTOCAN
ANGAT
PANTABANGAN-MASIWAY
AMBUKLAO
BINGA
BAKUN
Dam-type HEPP
Run-of-Rive type HEPP
Dam-type HEPP
Run-of-Rive type HEPP
Dam-type HEPP
Run-of-Rive type HEPP
Dam-type HEPP
Dam-type HEPP
Dam-type HEPP
Dam-type HEPP
Run-of-Rive type HEPP
CASECNAN (NIA)
Dam-type HEPP
SABANGAN
CAPACITY, MW
INSTALLED DEPENDABLE
844.0
691.8
LOCATION
MUN/PROV
OWNER
OWNER TYPE
TYPE OF
CONTRACT
DATE COMMISSIONED/
COMMERCIAL OPERATION
442.8
333.9
10
Calauan, Laguna
AP Renewable Inc.
NO
NON-NPC/IPP
4/26/1979
130.0
234.0
15.7
1.5
20.0
2,471.0
2,465.0
411.0
33.8
739.2
360.0
35.0
22.8
246.0
132.0
105.0
132.0
70.0
130.0
207.9
0.0
0.0
20.0
2,133.8
2,127.8
411.0
15.4
720.0
360.0
28.0
10.0
135.0
132.0
105.0
132.0
36.4
3
5
1
1
1
Bacon, Sorsogon
Tiwi, Albay
Bitin bay, Laguna
Albay
Sto. Tomas, Batangas
NO
NO
NO
NO
NO
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
9/10/1993
1/11/1979
3
13
4
4
2
3
9
6
3
4
2
San Manuel,Pangasinan
Benguet
Kalayaan, Laguna
Ramon, Isabela
Lumban, Laguna
Kalayaan,Laguna
Norzagaray, Bulacan
Pantabangan, Nueva Ecija
Bokud, Benguet
Itogon, Benguet
Alilem, Ilocos Sur
NO
YES
NO
NO
NO
NO
NO
NO
NO
NO
NO
NON-NPC/IPP
NON-NPC/IPP
NPC-IPP
NON-NPC/IPP
NPC-IPP
NPC-IPP
NPC
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
BOT-PPA
BOO-EPSA
BROT-PPA
BOT-PPA
5/1/2003
1/1/1993
8/13/1982 5/1/2004
8/14/1983 10/24/1983
1942 / 1947 / 1950
1946-48
10/16/1967 6/16/1986
4/1/1977 5/1/1977, 2/27/1981
12/23/1956
1/19/1960
2/6/2001 10/10/2000
165.0
39.0
NPC-IPP
BOT-PPA
4/5/2002
NON-NPC/IPP
01 June 2015
Ramon, Isabela
NIA
NO
NON-NPC/IPP
1987
NO
YES
NON-NPC/IPP
NON-NPC/IPP
June 2005
October 10, 2014
YES
NON-NPC/IPP
YES
NON-NPC/IPP
13.2
4.0
6.0
6.0
282.9
33.0
18.9
6.0
6.0
103.0
17.4
12.6
Number of
Unit/s
2/8/2014
BROT-PPA
BROT-PPA
BURGOS WIND
150.0
45.0
CAPARISPISAN WIND
BIOMASS
GREEN FUTURE
28.0
20.0
10.0
81.0
31.8
19.8
YES
NON-NPC/IPP
Mar 2013
SJC IPOWER
12.0
10.0
I Power Corporation
YES
NON-NPC/IPP
10/25/2014
41.3
41.3
20.0
20.0
YES
NON-NPC/IPP
SOLAR
MAJESTIC
POWER PLANT
FACILITY NAME
EMBEDDED
COAL
SUBTYPE
UPPC
OIL-BASED
Diesel
CALIBU DPP
PETERSVILLE DPP
FCVC DPP
TARLAC POWER
SINOMA DPP
HYDROELECTRIC
Small Hydroelectric Plants
CAWAYAN
BUHI-BARIT
AGUA-GRANDE
MAGAT A&B
BALUGBOG
PALAPAQUIN
CALIBATO
INARIHAN
YABO
Communal-Uddiawan
BIOMASS
MONTALBAN LFG
LAGUNA LFG
LUCKY PPH
PANGEA
SOLAR
PAMPANGA SOLAR
CAPACITY, MW
INSTALLED DEPENDABLE
167.4
139.2
30.0
24.0
Calumpit, Bulacan
89.8
30.0
80.8
30.0
Angeles City
9.3
6.0
Angeles City
25.6
24.0
Cabanatuan City
18.9
14.8
6.0
6.0
11.4
0.4
2.0
4.5
0.5
0.7
0.4
0.05
1.0
0.2
1.8
9.0
3.4
0.9
3.6
1.1
14.0
8.5
1
1
2
7
3
1
1
3
1
Guinlajon, Sorsogon
Buhi, Camarines Sur
Pagudpod,Ilocos Norte
Ramon, Isabela
Nagcarlan,Laguna
Sn Pablo,Laguna
Sn Pablo,Laguna
Panicuason, Naga City
Pili,Camarines Sur
Solano, Nueva Viscaya
SORECO II
People's Energy Inc.
INEC
ISELCO I
Phil. Power Dev.Co.
Phil. Power Dev.Co.
Phil. Power Dev.Co.
Bicol Hydropower Corp.
PROSAMAPI Coop.
Smith-Bell Mini-Hydro Corporation
Rodriguez, Rizal
San Pedro , Laguna
Alicia, Isabela
Payatas, Quezon City, M. Manila
4.0
SPCRPI SM NORTH
TOTAL LUZON
1.5
13,524.2
1.5
11,868.5
Note:
Excluding off-grid generators
Release date, 30 June 2015
FIT Approved Plants based on RE Proects under FIT System, April 2015
in GREEN - New Entry
in BLACK - NON-NPC/IPP
in RED - NPC
in BLUE - NPC-IPP
OWNER
24.0
BURGOS SOLAR
LOCATION
MUN/PROV
30.0
13.5
0.4
2.0
4.5
2.5
0.7
0.4
0.05
1.0
0.2
1.8
18.7
9.3
4.2
4.0
1.2
15.5
10.0
Number of
Unit/s
10
4
8
3
OWNER TYPE
TYPE OF
CONTRACT
DATE COMMISSIONED/
COMMERCIAL OPERATION
NON-NPC/IPP
1998
NON-NPC/IPP
12/5/1994
NON-NPC/IPP
8/14/1966
NON-NPC/IPP
1/15/1996
Capas, Tarlac
NON-NPC/IPP
July 1995
SECP WHRCI
NON-NPC/IPP
2-Apr-2015
NO
NO
NO
NO
NO
NO
NO
NO
NO
YES
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
6/1/2002
9/1/1957
1983
1984, 1985
1933
1933
YES
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
June 2009
March 2011
2008
4 Mar 2013
YES
YES
1998
2010
NON-NPC/IPP
February 5, 2015
NON-NPC/IPP
March 5, 2015
NON-NPC/IPP
April 7, 2015