Machine Preparation
1. Move the machine to a smooth horizontal location. Move away from working machines and personnel.
Lower the attachments to the ground.
2. Allow only one operator on the machine. Keep all personnel away from the machine or in the view of the
operator.
3. Engage the parking brake.
Stall Test
1. Shift the transmission to the NEUTRAL position.
2. Start the engine. Warm the transmission oil to normal operating temperature of approximately 95 20C
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print...alledpage=/sisweb/sisweb/techdoc/techdoc_print_page.jsp (1 de 3)19/11/2008 03:13:05 PM
844 Wheel Tractor 2KZ00001-UP (MACHINE) POWERED BY 3412E Engine(SEBP2765 - 71) - Estructura del documento
(200 35F).
3. Place the work tool flat on the ground.
4. Fully depress the right side service brake pedal. Hold the brake pedal in the depressed position for the
duration of the test.
5. Disengage the STIC control lock.
6. Release the parking brake.
NOTICE
To make sure that the transmission oil does not overheat, do not keep the torque
converter in a stall condition for more than 30 seconds. After the torque
converter stall test, reduce engine speed to low idle, move the transmission
control to neutral and increase the engine speed to approximately 1500 rpm to
cool the oil.
990
1850 55
990 Series II
1870 55