Doosan Heavy Industries


Vietnam

Dung Quat Economic Zone,


Binh Thuan, Binh Son, Quang Ngai,
Vietnam
T +84 55 5618 900
F +84 553 618 950

16-May-12

DANNY

J.Y.JEONG

K.J.LIM

Rev.

Date

Drawn

Checked

Approved

For Information

Details of Revision

Owner :

AES-VCM MONG DUONG POWER


COMPANY LIMITED
Owner's Engineer :

Contractor :

Project :

PC

MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT

Title :

Drawing No. :

T10206-DD09-POZEN__-14005 METHOD OF
STATEMENT FOR LIGHTING & SMALL POWER
INSTALLATION
T10206-DD09-P0ZEN-14005

Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

T10206

UAS :

DD09

Unit :

P0

KKS :

ZEN

Reg. No. :

14005

Revision :

Page-No :

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeon

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

AESVCM
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

INDEX
DESCRIPTION

SI NO.

PAGE NO.

1.0

PURPOSE

2.0

SCOPE

3.0

PRINCIPLE

4.0

REFERENCE DOCUMENTS

5.0

WORK PROCEDURE

6.0

EQUIPMENT AND TOOLS

7.0

ENVIRONMENT, HEALTH AND SAFETY (EHS)

8.0

RISK ASSESSMENT

9.0

ATTACHMENT

Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

3-5

8-10

10

Page 2

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeon

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

AESVCM
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

1.0

PURPOSE

This work procedure stipulates engineering standard,work process and techniques, and quality
management guidelines pertaining to the installation of Lighting & Small Power as well as
the accessories for Mong Duong 2 Coal Fired Power Plant Project.

2.0

SCOPE
This document lays down the procedure to be followed in the installation of Lighting & Small
Power and its accessories.

3.0

PRINCIPLE
All the concerning works procedure should follow this method statement.

4.0

5.0

REFERENCE DOCUMENTS
4.1

Issued For Construction Drawings.

4.2

Approved Contract Quality Plan

4.3

Project EHSS Management Plan

WORK PROCEDURE

5.1

5.2

BEFORE INSTALLATION
5.1.1

Make sure that materials to be used for construction are always approved,
identified and properly preserved.

5.1.3

Only the authorized and qualified personnel are allowed to perform such
required works at site.

5.1.4

The latest Approved Construction Drawings shall be used.

5.1.5

Lighting & Small Power Installation shall be confirmed with layout drawings
and proper coordination must be done for any obstruction.

DURING INSTALLATION
LIGHTING FIXTURES, RECEPTACLE/POWER SOCKET
5.2.1

The approved work plan should be followed.

5.2.2

Fields supervisors shall provide the plans for verification of any critical
dimension and portion/locations before proceeding the work.

Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

Page 3

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeon

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

AESVCM
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

5.2.3
5.2.4

Careful handling of lighting fixtures and receptacles upon installation must be properly
implemented to avoid damages.
Installed lighting fixtures and receptacles shall be aligned and leveled properly. It must
be free of dirt or any chemical impurities.

5.2.5

Prior to installation, check lighting fixtures accessories and make sure internal
connection are completed.

5.2.6

Unless otherwise shown, mounting heights of lighting fixtures shall be generally as


follows:
A) I)Low bay lighting fixture in general indoors areas of industrial plants shall be
3500MM from bottom to finish.

II)Medium bay lighting fixture shall be 3500MM to less than 7000MM from
bottom to finished floor.
III)High bay lighting fixture shall be 7000MM and above from bottom to
finish floor.
B) Light over door openings shall be 300MM bottom of fixture above top of
opening.
C) In boiler galleries, the mounting heght of fixture will be 2500MM from
platform except as shown.
D) Receptacles:
I)In control room/office shall be 300MM from finish floor to center.
II)Elsewhere shall be 1000MM from finish floor to center.
E) Local Swicthes shall be 1500MM from finish floor to center.
F) Lighting Panels shall be 1800MM from finish floor to top.
5.2.7

Unless otherwise noted ,all the lighting fixture shall be fed from respective
lighting panels. Normal AC lighting panels will be fed from MLDB. Emergency
AC lighting panels will be fed from emergency MLDB.DC emergency lighting
distribution boards will be fed from Main DC distribution boards.

5.2.8

All outdoor lighting poles/towers shall be provided with MCB's at their base
while receiving incoming cable.

5.2.9

Separate conduit shall be used for wiring lighting circuit of different lighting
distribution such as Normal AC lighting/emergency DC lighting.

5.2.10

AC & DC shall not be run in the same conduit and jb.Circuit fed from different
transformer and different batteries (DC source) shall not be run through same
conduit and junction boxes.

5.2.11

Receptacle circuits shall be kept separate and distinct fromm lighting circuit.

Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

Page 4

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeon

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

AESVCM
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

5.2.12

For classified hazardous area having flammable gases and vapors only, all items
and accessories of illumination system shall be explosion proof.
The lighting and small power system will meet the requirements established in
NFPA 499 for the appropriate hazard classification.

5.2.13

All outdoor lighting located in wet locations and small power circuits will use
ground-faults circuit interrupter (GFCI) protection for safety.

5.2.14

Elevation of lighting fixtures shall be in accordance with AFC.

5.2.15

Installation of Aviation lighting shall be accessble from landing plarform. It shall


be installed as per AFC.

5.2.16

Correct rated voltage of power supply shall be check prior for energizing.

5.2.17

Continuity & Insulation resistance test for each circuit shall performed prior for
energizing. It must be recorded.

5.2.18

Illumination test shall be performed during energizing and must be recorded.


LIGHTING SUB-DISTRIBUTION BOARD/PANEL

5.2.19

Location of Sub-distribution board installation shall be as per AFC drawing.


However exact location may be vary as per site condition. As built plan if
necessary

5.2.20

It shall be mounted with appropriate support and aligned properly.

5.2.21

It shall be free of damages and missing accessories.

5.2.22

Circuit Breaker ratings and number of poles are as per AFC drawing.

5.2.23

Mounting height shall be in accordance with AFC drawing.

5.2.24

Sub-distribution board shall be properly grounded as per AFC drawing.

5.2.25

Installed Sub-distribution board shall have padlocking facility.

5.2.26

Installed Sub-distribution board shall be as per required degree of protection


per area (IP41 for indoor & IP55 for outdoor.

5.2.27

Upon completion of installation, field engineer in coordination with QA/QC


shall notify AES inspector to perform the required inspection in order to assure
that all requirements are met. All inspection and testing shall be in accordance
with inspedtion plan.

Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

Page 5

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeon

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

AESVCM
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

6.0

EQUIPMENTS & TOOLS


6.1

Electric Hand Drill

6.3

Hand Crimping Tools

6.2

Electrical Hand Tools

6.2

Hand Cable Cutter

6.2

Adjustable Wrench

6.2

Pipe Vise

6.2

Ground Resistance Tester

6.2

Insulation Tester

6.2

Digital Multimeter

6.2

Other electrical tools..

Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

Page 6

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeon

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

AESVCM
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

7.0

ENVIRONMENT, HEALTH AND SAFETY (EHS)


7.1

Responsibilities and Instructions


7.1.1

PM/EHSS Officer shall ensure that all work is undertaken in accordance with the
specified work scope.

7.1.2

Safety training should be conducted to all personnel assigned at site prior to


commence any work.

7.1.3

All personnel should know the locations of fire extinguishers, communications,


manual alarms & ESD points.

7.1.4

All personnel should be aware of assembly points, escape routes, emergency


contact numbers.

7.1.5

Personal Protective Equipment (PPE) shall be worn at all times.

7.1.6

Good housekeeping shall be observed in work areas.

7.1.7

Construction wastes shall be segregated and disposed to an approved dump


yard area.

7.1.8

Keep non-essential workers clear of machinery whilst it is in operation.

7.1.9

7.1.10

Permit to work shall be obtained appropriately for the type of work and
location.

7.1.11

All vehicles must comply and observed speed limit of 10km/h on site.

7.1.12

Excavation and delivery of materials are prohibited during heavy rains.

7.1.13

Adequate lighting equipments when working night time.

7.1.14

7.1.15
7.2

7.3

Proper inspection of all equipments prior to use to avoid leakage and


equipment failure.

Ensure all workers and equipments working overtime are properly accounted
and obtained permit/approval from Doosan EHS Manager prior to carry-on
works. Regular working time is from 6:30 am ~ 5:00 pm.
Periodic refresher trainings, tool box talk and audit shall be conducted.

Safety ( PPE )
7.2.1

Personal Protective Equipment (PPE) will be issued to all workers such as safety
shoes, hard hat, working gloves,earplug, safety goggles, reflective vest and
safety harness for workers who will be assigned in elevated places 1.6m and
above.

7.2.2

Wearing of the basic PPE will be enforced fully.

7.2.3

All new recruits will undergo proper orientation and safety induction before
they could deployed at site for work.

First Aid Facilities


7.3.1

First aid facility is always made available during working hours by a qualified
first aiders.

7.3.2

Ambulance car with Driver, Helper and stand by Nurse are available at site at all
times.

Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

Page 7

APCPCWM_4828539:WP_0000001WP_0000001

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeong/

APCPCWM_4828539:WP_0000001WP_0000001

AESVCM
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

8.0

RISK ASSESSMENT (#1)


RESIDUAL RISK

BASE RISK

TASK/ JOB STEPS

A. Workers

LIST OF HAZARDS

TYPE OF DAMAGE

A.1 Not properly equipped with


PPE
A.2 Worker abnormal physical

delivery of materials

Risk

Injury

condition (drunken&fatigue)
B. Transportation of equipment &

(WITHOUT CONTROL)

(WITH CONTROL)

MITIGATING CONTROLS

A.1 Instructing to wear proper PPE


A.2 Make the worker to take
enough rest

Risk

B.1 Check the access road before

B. Crash/ traffic accident


Injury

passing the area


B.2 Designate a signalman when
moving the equipment

C. Heavy lifting works

C.1 Prepare a lifting plan for over

C. Crushing may cause fatal injury

10 tons and submit PTW

or permanent disability

C.2 Only a qualified and Certified


operators. Signalman should be inplace
C.3 Do not stand beneath the
lifting areas
C.4 Ensure loads are fixed with
sling belt correctly
3

Injury

C.5 All lifting equipments must be


in good conditions
C.6 Experienced lifting supervisor
at all times
C.7 Only monthly checking color
attached lifting tools allowed to
use
C.8 All lifting tools must have
identification tag (including serial
number,certification number, SWL
inspection date and due date)
C.9 Provide safe emtramce amd
exit access road for the labors
passing

D. Unloading equipment and

D.1 Struck down by things and

D.1.a Make sure the sling is

materials

materials

tied/binded/tightened correctly
D.1.b Check the lifting
devices(slings, shackles, etc) for
proper and safe use
D.1.c Analyzing the load (wight,
shape, lifting points, etc) and the
liftinf device
Injury

D.1.d Only monthly checking color


3

attached lifting tools allowed to


use
D.1.e All lifting tools must have
identification tag (including serial
number,certification number, SWL
inspection date and due date)
D.1.f Provide safe emtramce amd
exit access road for the labors
passing
D.2.a Use hand gloves when

D.2 Squeezed by the sling


Injury

D.3 Squeesed by the materials

Injury

D.4 Crane fall accidentally

Injury

tightning the slings


D.2.b Tightnig the slings before
carrying-out lifting
D.3.a Use wooden bar sa support
of the materials on the ground
D.4.a Analyzing the loads (weight,

Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

shape, lifting points, etc) and


lifting device to suit the crane
capacity

Page 8

APCPCWM_4828539:WP_0000001WP_0000001

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeong/

APCPCWM_4828539:WP_0000001WP_0000001

AESVCM
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

8.0

RISK ASSESSMENT (#2)


RESIDUAL RISK

BASE RISK

TASK/ JOB STEPS

LIST OF HAZARDS

TYPE OF DAMAGE

(WITHOUT CONTROL)

Risk

E. Equipment and material

E.1 Collision between machines.

E.1.a Always keep the site clear of

preparation for Temp. facilities

Overturning may cause death or

any obstructions.
E.1.b Tool-box talks on a daily

permanent disability
injury

(WITH CONTROL)

MITIGATING CONTROLS

basis

Risk

E.1.c Adequate warning signboards


E.1.d Checklist on all vehicles must
be provided everyday.
E.2.a Provide a signalman who is

E.2 Unnecessary movements of


causes injury and damage to

wearing reflective vest


E.2.b Heavy machinery should have

materials

backward movement warning light

equipments towards a person that

and beacon
E.2.c Equipment used to clear the
injury

site should be controlled and soted


by a banksman
E.2.d Provide safe entrance and
exit for the workers going to the
area
E.2.e All vehicles entering on the
site must turn-on their headlights

E.3 Equipment oil leakage during

pollution

day and night time


E.3.a Daily check of the
equipments prior to work
F.1.a Must provide sufficient

F. Working opearation during

operation
F.1 Working operation of the

night time

equipments may cause injury to

lightnings on the entire working

personnel due to poor visibility of

area
F.1.b All equipments must ensure

the area

all lights are operational and not


obscured by dirt or mud
F 1 c Supervisor must always be
F.1.c
present for the entire working
operation
F.1.d All workers must be wearing
reflective vest
F.1.e Ambulance car and
designated nurse must be on
stand-by for the entire working
Injury
4

operation
F.1.f Must use and connect 3 core
codes electric wire and separate
distribution pannel (must pass
arrangement of ELCB) and avoid
any water affect
F.1.g Provide safe entrance and
exit access road for the labors
passing
F.1.h All kinds of electric cable
must be hanged over ground
F.1.i Must use industrial socket and
plug
F.1.j Electric cabinet should not
affect any water
F.2.a Daily check of the equipment

F.2 Generator (diesel) equipment


oil leakage
3

Pollution

prior to start of work


F.2.b Regular check & monitoring
of the equipment prior to use
F.2.c Provide secondary
containment protection under the
equipment to prevent
contamination of soil by oil
F.3. Diesel/chemical shall be stored

F.3 Oil chemical storage

Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

Pollution

in secondary containment & MSDS


requirement shall be
communicated with all concerned

Page 9

APCPCWM_4828539:WP_0000001WP_0000001

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeong/

APCPCWM_4828539:WP_0000001WP_0000001

AESVCM
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

8.0

RISK ASSESSMENT (#3)


RESIDUAL RISK

BASE RISK

TASK/ JOB STEPS

LIST OF HAZARDS

TYPE OF DAMAGE

(WITHOUT CONTROL)

L
G. Welding and cutting works

(WITH CONTROL)

MITIGATING CONTROLS

Risk

G.1 Electric shock, fire, burn to

G.1.a Proper earthing and

body and injury to eye may cause

connection of welding machines

death or permanent disability

and generators

Risk

G.1.b Fashback arrestor and gauge


should be installed prior to use
cutting cylinders
G.1.c Proper PPE to be worn at all
times
G.1.d Must use and connect 3 core

Injury
2

codes electric wire and separate


distribution pannel (must pass
arrangement of ELCB) and avoid
any water affect
G.1.e All kinds of electric cable
must be hanged over ground
G.1.f Must use industrial socket
and plug
G.1.g Electric cabinet should not
affect any water

G.2 Generator(diesel) equipment

G.2.a Daily check of the

oil leakage during operation

equipments prior to start of work


G.2.b Regular monitoring of the
equipment in order to control and
prevent oil leakage and other
engine trouble
3

Pollution

G.2.c Provide secondary


containment protection under the
equipment to prevent
contamination of the soil by oil
spillage
G.2.d If oil leakage, must remove
the oil and contaminated soil
immediately

G.3 Oil/chemical storage

G.3 Diesel/chemical shall be stored


Pollution

in secondary containment and


MSDS requirements shall be
communicated with all concerned

9.0

Attachment
9.1

Job Safety Environment


Analysis (JSEA)

Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

Page 10

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeong/

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

JOB SAFETY ENVIRONMENT ANALYSIS

AES-VCM

MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
Task

LIGHTING & SMALL POWER INSTALLATION

Prepared by :

Reviewed by :

Original Date :

Revised by

Googles

Gloves
Yes

Safety Harness

Yes
Long Sleeves

Yes

No

Approved by :

Rev. Date:

Face Shield

Barricade Needed

Yes
Hearing Protection
Yes

Yes
MSDS Needed/Review (Y/N)
Yes

Revision :
Lock Out
No
Tack Out
No
Group Fault Interrupter

Dust Mask
No
Others

Other Safety Equipment Required :


Remarks :

List of All Job Steps


A. Workers

B. Transportation of equipment & delivery of materials

List of All Known Hazards

How to Eliminate Hazards

A.1 Not properly equipped with PPE properly equipped with PPE

A.1 Instructing to wear proper PPE

A.2 Worker abnormal physical condition (drunken&fatigue)

A.2 Make the worker to take enough rest

B. Crash/ traffic accident

B.1 Check the access road before passing the area


B.2 Designate a signalman who wear the red suit and safety helmet and control
the work.

C. Heavy Lifting Works

C. Crushing may cause fatal injury or permanent disability

C.1 Preparation of a rigging lift list and plans for lifts of ten (10) tons or greater.
C.2 Only a qualified and Certified operators. Signalman should be in-place
C.3 Do not stand beneath the lifting areas
C.4 Ensure loads are fixed with sling belt correctly
C.5 All lifting equipments must be in good conditions
C.6 Experienced lifting supervisor at all times
C.7 Only monthly checking color attached lifting tools allowed to use

Page 11
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeong/

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

JOB SAFETY ENVIRONMENT ANALYSIS

AES-VCM

MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
Task

LIGHTING & SMALL POWER INSTALLATION

Prepared by :

Reviewed by :

Original Date :

Revised by

Googles

Gloves
Yes

Safety Harness

Yes
Long Sleeves

Yes

No

Approved by :

Rev. Date:

Face Shield

Barricade Needed

Yes
Hearing Protection
Yes

Yes
MSDS Needed/Review (Y/N)
Yes

Revision :
Lock Out
No
Tack Out
No
Group Fault Interrupter

Dust Mask
No
Others

Other Safety Equipment Required :


Remarks :

List of All Job Steps

List of All Known Hazards

How to Eliminate Hazards


C.8 All lifting tools must have identification tag (including serial number,
certification number, SWL inspection date and due date)
C.9 Provide safe emtramce amd exit access road for the labors passing

D. Unloading Equipment and Materials

D.1.a Make sure the sling is tied/binded/tightened correctly

D.1 Struck down by things and materials

D.1.b Check the lifting devices(slings, shackles, etc) for proper and safe use
D.1.c Analyzing the load (wight, shape, lifting points, etc) and the lifting device
D.1.d Only monthly checking color attached lifting tools allowed to use
D.1.e All lifting tools must have identification tag (including serial number,
certification number, SWL inspection date and due date)

D.1.f Provide safe emtramce amd exit access road for the labors passing

Page 12
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeong/

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

JOB SAFETY ENVIRONMENT ANALYSIS

AES-VCM

MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
Task

LIGHTING & SMALL POWER INSTALLATION

Prepared by :

Reviewed by :

Original Date :

Revised by

Googles

Gloves
Yes

Safety Harness

Yes
Long Sleeves

Yes

No

Approved by :

Rev. Date:

Face Shield

Barricade Needed

Yes
Hearing Protection
Yes

Yes
MSDS Needed/Review (Y/N)
Yes

Revision :
Lock Out
No
Tack Out
No
Group Fault Interrupter

Dust Mask
No
Others

Other Safety Equipment Required :


Remarks :

List of All Job Steps

List of All Known Hazards


D.2 Squeezed by the sling

How to Eliminate Hazards


D.2.a Use hand gloves when tightning the slings
D.2.b Tightnig the slings before carrying-out lifting

E. Equipment and material preparation for Temp. facilities

D.3 Squeezed by the materials

D.3.a Use wooden bar sa support of the materials on the ground

D.4 Crane fall accidentally

D.4.a Analyzing the loads (weight, shape, lifting points, etc) and lifting device
to suit the crane capacity

E.1 Collision between machines. Overturning may cause death or permanent


disability

E.1.a Always keep the site clear of any obstructions.


E.1.b Tool-box talks on a daily basis
E.1.c Adequate warning signboards
E.1.d Checklist on all vehicles must be provided everyday.

E.2 Unnecessary movements of equipments towards a person that causes injury E.2.a Designate a signalman who wear the red suit and safety helmet and control
and damage to materials
the work
E.2.b Heavy machinery should have backward light and beacon movement
warning

Page 13
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeong/

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

JOB SAFETY ENVIRONMENT ANALYSIS

AES-VCM

MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
Task

LIGHTING & SMALL POWER INSTALLATION

Prepared by :

Reviewed by :

Original Date :

Revised by

Googles

Gloves
Yes

Safety Harness

Yes
Long Sleeves

Yes

No

Approved by :

Rev. Date:

Face Shield

Barricade Needed

Yes
Hearing Protection
Yes

Yes
MSDS Needed/Review (Y/N)
Yes

Revision :
Lock Out
No
Tack Out
No
Group Fault Interrupter

Dust Mask
No
Others

Other Safety Equipment Required :


Remarks :

List of All Job Steps

List of All Known Hazards

How to Eliminate Hazards


E.2.c Equipment used to clear the site should be controlled and soted by a
banksman
E.2.d Provide safe entrance and exit for the workers going to the area

E.2.e All vehicles entering on the site must turn-on their headlights day and night
time

F. Working Operation During Night Time.

E.3 Equipment oil leakage during operation

E.3.a Daily check of the equipments prior to work

F.1 Working operation of the equipments may cause injury to personnel due to
poor visibility of the area.

F.1.a Must provide sufficient lightnings on the entire working area


F.1.b All equipments must ensure all lights are operational and not
F.1.c Supervisor must always be present for the entire working
F.1.d All workers must be wearing proper PPE
F.1.e Ambulance car and designated nurse must be on stand-by for the entire
working operation

Page 14
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeong/

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

JOB SAFETY ENVIRONMENT ANALYSIS

AES-VCM

MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
Task

LIGHTING & SMALL POWER INSTALLATION

Prepared by :

Reviewed by :

Original Date :

Revised by

Googles

Gloves
Yes

Safety Harness

Yes
Long Sleeves

Yes

No

Approved by :

Rev. Date:

Face Shield

Barricade Needed

Yes
Hearing Protection
Yes

Yes
MSDS Needed/Review (Y/N)
Yes

Revision :
Lock Out
No
Tack Out
No
Group Fault Interrupter

Dust Mask
No
Others

Other Safety Equipment Required :


Remarks :

List of All Job Steps

List of All Known Hazards

How to Eliminate Hazards


F.1.f Must use and connect 3 core codes electric wire and separate any water
affect
F.1.g Provide safe entrance and exit access road for the labors passing
F.1.h All kinds of electric cable must be hanged over ground
F.1.i Must use industrial socket and plug
F.1.j Electric cabinet should not affect any water

F.2 Generator (Diesel) equipment oil leakage

F.2.a Daily check of the equipment prior to start of work


F.2.b Regular check & monitoring of the equipment prior to use
F.2.c Provide secondary containment protection under the equipment to prevent
contamination of soil by oil spillage
F.3. Diesel/chemical shall be stored in secondary containment & MSDS

F.3 Oil chemical storage

Page 15
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeong/

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

JOB SAFETY ENVIRONMENT ANALYSIS

AES-VCM

MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
Task

LIGHTING & SMALL POWER INSTALLATION

Prepared by :

Reviewed by :

Original Date :

Revised by

Googles

Gloves
Yes

Safety Harness

Yes
Long Sleeves

Yes

No

Approved by :

Rev. Date:

Face Shield

Barricade Needed

Yes
Hearing Protection
Yes

Yes
MSDS Needed/Review (Y/N)
Yes

Revision :
Lock Out
No
Tack Out
No
Group Fault Interrupter

Dust Mask
No
Others

Other Safety Equipment Required :


Remarks :

List of All Job Steps


G. Welding and cutting works

List of All Known Hazards


G.1 Electeric shock, fire burn to body and injury to eye may cause death or
permanent disability.

How to Eliminate Hazards


G.1.b Fashback arrestor and gauge should be installed prior to use cutting
cylinders
G.1.c Proper PPE to be worn at all times
G.1.d Must use and connect 3 core codes electric wire and separate distribution
pannel (must pass arrangement of ELCB) and avoid any water affect

G.1.e All kinds of electric cable must be hanged over ground


G.1.f Must use industrial socket and plug
G.1.g Electric cabinet should not affect any water
G.2 Generator(diesel) equipment oil leakage during operation

G.2.a Daily check of the equipments prior to start of work


G.2.b Regular monitoring of the equipment in order to control and prevent oil
leakage and other engine trouble
G.2.c Provide secondary containment protection under the equipment to prevent
contamination of the soil by oil spillage

Page 16
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.

2012-05-16 15:37/EPC)Mong Duong II /jinyong.jeong/

APCPCWM_4828539:WP_0000001WP_000000

APCPCWM_4828539:WP_0000001WP_0000001

JOB SAFETY ENVIRONMENT ANALYSIS

AES-VCM

MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
Task

LIGHTING & SMALL POWER INSTALLATION

Prepared by :

Reviewed by :

Original Date :

Revised by

Googles

Gloves
Yes

Safety Harness

Yes
Long Sleeves

Yes

No

Approved by :

Rev. Date:

Face Shield

Barricade Needed

Yes
Hearing Protection
Yes

Yes
MSDS Needed/Review (Y/N)
Yes

Revision :
Lock Out
No
Tack Out
No
Group Fault Interrupter

Dust Mask
No
Others

Other Safety Equipment Required :


Remarks :

List of All Job Steps

List of All Known Hazards

How to Eliminate Hazards


G.2.d If oil leakage, must remove the oil and contaminated soil

G.3 Oil/chemical storage

G.3 Diesel/chemical shall be stored in secondary containment and MSDS


requirements shall be communicated with all concerned

Page 17
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. All Rights Reserved.