TABLE OF CONTENTS
A.
Executive Summary.......................................................................................................... 3
B.
Main Report....................................................................................................................... 6
1
Introduction..................................................................................................................... 6
Work Done...................................................................................................................... 6
Background Information...........................................................................................6
3.2
Safety...................................................................................................................... 8
3.3
Precalciner Survey...................................................................................................9
3.4
3.5
Fan Efficiency........................................................................................................16
Recommendations........................................................................................................17
Acknowledgements.......................................................................................................18
Appendices.................................................................................................................... 18
A.
EXECUTIVE SUMMARY
Objectives:
The objective of the mission was to explain the poor combustion in the precalciner although
residence time is high enough and to advice on possible modification,
Aside from the initial objectives, some QW relative missions will be completed:
Fan efficiency Audit for #3 Kiln ID Fan, ESP Fan; #1 ESP Fan.
Organize a session to follow up QW recommendations tracking.
Results / Findings
Safety:
The accesses are very poor, no proper step or ladder to arrive the measuring points.
Many Preheater concrete beams overhead the accesses are too low to pass through,
and no necessary alarm marks.
Target/Normal
~ 2.0s
PC temperature
profile
PC exit gas
temperature
CO kiln exit
O2 kiln exit
CO PC exit gas
O2 PC exit gas
Temperature In
main section
Burn condition by
visual inspection
Stable fuel
splitting PC
Existing status
3.6s
Evaluation
OK
Uniform and
reasonable.
Bad
Stable 5
Max. 24
Bad
<100ppm
Not
measured
500ppm
Bad
2~3%
0.8~3.2%
Poor
Stable
Bad
Bad
Around 60%
OK
3-5%
No sparkle at
outlet
Kiln/PC=40:60
Therefore, the Kiln feed has to be maintained uniform quantity +/-1% before we really
evaluate the Calciner.
Page 3 of 18
Visual inspection
We tried to evaluate Precalciner combustion condition by visual inspection during the
mission implementation. We found that the brightness of flames between two inspection holes
at same level (measurement point C) are very different; at the same time many sparkles were
found inside the Precalciner. This confirms that the Precalciner combustion condition is poor.
Fan Efficiency:
Under the scope of fan efficiency audit we have covered #3 Kiln ID Fan, ESP Fan; #1
ESP Fan. Because of the lack of power factor of #3 kiln cooler ID Fan, we cant
complete Fan efficiency Audit for it. The Fans efficiency of #3 Kiln ID Fan, ESP Fan and
#1 ESP Fan is 44%, 41% and 51%. Fans Efficiency is less than 65% and the Fans
have obvious scope for the improvement.
The Impact would be 8-9 kW/tck. The analysis of the Fan Efficiency and Mechanical
check on the Fans should be given in order to formulate an action plan to improve the
performance to reduce the overall power consumption of the plant.
Page 4 of 18
Table of actions
No.
Action
Priority
Proper step or ladder for the measurement points should be installed; some
handrails must be installed also.
Safety
Alarm marks should be fixed on the Preheater concrete beams overhead the
accesses
Safety
Safety
Improve drying crusher air sealing and weld or change duct to reduce false air
10
11
Page 5 of 18
B.
MAIN REPORT
1
Introduction
This mission is mainly focus on Precalciner study and gives recommendations for further
optimization. On the other hand, Fan efficiency Audit of #3 Kiln ID Fan, ESP Fan, and #1 ESP
Fan and QW recommendations tracking have been completed.
2
Work Done
Precalciner temperature measurement has been done for three times.
Gas analysis of Pyro-system has been done for three times.
Fan efficiency audit.
QW recommendations follow up.
3
Analysis / Argument / Conclusions
Poor Precalciner operation condition was mentioned in QW mission. This mission is carried out
in order to get temperature profile and give recommendations for further optimization.
3.1
Background Information
QJP #3 kiln is semi-wet process product line with 1000t/d design capacity. Process flowsheet
show below:
Page 6 of 18
The whole product line is running at unstable status, the kiln feed still fluctuate (from 50t/h to
80t/h with kiln feed set 80t/h); raw meal composition is not consistent. These issues are all
impact on Precalciner performance negatively. Kiln only reach 770t/d~950t/d output and
tripped four times during 4 days (17th ~20th July).
There are no thermocouples at kiln inlet, Precalciner bottom, middle, upper and outlet, no
manometer and gas analyzer at the outlet of Precalciner. Much important information isnt
showed in CCR screens.
The kiln feed quantity and material moisture content was fluctuated seriously due to the
vacuum filter condition. This resulted in all pyroprocessing system running at unstable
condition. Improving vacuum filter running condition became the first thing for optimizing all
pyroprocessing system!
Page 7 of 18
Photo 2: Kiln feed system and material condition in QuJiang plant 200607
3.2
Safety
Some safety issues were found in the plant although several actions plans are in progress after
QW:
Page 8 of 18
3.3
Precalciner Survey
Page 9 of 18
A(PC Inlet)
798-850
815-828
B(PC Cone)
760-800
779-855
792-823
C(PC Middle)
872-885
820-828
801-855
D(PC Upside)
849-852
818-821
854-868
PC exit
881-905
O2 (%)
CO ppm
No indication
> 10000
1.4-2.0
3500-6250
C2 Cyclone exit
1.7-2.2
3264-3816
7.9-8.1
2824-3004
9.5-9.6
1587-2830
PC exit
C2 Cyclone exit
Kiln Feed: 65-70t/h (R/C=1.87) 18-July-2006 10:40 - 12:00
1
A(PC Inlet)
867-870
918-930
B(PC Cone)
790-806
808-818
813-817
C(PC Middle)
835-846
817-820
878-881
D(PC Upside)
835
875-886
894
PC exit
865-872
C2 Cyclone exit
861-904
O2 (%)
CO ppm
No indication
> 10000
0.8-1.2
275-1270
C2 Cyclone exit
0.5-0.9
2257-5171
7.1-7.2
4012-4612
8.4-8.5
4882-5771
PC exit
A(PC Inlet)
949
904
B(PC Cone)
891
833
C(PC Middle)
832
D(PC Upside)
838
PC exit
938
C2 Cyclone exit
839
O2 (%)
CO ppm
Kiln inlet
0.3-0.4
5200-7800
797
PC exit
1.5-3.2
2203-2014
843
849
C2 Cyclone exit
2.8-4.2
2623-1892
936
886
8.7-9.2
288-292
9.1-9.3
2535-2378
KSV
5~8
NSF
4.5~6
MFC
4~5
FLS
5.5~6.5
SC
10
MC
8~12
Residence time(s):
Page 10 of 18
D-D
7~10
KHD
18~20
The gas residence time in calciner is 3.6 s. And each of the precalciner type show a very wide
rang of residence times, but the longer residence times is better for burnout and heat
exchange, and avoid carrying excessive heat to the upper stages of the PH, normally, an
additional one second residence time will reduce heat consumption by 15kcal/kg.
Normal gas residence time > 2.0 sec (needs to be > 4.5 sec to allow for NOx reduction) allow
burnout of CO.
Lafarge Precalciners Residence time(s):
Page 11 of 18
QuJiang precalciner material loading is 3t/m3d. There is still room in QJP precalciner to
increase production by around 30% (to bring to 4t/m3d) :
Supplier
PC type
Polysius
Prepol
PC Loading
(t/m3d)
46
Inline
4 4.5
Separate Line
7 7.3
FLS
Fuller
IHI
KHD
ALL Kilns
Comments
PC combustion in TA only
4.5 6
NSF
6.0 7.5
Pyroclon
3.5 4
PyroTop
2.5
5.5
Table 3: Different type precalciner loading
Page 13 of 18
Target/Normal
4.5~10m/s
Page 14 of 18
Existing status
5m/s
Evaluation
OK
Residence time
PC heat loading
PC loading
Decarbonation degree
5.5~6.5m/s FLS
>3.5s
3
83 Mcal/m h
A bit high
2.5~7.5t/m3d
3t/m3d
OK
92~95%
OK
No sparkle at
outlet
>50%
91~95%
PC upper is higher than
middle and bottom;Max.
variations 98 between
two points at same level.
24 Max.
Normal 2014~6250ppm
Seldom 500ppm
0.8~3.2%
Unstable Max. variations
45
Many sparkles was found
in different section
Around 60%
0.2%
No testing
Uniform and
reasonable.
CO PC exit gas
O2 PC exit gas
Temperature In main section
Burn out rate by visual
inspection
Stable fuel splitting PC
Unburned carbon hot meal
OK
3
50~70Mcal/m h
PC temperature profile
3.6s
Stable 5
500ppm
2~3%without CO
Stable
Bad
Bad
Very bad
Bad
Bad
Bad
OK
After the measurements, it was found that the combustion is not proper in the total pyro
system.
The real Calciner performance could not be evaluated mainly because of the Kiln Feed
Fluctuations upto 40%. It is very difficult to determine the Calciner performance with
these fluctuations.
Therefore, the Kiln feed has to be maintained uniform quantity +/-1% before we really
evaluate the Calciner.
The Calciner performance will be studied in detail and the Calciner modification
recommendations will be done once the Process is stable with Kiln feed at reasonably
within the acceptable limits.
3.4
False air ratio was 61.1% between Precalciner exit and ID fan inlet, that resulted in high power
consumption in clinker production (increase at least 2kwh/tck more). And Drying Crusher was
the main leakage point where false air is 47.1%. Another main leakage point is dedust cyclone,
we heard strong air leakage sound from there.
Page 15 of 18
3.5
Fan Efficiency
This mission fan efficiency audit has covered #3 Kiln ID Fan, ESP Fan; #1 ESP Fan. We didnt
complete the #3 kiln cooler ID Fan audit because of the lack of power factor. The details of the
Fans efficiency audit are placed in appendices.
The total Power savings are calculated to be 8 9 Kwh/t of clinker. (Assumed that Kiln ID Fan
Efficiency is taken as 40% and not 17%)
Plant to contact with fan experts to increase fan efficiency.
Page 16 of 18
Recommendations
Action 1: Proper step or ladder for the measurement points should be installed; some
handrails must be installed also.
2: Alarm marks should be fixed on the Preheater concrete beams overhead the
accesses.
3: Gangways on the scaffolding optionally must be carried away to keep from
falling down.
Objective: Safety
Way to implement: Install handrails, step and ladder. Carry away gangways and scaffolding.
Reference documents: Safety guideline.
Plant or BU responsible: Plant.
Expected result: Decrease LTI.
Action 4: Install thermocouples at Precalciner bottom, middle, upper and kiln inlet.
Cross-check Preheater manometers and thermocouples regular to achieve
more uniform combustion and decarbonatation.
Objective: Optimize preheater and precalciner combustion
Way to implement: To buy and install thermocouples at proper position. ATC can advice.
Reference documents: Combustion optimization.
Plant or BU responsible: Plant.
Expected result: Increase output and decrease heat consumption.
Action 5: Improve vacuum filter performance to reduce the feed material quantity and
quality deviation.
Objective: Stabilize all pyroprocessing system.
Way to implement: Try to find high quality filter cloth and improve vacuum equipment.
Reference documents: Combustion optimization.
Plant or BU responsible: Plant, BU and ATC.
Expected result: Improve pyroprocessing system stability and increase capacity.
Action 6: Modify coal transport pipe to decrease the possibility of coal feed fluctuation
Objective: Decrease the fluctuation of coal feed to calciner
Way to implement: Modify incline coal transport pipe to horizontal or vertical pipe..
Page 17 of 18
5
Acknowledgements
The ATC Process Team sincerely thank the management of QuJiang Plant for their excellent
co-operation and positive attitude towards the mission. Thanks to all the plant team especially
to Mr. Zhang jinghong , the process Manager, Mr. Zhang zeping, the process engineer, Mr.
Fang xiongzi, the electrical engineer, Mrs., Zhou xiaorong, the quality Manager for their efforts
to make this mission a Successful.
6
Appendices
Pitot data of
QuJiang 200607
Fan efficiency
QuJiang PC
caiculation QuJiang 200607
calculation
Page 18 of 18