You are on page 1of 53

INICIO

10/9/2014

VALO

OCTUBRE

NOV

DIC

PAGOS DEL MES DE

OCTUBRE

Presupuesto

COMPONENTES

2014

Acumulado

Anterior

Actual

Sistema de Agua Potable

914,696.33

0.00

93,935.78

10.27%

Sistema de Alcantarillado

1,132,248.22

292,586.36

25.84%

Planta de Tratamiento

572,209.43

73,514.95

12.85%

Letrinas

141,168.41

0.00

0.00%

Impacto Ambiental
Costo Directo
Gastos General

8.65%

Utilidades

7.35%

A. Sub Total

54,834.81

0.00

0.00

0.00%

2,815,157.20

0.00

460,037.09

16.34%

243,511.10

0.00

39,793.21

206,914.05

0.00

33,812.73

3,265,582.35

0.00

533,643.03

Amortizaciones A.D.

-211,864.41

Amortizaciones A.M.

0.00

B. Amortizaciones
Total

-211,864.41

A+B

IGV

18.00%

Total
Redondeo por error
Total Final
Factor de Relac
Valor Final

1.00000

3,265,582.35

0.00

321,778.62

587,804.82

0.00

57,920.15

3,853,387.17

0.00

379,698.77

0.01

0.00

0.00

3,853,387.18

0.00

379,698.77

1.00000

1.00000

1.00000

3,853,387.18

0.00

379,698.77

SUPERVISION DE OBRA
Monto de Consultoria
Clausula Septima del contrato
avance fisico
Pago Correspondiente al avance
Fiel cumplimiento
Plazo de Ejecucin

###
S/. 96,000.00
16.34%
S/. 15,686.40 Nuevos Soles
10.00%
S/. 12,000.00
180 dias calendarios
80.00%

1era mitad
monto a retener
por fiel cumplimiento
Neto a cobrar del contratista

3.00 meses (tres primeros pagos)


-S/. 4,000.00 Del primer pago
S/. 11,686.40

SIN IGV
S/. 533,643.02

FUE AMORTIZADO TODO


AMORTI A PETI DE CONTRAT

AD

S/. 493,300.02

NO LE PAGARON NADA

S/. 639,327.21

NO LES PAGARON NADA

diciembre
enero
febrero
marzo

12/31/2014

Acumulado

Actual

Acum

Saldo

93,935.78

10.27%

820,760.55

292,586.36

5.65%

839,661.86

73,514.95

4.98%

498,694.48

0.00

141,168.41

0.00

13.29%

54,834.81

460,037.09

16.34%

2,355,120.11

39,793.21

203,717.89

33,812.73

17,621.60

533,643.03

2,576,459.60

533,643.03

2,576,459.60

96,055.75

463,762.73

629,698.78

3,040,222.33

0.00

0.00

629,698.78

3,040,222.33

1.00000

1.00000

629,698.78

3,040,222.33

Nuevos Soles
Clausula Decima del Contrato
dias calendarios

5
31
28
31
95

meses (tres primeros pagos)


Del primer pago

INICIO

10/9/2014

VALO

OCTUBRE

NOV

DIC

PAGOS DEL MES DE

OCTUBRE

Presupuesto

COMPONENTES

2014

Acumulado
Anterior

%
Actual

Sistema de Agua Potable

914,696.33

93,935.78

82,045.01

8.97%

Sistema de Alcantarillado

1,132,248.22

292,586.36

291,142.89

25.71%

Planta de Tratamiento

572,209.43

73,514.95

43,604.94

7.62%

Letrinas

141,168.41

0.00

0.00%

Impacto Ambiental
Costo Directo
Gastos General

8.65%

Utilidades

7.35%

54,834.81

0.00

8,465.80

15.44%

2,815,157.20

460,037.09

425,258.64

15.11%

243,511.10

39,793.21

36,784.87

206,914.05

33,812.73

31,256.51

3,265,582.35

533,643.03

493,300.02

Amortizaciones A.D.

-211,864.41

0.00

Amortizaciones A.M.

0.00

0.00

-211,864.41

0.00

3,265,582.35

321,778.62

493,300.02

587,804.82

57,920.15

88,794.00

3,853,387.17

379,698.77

582,094.02

0.01

0.00

0.00

3,853,387.18

379,698.77

582,094.02

1.00000

1.00000

1.00000

3,853,387.18

379,698.77

582,094.02

A. Sub Total

B. Amortizaciones
Total

A+B

IGV

18.00%

Total
Redondeo por error
Total Final
Factor de Relac
Valor Final

1.00000

SUPERVISION DE OBRA
Monto de Consultoria
Clausula Septima del contrato
avance fisico
Pago Correspondiente al avance

###
80.00%
S/. 96,000.00
15.11%
S/. 14,505.60 Nuevos Soles

Fiel cumplimiento
Plazo de Ejecucin
1era mitad
monto a retener
por fiel cumplimiento
Neto a cobrar del contratista

10.00%

S/. 12,000.00
180 dias calendarios
3.00 meses (tres primeros pagos)
-S/. 4,000.00 Del primer pago
S/. 10,505.60

SIN IGV
S/. 533,643.02

FUE AMORTIZADO TODO


AMORTI A PETI DE CONTRAT

AD

S/. 493,300.02

NO LE PAGARON NADA

S/. 639,327.21

NO LES PAGARON NADA

diciembre
enero
febrero
marzo

12/31/2014

Acumulado

Actual

Acum

Saldo

175,980.79

19.24%

738,715.54

583,729.25

5.65%

548,518.97

117,119.89

4.98%

455,089.54

0.00

141,168.41

8,465.80

13.29%

46,369.01

885,295.73

31.45%

1,929,861.47

76,578.08

166,933.02

65,069.24

14,439.71

1,026,943.05

2,111,234.20

1,026,943.05

2,111,234.20

184,849.75

380,022.16

1,211,792.80

2,491,256.36

0.00

0.00

1,211,792.80

2,491,256.36

1.00000

1.00000

1,211,792.80

2,491,256.36

Nuevos Soles

5
31
28
31
95

Clausula Decima del Contrato


dias calendarios
meses (tres primeros pagos)
Del primer pago

INICIO

10/9/2014

VALO

OCTUBRE

NOV

DIC

PAGOS DEL MES DE

OCTUBRE

Presupuesto

COMPONENTES

2014

Acumulado
Anterior

%
Actual

Sistema de Agua Potable

914,696.33

175,980.79

293,437.23

32.08%

Sistema de Alcantarillado

1,132,248.22

583,729.25

137,015.69

12.10%

Planta de Tratamiento

572,209.43

117,119.89

107,474.92

18.78%

Letrinas

141,168.41

0.00

0.00%

Impacto Ambiental
Costo Directo
Gastos General

8.65%

Utilidades

7.35%

54,834.81

8,465.80

13,216.30

24.10%

2,815,157.20

885,295.73

551,144.14

19.58%

243,511.10

76,578.08

47,673.97

206,914.05

65,069.24

40,509.09

3,265,582.35

1,026,943.05

639,327.20

Amortizaciones A.D.

-211,864.41

0.00

Amortizaciones A.M.

0.00

0.00

-211,864.41

0.00

3,265,582.35

815,078.64

639,327.20

587,804.82

146,714.16

115,078.90

3,853,387.17

961,792.80

754,406.10

0.01

0.00

0.00

3,853,387.18

961,792.80

754,406.10

1.00000

1.00000

1.00000

3,853,387.18

961,792.80

754,406.10

A. Sub Total

B. Amortizaciones
Total

A+B

IGV

18.00%

Total
Redondeo por error
Total Final
Factor de Relac
Valor Final

1.00000

SUPERVISION DE OBRA
Monto de Consultoria
Clausula Septima del contrato
avance fisico
Pago Correspondiente al avance

###
80.00%
S/. 96,000.00
19.58%
S/. 18,796.80 Nuevos Soles

Fiel cumplimiento
Plazo de Ejecucin
1era mitad
monto a retener
por fiel cumplimiento
Neto a cobrar del contratista

10.00%

S/. 12,000.00
180 dias calendarios
3.00 meses (tres primeros pagos)
-S/. 4,000.00 ultima retencin
S/. 14,796.80

SIN IGV
S/. 533,643.02

FUE AMORTIZADO TODO


AMORTI A PETI DE CONTRAT

AD

S/. 493,300.02

NO LE PAGARON NADA

S/. 639,327.21

NO LES PAGARON NADA

diciembre
enero
febrero
marzo

12/31/2014

Acumulado

Actual

Acum

Saldo

469,418.02

51.32%

445,278.31

720,744.94

5.65%

411,503.28

224,594.81

4.98%

347,614.62

0.00

141,168.41

21,682.10

13.29%

33,152.71

1,436,439.87

51.03%

1,378,717.33

124,252.05

175980.79
583729.25
117119.89
0
8465.8

119,259.05

105,578.33

10,315.91

1,666,270.25

1,508,292.29

1,666,270.25

1,508,292.29

299,928.65

271,492.61

1,966,198.90

1,779,784.90

0.00

0.00

1,966,198.90

1,779,784.90

1.00000

1.00000

1,966,198.90

1,779,784.90

Nuevos Soles

5
31
28
31
95

639327.2

115078.9
754406.10

0.00
0.00
0.00
0.00
0.00

Clausula Decima del Contrato


dias calendarios
meses (tres primeros pagos)
ultima retencin

S/. 30,162.52
S/. 5,429.25
S/. 35,591.77

INICIO

10/9/2014

VALO

OCTUBRE

NOV

DIC

PAGOS DEL MES DE

OCTUBRE

Presupuesto

COMPONENTES

2014

Acumulado

Anterior

Actual

Sistema de Agua Potable

914,696.33

469,418.02

60,439.68

6.61%

Sistema de Alcantarillado

1,132,248.22

720,744.94

247,391.81

21.85%

Planta de Tratamiento

572,209.43

224,594.81

25,124.28

4.39%

Letrinas

141,168.41

228.48

0.16%

54,834.81

21,682.10

4,794.56

8.74%

2,815,157.20

1,436,439.87

337,978.81

12.01%

243,511.10

124,252.05

29,235.17

Impacto Ambiental
Costo Directo
Gastos Generales

8.65%

Utilidades

7.35%

206,914.05

105,578.33

24,841.44

3,265,582.35

1,666,270.25

392,055.42

Amortizaciones A.D.

-211,864.41

0.00

Amortizaciones A.M.

0.00

0.00

-211,864.41

0.00

3,265,582.35

1,454,405.84

392,055.42

587,804.82

261,793.05

70,569.98

3,853,387.17

1,716,198.89

462,625.40

0.01

0.00

0.00

3,853,387.18

1,716,198.89

462,625.40

1.00000

1.00000

1.00000

3,853,387.18

1,716,198.89

462,625.40

A. Sub Total

B. Amortizaciones
Total

A+B

IGV

18.00%

Total
Redondeo por error
Total Final
Factor de Relacion

1.00000

Valor Final

SUPERVISION DE OBRA
Descripcin

Presupuesto

Acumulado

ACTAUL

Anterior
Monto de Consultoria
Clausula Septima
del contrato

80.00%

Acumulado
Actual

S/. 120,000.00

S/. 120,000.00

S/. 120,000.00

S/. 96,000.00

S/. 96,000.00

S/. 96,000.00

avance fisico

100.00%

51.03%

12.01%

S/. 48,988.80

S/. 11,529.60

S/. 12,000.00

S/. 0.00

S/. 12,000.00

S/. 84,000.00

S/. 36,988.80

S/. 11,529.60

S/. 48,518.40

S/. 11,529.60

S/. 60,518.40

Pago Correspondiente al avance

S/. 96,000.00

Fiel cumplimiento

S/. 12,000.00

Plazo de Ejecucin
1era mitad

10.00%

pago x
compatibilidad

5.00%

S/. 6,000.00

S/. 6,000.00

pago a la
recepcion

7.50%

S/. 9,000.00

S/. 0.00

7.50%

S/. 9,000.00

S/. 0.00

S/. 120,000.00

S/. 54,988.80

total a cobrar contratista

S/. 60,518.40

180

monto a retener
-S/. 12,000.00
por fiel
cumplimiento
Neto a cobrar del contratista

pago a la aprob
liquid

63.04%

SIN IGV
S/. 533,643.02

FUE AMORTIZADO TODO


AMORTI A PETI DE CONTRAT

AD

S/. 493,300.02

NO LE PAGARON NADA

S/. 639,327.21

NO LES PAGARON NADA

diciembre
enero
febrero
marzo

12/31/2014

Acumulado

Actual

Acum

Saldo

529,857.70

57.93%

384,838.63

968,136.75

5.65%

164,111.47

249,719.09

4.98%

322,490.34

228.48

140,939.93

26,476.66

13.29%

28,358.15

1,774,418.68

63.03%

1,040,738.52

153,487.22

90,023.88

130,419.77

76,494.28

2,058,325.67

1,207,256.68

2,058,325.67

1,207,256.68

370,498.62

217,306.20

2,428,824.29

1,424,562.88

0.00

0.00

2,428,824.29

1,424,562.88

1.00000

1.00000

2,428,824.29

1,424,562.88

Acumulado
Actual

5
31
28
31
95

Saldo

469,418.02
720,744.94
224,594.81
0.00
21,682.10
1,436,439.87
124,252.05
105,578.33
1,666,270.25

1,666,270.25
299,928.65
1,966,198.90
0.00
1,966,198.90
1
1966198.9

0.00
0.00
0.00
0.00
0.00

63.04%

36.96%

S/. 60,518.40

S/. 35,481.60

S/. 12,000.00

S/. 24,000.00

S/. 48,518.40

S/. 35,481.60

S/. 60,518.40

S/. 59,481.60

S/. 30,162.52
S/. 5,429.25
S/. 35,591.77

INICIO

10/9/2014

VALO

OCTUBRE

NOV

DIC

PAGOS DEL MES DE

OCTUBRE

Presupuesto

COMPONENTES

2014

Acumulado
Anterior

%
Actual

Sistema de Agua Potable

914,696.33

529,857.70

204,984.66

22.41%

Sistema de Alcantarillado

1,132,248.22

968,136.75

101,198.29

8.94%

Planta de Tratamiento

572,209.43

249,719.09

165,177.90

28.87%

Letrinas

141,168.41

228.48

0.00

0.00%

Impacto Ambiental
Costo Directo

54,834.81

26,476.66

8,476.36

15.46%

2,815,157.20

1,774,418.68

479,837.21

17.04%

Gastos Generales

8.65%

243,511.10

153,487.22

41,505.92

Utilidades

7.35%

206,914.05

130,419.77

35,268.03

3,265,582.35

A. Sub Total

2,058,325.67

556,611.16

Amortizaciones A.D.

0.00

0.00

Amortizaciones A.M.

0.00

0.00

0.00

0.00

3,265,582.35

2,058,325.67

556,611.16

587,804.82

370,498.62

100,190.01

3,853,387.17

2,428,824.29

656,801.17

0.01

0.00

0.00

3,853,387.18

2,428,824.29

656,801.17

1.00000

1.00000

1.00000

3,853,387.18

2,428,824.29

656,801.17

B. Amortizaciones
Total

A+B

IGV

18.00%

Total
Redondeo por error
Total Final
Factor de Relacion

1.00000

Valor Final

SUPERVISION DE OBRA
Descripcin

Presupuesto

Acumulado

ACTAUL

Anterior
Monto de Consultoria
Clausula Sptima
del contrato

80.00%

Acumulado
Actual

S/. 120,000.00

S/. 120,000.00

S/. 120,000.00

S/. 96,000.00

S/. 96,000.00

S/. 96,000.00

avance fisico

100.00%

Pago Correspondiente al avance

S/. 96,000.00

Fiel cumplimiento

S/. 12,000.00

Plazo de Ejecucin
1era mitad

10.00%

pago a la
recepcion
pago a la aprob
liquid
total a cobrar contratista

17.04%

S/. 60,518.40

S/. 16,358.40

80.07%
S/. 76,876.80

180
3

monto a retener
-S/. 12,000.00
por fiel
cumplimiento
Neto a cobrar del contratista
pago x
compatibilidad

63.03%

S/. 0.00
S/. 84,000.00

S/. 60,518.40

5.00%

S/. 6,000.00

S/. 6,000.00

7.50%

S/. 9,000.00

S/. 0.00

7.50%

S/. 9,000.00

S/. 0.00

S/. 120,000.00

S/. 66,518.40

penalidad por cambio de residente


Monto de Contrato
Penalidad x camio de residente
Monto de la Penalidad

S/. 0.00

S/. 16,358.40

S/. 76,876.80

S/. 16,358.40

S/. 76,876.80

3,853,387.18
0.001
S/. 3,853.39

1/12/2001
6/30/2015
5282.00

400

120

SIN IGV
S/. 533,643.02

FUE AMORTIZADO TODO


AMORTI A PETI DE CONTRAT

AD

S/. 493,300.02

NO LE PAGARON NADA

S/. 639,327.21

NO LES PAGARON NADA

diciembre
enero
febrero
marzo

12/31/2014

Acumulado

Actual

Acum

Saldo

734,842.36

80.34%

179,853.97

1,069,335.04

94.44%

62,913.18

414,896.99

72.51%

157,312.44

228.48

0.16%

140,939.93

34,953.02

63.74%

19,881.79

2,254,255.89

80.08%

560,901.31

194,993.13

48,517.96

165,687.81

41,226.25

2,614,936.83

650,645.52

2,614,936.83

650,645.52

470,688.63

117,116.19

3,085,625.46

767,761.71

0.00

0.00

3,085,625.46

767,761.71

1.00000

1.00000

3,085,625.46

767,761.71

Acumulado
Actual

5
31
28
31
95

Saldo

529,857.70
968,136.75
249,719.09
228.48
26,476.66
1,774,418.68
153,487.22
130,419.77
2,058,325.67

1,666,270.25
299,928.65
1,966,198.90
0.00
1,966,198.90
1
1966198.9

0.00
0.00
0.00
0.00
0.00

80.07%

19.93%

S/. 76,876.80

S/. 19,123.20

S/. 0.00

S/. 12,000.00

S/. 76,876.80

S/. 7,123.20

S/. 76,876.80

S/. 43,123.20

14.471232877

48000

S/. 30,162.52
S/. 5,429.25
S/. 35,591.77

INICIO

10/9/2014

VALO

OCTUBRE

NOV

DIC

PAGOS DEL MES DE

OCTUBRE

Presupuesto

COMPONENTES

2014

Acumulado
Anterior

%
Actual

SUBESTRUCTURA

2,867,326.39

2,385,432.66

250,660.70

8.74%

SUPERVESTRUCTURA

1,725,551.53

0.00

0.00

0.00%

590,777.45

0.00

125,875.03

21.31%

62,300.00

18,586.20

1,309.50

2.10%

5,245,955.37

2,404,018.86

377,845.23

7.20%

ELECTRIFICACION Y ACCESOS
IMPACTO AMBIENTAL

Costo Directo
Gastos Generales

6.86999510%

360,396.88

165,155.98

25,957.95

Utilidades

5.97000000%

313,183.54

143,519.93

22,557.36

5,919,535.79

A. Sub Total

2,712,694.77

426,360.54

Amortizaciones A.D.

-340,976.35

-53,592.05

Amortizaciones A.M.

0.00

0.00

-340,976.35

-53,592.05

5,919,535.79

2,371,718.42

372,768.49

1.00000

1.00000

1.00000

5,919,535.79

2,371,718.42

372,768.49

1,065,516.44

426,909.32

67,098.33

6,985,052.23

2,798,627.74

439,866.82

0.00

0.00

0.00

6,985,052.23

2,798,627.74

439,866.82

B. Amortizaciones
Total

A+B

Factor de Relacion

1.00000

Total x FR
IGV

18.00%

Total
Redondeo por error
Total Final
PENALIDADES

(camb de resi

0.00

Valor Final a pagar

439,866.82

CONTROL DE AMORTIZACIONES
ADELANTO DIREC

20%
20%
20%
20%

val
val
val
val

01
02
03
04

Val Bruta S/IGV


1,360,450.93
6,726.47
1,001,149.99
538,731.25

20%
20%
20%
20%
20%

Descripcin

val
val
val
val
val

Presupuesto

05
06
07
08
09

516,349.34
666,748.64
337,006.19
659,989.58
738,017.76

Acumulado

ACTUAL

Anterior
Monto de
Consultoria

C 580-2014-GRH

S/. 223,521.68

Adenda
x inicio
retardado

Saldo por Ejecutar


al 100%

S/. 223,521.68

80.00%

S/. 178,817.34

Clausula Sptima
del contrato
avance fisico de O

100.00%

Pago Correspondiente al avance


Fiel cumplimiento
Plazo de Ejecucin

pago a la aprob
liquid

S/. 94,987.76

S/. 12,874.85

S/. 22,352.17

S/. 22,352.17

S/. 0.00

S/. 156,465.17

S/. 72,635.59

S/. 12,874.85

5.00%

S/. 11,176.08

S/. 11,176.08

7.50%

S/. 16,764.13

S/. 0.00

7.50%

S/. 16,764.13

S/. 0.00

10.00%
270

Error de
Redondeo
Total

7.20%

S/. 178,817.34

Neto a cobrar del contratista x Avanc


pago x
compatibilidad
pago a la
recepcion

45.83%

S/. 0.00
S/. 223,521.68

penalidad por cambio de residente


Monto de Contrato
Penalidad x camio de residente
Monto de la Penalidad

S/. 106,163.84

S/. 12,874.85

#REF!
0.001
#REF!

1/12/2001
6/30/2015
5282.00

5.76%

400

120

SIN IGV
S/. 533,643.02

FUE AMORTIZADO TODO


AMORTI A PETI DE CONTRAT

AD

S/. 493,300.02

NO LE PAGARON NADA

S/. 639,327.21

NO LES PAGARON NADA

diciembre
enero
febrero
marzo

12/31/2014

Acumulado

Actual

Acum

Saldo

2,636,093.36

91.94%

231,233.03

0.00

0.00%

1,725,551.53

125,875.03

21.31%

464,902.42

19,895.70

31.94%

42,404.30

2,781,864.09

53.03%

2,464,091.28

191,113.93

169,282.95

166,077.29

147,106.25

3,139,055.31

2,780,480.48

3,139,055.31

2,780,480.48

1.00000

1.00000

3,139,055.31

2,780,480.48

565,029.96

500,486.49

3,704,085.27

3,280,966.97

0.00

0.00

3,704,085.27

3,280,966.97

3,704,085.27

3,280,966.97

272,090.19
1,345.29
200,230.00
107,746.25

5
31
28
31
95

734,842.36
1,069,335.04
414,896.99
228.48
34,953.02
2,254,255.89
360,397.13 6.8699999252948300%
313,183.54 5.9700000840838300%
2,614,936.83
5359351.9878

2,614,936.83
1
470,688.63
3,085,625.46
0.00
3,085,625.46
10,500,709.59
10,499,496.49
0.99988447447388200

103,269.87
133,349.73
67,401.24
131,997.92
147,603.55
1,165,034.04
1,157,950.08
7,083.96

Acumulado
Actual

53.03%

Saldo

46.97%

S/. 107,862.61

0.7621089149
S/. 73,171.20

S/. 22,352.17

S/. 85,510.44

S/. 70,954.73

0
73171.2

S/. 119,038.69

14.471232877

53.26%

S/. 104,482.99

48000

1,650,590.30
-1,069,335.04
-414,896.99
18,357.72
-34,953.02

12
AMORTI AD. DIREC
S/. 57,949.71
S/. 120,607.95
S/. 47,203.96
S/. 57,244.18
S/. 57,970.55
S/. 53,592.05 JULIO

INICIO

10/9/2014

VALO

OCTUBRE

NOV

DIC

PAGOS DEL MES DE

OCTUBRE

Presupuesto

COMPONENTES

Acumulado

Anterior

SUBESTRUCTURA
SUPERVESTRUCTURA
ELECTRIFICACION Y ACCESOS
IMPACTO AMBIENTAL

Actual

2,867,326.39
1,725,551.53
590,777.45
62,300.00

2,636,093.36
0.00
125,875.03
19,895.70

203,815.07
0.00
84,332.00
2,694.00

7.11%
0.00%
14.27%
4.32%

5,245,955.37
360,396.88
313,183.54
5,919,535.79

2,781,864.09
191,113.93
166,077.29
3,139,055.31

290,841.07
19,980.77
17,363.21
328,185.05

5.54%

Amortizaciones A.D.

-394,568.44

-41,251.73

Amortizaciones A.M.

0.00

0.00

-394,568.44

-41,251.73

5,919,535.79

2,744,486.87

286,933.32

1.00000

1.00000

1.00000

5,919,535.79

2,744,486.87

286,933.32

Costo Directo
Gastos Generales
Utilidades
A. Sub Total

6.86999510%
5.97000000%

B. Amortizaciones
Total A+B
Factor de Relacion

1.00000

Total x FR
IGV

18.00%

Total
Redondeo por error
Total Final
PENALIDADES

2014

1,065,516.44

494,007.64

51,648.00

6,985,052.23

3,238,494.51

338,581.32

0.00

0.00

0.00

6,985,052.23

3,238,494.51

338,581.32

Clausula (12) cont


-1,397.01

Permanencia Recidente de Obra


Cuaderno de Obra

-1,397.01

Valor Final a pagar

335,787.30

CONTROL DE AMORTIZACIONES
ADELANTO DIRECTO

20%
20%
20%
20%
20%
20%
20%

val
val
val
val
val
val
val

01
02
03
04
05
06
07

Val Bruta S/IGV


###
6,726.47
###
###
###
###
###

20%
20%

Descripcin

val 08
val 09

Presupuesto

###
###

Acumulado

ACTUAL

Anterior
Monto de Consultoria

Clausula Sptima del contrato


avance fisico de Obra

C 580-2014-GRH

S/. 223,521.68

80.00%

Plazo de Ejecucin

S/. 178,817.34

100.00%

Pago Correspondiente al avance


Fiel cumplimiento

10.00%

53.03%

5.54%

S/. 178,817.34

S/. 94,987.76

S/. 9,906.48

S/. 22,352.17

S/. 22,352.17

S/. 0.00

S/. 9,906.48

270

Neto a cobrar del contratista x Avanc


pago x compatibilidad

5.00%

S/. 156,465.17
S/. 11,176.08

S/. 72,635.59
S/. 11,176.08

pago a la recepcion

7.50%

S/. 16,764.13

S/. 0.00

pago a la aprob liquid

7.50%

S/. 16,764.13

S/. 0.00

Error de Redondeo
Total

S/. 0.00
S/. 223,521.68

S/. 106,163.84

S/. 9,906.48

4.43%

PENALIDADES

penalidad por cambio de residente


Monto de Contrato
Penalidad x camio de residente
Monto de la Penalidad

1/12/2001
6/30/2015
5282.00

400

120

SIN IGV
###

FUE AMORTIZADO TODO


AMORTI A PETI DE CONTRAT

AD

###

NO LE PAGARON NADA

###

NO LES PAGARON NADA

diciembre
enero
febrero
marzo

12/31/2014

Acumulado

Actual

Acum

5
31
28
31
95

Saldo

2,839,908.43
0.00
210,207.03
22,589.70

99.04%
0.00%
35.58%
36.26%

27,417.96
1,725,551.53
380,570.42
39,710.30

3,072,705.16
211,094.69
183,440.50
3,467,240.35

58.57%

2,173,250.21
149,302.18
129,743.04
2,452,295.43

2,636,093.36
0.00
125,875.03
19,895.70

360,397.13
313,183.54
4125286.0785

2,781,864.09

-435,820.17

3,467,240.35

2,452,295.43

2,614,936.83

1.00000

1.00000

3,467,240.35

2,452,295.43

624,103.26

441,413.18

470,688.63

4,091,343.61

2,893,708.61

3,085,625.46

0.00

0.00

0.00

4,091,343.61

2,893,708.61

3,085,625.46

4,091,343.61

2,893,708.61

10,500,709.59
10,499,496.49
0.99988447447388200

###
1,345.29
###
###
###
###
67,401.24

###
###
###
###
7,083.96

Acumulado
Actual

58.57%

Saldo

41.43%

0.7621089149
S/. 73,171.20

S/. 104,894.24
S/. 22,352.17

S/. 82,542.07

S/. 116,070.32

14.471233

48000

S/. 73,923.10

51.93%

S/. 107,451.36

0
73171.2

12
0.00
0.00
0.00
0.00

340976.35
53592.05

AMORTI AD. DIREC


S/. 57,949.71
S/. 120,607.95
S/. 47,203.96
S/. 57,244.18
S/. 57,970.59
S/. 53,592.05

JULIO

INICIO

10/9/2014

VALO

OCTUBRE

NOV

DIC

PAGOS DEL MES DE

OCTUBRE

Presupuesto

Componentes

Acumulado

Anterior

SUBESTRUCTURA
SUPERVESTRUCTURA
ELECTRIFICACION Y ACCESOS
IMPACTO AMBIENTAL

Actual

2,867,326.39
1,725,551.53
590,777.45
62,300.00

2,839,908.43
0.00
210,207.03
22,589.70

19,806.85
536,529.69
122,185.40
1,137.00

0.69%
31.09%
20.68%
1.83%

5,245,955.37
360,396.88
313,183.54
5,919,535.79

3,072,705.16
211,094.69
183,440.50
3,467,240.35

679,658.94
46,692.54
40,575.64
766,927.12

12.96%

Amortizaciones A.D.

-435,820.17

-96,400.10

Amortizaciones A.M.

0.00

0.00

-435,820.17

-96,400.10

5,919,535.79

3,031,420.18

670,527.02

1.00000

1.00000

1.00000

5,919,535.79

3,031,420.18

670,527.02

1,065,516.44

545,655.63

120,694.86

6,985,052.23

3,577,075.81

791,221.88

0.00

0.00

0.00

6,985,052.23

3,577,075.81

791,221.88

Costo Directo
Gastos Generales
Utilidades
A. Sub Total

6.86999510%
5.97000000%

B. Amortizaciones
Total A+B
Factor de Relacion

1.00000

Total x FR
IGV

18.00%

Total
Redondeo por error
Total Final
PENALIDADES

2014

Clausula (12) cont


6,985.05

Cambio de Residente de Obra


Cuaderno de Obra

0.00

Valor Final a pagar

798,206.93

CONTROL DE AMORTIZACIONES
ADELANTO DIRECTO

20%
20%
20%
20%
20%
20%
20%

val
val
val
val
val
val
val

01
02
03
04
05
06
07

Val Bruta S/IGV


###
6,726.47
###
###
###
###
###

20%
20%

Descripcin

val 08
val 09

Presupuesto

###
###

Acumulado

ACTUAL

Anterior
Monto de Consultoria

Clausula Sptima del contrato


avance fisico de Obra

C 580-2014-GRH

S/. 223,521.68

80.00%

Plazo de Ejecucin

S/. 178,817.34

100.00%

Pago Correspondiente al avance


Fiel cumplimiento

10.00%

58.57%

12.96%

S/. 178,817.34

S/. 94,987.76

S/. 23,174.73

S/. 22,352.17

S/. 22,352.17

S/. 0.00

S/. 23,174.73

270

Neto a cobrar del contratista x Avanc


pago x compatibilidad

5.00%

S/. 156,465.17
S/. 11,176.08

S/. 72,635.59
S/. 11,176.08

pago a la recepcion

7.50%

S/. 16,764.13

S/. 0.00

pago a la aprob liquid

7.50%

S/. 16,764.13

S/. 0.00

Error de Redondeo
Total

S/. 0.00
S/. 223,521.68

S/. 106,163.84

S/. 23,174.73

10.37%

PENALIDADES

penalidad por cambio de residente


Monto de Contrato
Penalidad x camio de residente
Monto de la Penalidad

1/12/2001
6/30/2015
5282.00

400

120

SIN IGV
###

FUE AMORTIZADO TODO


AMORTI A PETI DE CONTRAT

AD

###

NO LE PAGARON NADA

###

NO LES PAGARON NADA

diciembre
enero
febrero
marzo

12/31/2014

Acumulado

Actual

Acum

5
31
28
31
95

Saldo

2,859,715.28
536,529.69
332,392.43
23,726.70

99.73%
31.09%
56.26%
38.08%

7,611.11
1,189,021.84
258,385.02
38,573.30

3,752,364.10
257,787.23
224,016.14
4,234,167.47

71.53%

1,493,591.27
102,609.65
89,167.40
1,685,368.32

2,839,908.43
0.00
210,207.03
22,589.70

360,397.13
313,183.54

3,072,705.16
21109469.0000000000000000%
18344050.0000000000000000%
3,467,240.35

9640273.8984

3,467,240.35

4,234,167.47

1,685,368.32

1.00000

1.00000

4,234,167.47

1,685,368.32

3467240.35

762,150.14

303,366.30

624,103.26

4,996,317.61

1,988,734.62

4,091,343.61

0.00

0.00

0.00

4,996,317.61

1,988,734.62

4,091,343.61

4,996,317.61

1,988,734.62

10,500,709.59
10,499,496.49
0.99988447447388200

###
1,345.29
###
###
###
###
67,401.24

###
###
###
###
7,083.96

Acumulado
Actual

71.53%

Saldo

28.47%

0.7621089149
S/. 73,171.20

S/. 118,162.49
S/. 22,352.17

S/. 95,810.32

S/. 129,338.57

14.471233

48000

S/. 60,654.85

57.86%

S/. 94,183.11

0
73171.2

6919536.04 2,685,368.74
4,234,167.30

71.53
64.45

12
0.00
0.00
0.00
0.00

340976.35
53592.05

AMORTI AD. DIREC


S/. 57,949.71
S/. 120,607.95
S/. 47,203.96
S/. 57,244.18
S/. 57,970.59
S/. 53,592.05
41,251.73

JULIO
AGOSTO

7.08

Descripcin

Valorizado
S/IGV

Pago a Cuenta

Amortizarcion
AD

IGV

Neto A Cobrar
C/IGV

Monto Contrato
Val N 01-OCT 14

S/. 533,643.03

S/. 0.00

Val N 02-NOV 14

S/. 493,300.02

Val N 03-DIC 14
Totales

-S/. 211,864.41

S/. 57,920.15

S/. 379,698.77

S/. 0.00

S/. 88,794.00

S/. 582,094.02

S/. 639,327.20

S/. 0.00

S/. 115,078.90

S/. 754,406.10

S/. 1,666,270.25

S/. 0.00

S/. 261,793.05

S/. 1,716,198.89

Saldo
Financiero

OBSERVACIONES

S/. 3,853,387.18
S/. 3,223,688.40 PAGO EN TRAMITE
S/. 2,641,594.38 PAGO EN TRAMITE
S/. 1,887,188.28 PAGO EN TRAMITE
S/. 1,887,188.28

-S/. 2,641,594.38

metrado

COMPONENTES
Trabajos preliminares
Demolicin de canal en tramos requeridos
Reposicin de canal afectado
Concreto f'c= 140Kg/Cm2 para reposicin de canal
Concreto f'c= 175Kg/cm2 para tapa de canal repuesto
Encofrado y Desencofrado normal
Acero Fy= 4200 Kg/cm2 grado 60
Costo Directo
Gastos Generales
Utilidades
A. Sub Total
IGV
Presupuesto Total

Descripcin
Presupuesto Contratado
Presupuesto Adicional de Obra
incidencia

Precio
unitario

7.35%
18.00%

Monto
3,853,387.18
11,393.10
0.295665%

63

13.75

6.93
1.58
95.38
215.59

279.89
416.37
40.97
5.15

Presupuesto
866.25
866.25
7,615.51
1,939.64
657.86
3,907.72
1,110.29
8,481.76
550.00
623.41
9,655.17
1,737.93
11,393.10

578008.077

3/24/2015
14
4/7/2015

PRESUPUESTO DEDUCTIVO

ITEM

DESCRIPCION

UND

1 PUENTE CARROZABLE
1.07 VARIOS
01.07.01
APOYOS
01.07.01.01
APARATO DE APOYOS
01.08.00
BARANDAS
01.08.01
BARANDAS METLICAS PARA PUENTES
02.00.00
DEFENSA RIBERAA
02.02.00
MOVIMIENTO DE TIERRAS
02.02.01
EXCAVACION EN SUELO NORMAL SECO
02.02.02
EXCAVACION EN SUELO NORMAL BAJO AGUA
02.02.03
RELLENO CON MATERIAL SELECCIONADO
02.02.04
ELIMINACION DE MATERIAL EXCEDENTE
02.03.00
CONSTRUCCION DE GAVIONES
02.03.01
GAVION TIPO CAJA 10X12 DE 2.40mm 5.0X1.0X1.0 m G+PVC
02.03.02
GAVION TIPO CAJA 10X12 DE 2.40mm 5.0X1.5X1.0 m G+PVC
02.03.03
GAVIONES TIPO COLCHO RENO 10X12 2.40MM G+PVC 5.0X1
02.03.04
INSTALACION DE FILTRO GEOTEXTIL

UND

COSTO
UNITARIO

METRADO

160.72

ML

42.2

212.80

M3
M3
M3
M3

56.08
24.01
0.63
21.74

7.83
36.41
70.07
13.89

M3
M3
M3
M2

140
105
24
60

215.91
201.55
209.62
4.69

COSTO DIRECTO

Gastos Generales
Utilidades

10.00%
5.00%

Sub Total
IGV
Total Presupuesto

18.00%

PRESUPUESTO
DEDUCTIVO

642.88

642.88

8,980.16

8980.16

439.11
874.20
44.14
301.97
30,227.40
21,162.75
5,030.88
281.40

22670.55
15116.25

67,984.89

47,409.84

6,798.49

4,740.98

3,399.24

2,370.49

78,182.62

54,521.31

14,072.87

9,813.84

92,255.49

64,335.15

You might also like