BSC6900 UMTS

V900R017C10

Installation Guide
Issue

01

Date

2015-03-25

HUAWEI TECHNOLOGIES CO., LTD.

Copyright Huawei Technologies Co., Ltd. 2015. All rights reserved.


No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions


and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or representations
of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address:

Huawei Industrial Base


Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website:

http://www.huawei.com

Email:

support@huawei.com

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

About This Document

About This Document

Overview
This document describes how to install the BSC6900. The components to be installed include
external power cables, PGND cables, boards, signal cables, cabinet fittings, the computer serving
as the local maintenance terminal (LMT), and the alarm box. This document also describes how
to check the installed hardware, constructing connectors for power cables and signal cables, and
making and attaching engineering labels. Finally, this document provides requirements for the
operational environment of the equipment.

Product Version
The following table lists the product versions related to this document.
Product Name

Product Version

Solution Version

BSC6900

V900R017C10

RAN17.1

Intended Audience
This document is intended for installation personnel.

Organization
1 Change Description
This section provides information about the changes in different document versions. There are
two types of changes, including function changes and editorial changes. Function changes refer
to changes in functions of a specific product version. Editorial changes refer to changes in
wording or addition of information that was not described in the earlier version.
2 Tools Required for Installation
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

ii

BSC6900 UMTS
Installation Guide

About This Document

The tools required for installing the BSC are tools for measuring, marking, drilling, and
fastening, small tools, auxiliary tools, instruments, and special tools.
3 Installation Process
The BSC6900 installation process includes the installation of the cabinet and its fittings, power
cables and PGND cables, OMUc boards , signal cables, LMT computers, and alarm boxes.
4 Installing Power Cables and PGND Cables
This section describes how to install power cables and PGND cables between a cabinet and the
power distribution frame (PDF) ,and PGND cables between cabinets. For items and
specifications for checking the installation of the power cables and PGND cables, see 11.1
Checklist for BSC6900 Cable Installation.
5 Checking and Setting DIP Switches on Subracks
This section describes how to check and set the DIP switch on a subrack. In general, subracks
are installed in the cabinet before delivery.
6 Checking the Power-On Performance of Cabinet
This section describes how to check the power supply to cabinets, fan assembly, and boards.
7 Installing and Setting Boards
Most boards except the OMUa/OMUc/SAUa/SAUc boards are installed in subracks before the
delivery. If AEUa/AOUa/PEUa/PEUc/POUa/PAMU/PFCU boards are installed in the cabinet,
check and set the DIP switches of the boards. Install the OMUa/OMUc/SAUa/SAUc boards
onsite.
8 Installing the Signal Cables
This chapter describes how to install the signal cables according to the layout requirements. The
signal cables to be installed include clock signal cables, Ethernet cables, E1/T1 cables and optical
cables. For items and specifications for checking the installation of signal cables, see 11.1
Checklist for BSC6900 Cable Installation.
9 Installing the Alarm Box and the Computer Serving as the LMT
This section describes how to install an alarm box and a computer serving as the LMT. If you
are installing the computer and the alarm box in the equipment room, you can install them along
with the BSC6900 equipment. For items and specifications for checking the installation of the
LMT computer and the alarm box, see 11.3 Checklist for the Installation of the LMT
Computer and Alarm Box.
10 Attaching the Engineering Labels to the Cables
This chapter describes how to attach engineering labels to the power, PGND, and signal cables
after the cables are installed
11 Checklist for the Hardware Installation
This chapter describes how to check the hardware installation. The hardware consists of cables,
Local Maintenance Terminal (LMT) PC, and alarm box. In addition, you should check the
installation environment.
12 Installation Records
The table is used to record the BSC6900 hardware installation information.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

iii

BSC6900 UMTS
Installation Guide

About This Document

Conventions
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol

Description
Indicates an imminently hazardous situation which, if not
avoided, will result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, may result in minor or moderate injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to personal
injury.
Calls attention to important information, best practices and
tips.
NOTE is used to address information not related to personal
injury, equipment damage, and environment deterioration.

General Conventions
The general conventions that may be found in this document are defined as follows.
Convention

Description

Times New Roman

Normal paragraphs are in Times New Roman.

Boldface

Names of files, directories, folders, and users are in


boldface. For example, log in as user root.

Italic

Book titles are in italics.

Courier New

Examples of information displayed on the screen are in


Courier New.

Command Conventions
The command conventions that may be found in this document are defined as follows.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

iv

BSC6900 UMTS
Installation Guide

About This Document

Convention

Description

Boldface

The keywords of a command line are in boldface.

Italic

Command arguments are in italics.

[]

Items (keywords or arguments) in brackets [ ] are optional.

{ x | y | ... }

Optional items are grouped in braces and separated by


vertical bars. One item is selected.

[ x | y | ... ]

Optional items are grouped in brackets and separated by


vertical bars. One item is selected or no item is selected.

{ x | y | ... }*

Optional items are grouped in braces and separated by


vertical bars. A minimum of one item or a maximum of all
items can be selected.

[ x | y | ... ]*

Optional items are grouped in brackets and separated by


vertical bars. Several items or no item can be selected.

GUI Conventions
The GUI conventions that may be found in this document are defined as follows.
Convention

Description

Boldface

Buttons, menus, parameters, tabs, window, and dialog titles


are in boldface. For example, click OK.

>

Multi-level menus are in boldface and separated by the ">"


signs. For example, choose File > Create > Folder.

Keyboard Operations
The keyboard operations that may be found in this document are defined as follows.
Format

Description

Key

Press the key. For example, press Enter and press Tab.

Key 1+Key 2

Press the keys concurrently. For example, pressing Ctrl+Alt


+A means the three keys should be pressed concurrently.

Key 1, Key 2

Press the keys in turn. For example, pressing Alt, A means


the two keys should be pressed in turn.

Mouse Operations
The mouse operations that may be found in this document are defined as follows.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

Issue 01 (2015-03-25)

About This Document

Action

Description

Click

Select and release the primary mouse button without moving


the pointer.

Double-click

Press the primary mouse button twice continuously and


quickly without moving the pointer.

Drag

Press and hold the primary mouse button and move the
pointer to a certain position.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

vi

BSC6900 UMTS
Installation Guide

Contents

Contents
About This Document.....................................................................................................................ii
1 Change Description.......................................................................................................................1
2 Tools Required for Installation..................................................................................................2
3 Installation Process.......................................................................................................................4
4 Installing Power Cables and PGND Cables.............................................................................6
4.1 Power Cables and PGND Cables to Be Installed...........................................................................................................7
4.2 Connections of Power Cables and PGND Cables..........................................................................................................8
4.3 Principles for Installing Power Cables and PGND Cables.............................................................................................8
4.4 Installing Power Cables and PGND Cables Between a BSC6900 Cabinet and the PDF...............................................9
4.4.1 Installing Power Cables and PGND cable Between the BSC6900 and the PDF in Overhead Cabling Mode............9
4.4.2 Installing Power Cables and PGND Cable Between the BSC6900 and the PDF in Underfloor Cabling Mode.......12
4.5 Installing the PGND Cables Between Adjacent Cabinets............................................................................................17

5 Checking and Setting DIP Switches on Subracks................................................................19


6 Checking the Power-On Performance of Cabinet.................................................................22
7 Installing and Setting Boards....................................................................................................24
7.1 Safety Precautions for Board Installation.....................................................................................................................25
7.2 Installing the OMUa/OMUc/SAUa/SAUc Boards.......................................................................................................25
7.3 Checking and Setting the DIP Switch on the Board.....................................................................................................27
7.4 DIP Switches on the BSC6900 Boards.........................................................................................................................29

8 Installing the Signal Cables......................................................................................................30


8.1 Signal Cables to Be Installed........................................................................................................................................32
8.2 Principles of Installing Signal Cables...........................................................................................................................34
8.3 Installing the Clock Signal Cables................................................................................................................................36
8.3.1 Installing the Y-Shaped Clock Cables.......................................................................................................................36
8.3.2 Installing Line Clock Signal Cables..........................................................................................................................39
8.3.3 Installing the BITS Clock Signal Cables...................................................................................................................41
8.4 Installing the Ethernet Cables.......................................................................................................................................44
8.4.1 Arranging the Ethernet Cables..................................................................................................................................44
8.4.2 Installing the Inter-SCUa Cables Between Different Subracks.................................................................................45
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

vii

BSC6900 UMTS
Installation Guide

Contents

8.4.3 Installing Ethernet Cables Between the OMUa and the LAN...................................................................................48
8.4.4 Installing the Ethernet Cables Between the OMUc Board and the LAN..................................................................51
8.4.5 Installing the Ethernet Cables Between the SAUa Board and the LAN....................................................................53
8.4.6 Installing the Ethernet Cables Between the SAUc Board and the LAN....................................................................54
8.4.7 Installing the Ethernet Cables Between the FG2a/FG2c Board and the Other Equipment.......................................56
8.5 Installing the E1/T1 Cables..........................................................................................................................................58
8.5.1 Arranging the E1/T1 Cables Between the AEUa/PEUa/PEUc Board and the DDF.................................................59
8.5.2 Installing the E1/T1 Cables Between the AEUa/PEUa/PEUc Board and the DDF in Overhead Cabling Mode......60
8.5.3 Installing the E1/T1 Cables Between the AEUa/PEUa/PEUc Board and the DDF in Underfloor Cabling Mode
............................................................................................................................................................................................68
8.6 Installing the Optical Cables.........................................................................................................................................75
8.6.1 Using the Accessories of the Optical Cable..............................................................................................................75
8.6.2 Arranging the Optical Cables....................................................................................................................................78
8.6.3 Installing the Optical Splitter/Combiner....................................................................................................................79
8.6.4 Installing an Optical Cable Between the SCU Boards in Different Subracks with a Long Distance........................82
8.6.5 Installing the Optical Cables Between the AOUa/AOUc/GOUa/GOUc/GOUe/POUa/POUc/UOIa/UOIc Boards and
the Other Equipment...........................................................................................................................................................87
8.7 Installing the EMU RS485 Communication Cables.....................................................................................................90
8.8 Connecting the GPS Surge Protector to the GCGa/GCGb Board................................................................................92

9 Installing the Alarm Box and the Computer Serving as the LMT.....................................97
9.1 Installing the Computer Serving as the LMT...............................................................................................................98
9.2 Installing the Alarm Box..............................................................................................................................................98

10 Attaching the Engineering Labels to the Cables...............................................................100


10.1 Attaching the Engineering Labels to the Power Cables and PGND Cables.............................................................101
10.2 Attaching the Engineering Labels to the Signal Cables...........................................................................................101

11 Checklist for the Hardware Installation.............................................................................104


11.1 Checklist for BSC6900 Cable Installation................................................................................................................105
11.2 Checklist for the Installation of the BSC6900 GPS Antenna System......................................................................105
11.3 Checklist for the Installation of the LMT Computer and Alarm Box......................................................................105
11.4 Checklist for Field Cleanliness of BSC6900 Installation.........................................................................................105

12 Installation Records................................................................................................................106

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

viii

BSC6900 UMTS
Installation Guide

1 Change Description

Change Description

This section provides information about the changes in different document versions. There are
two types of changes, including function changes and editorial changes. Function changes refer
to changes in functions of a specific product version. Editorial changes refer to changes in
wording or addition of information that was not described in the earlier version.

01 (2015-03-25)
This issue does not include any changes.

Draft A (2015-01-15)
Compared with Issue 01 (2014-04-29) of V900R016C00, this issue does not include any
changes.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

2 Tools Required for Installation

Tools Required for Installation

The tools required for installing the BSC are tools for measuring, marking, drilling, and
fastening, small tools, auxiliary tools, instruments, and special tools.

NOTICE
Electronic devices are prone to electrostatic discharge (ESD). Wear an ESD wrist strap correctly
and touch only the edges of the boards, especially when dealing with components such as boards.
Table 2-1 lists the tools required for installation.
Table 2-1 Tools required for installation
Common Tools

Measuring tools

Long measuring tape, ruler (1 m), right angle,


industrial horizontal ruler, and plumb

Marking tools

Marking pen or ink fountain

Drilling tools

Percussion drill (16 drill bit) and vacuum cleaner

Fastening tools

M3-M6 straight screwdrivers


M3-M6 Phillips screwdrivers
Adjustable wrench
Socket wrenches M6, M8, M12, M14, M17, and M19
Double offset ring wrenches M6, M8, M12, M14,
M17, and M19
Long-arm wrench

Small tools

Issue 01 (2015-03-25)

Sharp-nose pliers, diagonal pliers, pliers, hand-held


electric drill, file, handsaw, crowbar, rubber mallet,
and claw hammer

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

2 Tools Required for Installation

Auxiliary tools

Issue 01 (2015-03-25)

Tweezers, brush, bellows, paper knife, bellows,


soldering iron, solder wires, ladder, pallet truck, panel
lifter, heat gun, and electric outlet (with three 2-phase
sockets and three 3-phase sockets, rated current higher
than 15 A)

Meters

Earth resistance tester, Ethernet cable tester, multimeter, 500 V


megohmmeter, optical multimeter, and optical power meter

Special tools

ESD wrist strap, glove, wire stripper, clamp pincer, feeder cutter, SMB
crimping tool, RJ-45 crimping tool, and cable cutter

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

3 Installation Process

Installation Process

The BSC6900 installation process includes the installation of the cabinet and its fittings, power
cables and PGND cables, OMUc boards , signal cables, LMT computers, and alarm boxes.

Prerequisites
l

The equipment has been unpacked and accepted.

The tools required for the installation are available.

Procedure
Step 1 Install the cabinet and its fittings. For details, see the N68E-22 Cabinet Installation Guide.
Step 2 Install the power cables and PGND cables.
If...

Then...

The type of the cabinet is N68E-22

See 4 Installing Power Cables and PGND


Cables.

The type of the cabinet is N68E-21-N See the description of installing power cables and
PGND cables for the N68E-21-N cabinet in the
N68E-21-N Cabinet Installation Guide.
Step 3 Check and Set the Subrack DIP Switch. For details, see 5 Checking and Setting DIP Switches
on Subracks.
Step 4 Check the Power-On Performance. For details, see 6 Checking the Power-On Performance
of Cabinet.
Step 5 Install the OMU board. For details, see Installing the OMUc Boards.
Step 6 Optional: Install the SAU board. For details, see Installing the SAUc Boards.
Step 7 Install signal cables. For details, see 8 Installing the Signal Cables.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

3 Installation Process
NOTE

The same method is used to install signal cables in both the N68E-22 and N68E-21-N cabinets. This
document uses the N68E-22 cabinet as an example.

Step 8 Optional: Install the GPS antenna system. For details, see the GPS Satellite Antenna System
Quick Installation Guide.
Step 9 Install the computer serving as the LMT and the alarm box. For details, see 9 Installing the
Alarm Box and the Computer Serving as the LMT.
Step 10 Attach engineering labels to the cables. For details, see 10 Attaching the Engineering Labels
to the Cables.
Step 11 Check the installed hardware. For details, see 11 Checklist for the Hardware Installation.
----End

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

Installing Power Cables and PGND Cables

About This Chapter


This section describes how to install power cables and PGND cables between a cabinet and the
power distribution frame (PDF) ,and PGND cables between cabinets. For items and
specifications for checking the installation of the power cables and PGND cables, see 11.1
Checklist for BSC6900 Cable Installation.
4.1 Power Cables and PGND Cables to Be Installed
Power cables and PGND cables to be installed include external -48 V power cables for
cabinets, external RTN power cables for cabinets, external PGND cables for cabinets, and intercabinet PGND cables.
4.2 Connections of Power Cables and PGND Cables
This section describes the connections of power cables and PGND cables between a BSC6900
cabinet and the PDF and the connections of inter-cabinet PGND cables.
4.3 Principles for Installing Power Cables and PGND Cables
This section describes the principles for installing power cables and PGND cables. When you
install power cables and PGND cables, follow the routing and binding principles.
4.4 Installing Power Cables and PGND Cables Between a BSC6900 Cabinet and the PDF
This section describes how to install power cables and PGND cables for BSC6900 cabinets in
both overhead cabling and underfloor cabling modes.
4.5 Installing the PGND Cables Between Adjacent Cabinets
This section describes how to connect the upper, middle, and lower parts of the PGND busbar
of one cabinet to those of its adjacent cabinet through PGND cables. PGND cables need to be
installed in adjacent cabinets only when they are installed in combined mode.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

4.1 Power Cables and PGND Cables to Be Installed


Power cables and PGND cables to be installed include external -48 V power cables for
cabinets, external RTN power cables for cabinets, external PGND cables for cabinets, and intercabinet PGND cables.
Table 4-1lists the external power cables and PGND cables to be installed for each cabinet.
Table 4-1 Power cables and PGND cables to be installed
Item

Color

CrossSection
al Area
(mm2)

Allowed
Bending
Radius
(mm)

Connector
Type/
Installatio
n Position

Connector
Type/
Installatio
n Position

Number

External
-48 V
power
cable for
the cabinet

Blue

25/35

30

OT
terminal/-48
V input on
the cabinet

OT
terminal/-48
V output on
the PDF

External
RTN
power
cable for
the cabinet

Black

25/35

30

OT terminal/
RTN input
on the
cabinet

OT terminal/
RTN output
on the PDF

External
PGND
cable

Green
and
yellow

25/35

30

OT terminal/
PGND input
on the
cabinet

OT terminal/
PGND
output on the
PDF

Intercabinet
PGND
cable

Green
and
yellow

15

OT terminal/
PGND
busbar in the
cabinet

OT terminal/ 3
PGND
busbar in the
cabinet

NOTE

The required length of power cables and PGND cables is specified in the site survey report. Cut an
appropriate length of cables and crimp terminals onsite.
l

The colors of power cables and PGND cables must meet the customer requirements. Table 4-1 lists
only their default colors.

Whether to use one-hole OT terminals or two-hole OT terminals for power cables and PGND cables
is determined based on customer requirements. Table 4-1 lists the one-hole OT terminals.

For details about power cables, see Power Cables. For details about PGND cables, see PGND Cables.

NOTE

To facilitate the crimping of OT terminals, crimp them on the ground with hydraulic pliers, and then place
them in the installation positions.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

4.2 Connections of Power Cables and PGND Cables


This section describes the connections of power cables and PGND cables between a BSC6900
cabinet and the PDF and the connections of inter-cabinet PGND cables.
Figure 4-1 shows the connections of cabinet power cables and PGND cables.
Figure 4-1 Connections of power cables and PGND cables

NOTE

In each cabinet, A1 and B1 form a pair of active and standby power supply ports, as do A3 and B3. As
shown in the preceding figure, to create a hot backup, connect ports A1 and A3 to one power supply group
in the PDF, and ports B1 and B3 to a different power supply group.
Connect the PGND cables for a cabinet to the nearest ground bar. If the PDF is located a great distance
from the cabinet (for example, they are not in the same equipment room), connect the PGND cables to the
nearest ground bar that is co-grounded with the PDF instead of connecting them directly to the PDF. In
this case, the methods of installing and routing PGND cables are the same as those of connecting PGND
cables directly to the PDF. In practice, PGND cables must be connected based on customer requirements.

4.3 Principles for Installing Power Cables and PGND


Cables
This section describes the principles for installing power cables and PGND cables. When you
install power cables and PGND cables, follow the routing and binding principles.

Minimum Bending Radius of Power Cables


Table 4-2 lists the requirements for bending radius of power cables.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

Table 4-2 Bending radius of power cables


Cross-Sectional Area (mm2)

Radius

25

50 mm or larger

35

55 mm or larger

Cable Layout Requirements


l

Lay out power cables and PGND cables with future capacity expansion in mind.

When laying out power cables and PGND cables, separate them from signal cables. Lay
out power cables along outer columns. When you lay out power cables and PGND cables
parallel to signal cables, the space between them must be at least 30 mm.

The bending radius of a cable must be five times larger than the diameter of the cable.

When using the underfloor cabling mode, reserve a surplus length of power cable outside
the cable inlet of the power distribution box on the top of the cabinet. This facilitates the
installation of terminals. In addition, lay out cables flat on the top of the cabinet.

When connecting power cables to the terminals on the power distribution box, lay out the
cables straightly and smoothly.

Cable Binding Requirements


l

When binding power cables and PGND cables, separate them from signal cables.

Keep a 200 mm space between cable ties.

When using the underfloor cabling mode, route the power cables and PGND cables along
the middle standing pillar on the front right side of the cabinet.

Select the appropriate cable ties, either 150 mm or 300 mm according to the diameter and
number of cables.

Bind the cable ties in the same direction. Cut any excess from the cable ties, cutting surfaces
smoothly without sharp edges.

4.4 Installing Power Cables and PGND Cables Between a


BSC6900 Cabinet and the PDF
This section describes how to install power cables and PGND cables for BSC6900 cabinets in
both overhead cabling and underfloor cabling modes.

4.4.1 Installing Power Cables and PGND cable Between the


BSC6900 and the PDF in Overhead Cabling Mode
This section describes how to install power cables and PGND cable between a cabinet and the
PDF in overhead cabling mode.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

Prerequisites
l

The cabinet to be connected with power cables and PGND cable has been installed.

On the PDF, the power distribution switches for the relevant output terminals have been
set to OFF.

All power distribution switches on the power distribution box have been set to OFF.

Power cables and PGND cable are available.

The materials required for the installation are available. The materials include cable ties,
wax strings, and PVC insulation tape.

The tools required for the installation are available. These tools include a handsaw, a cable
cutter, a wrench, a Phillips screwdriver, a flat-head screwdriver, an electric Phillips
screwdriver (> 5 Nm = 44.25 lbfin.), diagonal pliers, and hydraulic pliers.

Context
If you are using the overhead cabling mode, route the cables from the PDF through the upper
cable hole into the cable tray and then to the top of each cabinet along the cable tray. Figure
4-2 shows how to install power cables and PGND cable between a cabinet and the PDF in
overhead cabling mode.
Figure 4-2 Installing power cables and PGND cable in overhead cabling mode

Procedure
Step 1 Determine the length of each power cable and PGND cable by referring to the related engineering
design documents or by measuring the actual cabling route.
Step 2 Uncoil the power cable roll and the PGND cable roll onsite. Measure an appropriate length of
cables with a measuring tape or other measuring tools. Then, cut the cables with a cable cutter
(KT35) or a handsaw with 0.8 mm of teeth space. When cutting the cables, leave sufficient slack.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

10

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

NOTICE
If you find the slack insufficient, replace the cables. Do not make connectors or solder joints.
Step 3 Attach temporary labels to both ends of the cables. The contents on these temporary labels are
not necessarily the same as those on the formal labels because they are only for easy
identification.
Step 4 Lay out power cables and PGND cable between a cabinet and the PDF. Routed the power cables
from the PDF through the upper cable hole into the cable tray and then to the top of each
cabinet along the cable tray.
NOTE

l If the space between a cable tray and the top of a cabinet exceeds 800 mm, use a cable ladder to facilitate
the cable layout.
l The bending radius of a cable must be five times larger than the diameter of the cable.

Step 5 Connect the power cables and PGND cable for the cabinet.
1.

According to the installation position of each cable, determine the exact length required,
and cut off any excess.

2.

Obtain the cable terminals delivered with the cabinet. For details, see Assembling the OT
Terminal and the Power Cable. Crimp the OT terminals of the power cable and OT terminals
of PGND cable for the cabinet.
NOTE

OT terminals (M6) are used for the -48 V and RTN power cables whereas OT terminals (M8) are
used for PGND cable on the cabinet side. The type of OT terminals used on the PDF side is determined
by the actual situation.
NOTE

To facilitate the crimping of OT terminals, crimp them on the ground with hydraulic pliers, and then
place them in the installation positions.

3.

Remove the left and right plastic cover plates from the top rear of the cabinet and cut holes
on the cover plates, matching the holes to the power cable inlets on the power distribution
box.

4.

Place both cover plates back to their original positions.

5.

Through the hole on the cover plate on the top of the cabinet, connect OT terminals of the
-48 V power cable to wiring terminals labeled "3(-)" and "1(-)" in both part A and part B
of the power distribution box, and connect OT terminals of the RTN power cable to wiring
terminals labeled "3(+)" and "1(+)" in both part A and part B of the power distribution box.

6.

Connect the OT terminals of the -48 V power cable and RTN power cable to the wiring
terminals in the power distribution box. .

7.

Secure the OT terminal of PGND cableto the ground bolt at the rear of the cabinet top.

Step 6 Connect power cables and PGND cable to the PDF output terminals.
1.

According to the installation position of each cable, determine the exact length required,
and cut off any excess.

2.

Obtain the cable terminals delivered with the cabinet. For details, see Assembling the OT
Terminal and the Power Cable. Crimp the OT terminals of power cables and PGND cable.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

11

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

3.

Connect the -48 V power cables, RTN power cables, and PGND cable to the corresponding
wiring terminals on the power distribution box.
NOTE

When connecting OT terminals to the wiring terminals, add flat washers and spring washers, and
assemble them in order.

Figure 4-3 shows how to install an OT terminal.


Figure 4-3 Installing an OT terminal

4.

(1) Cable

(2) Heat shrink tubing

(3) Nut

(4) Spring washer

(5) Flat washer

(6) Wiring terminal

Record the installation results in 12 Installation Records.

----End

4.4.2 Installing Power Cables and PGND Cable Between the


BSC6900 and the PDF in Underfloor Cabling Mode
This section describes how to install power cables and PGND Cable between a cabinet and the
PDF for the BSC6900 in underfloor cabling mode.

Prerequisites
l

The cabinet to be connected with power cables and PGND Cable has been installed.

On the PDF, the power distribution switches for the relevant output terminals have been
set to OFF.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

12

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

All power distribution switches on the power distribution box have been set to OFF.

Power cables and PGND Cable are available.

The materials required for the installation are available. The materials include cable ties,
wax strings, PVC insulation tape, and lifting sling.

The tools required for the installation are available. These tools include a handsaw, a cable
cutter, a wrench, a Phillips screwdriver, a flat-head screwdriver, an electric Phillips
screwdriver (> 5 Nm = 44.25 lbfin.), diagonal pliers, and hydraulic pliers.

Context
If you are using the underfloor cabling mode, route the cables from the PDF through the cable
hole under the PDF, to the bottom of the cabinet beneath the ESD floor to the top of the cabinet
along the middle standing pillar. Figure 4-4Figure 4-5 shows how to install power cables and
PGND Cable between a cabinet and the PDF in underfloor cabling mode.
Figure 4-4 Installing power cables and PGND Cable in underfloor cabling mode

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

13

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

Figure 4-5 Installing power cables and PGND Cable in underfloor cabling mode

Procedure
Step 1 Determine the length of each power cable and PGND cable by referring to the related engineering
design documents or by measuring the actual cabling route.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

14

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

Step 2 Uncoil the power cable roll and the PGND cable roll onsite. Measure an appropriate length of
cables with a measuring tape or other measuring tools. Then, cut the cables with a cable cutter
(KT35) or a handsaw with 0.8 mm of teeth space. When cutting the cables, leave sufficient slack.

NOTICE
If you find the slack insufficient, replace the cables. Do not make connectors or solder joints.
Step 3 Attach temporary labels to both ends of the cables. The contents on these temporary labels are
not necessarily the same as those on the formal labels because they are only for easy
identification.
Step 4 Lay out power cables and PGND Cable according to cable routing and engineering requirements.
1.

Route four pairs of power cables and one PGND cable from the cable outlet at the bottom
of the PDF. Then route the cables under the ESD floor for the cabinet.

2.

Divide the four pairs of power cables into two groups . Use a temporary cable tie to bind
one group with the PGND cable. Repeat this procedure with the other group. Route the two
groups of cables to the middle standing pillars on the left and right sides of the cabinet,
respectively.

3.

Place one end of the lifting sling on the top of the middle standing pillar. Route the other
end of the lifting sling to the bottom of the cabinet through the middle standing pillar, and
bind it to the power cables and PGND cable at the bottom of the middle standing pillar.

4.

Pull the upper end of the lifting sling to lift the power cables and PGND cable to the top of
the cabinet along the middle standing pillar.

5.

Remove the lifting sling and the temporary cable ties on the power cables and PGND cable.

Step 5 Connect power cables and the PGND cable to the cabinet.
1.

According to the installation position of each cable, determine the exact length required,
and cut off any excess.

2.

Obtain the cable terminals delivered with the cabinet. For details, see Assembling the OT
Terminal and the Power Cable. Crimp the OT terminals of the power cable and OT terminals
of the PGND cable for the cabinet.
NOTE

OT terminals (M6) are used for the -48 V and RTN power cables on the cabinet side. OT terminals
(M8) are used for PGND Cable. The type of OT terminals used on the PDF side is determined by the
actual situation.
To facilitate the crimping of OT terminals, crimp them on the ground with hydraulic pliers, and then
place them in the installation positions.

3.

Remove the left and right plastic cover plates from the top rear of the cabinet and cut holes
on the cover plates, matching the holes to the power cable inlets on the power distribution
box.

4.

Place both cover plates back to their original positions.

5.

Through the hole on the cover plate on the top of the cabinet, connect OT terminals of the
-48 V power cable to wiring terminals labeled "3(-)" and "1(-)" in both part A and part B
of the power distribution box, and connect OT terminals of the RTN power cable to wiring
terminals labeled "3(+)" and "1(+)" in both part A and part B of the power distribution box.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

15

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

6.

Connect the OT terminals of the -48 V power cable and RTN power cable to the wiring
terminals in the power distribution box. .

7.

Secure the OT terminals of PGND Cable to the ground bolt at the rear of the cabinet top.

Step 6 Connect power cables and PGND Cable to the PDF output terminals.
1.

According to the installation position of each cable, determine the exact length required,
and cut off any excess.

2.

Obtain the cable terminals delivered with the cabinet. For details, see Assembling the OT
Terminal and the Power Cable. Crimp the OT terminals of power cables and PGND Cable.

3.

Connect the -48 V power cables, RTN power cables, and PGND Cable to the corresponding
wiring terminals on the power distribution box.
NOTE

When connecting OT terminals to the wiring terminals, add flat washers and spring washers, and
assemble them in order.

Figure 4-6 shows how to install an OT terminal.


Figure 4-6 Installing an OT terminal

4.

(1) Cable

(2) Heat shrink tubing

(3) Nut

(4) Spring washer

(5) Flat washer

(6) Wiring terminal

Record the installation results in 12 Installation Records.

----End

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

16

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

4.5 Installing the PGND Cables Between Adjacent Cabinets


This section describes how to connect the upper, middle, and lower parts of the PGND busbar
of one cabinet to those of its adjacent cabinet through PGND cables. PGND cables need to be
installed in adjacent cabinets only when they are installed in combined mode.

Prerequisites
The power distribution switches for the relevant output terminals have been set to OFF.

Procedure
Step 1 As described in 4.2 Connections of Power Cables and PGND Cables, use inter-cabinet PGND
cables to connect the upper, middle, and lower PGND busbars on the mounting bar of adjacent
cabinets as shown in Figure 4-7.
Figure 4-7 Installing PGND cables for adjacent cabinets

----End

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

17

BSC6900 UMTS
Installation Guide

4 Installing Power Cables and PGND Cables

Follow-up Procedure
Record the installation results in 12 Installation Records.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

18

BSC6900 UMTS
Installation Guide

5 Checking and Setting DIP Switches on Subracks

Checking and Setting DIP Switches on


Subracks

This section describes how to check and set the DIP switch on a subrack. In general, subracks
are installed in the cabinet before delivery.

Prerequisites
Subracks have been installed in the cabinet.

Context

NOTICE
l Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before performing
any operations. For details, see Wearing an ESD Wrist Strap.
l DIP switches cannot be set after the cabinet is powered on. Therefore, check and set the DIP
switches before powering on the cabinet.
The DIP switch is used to set the subrack number. Figure 5-1 shows the cover of a DIP
switch.
Figure 5-1 DIP switch cover

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

19

BSC6900 UMTS
Installation Guide

5 Checking and Setting DIP Switches on Subracks

The bit 0 indicates the ON state, and the bit 1 indicates the OFF state. The most significant bit
(MSB) of the DIP switch corresponds to the MSB of a byte. Table 5-1 provides the definition
of each bit.
Table 5-1 Definition of each DIP bit
DIP Bit

Definition

1 (the least significant bit)

Subrack number setting bit

Subrack number setting bit

Subrack number setting bit

Subrack number setting bit

Subrack number setting bit

Odd parity check bit

Reserved bit, generally set to ON

8 (the most significant bit)

Startup type of the subrack, generally set to


OFF
NOTE
l For the inventory sites upgrading from
BSC6000 to BSC6900, keep the former
settings.
l For the new sites in BSC6900, the bit is
conservative and is fixed to OFF.

The DIP switch uses odd parity check, so the number of bits that are set to OFF must be odd.
The setting is as follows:
1.

Set bit 1 to bit 5.

2.

Set bit 7 to ON.

3.

Set bit 8 to OFF.

4.

Count the number of bits that are set to OFF.


l If the number of bits is even, set bit 6 to OFF.
l If the number of bits is odd, set bit 6 to ON.

Table 5-2 lists the DIP switch setting.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

20

BSC6900 UMTS
Installation Guide

5 Checking and Setting DIP Switches on Subracks

Table 5-2 DIP switch setting


Subr
ack
No.

DIP Bit
1

ON

ON

ON

ON

ON

ON

ON

OFF

OFF

ON

ON

ON

ON

OFF

ON

OFF

ON

OFF

ON

ON

ON

OFF

ON

OFF

OFF

OFF

ON

ON

ON

ON

ON

OFF

ON

ON

OF
F

ON

ON

OFF

ON

OFF

OFF

ON

OF
F

ON

ON

ON

ON

OFF

DIP Switch
Setting

Procedure
Step 1 Loosen the screws on the cover of the DIP switch by turning them counterclockwise for two or
three circles, as shown in Figure 5-1.
Step 2 Turn the cover around the lower right screw and open the cover. Set the DIP switch.
Step 3 Attach a formal label or temporary label to the subrack. The contents on the temporary label are
not necessarily the same as those on the formal labels because they are used for identifying a
subrack during BSC6900 software commissioning.
----End

Follow-up Procedure
Record the checking and setting results of the DIP switch in 12 Installation Records.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

21

BSC6900 UMTS
Installation Guide

6 Checking the Power-On Performance of Cabinet

Checking the Power-On Performance of


Cabinet
This section describes how to check the power supply to cabinets, fan assembly, and boards.

Prerequisites
l

Power cables and PGND cables between a cabinet and the PDF are installed.

Subracks, fan assemblies, and boards are installed.

A multimeter required for the installation is available.

Context
The cabinet uses a DC power supply. For details, see Technical Specifications of the Power
Distribution Box.

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before performing
any operations.
You need not to remove the board for performing the power-on check. During powering on a
subrack, do not insert a board into or remove a board from the subrack to avoid static damage
to boards.

Procedure
Step 1 Set the corresponding output switches on the PDF and all the output switches on the power
distribution box to OFF.
Step 2 Use the multimeter to measure the resistance at the power output terminal for the PDF and at
the input and output terminals for the power distribution box. Ensure that short-circuiting does
not occur either between the -48 V working power and the RTN working ground or between the
-48 V working power and the PGND protection ground.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

22

BSC6900 UMTS
Installation Guide

6 Checking the Power-On Performance of Cabinet

Step 3 Set the output switches on the PDF to ON and all the output switches on the power distribution
box to OFF.
Then, the power distribution box starts self-check. (The RUN and ALM indicators on the power
distribution box are on and the buzzer sounds.) After the self-check, the power distribution box
requests registering at the SCUb board (the RUN indicator on the power distribution box blinks
at 2 Hz) until the registration is successful (the RUN indicator blinks at 0.5 Hz). For details about
the indicators on the power distribution box, see Indicators on the Power Distribution Box.
Step 4 Set the multimeter to the voltage scale. Use the multimeter to measure the output voltage of the
PDF or the input voltage of the power distribution box. Ensure that the voltages range from -40
V to -57 V.
Step 5 Set the corresponding two switches on the power distribution box to ON.
Step 6 Set the multimeter to the voltage scale. Use the multimeter to check whether the output power
provided by the power distribution box for each subrack ranges from -40 V to -57 V. Check
whether the fan assembly in the subrack can be normally started and whether the power supply
to the boards in the subrack is normal.
l If a subrack is powered on and started normally, the green STATUS indicator on the panel
of the fan assembly blinks. If exceptions occur, turn off the switches on the power distribution
box and the PDF immediately. Check whether the output voltage of the power distribution
box is normal and the power cables are installed correctly. For details about the indicators
on the fan assembly, see Indicators on the Fan Assembly.
l If a subrack is powered on and started normally, the RUN indicator on the board panel is ON
or blinks. If all the indicators on a board are OFF, the board or its slot may be faulty. Contact
Huawei technical support to resolve this problem.
l If indicators on all the boards in a subrack are OFF, turn off the switches on the power
distribution box and the PDF immediately. Check whether the output voltage of the power
distribution box is normal and the power cables are installed correctly.
Step 7 Repeat Step 5 to Step 6 to check the power supply to all the subracks in one cabinet.
Step 8 Repeat Step 1 to Step 7 to measure the power supply to each cabinet.
----End

Follow-up Procedure
Record the power-on check results in 12 Installation Records. Set the corresponding output
switches on the PDF and all the output switches on the power distribution box to OFF.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

23

BSC6900 UMTS
Installation Guide

7 Installing and Setting Boards

Installing and Setting Boards

About This Chapter


Most boards except the OMUa/OMUc/SAUa/SAUc boards are installed in subracks before the
delivery. If AEUa/AOUa/PEUa/PEUc/POUa/PAMU/PFCU boards are installed in the cabinet,
check and set the DIP switches of the boards. Install the OMUa/OMUc/SAUa/SAUc boards
onsite.
7.1 Safety Precautions for Board Installation
This section describes the precautions you must take when you install, remove, or replace the
boards, or perform any other operation that requires bodily contact with the boards.
7.2 Installing the OMUa/OMUc/SAUa/SAUc Boards
This section describes how to install the OMUa/OMUc/SAUa/SAUc board in the MPS.
7.3 Checking and Setting the DIP Switch on the Board
The boards are installed in the subrack before delivery. If the AEUa/AOUa/PEUa/PEUc/
POUa /PAMU/PFCU board is configured in the cabinet, you need to check and set the DIP
switches of the AEUa/AOUa/PEUa/PEUc/POUa/PAMU/PFCU board.
7.4 DIP Switches on the BSC6900 Boards
This section describes the DIP switches on the BSC6900 AEUa/AOUa/PEUa/PEUc/POUa
boards and the PAMU/PFCU boards.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

24

BSC6900 UMTS
Installation Guide

7 Installing and Setting Boards

7.1 Safety Precautions for Board Installation


This section describes the precautions you must take when you install, remove, or replace the
boards, or perform any other operation that requires bodily contact with the boards.

Precautions Before Operation


l

Store materials for board installation (such as ESD boxes and bags) in the equipment room
for future use.

Keep the boards and other electrostatic-sensitive parts in ESD bags. Do not pack or hold
the boards or parts by using plastic foam, common plastic bags, or paper bags.

Ensure that the cabinet is well grounded before inserting the board into the subrack.
Otherwise, the board mill be severely damaged.

Ensure that the wrist strap is functioning. The value of the resistance measured by the
multimeter must range from 0.8 megohm to 1.2 megohms.

see Wearing an ESD Wrist Strap for the method of measuring the resistance.

Precautions During Operation


l

Wear an ESD wrist strap or gloves and ensure that the ESD wrist strap is well grounded.

See Wearing an ESD Wrist Strap for the procedure for wearing an ESD wrist strap or gloves.

Place the board on an ESD pad when replacing board hardware or chips. Use ESD tweezers
or extraction tools to replace chips. Do not touch board chips or pins with your bare hands.

Discharge the static electricity of the cables and protective sleeves before connecting them
to the ports.

Do not touch the PCB or any other part except jumpers and DIP switches during board
replacement.

Place the removed boards and components on an ESD pad or other ESD materials. Do not
pack or hold the boards or parts by using plastic foam, common plastic bags, or paper bags.

7.2 Installing the OMUa/OMUc/SAUa/SAUc Boards


This section describes how to install the OMUa/OMUc/SAUa/SAUc board in the MPS.

Prerequisites
l

The tools required for the installation are available. The tools include ESD wrist strap or
gloves and Phillips screwdriver.

The boards to be installed are available.

Context
For the position of the OMUa/OMUc/SAUa/SAUc board in the subrack, see Configuration of
a Subrack and Principles for Installing Boards.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

25

BSC6900 UMTS
Installation Guide

7 Installing and Setting Boards

Procedure
Step 1 Remove the board from the ESD box, and then check the pins and sockets of the board.
In case of any bent, missing or broken pins, or any deformed sockets, contact Huawei engineers
to replace the board.
Step 2 As shown in part a of Figure 7-1, press the self-locking latches on the front panel and turn the
ejector levers outwards until the ejector levers cannot be turned further. Check that the ejector
levers are located in the positions shown in part 2 of Figure 7-1.
Step 3 Hold the panel of the board with one hand and support the board with the other. Then, slide the
board into the subrack along the guide rail until the ejector levers are half closed, as shown in
part 3 of Figure 7-1.

NOTICE
When inserting the board into the subrack, push the board slowly and steadily to avoid damaging
the pins on the backplane and the metal piece on the board.

Figure 7-1 Installing the board

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

26

BSC6900 UMTS
Installation Guide

7 Installing and Setting Boards

Step 4 As shown in part 4 of Figure 7-1, turn the two ejector levers inwards at an angle of about 60
until they hook on to the self-locking latches on the front panel. Ensure that the board is in close
contact with the backplane and that the front panel is inserted into the subrack.
Step 5 Press and fasten the screws on the front panel to secure the board, as shown in part b of Figure
7-1.
NOTE

The screws on the front panel have springs. Therefore, the screws can touch the corresponding holes of the
subrack only when you press the screws.

----End

Follow-up Procedure
Record the installation result in the templates provided in 12 Installation Records.

7.3 Checking and Setting the DIP Switch on the Board


The boards are installed in the subrack before delivery. If the AEUa/AOUa/PEUa/PEUc/
POUa /PAMU/PFCU board is configured in the cabinet, you need to check and set the DIP
switches of the AEUa/AOUa/PEUa/PEUc/POUa/PAMU/PFCU board.

Prerequisites
l

The tools required for setting the DIP switches are available. The required tools are ESD
wrist strap, ESD gloves, ESD pad, ESD tweezers, Phillips screwdriver and flat-head
screwdriver.

The DIP switches on the board are found.

The actual transmission mode on site is determined.

Context
Before delivery, the DIP switches on the AEUa/AOUa/PEUa/PEUc/POUa/PAMU/PFCU board
are set by default. The settings of the DIP switches on the AEUa/AOUa/PEUa/PEUc/POUa/
PAMU/PFCU board should be checked according to the transmission mode used onsite and the
slots housing the boards. If the settings do not match the actual conditions, you need to adjust
the settings of the DIP switches.
The PFCU board is installed in the front of the fan box. Operators only need to pull the fan box
out of the subrack and check the DIP switches on the PFCU board.

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

27

BSC6900 UMTS
Installation Guide

7 Installing and Setting Boards

Procedure
Step 1 Determine the position of the AEUa/AOUa/PEUa/PEUc/POUa/PAMU/PFCU board in the
subrack, and then remove any of the preceding board from the subrack. For details on how to
remove the AEUa/AOUa/PEUa/PEUc/POUa board, see Removing the Board. For details on
how to remove the PAMU board, see steps 3 to 6 in Replacing a PAMU Board. For details on
how to remove the PFCU board, see steps 2 to 4 in Replacing a Fan Assembly.
Step 2 Determine the proper settings of the DIP switches based on the board type, actual transmission
mode onsite, or the slot that housing the board.
Step 3 Check whether the settings of the DIP switches on the board match the actual conditions.
If...

Then...

The settings of the DIP switches on the


board match the actual conditions

Do no modify the settings of the DIP switches.


Go to Step 5.

The settings of the DIP switches on the


board do not match the actual conditions

Modify the settings of the DIP switches by


performing Step 4.

Step 4 Wear the ESD gloves and place the board on the ESD pad. Then, use the tweezers to set the
target DIP bits to the correct positions with moderate force.
l For details about the settings of the DIP switches on the AEUa board, see DIP Switches on
the AEUa Board.
l For details about the settings of the DIP switches on the AOUa board, see DIP Switches on
the AOUa Board.
l For details about the settings of the DIP switches on the PEUa board, see DIP Switches on
the PEUa Board.
l For details about the settings of the DIP switches on the PEUc board, see DIP Switches on
the PEUc Board.
l For details about the settings of the DIP switches on the POUa board, see DIP Switches on
the POUa Board.
l For details about the settings of the DIP switches on the PFCU board, see DIP Switch on the
PFCU Board.
l For details about the settings of the DIP switches on the PAMU board, see DIP Switch on
the PAMU Board.
Step 5 Install the board in its original slot. For details on how to install the AEUa/AOUa/PEUa/PEUc/
POUa boards, see Installing the Board. For details on how to install the PAMU board, see steps
7 to 12 in Replacing a PAMU Board. For details on how to install the PFCU board, see steps 5
to 7 in Replacing a Fan Assembly.
Step 6 Check and set all the DIP switches on the board by repeating steps Step 1 to Step 5.
----End

Follow-up Procedure
Record the checking and setting results of the DIP switches on the AEUa/AOUa/PEUa/PEUc/
POUa/PAMU/PFCU board in the templates provided in 12 Installation Records.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

28

BSC6900 UMTS
Installation Guide

7 Installing and Setting Boards

7.4 DIP Switches on the BSC6900 Boards


This section describes the DIP switches on the BSC6900 AEUa/AOUa/PEUa/PEUc/POUa
boards and the PAMU/PFCU boards.
Table 7-1 DIP Switches on BSC Components

Issue 01 (2015-03-25)

DIP Switches on
BSC Components

Description

DIP Switch on the


AEUa Board

For details, see BSC6900 Hardware DescriptionDIP Switches on


the AEUa Board

DIP Switch on the


AOUa Board

For details, see BSC6900 Hardware DescriptionDIP Switches on


the AOUa Board

DIP Switch on the


PEUa Board

For details, see BSC6900 Hardware DescriptionDIP Switches on


the PEUa Board

DIP Switch on the


PEUc Board

For details, see BSC6900 Hardware DescriptionDIP Switches on


the PEUc Board

DIP Switch on the


POUa Board

For details, see BSC6900 Hardware DescriptionDIP Switches on


the POUa Board

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

29

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Installing the Signal Cables

About This Chapter


This chapter describes how to install the signal cables according to the layout requirements. The
signal cables to be installed include clock signal cables, Ethernet cables, E1/T1 cables and optical
cables. For items and specifications for checking the installation of signal cables, see 11.1
Checklist for BSC6900 Cable Installation.
8.1 Signal Cables to Be Installed
This section describes the signal cables to be installed on site.
8.2 Principles of Installing Signal Cables
This section describes principles of installing signal cables. The principles involve minimum
bending radius, cable layout, cable routing, and cable binding.
8.3 Installing the Clock Signal Cables
The clock signal cables refer to the Y-shaped clock signal cable, line clock signal cable and the
BITS clock signal cable.
8.4 Installing the Ethernet Cables
This section describes how to install the Ethernet cables. These cables are the inter-SCUa cable,
the Ethernet cable between the OMUa/OMUc board and the U2000 or the LAN of the customer,
and the Ethernet cable between the FG2a/FG2c board and the other device.
8.5 Installing the E1/T1 Cables
This section describes how to install the E1/T1 cables between the AEUa/PEUa/PEUc board
and the DDF.
8.6 Installing the Optical Cables
This section describes how to install the optical cables between the AOUa/AOUc/GOUa/GOUc/
GOUe/POUa/POUc/UOIa/UOIc board and the other equipment.
8.7 Installing the EMU RS485 Communication Cables
This section describes how to install the EMU RS485 communication cable between the
BSC6900 and the EMU.
8.8 Connecting the GPS Surge Protector to the GCGa/GCGb Board

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

30

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

For cabinets equipped with the GCGa/GCGb board, install an indoor surge protector on the top
of the cabinet. Use the cable for the input of the satellite signals to connect the port Protect of
the GPS surge protector on the top of the cabinet and the port ANT on the GCGa/GCGb board.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

31

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

8.1 Signal Cables to Be Installed


This section describes the signal cables to be installed on site.
Table 8-1 lists the signal cables to be installed.
Table 8-1 Signal cables
Name

Cable Type

Function

Remarks

Clock
signal
cables

Y-shaped clock
cable

Connects the GCUa/


GCGa/GCUb/GCGb
board to the SCUb board.

Line clock
signal cable

Connects the BSC6900


interface board to the
GCUa/GCGa/GCUb/
GCGb board.

BSC6900 uses the BITS clock


cables to transmit the reference
clock signals extracted from the
BITS clock source, see 8.3
Installing the Clock Signal
Cables.

BITS clock
signal cable

Connects the GCUa/


GCGa/GCUb/GCGb
board to the BITS clock.

Unshielded
straightthrough cable

Connects the SCUb boards


in the main BM and TC
subracks.

Ethernet
cable

When the capacity of a site is


expanded, the inter-SCUb cables
need to be made and installed on
site, see Installing the InterSCUb SFP+ High-Speed Cables
Between Different Subracks.
NOTE
GE ports numbered from 0 to 7 are
recommended for the
interconnection between SCUb
boards.

Shielded
straightthrough cable

Connects the OMUc/


SAUc board to the U2000
or the LAN of the
customer.

The shielded straight-through


cables are made before delivery.

Connects the FG2a/FG2c


board to other devices.
E1/T1
cable

75-ohm coaxial
cable

Connects the AEUa/PEUa/


PEUc board to the DDF.

Active/standby
75-ohm coaxial
cable

The coaxial cables or twisted


pair cables are selected
according to the site survey, see
8.5 Installing the E1/T1
Cables.

120-ohm
twisted pair
cable
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

32

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Name

Cable Type

Function

Remarks

Active/standby
120-ohm
twisted pair
cable
Optical
cable

LC/PC-LC/PC
single-mode/
multimode
optical cable or
LC/PC-FC/PC
single-mode/
multimode
optical cable or
LC/PC-SC/PC
single-mode/
multimode
optical cable

Connects the AOUa/


AOUc/GOUa/GOUc/
GOUe/POUa/POUc/
UOIa/UOIc board to the
ODF.

The single-mode optical cables


are yellow, and the multimode
optical cables are orange, see 8.6
Installing the Optical Cables.

Highspeed
cable

SFP+ highspeed cable

Connects SCUb boards in


different subracks.

When a new site is deployed, the


inter-SCUb cables are already
installed on the MPR cabinet
configured with two or three
subracks or the TCR cabinet.
When the capacity of a site is
expanded, the inter-SCUb cables
need to be made and installed on
site, see Installing the InterSCUb SFP+ High-Speed Cables
Between Different Subracks.
NOTE
10GE ports numbered from 8 to 11
are recommended for the
interconnection between SCUb
boards.

Other
signal
cables

EMU RS485
communicatio
n cable

Connects the power


distribution box to the
EMU.

The crossover cables are made


before delivery.

Signal cable of
the alarm box

Connects the alarm box to


the Local Maintenance
Terminal (LMT) PC.

The crossover cables are made


before delivery.

For details about the signal cables, see Cables.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

33

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

8.2 Principles of Installing Signal Cables


This section describes principles of installing signal cables. The principles involve minimum
bending radius, cable layout, cable routing, and cable binding.

Principles of Installing Signal Cables


When installing signal cables, take the following precautions:
l

Optical cables should not be stretched roughly or stepped on, and heavy objects should not
be placed on the cable to avoid damage.

Optical connectors not in use must be covered with a dustproof cap.

If connectors of signal cables are made before delivery, pack the connectors with soft and
durable materials such as a packing bag during cabling.

Protect jackets of signal cables from being damaged during the routing.

When coiling the extra length of optical cables on the fiber management tray, apply proper
force to avoid damaging the optical.

The actual installation positions must meet the requirements of site survey and data
configuration.

When installing the signal cables, you should route the extra length of the interconnection
cables on both sides of the cabinet according to the requirement for the bending radius of
the cables.

The related operation guide is intended for only the installation method. The actual
installation position of cables should meet the requirements of site survey and should be
consistent with the data configuration scheme.

Minimum Bending Radius


The bending radius of the signal cable meets the requirements of all types of cables. Table
8-2 lists the bending radius of the signal cables.
Table 8-2 Requirements for the bending radius

Issue 01 (2015-03-25)

Wire

Bending Radius

BITS clock signal cable

Not less than 45 mm

Y-shaped clock cable

Not less than 25 mm

Ethernet cable

Not less than 25 mm

Optical cable

Not less than 40 mm

SFP+ high-speed cable

Not less than 40 mm

E1/T1 cable

Not less than 40 mm

EMU RS485 Communication Cable

Not less than 25 mm

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

34

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Wire

Bending Radius

OMUc serial cable

Not less than 25 mm

NOTE
The port does not require a signal cable
or connection to other devices when the
system runs properly. Therefore,
equipment security is not affected.

Signal cable of the alarm box

Not less than 25 mm

Principles of Routing the Signal Cables


To facilitate maintenance and capacity expansion, follow these principles when routing cables.
The layout sequence in overhead and underfloor cabling modes must be the same.
l

The cables can be routed either on the front side first or on the rear side first. The cables
meant for the front of the cabinet must be laid only in the front side of the cabinet. Follow
the same principle for the cables meant for the rear of the cabinet.

whereas routing the cables at the back of the cabinet, you should route the E1/T1 cables
before routing the optical cables.

Requirements of Routing the Signal Cables


The requirements for routing signal cables are as follows:
l

Protect the jackets of the signal cables from being damaged during the routing.

Hold the connector when plugging out the signal cables to protect the signal cable from
damage.

When installing the signal cables, you should route the extra length of the interconnection
cables on both sides of the cabinet according to the requirement for the bending radius of
the cables.

For combined cabinets, the extra signal cable in front of the cabinet should be routed along
the cable ladder or at one side of the cabinet. It should not be placed in the gap between the
combined cabinets.

The signal cables must be separated from the power cables.

The bending radius of the signal cable satisfies the requirements of all kinds of cables.
Table 8-2 lists the bending radius of the signal cables.

Extra length of the signal cable should be reserved near the connector.

The signal cables must be neatly laid in the rack, according to the engineering design.

If the height difference between the cable tray and the top of the cabinet exceeds 800 mm,
a vertical cable ladder must be used. The signal cables and the lower part of the downward
cable ladder must be bound together.

The routing should be in accordance with the engineering design.

The cabling is clear, proper, and smooth at the bends. The cables are laid in parallel.

The signal cables layout facilitates maintenance and future expansion.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

35

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Requirements of Binding the Signal Cables


The requirements of binding the signal cables are as follows:
l

The signal cables and power cables must be bound separately. The spacing between cable
ties must be at least 150 mm.

The twine for binding the cables must be coated with wax.

The signal cables must be bound at the entrance and exit of the cable trough and at the
turning points, as shown in Figure 8-1.
Figure 8-1 Bending and binding signal cables

The optical cables must be neatly bound in pairs.

The cables on the cable tray must be bound neatly.

The cable ties must face the same direction and be tied with proper tightness.

The cable ties must be placed at regular intervals, 200 mm for E1/T1 cables , and 150 mm
for optical cables.

The extra length of the cable ties must be cut and the cut surface must be smooth.

8.3 Installing the Clock Signal Cables


The clock signal cables refer to the Y-shaped clock signal cable, line clock signal cable and the
BITS clock signal cable.

8.3.1 Installing the Y-Shaped Clock Cables


This section describes how to install the Y-shaped clock cables between the GCUa/GCUb/
GCGa/GCGb board in the MPS and the SCUa/SCUb board in the EPS. When a new site is
deployed, the Y-shaped clock cables are already installed on the MPR cabinet configured with
two or three subracks. When the capacity of a site is expanded, the Y-shaped clock cables need
to be installed on site.

Prerequisites
l

The Y-shaped clock cables required for the installation are available.

The required cable ties and wax strings are available.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

36

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, and cable cutter.

The wires in the Y-shaped clock cables are intact, the jacket of the cable is undamaged,
and the pins in the connector are straight.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.
For the installation positions of the Y-shaped clock cables in the cabinet, see Connections of
Signal Cables for the MPR.
The Y-shaped clock cable has three specifications in length: 2.0 m, 2.5 m, and 9.7 m. The 2.0
m cable is used to connect the GCUa/GCUb/GCGa/GCGb board to the SCUa/SCUb board in
two adjacent subracks in one cabinet. The 2.5 m cable is used to connect the GCUa/GCUb/
GCGa/GCGb board to the SCUa/SCUb board in different subracks in one cabinet. The 9.7 m
cable is used to connect the GCUa/GCUb/GCGa/GCGb board to the SCUa/SCUb board in
different cabinets.

Procedure
Step 1 Attach formal labels to identify the signal cables of the same type when the number of signal
cables of the same type to be installed is more than one.
Step 2 Put one end with an RJ45 connector to the SCUa/SCUb board. Take one end of the cable that
has two RJ45 connectors and lead it from the SCUa/SCUb board to the distribution post in the
cable trough. Estimate the length of the cable between the SCUa/SCUb board and the GCUa/
GCUb/GCGa/GCGb board. The bending radius must be at least 25 mm. Then, bind the cable
and the distribution post. Route the cable along the cable trough to the GCUa/GCUb/GCGa/
GCGb board.
Step 3 Route the cable to the GCUa/GCUb/GCGa/GCGb according to the requirements specified in
8.2 Principles of Installing Signal Cables and the engineering requirements. The cabling of
the Y-shaped clock cables is described in Table 8-3.
Table 8-3 Cabling of the Y-shaped clock cables

Issue 01 (2015-03-25)

Condition

Cabling mode

Action

The SCUa/SCUb and the


GCUa/GCUb/GCGa/GCGb
are located in the same
cabinet.

Cabling within the cabinet

Lead the optical cables to the


GCUa/GCUb/GCGa/GCGb
board through the cable
trough beneath the MPS
along the column of the
cabinet.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

37

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Condition

Cabling mode

Action

The SCUa/SCUb and the


GCUa/GCUb/GCGa/GCGb
are located in different
cabinets.

Overhead cabling

1. Route the cable upwards


through the cable hole on
top of the cabinet and to
the cable tray. Then, lead
the cable along the cable
tray to the cable hole on
top of another cabinet.
2. Route the cable upwards
or downwards along the
column to the cable
trough under the subrack
that holds the board.
Then, lead the cable along
the cable trough to the
GCUa/GCUb/GCGa/
GCGb board.

Underfloor cabling

1. Lead the cable out of the


cabinet along the column
through the lower cable
hole. Then, lead the cable
to the cabinet through the
lower cable hole
according to the cabling
and engineering
requirements.
2. Route the cable upwards
or downwards along the
column to the cable
trough under the subrack
that holds the board.
Then, lead the cable along
the cable trough to the
GCUa/GCUb/GCGa/
GCGb board.

Step 4 Cut off the cable ties that are attached on the distribution post of the cable trough. Insert the
RJ45 connector at the SCUa/SCUb end of the clock cable into the corresponding port on the
SCUa/SCUb. Then, insert the two RJ45 connectors at the GCUa/GCUb/GCGa/GCGb end into
the two ports on the active and standby GCUa/GCUb/GCGa/GCGb boards, as shown in Figure
8-2.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

38

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-2 Connecting the Y-shaped clock cables

----End

Follow-up Procedure
Record the installation results in the templates provided in 12 Installation Records.

8.3.2 Installing Line Clock Signal Cables


This topic describes how to install the line clock signal cables to connect the interface boards,
which are used to extract line clock signals, to the GCUa/GCGa/GCUb/GCGb boards.

Prerequisites
l

The line clock signal cables to be installed are all ready.

The tools required for the installation refer to the ESD wrist strap, the cable cutter, diagonal
pliers, and cable ties.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

39

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.
Figure 8-3 shows the connections of the line clock signal cable. This shows an example of the
AOUa board. In the BSC6900, the interface boards that can extract line clock signals are the
AOUa/AOUc board, the UOIa/UOIc board, the AEUa board, the PEUc board, and the POUa/
POUc board.
NOTE

For the AOUc board, the UOIc board, and the POUc board do not have 2MHZ clock output port, line clock
signals can be extracted when these boards are installed in MPS instead of EPS.

Figure 8-3 Connections of the line clock signal cables

Procedure
Step 1 Attach temporary labels to the cables to distinguish different types of cables. The contents of
the temporary labels can be either the same as or different from those of the engineering labels.
Step 2 According to the cabling method on site, lead the line clock signal cable into the cabinet through
the cable hole at the top or bottom of the cabinet. If the interface board and the GCUa/GCGa/
GCUb/GCGb board to be connected reside in the same cabinet, skip this step.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

40

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Step 3 Along the front of the cabinet, lead one end of the line clock signal cables to the cable trough
beneath the subrack where the GCUa/GCGa/GCUb/GCGb boards are installed, and then lead
the end to the GCUa/GCGa/GCUb/GCGb boards along the cable trough. Along the side of the
cabinet, lead the other end of the line clock signal cables to the cable trough beneath the subrack
where the interface boards are installed, and then lead the end to the interface boards along the
cable trough.
Step 4 As shown in Figure 8-3 (The AOUa board is illustrated here), connect one end of the line clock
signal cables to ports CLK IN0 or ports CLK IN0 on the GCUa/GCGa/GCUb/GCGb boards and
connect the other end of the line clock signal cables to ports 2M0 or ports 2M1 on interface
boards.
----End

8.3.3 Installing the BITS Clock Signal Cables


This section describes how to install the BITS clock signal cables between the GCUa/GCUb/
GCGa/GCGb board and the BITS clock source. Based on the impedance, the BITS clock signal
cables are classified into 75-ohm coaxial clock cable and 120-ohm clock conversion cable.

Prerequisites
l

The required 75-ohm coaxial clock cables or 120-ohm clock conversion cables are
available.

The required cable ties and wax strings are available.

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, and cable cutter.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.
The BITS clock signal cables are classified into 75-ohm coaxial clock signal cable and 120-ohm
clock conversion cable. The functions and connection modes of the clock cables are as follows:
l

75-ohm coaxial clock cable


One end of the 75-ohm coaxial clock cable is fixed to the GCUa/GCUb/GCGa/GCGb board
through the SMB connector. The other end is fixed to the BITS clock source through the
connector delivered with the clock source.

120-ohm clock conversion cable


The 120-ohm clock conversion cable completes the conversion from 75 ohms to 120 ohms.
One end of the 120-ohm clock conversion cable is fixed to the GCUa/GCUb/GCGa/GCGb
board through the SMB connector. The other end is fixed to the BITS clock source through
the connector delivered with the clock source.

For the installation positions of the 75-ohm coaxial clock signal cable and 120-ohm clock
conversion cable in the cabinet, see Connections of Signal Cables for the MPR.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

41

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Procedure
Step 1 Route one end of the 75-ohm coaxial clock signal cable or 120-ohm clock conversion cable to
the GCUa/GCUb/GCGa/GCGb board, and lead the other end to the distribution post in the cable
trough. Estimate the length of the cable between boards. Then, bind the cable and the distribution
post, and route the cable along the cable trough to the left side of the cabinet.
Step 2 Route the cable along the cable tray to the BITS clock according to the cabling and engineering
requirements.
Step 3 Insert one end of the 75-ohm coaxial clock signal cable or 120-ohm clock conversion cable into
the CLKIN 0 or CLKIN 1 port on the GCUa/GCUb/GCGa/GCGb board, and insert the other
end into the port of the BITS clock source, as shown in Figure 8-4. Ensure that the connectors
of cables are appropriately linked to the ports.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

42

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-4 Connecting the cables between the GCUa/GCUb/GCGa/GCGb and the BITS clock

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

43

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables


NOTE

The 120-ohm clock conversion cable contains two SMB connectors on one end. Only one SMB connector
is used for the connection with the GCUa/GCUb/GCGa/GCGb board. The other SMB connector is bound
with the wire bushing through cable ties. Pay attention to the connection when using the 120-ohm clock
conversion cable.

----End

Follow-up Procedure
Record the installation results in the templates provided in 12 Installation Records.

8.4 Installing the Ethernet Cables


This section describes how to install the Ethernet cables. These cables are the inter-SCUa cable,
the Ethernet cable between the OMUa/OMUc board and the U2000 or the LAN of the customer,
and the Ethernet cable between the FG2a/FG2c board and the other device.

8.4.1 Arranging the Ethernet Cables


This section describes how to arrange the Ethernet cables. Before installation, you should obtain
the Ethernet cables of appropriate length and attach formal or temporary labels to the cables.

Prerequisites
l

The shielded or unshielded straight-through cables to be installed are available.

The required cable ties and wax strings are available.

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, cable cutter, Ethernet cable tester, and long measuring tape or ruler.

Context
NOTE

l The unshielded straight-through cables are required to connect SCUa boards in different subracks.
When the capacity of a site is expanded, the inter-SCUa cables need to be made and installed on site.
For details on how to add a connector to the Ethernet cable, see Assembling the Unshielded RJ45
Connector and the Ethernet Cable.
l The shielded straight-through Ethernet cables between the OMUa/OMUc/FG2a/FG2c board and the
other equipment. The Ethernet cables need to be only installed on site.

Procedure
Step 1 Measure the distance between Ethernet ports to be connected.
Step 2 Based on the measurement, obtain an Ethernet cable of appropriate length. The cable should be
a little longer than the required length.
Step 3 optional: Make the unshielded straight-through inter-SCUa cables in different subracks and
ensure that the two ends of the Ethernet cables are available for use by using the Ethernet cable
tester.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

44

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Step 4 Attach formal or temporary labels to both ends of the cable for easy identification. The contents
on the temporary labels are not restricted because they are only for distinguishing the cables
after the layout.
Step 5 Attach formal or temporary labels to both ends of the cable for easy identification.
NOTE

The contents on the temporary labels are not restricted because they are only for distinguishing the cables
after the layout.

----End

8.4.2 Installing the Inter-SCUa Cables Between Different Subracks


When the capacity of a site is expanded, the inter-SCUa cables need to be installed on site.

Prerequisites
l

The straight-through cables to be installed are available.

The required cable ties and wax strings are available.

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, and cable cutter.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.
Connections of Signal Cables for the ,Connections of Signal Cables for the MPR and
Connections of Signal Cables for the EPR describe the installation positions of the inter-SCUa
cables in the cabinet.
The crossed and straight connection principle is as follows in Figure 8-5.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

45

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-5 Crossed and straight connections between two subracks

NOTE

l A pair of active and standby SCU boards are installed in each subrack. Each SCU board has two ports
for inter-subrack connection, so each subrack has four ports for inter-subrack connection. The ports
are connected in the crossed and straight modes, as shown in Figure-1. Ports 0 are used for straight
connection and ports 1 are used for crossed connection.
l For the SCUa board, ports 10/100/1000BASE-T0 to T9 can be used as Ethernet ports with the rates of
10 Mbit/s, 100 Mbit/s, or 1000 Mbit/s. These ports are used for inter-subrack interconnection. Ports
10/100/1000BASE-T10 and T11 are reserved and cannot be used to connect the base station controller
to other devices.

Procedure
l

Installing the Inter-SCUa Cables Between Different Subracks


1.

Lay one end of the cable to the SCUa board (usually starting from the SCUa boards
in the main surback, which is located at the bottom of the cabinet). Lead the other end
to the other SCUa board. Estimate the length of the cable between the SCUa boards.
The bending radius must be at least 25 mm. Then, bind the cable and the distribution
post in the cable trough.

2.

Route the cable to the SCUa board according to the requirements specified in 8.2
Principles of Installing Signal Cables and the engineering requirements. The cabling
is described in Table 8-4.
Table 8-4 Cabling of the inter-SCUa cables when the TCS is configured
locallyCabling for connecting inter-subrack SCUa boards

Issue 01 (2015-03-25)

Condition

Cabling Mode

Action

The SCUa boards to be


connected are located in
the same cabinet.

Cabling within the


cabinet

Route the cable upwards along


the column to the cable trough
under the subrack where the
SCUa board is located. Then,
lead the cable to the SCUa board
along the cable trough.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

46

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Condition

Cabling Mode

Action

The SCUa boards to be


connected are located in
different cabinets.

Overhead cabling

1. Route the cable upwards


through the cable hole on top
of the cabinet and to the cable
tray. Then, lead the cable
along the cable tray to the
cable hole on top of another
cabinet.
2. Route the cable downwards
along the column to the cable
trough under the subrack
where the SCUa board is
located. Then, lead the cable
along the cable trough to the
SCUa board.

Under cabling

1. Lead the cable out of the


cabinet along the column
through the lower cable hole.
Then, lead the cable to the
cabinet through the lower
cable hole according to the
cabling and engineering
requirements.
2. Route the cable along the
column to the cable trough
under the subrack where the
SCUa board is located. Then,
lead the cable along the cable
trough to the SCUa board.

3.

Cut the cable tie that binds the cable and the distribution post in the cable trough. Then,
insert the two ends of the cable into the ports on the SCUa boards in slots 6 and 7, as
shown in Figure 8-6.
NOTE

When the TCS is installed on the BSC6900 side, on-site engineers need to adjust the
connections of Ethernet cables. Figure 4 shows the connections of Ethernet cables after the
adjustment.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

47

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-6 Connection of the inter-SCUa cables in full configuration of two cabinets

4.

Bind the cables that are led out of the same board by using cable ties.

5.

Check all the ports connected with cables, and make sure both crossed and straight
connections correct, as show in Figure 8-5.

NOTICE
The inter-SCUa cables are installed close to the front door of the cabinet. After the cables
are installed, be careful not to remove them when you open the front door.
----End

8.4.3 Installing Ethernet Cables Between the OMUa and the LAN
One end of the Ethernet cables for the OMUa is connected to the Ethernet ports on the OMUa,
and the other end is connected to the Ethernet ports of the LAN.

Prerequisites
l
Issue 01 (2015-03-25)

The straight-through cables to be installed are available.


Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.

48

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Cable ties or wax strings are available.

Required tools are available, including an ESD wrist strap or gloves and a cable cutter.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.

Procedure
l

Issue 01 (2015-03-25)

BSC6900 is independently configured.


1.

Route the Ethernet cables on the cable ladder or cable trough outside the cabinet
according to the requirements for routing signal cables and the cabling method onsite.

2.

Route one end of the Ethernet cables to the peer equipment, and properly insert the
cables into the Ethernet ports on the peer equipment.

3.

Route the other end of the Ethernet cables into the cabinet through the cable hole at
the top or bottom of the cabinet.

4.

Properly insert the Ethernet cables into the corresponding ports on the OMUa and on
the peer equipment, as shown in Figure 8-7.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

49

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-7 Connections of Ethernet cables between the OMUa and the LAN

NOTE

Two or four Ethernet cables can be used to connect active and standby OMUa boards to the
LAN, depending on customer requirements.

----End

Follow-up Procedure
Record the installation result in 12 Installation Records.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

50

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

8.4.4 Installing the Ethernet Cables Between the OMUc Board and
the LAN
This section describes how to install the Ethernet cables between the OMUc board and the LAN.
You should route one end of the cable to the OMUc board and lead the other end through the
Ethernet port on the OMUc board.

Prerequisites
l

The straight-through cables to be installed are available.

The required cable ties and wax strings are available.

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, and cable cutter.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.

Procedure
Step 1 Lay the Ethernet cable on the cable ladder or in the cable trough outside the cabinet and route
the Ethernet cable according to the requirements for routing signal cables and the cabling method
on site.
Step 2 Lead one end of the Ethernet cable to the Ethernet port on the peer equipment.
Step 3 According to the actual scenarios, lead the other end of the cable into the cabinet through the
cable hole either at the top of or at the bottom of the cabinet.
Step 4 Along one side of the cabinet, lead the Ethernet cable to the cable trough beneath the subrack
where the OMUc board is installed, and then lead the cable to the Ethernet port on the OMUc
board along the cable trough.
Step 5 Tightly insert the cables into the corresponding Ethernet ports on the OMUc board and on the
peer equipment, as shown in Figure 8-8.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

51

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-8 Connections of Ethernet cables between the OMUc board and the LAN

NOTE

The number of Ethernet cables used to connect the active and standby OMUc boards to the LAN can be
two or four, depending on the customer's requirements.

----End

Follow-up Procedure
Record the installation result in the templates provided in 12 Installation Records.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

52

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

8.4.5 Installing the Ethernet Cables Between the SAUa Board and
the LAN
This section describes how to install the Ethernet cables between the SAUa board and the LAN.
You should route one end of the cable to the SAUa board and lead the other end through the
Ethernet port on the SAUa board.

Prerequisites
l

The straight-through cables to be installed are available.

The required cable ties and wax strings are available.

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, and cable cutter.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.

Procedure
Step 1 Lay the Ethernet cable on the cable ladder or in the cable trough outside the cabinet and route
the Ethernet cable according to the requirements for routing signal cables and the cabling method
onsite.
Step 2 Route one end of the Ethernet cables to the peer equipment, and properly insert the cables into
the Ethernet ports on the peer equipment.
Step 3 Route the other end of the Ethernet cables into the cabinet through the cable hole at the top or
bottom of the cabinet.
Step 4 Properly insert the Ethernet cables into the corresponding ports on the SAUa and on the peer
equipment, as shown in Figure 8-9.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

53

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-9 Connections of Ethernet cables between the SAUa board and the LAN

----End

Follow-up Procedure
Record the installation result in the templates provided in 12 Installation Records.

8.4.6 Installing the Ethernet Cables Between the SAUc Board and
the LAN
This section describes how to install the Ethernet cables between the SAUc board and the LAN.
You should route one end of the cable to the SAUc board and lead the other end through the
Ethernet port on the SAUc board.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

54

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Prerequisites
l

The straight-through cables to be installed are available.

The required cable ties and wax strings are available.

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, and cable cutter.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.

Procedure
Step 1 Lay the Ethernet cable on the cable ladder or in the cable trough outside the cabinet and route
the Ethernet cable according to the requirements for routing signal cables and the cabling method
on site.
Step 2 Lead one end of the Ethernet cable to the Ethernet port on the peer equipment.
Step 3 According to the actual scenarios, lead the other end of the cable into the cabinet through the
cable hole either at the top of or at the bottom of the cabinet.
Step 4 Along one side of the cabinet, lead the Ethernet cable to the cable trough beneath the subrack
where the SAUc board is installed, and then lead the cable to the Ethernet port on the SAUc
board along the cable trough.
Step 5 Tightly insert the cables into the corresponding Ethernet ports on the SAUc board and on the
peer equipment, as shown in Figure 8-10.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

55

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-10 Connections of Ethernet cables between the SAUc board and the LAN

----End

Follow-up Procedure
Record the installation result in the templates provided in 12 Installation Records.

8.4.7 Installing the Ethernet Cables Between the FG2a/FG2c Board


and the Other Equipment
This section describes how to install the Ethernet cables between the FG2a/FG2c board and the
other equipment.

Prerequisites
l
Issue 01 (2015-03-25)

The straight-through cables to be installed are available.


Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.

56

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

The required cable ties and wax strings are available.

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, and cable cutter.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.

Procedure
Step 1 Lay the Ethernet cable on the cable ladder or in the cable trough outside the cabinet and route
the Ethernet cable according to the requirements for routing signal cables and the cabling method
onsite.
Step 2 Lead one end of the Ethernet cable to the Ethernet port on the peer equipment.
Step 3 According to the actual scenarios, lead the other end of the cable into the cabinet through the
cable hole either at the top of or at the bottom of the cabinet.
Step 4 Lead one end of the Ethernet cable along the middle standing pillar in the cabinet, lead the other
end of the Ethernet cable to the cable trough beneath the subrack where the FG2a/FG2c board
is installed, and then lead the cable to the Ethernet port on the FG2a/FG2c board along the cable
trough.
Step 5 Tightly insert the cables into the corresponding Ethernet ports on the FG2a/FG2c board and on
the peer equipment, as shown in Figure 8-11.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

57

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-11 Connection between the FG2a/FG2c board and the other equipment (taking the
FG2a board as an example)

----End

Follow-up Procedure
Record the installation result in the templates provided in 12 Installation Records.

8.5 Installing the E1/T1 Cables


This section describes how to install the E1/T1 cables between the AEUa/PEUa/PEUc board
and the DDF.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

58

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Prerequisites
l

The required E1/T1 cables are available.

The required cable ties and wax strings are available.

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, cable cutter, long measuring tape or ruler, and flat-head screwdriver.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.
You should route the E1/T1 cables in the following sequence:
l

E1/T1 cables for different subracks in the same cabinet: In overhead cabling mode, the
cables should be routed from the bottom to the top. In underfloor cabling mode, the cables
should be routed from the top to the bottom.

E1/T1 cables for different boards in the same subrack: The cables connected to the boards
in slots 20 through 27 should be routed to the left, and those connected to the boards in
slots 19 through 14 should be routed to the right.

E1/T1 cables for different ports on the same board: The cables should be routed from the
bottom to the top.

E1/T1 cables for combined cabinets: The cables exposed at the rear of the cabinets should
be bound with cable ties.

You should connect the E1/T1 cables as follows:


l

The TX wire in the E1/T1 cable on the BSC6900 side must be connected to the RX wire
in the E1/T1 cable on the peer end.

The RX wire in the E1/T1 cable on the BSC6900 side must be connected to the TX wire
in the E1/T1 cable on the peer end.

The connections of the E1/T1 cables on the BSC6900 side must be consistent with the data
configuration.

8.5.1 Arranging the E1/T1 Cables Between the AEUa/PEUa/PEUc


Board and the DDF
This section describes how to arrange the E1/T1 cables between the AEUa/PEUa/PEUc board
and the digital distribution frame (DDF). Before installing the E1/T1 cables between the AEUa/
PEUa/PEUc board and the DDF, you should unpack and check the E1/T1 cables, and attach
temporary labels to the cables.

Prerequisites
l
Issue 01 (2015-03-25)

The required E1/T1 cables are available.


Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.

59

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, cable cutter, and diagonal pliers.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.

NOTICE
l The types of E1/T1 cables that are used depend on the actual conditions. The cable type must
be compatible with the connector type and be consistent with the setting of DIP switches on
the AEUa/PEUa/PEUc board.
For the installation positions of the E1/T1 cables in the cabinet, see Connections of Signal Cables
for the MPR and Connections of Signal Cables for the EPR.

Procedure
Step 1 Measure the distance between the AEUa/PEUa/PEUc board and the DDF.
Step 2 Unpack the E1/T1 cables and spread the cables out.
Step 3 Obtain an E1/T1 cable of appropriate length. You should cut off the cables with the length a
little longer than necessary.
Step 4 Attach temporary labels to both ends of the E1/T1 cable for easy identification. The contents on
the temporary labels are not restricted because they are only for distinguishing the cables after
the layout.
----End

8.5.2 Installing the E1/T1 Cables Between the AEUa/PEUa/PEUc


Board and the DDF in Overhead Cabling Mode
This section describes how to install the active/standby E1/T1 cables between the AEUa/PEUa/
PEUc board and the DDF in overhead cabling mode.

Prerequisites
l

The required cable ties and wax strings are available.

The tools required for the installation are available. The required tools are ESD gloves or
ESD wrist strap, cable cutter, long measuring tape or ruler, and flat-head screwdriver.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

60

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.

NOTICE
The types of E1/T1 cables that are used on the BSC6900 depend on the actual conditions. The
cable must match the connector and be consistent with the setting of DIP switches on the AEUa/
PEUa/PEUc board.

NOTICE
When soldering the E1/T1 cable connector for the DDF, ensure that the E1/T1 connector is
disconnected from the board to protect the board from possible leakage current.
E1/T1 cables are classified into two types: non-active/standby E1/T1 cable and active/standby
E1/T1 cable. A non-active/standby E1/T1 cable is connected to only one board, whereas the
active/standby E1/T1 cable is connected to the active and standby boards respectively through
two connectors at one end of the cable.Figure 8-12 and Figure 8-13 show how to install the E1/
T1 cables between the AEUa/PEUa/PEUc board and the DDF in overhead cabling mode.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

61

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-12 Installing non-active/standby E1/T1 cables between the AEUa/PEUa/PEUc board
and the DDF in overhead cabling mode

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

62

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-13 Installing active/standby E1/T1 cables between the AEUa/PEUa/PEUc board and
the DDF in overhead cabling mode

Procedure
Step 1 Tie the E1/T1 cables in bundles and route the E1/T1 cables along the cable tray until they reach
the top of the cabinet. Reserve an appropriate length of the E1/T1 cables and then lead the cables
into the cabinet through the cable hole on the top of the cabinet (4 PCS at a time).

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

63

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

NOTICE
l If the E1/T1 cable is not long enough, replace it with another E1/T1 cable of proper length.
In special scenarios, you can use special connectors to link another cable to the short cable.
Do not solder E1/T1 cables directly.
l Do not block the mesh for heat dissipation whereas routing the E1/T1 cables.
l To facilitate the installation of the E1/T1 cables, you can remove the side doors of the cabinet.
When the BSC6900 cabinet is combined with the PDF, do not remove the side doors.
Step 2 Route the E1/T1 cables along the middle column towards the corresponding subrack.
Step 3 Open the cover plate of the back cable trough for ease of routing the E1/T1 cables towards the
subrack, as shown in Figure 8-14.
Figure 8-14 Opening the cover plate of the back cable trough

Step 4 Route the E1/T1 cables through the back cable trough and align the DB44 connectors of the
cables with the DB44 sockets on the AEUa/PEUa/PEUc board. Insert the connectors into the
socket vertically. Then, use your hand to tighten the two screws on each DB44 connector.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

64

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

NOTICE
l To bundle the E1/T1 cables neatly and to avoid any damage to the sockets, check that all the
boards to which the E1/T1 cables are to be connected are secured on the subrack.
l Tighten the screw on the DB44 connector with proper force to prevent it from being damaged.
Step 5 Lay and bundle the E1/T1 cables within the cabinet.
1.

When installing non-active/standby E1/T1 cables, use the cable ties to bundle the E1/T1
cables led from the same AEUa/PEUa/PEUc board. When installing active/standby E1/T1
cables, use the cable ties to bundle the E1/T1 cables respectively from the active and standby
AEUa/PEUa/PEUc boards. Ensure that the bundled cables are in the same plane. Figure
8-15 shows the bundling mode.
Figure 8-15 Bundling E1/T1 cables led from the boards (non-active/standby E1/T1 cable
as example)

2.

Issue 01 (2015-03-25)

Use the cable ties to bundle the cables led from the board, and then guide the cables to the
corresponding cable post at the back cable trough, as shown in Figure 8-16. The E1/T1
cables of the board in each slot are located in the separate space between two cable posts.
Use the cable ties to bundle the cables round the cable post where the cables bend.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

65

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-16 Routing the E1/T1 cables through the back cable trough

1 Cable tie

2 Cable post

3 Hole for the cable tie

NOTE

l The cables connected to the boards in slots 20-27 should be routed to the left, and those connected
to the boards in slots 19-14 should be routed to the right.
l To tighten the cables, lead the cable tie through the hole at the bottom of the back cable trough
and then bundle the cables.

3.

Place the E1/T1 cables neatly and bundle them on the side of the cabinet. Bundle the cables
in a 4 x 2 stack. That is, bundle the cables in two orderly piles arranged in layers, each of
which involves four cables from inwards to outwards. Figure 8-17 shows the bundled E1/
T1 cables on the cabinet side.
Figure 8-17 E1/T1 cables bundled on the side of the cabinet

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

66

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

NOTICE
l When there is insufficient space for the bundling inside the cabinet, you are advised to
bundle the E1/T1 cables of the board in each slot in a 4 x 2 stack, and then route the
stacked cables to the column of the cabinet. Bundle the adjacent stacked E1/T1 cables
using the cable ties.
l The space between two stacked E1/T1 cables must not be greater than 200 mm.
l Ensure that all cable ties are in the same direction. This helps in saving the space.
Step 6 Place the E1/T1 cables neatly and bundle them on the cable tray. Figure 8-18 and Figure
8-19 show the bundled cables on the cable tray.
Figure 8-18 E1/T1 cables bundled on the cable tray I

Figure 8-19 E1/T1 cables bundled on the cable tray II

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

67

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

NOTICE
l Separate the power cables from the E1/T1 cables when routing the cables along the cable
tray. A minimum of 100 mm should be reserved between the power cables and the E1/T1
cables.
l The E1/T1 cables on the cable tray are bundled in a stack. The first stack of bundled E1/T1
cables is secured to the rungs of the cable tray with the cable ties. All other stacks of bundled
E1/T1 cables are neatly stacked to the first stack of cables. The adjacent two stacks of E1/
T1 cables are bundled by the cable ties.
l Bundle the stack of E1/T1 cables at the rungs of the cable tray.
Step 7 Cut the E1/T1 cables on the DDF side according to the field requirements.
Step 8 Assemble the connectors for the E1/T1 cables on the DDF side according to the DDF type.

NOTICE
l Before soldering the connector to the E1/T1 cable on the DDF side, you should remove the
E1/T1 connector from the AEUa/PEUa/PEUc board in the BSC6900 cabinet to avoid any
damage to the board. After the soldering, reinstall the connector to the port on the AEUa/
PEUa board.
l Before soldering the connector to the DDF, you should ensure that the soldering iron is
grounded; otherwise, the board may be burnt.
l After installing the connectors to the E1/T1 cables, perform the conductivity test using the
cable tester.
Step 9 Connect the connector on the E1/T1 cable to the DDF terminal.
----End

Follow-up Procedure
Record the installation result in 12 Installation Records.

8.5.3 Installing the E1/T1 Cables Between the AEUa/PEUa/PEUc


Board and the DDF in Underfloor Cabling Mode
This section describes how to install the active/standby E1/T1 cables between the AEUa/PEUa/
PEUc board and the DDF in underfloor cabling mode.

Prerequisites
l

The required cable ties and wax strings are available.

The tools required for the installation are available. The required tools are ESD gloves or
ESD wrist strap, cable cutter, long measuring tape or ruler, and flat-head screwdriver.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

68

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.

NOTICE
The types of E1/T1 cables that are used on the BSC6900 depend on the actual conditions. The
cable must match the connector and be consistent with the setting of DIP switches on the AEUa/
PEUa/PEUc board.

NOTICE
When soldering the E1/T1 cable connector for the DDF, ensure that the E1/T1 connector is
disconnected from the board to protect the board from possible leakage current.
E1/T1 cables are classified into two types: non-active/standby E1/T1 cable and active/standby
E1/T1 cable. A non-active/standby E1/T1 cable is connected to only one board, whereas the
active/standby E1/T1 cable is connected to the active board and standby board respectively
through two connectors at one end of the cable.Figure 8-20 and Figure 8-21 show how to install
the E1/T1 cables between the AEUa/PEUa/PEUc board and the DDF in underfloor cabling
mode.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

69

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-20 Installing non-active/standby E1/T1 cables between the AEUa/PEUa/PEUc board
and the DDF in underfloor cabling mode

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

70

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-21 Installing active/standby E1/T1 cables between the AEUa/PEUa/PEUc board and
the DDF in underfloor cabling mode

Procedure
Step 1 Reserve the appropriate length of the E1/T1 cables on the BSC6900 side, and then route the
cables through the bottom of the cabinet until they reach the BSC6900 cabinet (4 PCS at a time).

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

71

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

NOTICE
l If the E1/T1 cable is not long enough, replace it with another E1/T1 cable of proper length.
In special scenarios, you can use special connectors to link another cable to the short cable.
Do not solder E1/T1 cables directly.
l Do not block the mesh for heat dissipation whereas routing the E1/T1 cables.
l To facilitate the installation of the E1/T1 cables, you can remove the side doors of the cabinet.
When the BSC6900 cabinet is combined with the PDF, do not remove the side doors.
Step 2 Route the E1/T1 cables along the middle column towards the corresponding subrack.
Step 3 Open the cover plate of the back cable trough for ease of routing the E1/T1 cables towards the
subrack, as shown in Figure 8-22.
Figure 8-22 Opening the cover plate of the back cable trough

Step 4 Route the E1/T1 cables through the back cable trough and align the DB44 connectors of the
cables with the DB44 sockets on the AEUa/PEUa/PEUc board. Insert the connectors into the
socket vertically. Then, use your hand to tighten the two screws on each DB44 connector.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

72

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

NOTICE
l To bundle the E1/T1 cables neatly and to avoid any damage to the sockets, check that all the
boards to which the E1/T1 cables are to be connected are secured on the subrack.
l Tighten the screw on the DB44 connector with proper force to prevent it from being damaged.
Step 5 Lay and bundle the E1/T1 cables inside the cabinet.
1.

When installing non-active/standby E1/T1 cables, use the cable ties to bundle the E1/T1
cables led from the same AEUa/PEUa/PEUc board. When installing active/standby E1/T1
cables, use the cable ties to bundle the E1/T1 cables respectively from the active and standby
AEUa/PEUa/PEUc boards. Ensure that the bundled cables are in the same plane. Figure
8-23 shows the bundling mode.
Figure 8-23 Bundling E1/T1 cables from the boards (non-active/standby E1/T1 cables as
an example)

2.

Issue 01 (2015-03-25)

Use the cable ties to bundle the cables led from the board, and then guide the cables to the
corresponding cable post at the back cable trough, as shown in Figure 8-22. The E1/T1
cables of the board in each slot are located in the separate space between two cable posts.
Use the cable ties to bundle the cables round the cable post where the cables bend.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

73

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-24 Routing the E1/T1 cables through the back cable trough

1 Cable tie

2 Cable post

3 Hole for the cable tie

NOTE

l The cables connected to the boards in slots 20-27 should be routed to the left, and those connected
to the boards in slots 19-14 should be routed to the right.
l To tighten the cables, lead the cable tie through the hole at the bottom of the back cable trough
and then bundle the cables.

3.

Place the E1/T1 cables neatly and bundle them on the side of the cabinet. Bundle the cables
in a 4 x 2 stack. That is, bundle the cables in two orderly piles arranged in layers, each of
which involves four cables from inwards to outwards.

NOTICE
l When there is insufficient space for the bundling inside the cabinet, you are advised to
bundle the E1/T1 cables of the board in each slot in a 4 x 2 stack, and then route the
stacked cables to the column of the cabinet. Bundle the adjacent stacked E1/T1 cables
using the cable ties.
l The space between two stacked E1/T1 cables must not be greater than 200 mm.
l Ensure that all cable ties are in the same direction. This helps in saving the space.
Step 6 Route the E1/T1 cables through under the ESD floor until they reach the DDF.
Step 7 Cut the E1/T1 cables on the DDF side according to the field requirements.
Step 8 Assemble the connectors for the E1/T1 cables on the DDF side according to the DDF type.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

74

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

NOTICE
l Before soldering the connector to the E1/T1 cable on the DDF side, you should remove the
E1/T1 connector from the AEUa/PEUa/PEUc board in the BSC6900 cabinet to avoid any
damage to the board. After the soldering, reinstall the connector to the port on the AEUa/
PEUa/PEUc board.
l Before soldering the connector to the DDF, you should ensure that the soldering iron is
grounded; otherwise, the board may be burnt.
l After installing the connectors to the E1/T1 cables, perform the conductivity test using the
cable tester.
Step 9 Connect the connector on the E1/T1 cable to the DDF terminal.
----End

Follow-up Procedure
Record the installation result in 12 Installation Records.

8.6 Installing the Optical Cables


This section describes how to install the optical cables between the AOUa/AOUc/GOUa/GOUc/
GOUe/POUa/POUc/UOIa/UOIc board and the other equipment.

8.6.1 Using the Accessories of the Optical Cable


This section describes how to use the SC/PC, VC/PC, and LC/PC adapters and also how to use
the fiber management tray.

Using the SC/PC Adapter


An SC/PC adapter connects to an optical cable that has an SC/PC connector.

Context
Figure 8-25 shows the appearance of an SC/PC adapter.
Figure 8-25 Appearance of an SC/PC adapter

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

75

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Procedure
Step 1 Align one SC/PC connector of an optical cable with the SC/PC adapter, and feed the connector
into the adapter. If you hear a clicking sound, the connector is securely connected.
Step 2 Use the same method to connect another SC/PC connector of the optical cable to the other end
of the SC/PC adapter.
----End

Using the FC/PC Adapter


An FC/PC adapter connects to an optical cable that has an FC/PC connector.

Context
Figure 8-26 shows the appearance of an FC/PC adapter.
Figure 8-26 Appearance of an FC/PC adapter

Procedure
Step 1 Align one FC/PC connector of an optical cable with the FC/PC adapter, feed the connector into
the adapter, and then fasten the connector.
Step 2 Use the same method to connect another FC/PC connector of the optical cable to the other end
of the FC/PC adapter.
----End

Using the LC/PC Adapter


An LC/PC adapter connects to an optical cable that has an LC/PC connector.

Context
Figure 8-27 shows the appearance of an LC/PC adapter.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

76

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-27 Appearance of an LC/PC adapter

Procedure
Step 1 Align one LC/PC connector of an optical cable with the LC/PC adapter, and feed the connector
into the adapter. If you hear a clicking sound, the connector is securely connected.
Step 2 Use the same method to connect another LC/PC connector of the optical cable to the other end
of the LC/PC adapter.
----End

Using the Fiber Management Tray


This section describes how to use the fiber management tray. When routing optical cables, coil
the redundant cables on the fiber management tray below the rear cable trough at the rear of the
cabinet.

Context
Figure 8-28 shows the installation position of the fiber management tray.
Figure 8-28 Installation position of the fiber management tray

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

77

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Procedure
Step 1 Route optical cables upwards or downwards to the under-mount fiber management tray along
the middle standing pillar in the cabinet. If both optical cables and Ethernet cables are available,
route Ethernet cables along the side next to the middle standing pillar.
Step 2 Wrap redundant optical cables on the fiber management tray according to the operation method
printed on the cover of the fiber management tray.
NOTE

If only one optical cable is wrapped, the length of the wrapped cable is about 80 m. If 100 optical cables
are wrapped, the length of each wrapped cable is about 0.5 m. Extra cables can be wrapped onto the ODF.

----End

8.6.2 Arranging the Optical Cables


This section describes how to arrange the optical cables. Before installing optical cables, you
should unpack and check them, attach temporary labels to them, and keep the corrugated pipes
ready.

Prerequisites
l

The required optical cables, optical connectors, and corrugated pipes are delivered to the
site.

The tools required for the installation are available. The tools are the measuring tape, cable
cutter, diagonal pliers, and cable ties.

Procedure
Step 1 Check the optical module. If the metal sheet is exposed, push the optical module until you hear
a click sound.
Step 2 Take the optical cables out of the package and sort them by length and installation position.
Step 3 Check each optical cable. If the optical cable is broken or the jacket of the cable is damaged,
contact technical support engineers of Huawei for replacement.
Step 4 Remove the protective caps from the optical connectors of the optical cable and check whether
the connectors are clean. If they are clean, put the protective caps onto the connectors. If they
are not clean, clean the optical connectors, and then put the protective caps on to the connectors.
For details about how to clean the connectors, see Cleaning Fiber Connectors.
Step 5 Attach temporary labels to both ends of the cables. The contents on the temporary labels are not
restricted because they are only for distinguishing the cables after the layout.
Step 6 Distribute the corrugated pipes according to the following aspects: the quantity of the optical
cables and the length of the delivered corrugated pipes.
NOTE

l All the optical cables outside the cabinet should be covered with corrugated pipe.
l All the optical cables inside the cabinet do not need to be coated with corrugated pipe.

Step 7 Cut the corrugated pipes, and then cover the cut surface with PVC insulation tape.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

78

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Step 8 Cover the optical cables with the corrugated pipes.


----End

8.6.3 Installing the Optical Splitter/Combiner


This section describes how to install optical splitters/combiners between an adapter and optical
interface boards. The optical splitters/combiners are used in pairs. The end with two LC/PC
optical connectors of the optical splitter/combiner is connected to optical interface boards of the
BSC6900. The other end with one LC/PC optical connector is connected to an LC/PC adapter,
which is connected to the peer equipment by using an optical fiber. The type of the optical fiber
used for connection depends on the peer equipment.

Prerequisites
l

The optical fibers and corrugated pipes to be installed are available.

The required single-mode or multi-mode optical splitters/combiners are available.

The LC/PC adapters to be installed are available.

The binding tapes, labels, and cable ties required for installing optical splitters/combiners
are available.

The following tools are available: diagonal pliers and ESD gloves.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.
NOTE

l To remove optical fibers during the installation, do as follows:


l If an LC/PC or SC/PC optical connector is used, press the tab on the optical connector to remove
the optical fiber.
l If an FC/PC optical connector is used, unscrew the optical connector counterclockwise.
l When installing an optical fiber, do not look into the optical port without eye protection.
l The optical fibers are bound with binding tapes to separate them from other cables. Note that optical
fibers must be loosely bound to avoid signal attenuation.

Connections of Signal Cables for the MPR and Connections of Signal Cables for the EPR
describe the installation positions of interface boards in the BSC cabinet.
Figure 8-29 shows the connections of optical splitters/combiners.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

79

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-29 Connections of optical splitters/combiners

Procedure
Step 1 Route the end with two LC/PC optical connectors (the end marked A and B in the figure) to the
subrack. The cables connected to the boards in slots 20 to 27 should be routed to the right, and
those connected to the boards in slots 14 to 19 should be routed to the left. Use cable ties to bind
the optical fibers to the cable trough. Optical splitters/combiners can be bound in one or several
groups, depending on the number of optical splitters/combiners to be installed on site.
Step 2 Route the optical fibers along the spacing between the optical splitter/combiner and the rear
baffle plate of the cable trough to the bottom of the cable trough. Coil the redundant part of the
optical fibers on the fiber spool if the optical fibers are too long.
Step 3 Route the optical fibers to the top of the cable trough, and then to the optical ports on interface
boards.
Step 4 Route the end with one LC/PC optical connector (the end marked C in the figure) upwards to
one side of the cabinet, and use binding tapes to bind the optical fiber to the wire bushing.
Step 5 Route the optical fibers into the cabinet according to the requirements specified in 8.2 Principles
of Installing Signal Cables and engineering requirements, and use binding tapes to bind the
optical fibers to the wire bushing.
Step 6 Connect the optical fibers (the end with two LC/PC optical connectors) to the optical ports, as
shown in Figure 8-30.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

80

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-30 Routing of the optical splitters/combiners

1.

Remove the protective cap from the optical port and the dustproof cap from the optical
connector. Keep them for future use.

2.

Insert the connectors of optical fibers into the optical ports marked "TX" on the interface
boards until you hear a click sound.

3.

Insert the connectors of the other optical splitter/combiner in the pair into the optical ports
marked "RX" on the interface boards by repeating sub-step Step 6.2.

4.

Record the mappings between optical fibers and optical ports for correct connections.

Step 7 Connect the end with one LC/PC optical connector to an optical adapter, which adapts the LC/
PC optical connector to a common optical fiber.
Step 8 Route the optical fiber interconnected with the LC/PC connector to the peer equipment and
connect the optical fiber to it.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

81

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables


NOTE

A maximum of 48 optical splitters/combiners can be installed in a subrack. The actual number is determined
by site requirements.

----End

Follow-up Procedure
Record the installation result in the templates provided in 12 Installation Records.

8.6.4 Installing an Optical Cable Between the SCU Boards in


Different Subracks with a Long Distance
When the cabling distance between two subracks in two cabinets is longer than 10 m (32.81 ft),
the SCU boards in the two subracks are connected by multi-mode optical cables. The SCU boards
in the same cabinet are connected by SFP+ high-speed cables.

Prerequisites
l

LC/PC-LC/PC multi-mode optical cables, corrugated pipes, and cabling frames are
available.

Binding straps, labels for optical cables, and cable ties or wax strings are available.

An ESD wrist strap or gloves, cable cutters, diagonal pliers, and a Phillips screwdriver are
available.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.
To know where to install an optical cable between the SCU boards in different subracks with a
long cabling distance, see Connections of Signal Cables for the MPR and Connections of Signal
Cables for the EPR.
Figure 8-31 shows the cable connections between SCU boards.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

82

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-31 Cable connections between SCU boards

NOTE

Each of the two subracks is configured with a pair of active and standby SCU boards. Each SCU board
provides two ports for connecting to the other subrack. Therefore, each subrack has four ports connected
to the other subrack. As shown in Figure 8-31, ports 0 of the SCU boards in the two subracks are directly
connected, and ports 1 of the SCU boards in the two subracks are crossly connected.

Procedure
Step 1 Install multi-mode optical cables by performing Step 2 to Step 6, as shown in Figure 8-32 and
Figure 8-33.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

83

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-32 Installed inter-SCU optical cables (front view)(The SCUb is used as an example.)

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

84

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-33 Installed inter-SCU optical cables (rear view)(The SCUb is used as an example.)

Step 2 Install a cabling frame at the bottom of each cabinet.


Step 3 Route the optical cable to the cabling frame at the bottom of each cabinet according to the
requirements in 8.2 Principles of Installing Signal Cables and the engineering requirements.
The cabling is described in Table 8-5.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

85

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Table 8-5 Routing the inter-SCU optical cables


Condition

Cabling Mode

Action

The SCU boards to be


connected are located in
different cabinets.

Overhead cabling

1. Route the cable upwards through the


cable hole on top of the cabinet and
to the cable tray. Then, lead the cable
along the cable tray to the cable hole
on top of another cabinet.
2. Route the cable downwards along
the column to the cabling frame at the
bottom of the cabinet.

Underfloor
cabling

1. Lead the cable out of the cabinet


along the column through the lower
cable hole. Then, lead the cable to the
cabinet through the lower cable hole
according to the cabling and
engineering requirements.
2. Route the cable along the column to
the cabling frame at the bottom of the
cabinet.

Step 4 Determine the accurate length of the optical cable between the cabling frame and the optical
port on the SCU board. If the optical cable is too long, coil the redundant part on the fiber spool
below the cable trough of the subrack housing the SCU board at the rear of the cabinet.
Step 5 Route the optical cable through the cabling frame at the bottom of the cabinet to the front of the
cabinet and bind the optical cable near the cable holes with binding straps, as shown in Figure
8-34.
Figure 8-34 Routing the optical cable at the bottom of the cabinet

NOTE

Use an Ethernet cable or other auxiliary tools to route the optical cable through cable holes.

Step 6 Connect the optical cable to the optical ports on the SCU boards.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

86

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

1.

Remove the protective cap from the optical port and the dustproof cap from the optical
connector. Keep them for future use.

2.

Insert the LC/PC connector at each end of the optical cable into the optical port of the
corresponding board until you hear a click sound.

NOTICE
Two optical cables form a pair. Before installing optical cables, attach a temporary TX or
RX label to each end of the cables. When installing optical cables, ensure that the cables
are connected to the correct TX and RX ports.
----End

Follow-up Procedure
Fill in the form stated in 12 Installation Records.

8.6.5 Installing the Optical Cables Between the AOUa/AOUc/


GOUa/GOUc/GOUe/POUa/POUc/UOIa/UOIc Boards and the
Other Equipment
This section describes how to install the optical cables between the AOUa/AOUc/GOUa/GOUc/
GOUe/POUa/POUc/UOIa/UOIc board and other equipment. The end of the optical cable
connected to the BSC6900 uses an LC/PC connector, and the other end uses a connector as
required.

Prerequisites
l

The optical cables and corrugated pipes to be installed are available.

The required cable ties, wax strings, binding straps, and optical labels are available.

The tools required for the installation are available. The tools are ESD gloves or ESD wrist
strap, cable cutter, and diagonal pliers.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.
For the installation positions of the optical cables between the AAOUa/AOUc/GOUa/GOUc/
GOUe/POUa/POUc/UOIa/UOIc board and the other equipment, see Connections of Signal
Cables for the MPR.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

87

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables


NOTE

If you need to remove the optical cables during the installation, do as follows:
l For the IC/PC or SC/PC connector, press the tab on the connector and remove the optical cable.
l For the FC/PC connector, unscrew the optical connector counterclockwise.

Procedure
Step 1 Lead the optical cables from the optical port of the AOUa/AOUc/GOUa/GOUc/GOUe/POUa/
POUc/UOIa/UOIc board to the back (the side near the subrack) of rear cable trough beneath the
subrack. Use cable ties to bind the optical cables to the rear cable trough.
Step 2 Put the optical cables to one side of the cabinet through the bottom of the rear cable trough. (The
optical cables on slots 20 through 27 are put on the left side and those on slots 14 through 19
are put on the right side.) Coil the extra length of the optical cables on the fiber management
trays below the rear cable trough.
Step 3 Route the optical cables to the other equipment along the cable tray according to the requirements
specified in 8.2 Principles of Installing Signal Cables and the engineering requirements. You
can use either the overhead cabling or the underfloor cabling.
Step 4 Connect the optical cables to the optical ports, as shown in Figure 8-35.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

88

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-35 Connection of the optical cables between the AOUa/AOUc/GOUa/GOUc/GOUe/


POUa/POUc/UOIa/UOIc and the other equipment (taking the GOUc as an example)

1.

Remove the protective caps from the optical connectors and ports, and store the protective
caps for future use.

2.

Insert the LC/PC connectors into the ports labeled "TX" on the interface boards until you
hear a slight click.

3.

Repeat Step 4.2 to insert the LC/PC connectors at one end of another optical cable into the
ports labeled "RX" on the interface boards.

4.

Record the relationship between the optical cables and the optical ports to help correctly
connect the optical cables to the peer equipment.

Step 5 Connect the other end of each optical cable to the peer equipment. For the detailed procedure,
refer to Table 8-6.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

89

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Table 8-6 Connecting different types of connectors to peer equipment


Peer Equipment

Connectors of
Optical Cables

Connection Method

ODF

SC/PC

Insert the connectors into the corresponding


optical ports on the flange of the ODF until you
hear a slight click.

LC/PC

Peer network element


(NE)

Optical cable of peer


equipment

FC/PC

Insert the connectors into the corresponding


optical ports on the flange of the ODF and
screw the connectors.

SC/PC

Insert the connectors into the corresponding


optical ports on the peer NE until you hear a
slight click.

LC/PC
FC/PC

Insert the connectors into the corresponding


optical ports on the peer NE and screw the
connectors.

SC/PC

Optical cable adapters are required to connect


the optical cables.

LC/PC
FC/PC

----End

Follow-up Procedure
Record the installation result in the templates provided in 12 Installation Records.

8.7 Installing the EMU RS485 Communication Cables


This section describes how to install the EMU RS485 communication cable between the
BSC6900 and the EMU.

Prerequisites
l

The RS485 communication cable to be installed is available.

The wires in the RS485 communication cable are intact, the jacket of the cable is
undamaged, and the pins in the connector are straight.

Context
NOTE

l The RS485 communication cable is used to connect the EMU environment monitoring instrument
(EMI) and the power distribution box of the cabinet .
l The EMU EMI has two types: type A and type B. Type A and B are wall-mounted. The methods of
installing the RS485 communication cable for type A and type B are the same. The following takes the
type-B EMI as an example to describe how to install the RS485 communication cable.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

90

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Procedure
Step 1 Attach the DB9 male connector at one end of the RS485 communication cable to the DB9 female
connector on the EMI.
Step 2 Attach the RJ45 connector at the other end of the RS485 communication cable to the power
distribution box of the cabinet, as shown in Figure 8-36.
Figure 8-36 Connections of cables between the EMU and the power distribution box

----End

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

91

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

8.8 Connecting the GPS Surge Protector to the GCGa/GCGb


Board
For cabinets equipped with the GCGa/GCGb board, install an indoor surge protector on the top
of the cabinet. Use the cable for the input of the satellite signals to connect the port Protect of
the GPS surge protector on the top of the cabinet and the port ANT on the GCGa/GCGb board.

Prerequisites
l

The indoor surge protector to be installed, its fastener, and the signal cable used to connect
the GPS surge protector to the GCGa/GCGb board are ready.

The tool required during the installation, that is, the Phillips screwdriver, is ready.

Context

NOTICE
Wear an ESD wrist strap and connect it to the ESD connector on the cabinet before you perform
the operation. For details, see Wearing an ESD Wrist Strap.
The signal cables refer to the 1 meter and 2.5 meter cables. Thus, a 3.5 meter signal cable is
made for the input GPS signals. Figure 8-37 shows the connection between the GPS surge
protector and the GCGa/GCGb board.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

92

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-37 Connecting the GPS surge protector to the GCGa/GCGb board

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

93

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables


NOTE

l You are advised to route the clock signal cable between the GCGa/GCGb board and surge protector
along the right side of the cabinet, because the GCGa/GCGb board is installed in a slot at the right side
of the subrack.
l You are advised to route the feeder between the GPS antenna and surge protector along the left side
of the cabinet in the underfloor cabling mode. In addition, you must leave a clearance greater than 30
mm between the feeder and power cable, and between the feeder and signal cable. For details on the
underfloor cabling mode, see Overhead and Underfloor Cabling Modes.

Procedure
Step 1 Install the surge protector to its fastener, as shown in Figure 8-38.
Figure 8-38 Installing the surge protector to its fastener

1.

Remove the retention screws at the GND and Surge ports from the indoor GPS surge
protector.

2.

Put the surge protector onto the fastener, and then tighten the retention screws on the GND
and Surge ports. Ensure that the GPS surge protector is well-connected to the fastener.

Step 2 Use the bolt to fix the fastener to the top of the cabinet and ensure that the fastener is reliably
grounded. Refer to Figure 8-39 and Figure 8-40.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

94

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Figure 8-39 Installing the fastener of the surge protector (N68E-22 cabinet)

Figure 8-40 Installing the fastener of the surge protector (N68E-21-N cabinet)

1 Screw

2 Fastener

3 Lightning arrester

NOTE

When the fastener is fixed on the top of N68E-21-N cabinet:


l Remove the M5 tapping screw near the ground screw before fixing the fastener to the ground screw at
the rear right of the cabinet.
l The conductive fastener is installed on the ground screw. Therefore, you do not need to ground with
PGND cable.

Step 3 Connect the N type female connector of the 1 meter long cable to the N type male connector of
the 2.5 meter long cable, and thus a 3.5 meter long cable is formed.
Step 4 Along the left side at the front of the cabinet, lead the end (with the elbow SMA connector) of
the cable to the cable trough beneath the RSS subrack, and then lead the end to port ANT on the
GCGa/GCGb board along the cable trough.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

95

BSC6900 UMTS
Installation Guide

8 Installing the Signal Cables

Step 5 Lead the other end (with the N-type female connector) of the cable upwards along the mounting
bar on the left at the front of the cabinet and through the cabling holes on the top of the cabinet
until the cable end reaches the GPS surge protector.
Step 6 As shown in Figure 8-37, connect the elbow SMA connector to port ANT on the GCGa/GCGb
board. Lead the N-type female connector to the port Protect of the surge protector on the top of
the cabinet, and then fasten the nut.
----End

Follow-up Procedure
Record the installation result in the templates provided in 12 Installation Records.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

96

BSC6900 UMTS
Installation Guide

9 Installing the Alarm Box and the Computer Serving as the


LMT

Installing the Alarm Box and the Computer


Serving as the LMT

About This Chapter


This section describes how to install an alarm box and a computer serving as the LMT. If you
are installing the computer and the alarm box in the equipment room, you can install them along
with the BSC6900 equipment. For items and specifications for checking the installation of the
LMT computer and the alarm box, see 11.3 Checklist for the Installation of the LMT
Computer and Alarm Box.
9.1 Installing the Computer Serving as the LMT
This section describes how to install a computer serving as the LMT. If you are installing the
computer in the equipment room, you can install it along with the BSC6900 equipment.
9.2 Installing the Alarm Box
This section describes how to install an alarm box. If you are installing the alarm box in the
equipment room, you can install it along with the BSC6900 equipment.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

97

9 Installing the Alarm Box and the Computer Serving as the


LMT

BSC6900 UMTS
Installation Guide

9.1 Installing the Computer Serving as the LMT


This section describes how to install a computer serving as the LMT. If you are installing the
computer in the equipment room, you can install it along with the BSC6900 equipment.

Prerequisites
l

The components required for the installation are available. The components include the
computer, power cables, and signal cables.

The tools required for the installation are available. These tools include a Phillips
screwdriver and a wrench.

Procedure
Step 1 Place the computer on the workbench.
Step 2 Connect the power cable for the computer and signal cables for the mouse, keyboard, and
monitor.
Step 3 Connect a network cable to the computer.
Step 4 Connect the PGND cable of the power socket for the computer to the ground bar of the PDF or
any nearby ground.
NOTE

The distance between the power socket and PDF ground bar or nearby ground must be equal to or less than
30 m. If the distance exceeds 30 m, find a closer ground bar. The cross-sectional area of the connecting
cable must be equal to or larger than 6 mm2.

----End

Follow-up Procedure
Record the installation results in 12 Installation Records.

9.2 Installing the Alarm Box


This section describes how to install an alarm box. If you are installing the alarm box in the
equipment room, you can install it along with the BSC6900 equipment.

Prerequisites
l

The components required for the installation are available. The components include the
alarm box, power cables, and signal cables.

The tools required for the installation are available. These tools include a Phillips
screwdriver and a PVC cable trough.

Context
For detailed operations for installing the alarm box and connecting power cables and signal
cables, see the accompanying documents.
Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

98

9 Installing the Alarm Box and the Computer Serving as the


LMT

BSC6900 UMTS
Installation Guide

The alarm box requires a -48 V DC or 220 V AC power supply. Connect one end of the power
cable to the alarm box, and connect the other end to a nearby PDF or 220 V AC power output
terminal.

Procedure
Step 1 Install the alarm box.
Step 2 Route signal cables and power cables.
NOTE

l Route signal cables and power cables along with network cables for the alarm management system terminal.
l Route the power cables and signal cables through a PVC cable trough to protect and hide the cables.
l Connect the alarm box signal cable to the LMT computer.

Step 3 Install power cables for the alarm box.


Step 4 Install signal cables for the alarm box.
----End

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

99

BSC6900 UMTS
Installation Guide

10

10 Attaching the Engineering Labels to the Cables

Attaching the Engineering Labels to the


Cables

About This Chapter


This chapter describes how to attach engineering labels to the power, PGND, and signal cables
after the cables are installed
10.1 Attaching the Engineering Labels to the Power Cables and PGND Cables
This section describes how to attach the engineering labels to the power cables and PGND cables.
After installing the power cables and PGND cables, replace the temporary labels with
engineering labels.
10.2 Attaching the Engineering Labels to the Signal Cables
This section describes how to attach the engineering labels to the signal cables after the signal
cables are installed.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

100

BSC6900 UMTS
Installation Guide

10 Attaching the Engineering Labels to the Cables

10.1 Attaching the Engineering Labels to the Power Cables


and PGND Cables
This section describes how to attach the engineering labels to the power cables and PGND cables.
After installing the power cables and PGND cables, replace the temporary labels with
engineering labels.

Prerequisites
l

The power cables and PGND cables are installed.

The required materials are available. The required materials are pen and label paper.

Procedure
Step 1 Fill out the engineering labels of the power cables and PGND cable according to Labeling Power
Cables, referring to the temporary labels.
Step 2 Remove the temporary labels. Then, attach the engineering labels according to the specifications
described in Labeling Power Cables.
----End

Follow-up Procedure
Record the operation result in the templates provided in 12 Installation Records.

10.2 Attaching the Engineering Labels to the Signal Cables


This section describes how to attach the engineering labels to the signal cables after the signal
cables are installed.

Prerequisites
The signal cables are installed.

Procedure
Step 1 Arrange an engineering label and attach the long end of the label to the cable, as shown in Figure
10-1.
Figure 10-1 Attaching an engineering label

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

101

BSC6900 UMTS
Installation Guide

10 Attaching the Engineering Labels to the Cables

Step 2 Attach the label 2 cm away from the connector, and turn over the long end. Ensure that the long
end is aligned with the label.
NOTE

By default, the label is attached 2 cm away from the connector. If required, you can change the position to
facilitate smooth installation. Consistency and neatness, however, must be maintained.

Step 3 There should be a 2 mm to 3 mm space between the label and the cable, as shown in Figure
10-2.
Figure 10-2 Required space between the label and the cable

Step 4 Fold the lower edge of the label upwards, and align the upper edge with the lower edge, as shown
in Figure 10-3 and Figure 10-4.
Figure 10-3 Folding the lower edge upwards

Figure 10-4 Installed label

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

102

BSC6900 UMTS
Installation Guide

10 Attaching the Engineering Labels to the Cables

----End

Follow-up Procedure
Record the result of label attachment in the templates provided in 12 Installation Records.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

103

BSC6900 UMTS
Installation Guide

11

11 Checklist for the Hardware Installation

Checklist for the Hardware Installation

About This Chapter


This chapter describes how to check the hardware installation. The hardware consists of cables,
Local Maintenance Terminal (LMT) PC, and alarm box. In addition, you should check the
installation environment.
11.1 Checklist for BSC6900 Cable Installation
This lists the items and specifications for checking the installation of the BSC6900 power cables,
PGND cables, and signal cables.
11.2 Checklist for the Installation of the BSC6900 GPS Antenna System
This lists the items and specifications for checking the installation of the BSC6900 GPS antenna
system.
11.3 Checklist for the Installation of the LMT Computer and Alarm Box
This lists the items and specifications for checking the installation of the LMT computer and the
alarm box.
11.4 Checklist for Field Cleanliness of BSC6900 Installation
This lists the items and specifications for checking the field cleanliness of BSC6900 installation.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

104

BSC6900 UMTS
Installation Guide

11 Checklist for the Hardware Installation

11.1 Checklist for BSC6900 Cable Installation


This lists the items and specifications for checking the installation of the BSC6900 power cables,
PGND cables, and signal cables.
For details, see Checklist for the BSC6900 Cable Installation.

11.2 Checklist for the Installation of the BSC6900 GPS


Antenna System
This lists the items and specifications for checking the installation of the BSC6900 GPS antenna
system.
For details, see Checklist for the Installation of the BSC6900 GPS Antenna System.

11.3 Checklist for the Installation of the LMT Computer and


Alarm Box
This lists the items and specifications for checking the installation of the LMT computer and the
alarm box.
For details, see Checklist for the Installation of the LMT Computer and Alarm Box.

11.4 Checklist for Field Cleanliness of BSC6900 Installation


This lists the items and specifications for checking the field cleanliness of BSC6900 installation.
For details, see Checklist for Field Cleanliness of the Installation.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

105

BSC6900 UMTS
Installation Guide

12 Installation Records

12

Installation Records

The table is used to record the BSC6900 hardware installation information.


For details, see Hardware Installation Records and Installation Record of the Positions of
Signal Cables.

Issue 01 (2015-03-25)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

106