Project Background
1

National Energy Policy


National Energy Mix 2025

To increase the use of renewable


energy by total 23% of national energy
in 2025, including the solar energy for
power plant

Decree of Ministry of Energy and Mineral Resources


No. 17 / 2013

Feed in tariff for solar power plant.


Maximum at USD 25 cents per kWh with
additional incentive USD 5 cents for
local solar module application

Decree of Director General of New and Renewable Energy


and Energy Conservation No. 979 K/29/DJE/2013

Capacity Quota for Solar Power Plant


80 Sites,140 MWp.
Kupang 5 MW was included in the 7 first
sites to be tendered

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Capacity Quota for PV Power Plant (2013)


80 LOCATIONS OF CAPACITY QUOTA FOR PV POWER PLANT
2013

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Why Len ?
PT Len Industri (Persero) is an Indonesian state owned company which develops business and products in electronics for industry and
infrastructure. As the highly competition in electronic technology based business, Len takes focus on 5 (five) sectors : Railway Transportation,
ICT, Renewable Energy, Defense Electronics, and Navigation System. As for the solar energy business, Len is the most experienced company in
Indonesia with many success stories, both in manufacturing and EPC business.

Airport BIPV/Rooftop
Lampung, Southern Sumatera

Solar Street Lighting


Toll Road of Purbaleunyi

2 x 1 MW On Grid PV Plant
Bali

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

The First PPA in Solar Energy


1

MEMR designated Len as the winner for IPP PV Plant in Kupang 5 MW


(February 2014)

Power Purchase Agreement (PPA) between Len and PLN 9th of January 2015

Electricity Price
USD 0.25/kWh during
20 years period

The PPA Agreement was signed by General Manager PLN of East Nusa Tenggara Area Richard Safkaur
and President Director of Len Abraham Mose,
in headquarter of PLN, Jakarta

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Site Location

Location
Coordinate
Avg. ESH
Summer Season
Area
Electrification Ratio of ENT

Desa Oelpuah, Kupang Regency, East Nusa Tenggara


123o 4455 E | 10o 858 S
6.38, lowest at 5.52 (kWh/m2/day)
Approximately 8 months / year
Above 75.000 m2
58.91%, the second lowest level in Indonesia

ESH : Equivalent Sun Hour


ENT : East Nusa Tenggara

Competitive Technological Independence

www.len.co.id

PT Len Industri (Persero)

Site Position to the Grid (nearest feeder point)

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Site Survey

The Site
Some parts are plantation areas

Middle voltage line near site

Main Substation Naibonat

Site, forest

Express Feeder power lines on Jl.Timor Raya

Main Substation Maulafa


7

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Feasibility Analysis
90%

7% 3%

Investment Cost

USD 11.200.000
EPC

Other Expenses (Legal, A dmin, Bank)


30%

Land

70%

Financial Source
Equity

20,000,000

15,000,000

Loan

PBP

NPV

IRR

8.58

USD

18.40
%

years

792.635

10,000,000

5,000,000

0
1

(5,000,000)
Competitive Technological Independence

10

11

12

13

14

15

16

17

18

Accumulated Cashflow

19

20

21

8
www.len.co.id

PT Len Industri (Persero)

Construction Schedule
2015
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Financial Closing
Procurement & Logistics
Land Clearing & Civil Works
Concrete Works
Metal Support Inst.
Water & Drainage System
Control Room

civil

Road Works
CCTV
Solar Module Installation
Combiner & Inverter
Monitoring & Weather Inst.
Transformer & Switch Gear
Commissioning Certificate

mechanical & electrical

COD

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

General Block Diagram

10

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

General PV Arrays Design


PV Module

Tilt/Azimuth Orientation

10o/0o

Number of PV Modules

21.840

Nb. in series

21 modules

Nb. in parallel

1.040 strings

Unit Nominal Power

230 Wp
36.614 m2

Module Area

Inverter
Number of Inverter

260

Unit Nominal Power

17.0 kW

Operating Voltage

430 900 V

11

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

video

click image

Competitive Technological Independence

click image

thankyou
12

www.len.co.id

PT Len Industri (Persero)

Pictures from Kupang


Land Clearing & Civil Works

Concrete Works

13

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Pictures from Kupang


Metal Support Inst.

Water & Drainage System


Control Room
Road Works

14

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Pictures from Kupang


Solar Module Installation

15

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Pictures from Kupang


Combiner & Inverter
Monitoring & Weather Inst.

Transformer & Switch Gear

16

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Pictures from Kupang

17

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Pictures from Kupang

18

Competitive Technological Independence


www.len.co.id

PT Len Industri (Persero)

Pictures from Kupang

19

Competitive Technological Independence


www.len.co.id

You might also like