You are on page 1of 28

Focus on Mining Project Evaluation

Santa Rita project financing

No. 42
SRK’s
International
Newsletter

Initial ore mining at Santa Rita

In January 2008 SRK took on the role of Independent Engineer (IE) for the project financing for
Mirabela Nickel’s Santa Rita project located in Bahia state, Brazil.

The Santa Rita project is an open pit mine with a Despite negative sentiment surrounding the
conventional nickel sulfide concentrator. Initially, financial crisis and rapidly declining metals
it was based on a proven and probable reserve prices, Mirabela took the bold step of continuing
of 84Mt with a grade of 0.61% Ni, mining with project construction, albeit at a slower
4.6Mt of ore a year and producing 17,000t of Ni pace. Using equity funding, they initiated an
concentrate, with a Ni grade of 13% plus Cu and expansion study to 6.4Mt a year, based on an
Co by-products. increased reserve of 120Mt. In January 2009,
SRK was engaged again to audit the new reserve
SRK’s initial IE report supported the project
and expansion plan. Mirabela successfully raised
but flagged a number of risk issues and
additional equity funding and procured bridging,
recommended subsequent follow-up work. The
offtake and trade finance to support continued
report was submitted to prospective lenders and
construction activities.
in September 2008, SRK made presentations to
selected syndicate members in New York and SRK signed off on the new scope and cashflow
London. Letters of Commitment were due from model for the project in April 2009; funding for
lenders when the financial crisis hit, as the firm US$190M was successfully concluded with the
of Lehman Brothers failed. Needless to say, the first loan drawdown shortly thereafter.
project financing did not proceed.
…continued

1
SENEGAL
Koundara MALI
GUINEA - B I S S A U
Mali

Santa Rita project financing…


Gaoual
Tongue Siguiri
Labe Dinguiraye
(continued)
Boke
GUINEA Pita
Dabola
Dalaba Kouroussa
Fria Mamou Kankan
Throughout
Boffa the often painful
Kindia Faranah maintaining its independence,
process,
Conakry SRK kept a close watch
performed the role of devil’s advocate
on developments
Forecariah at the request
of prospective lenders
S I E R R A L E Oand, while
Kissidougou Kerouane
with the site team during regular site AFR ICA
NE visits. The team’s response indicates
Beyla
Macenta they found this interaction invaluable.

N e a l R igby LIBERIA The stalled financing, expanded


Nzerekore
scope, and lengthened construction
schedule inevitably combined
D r. Neal Rigby, to increase project capital
SRK Global Group RIO TINTO
costs. Nevertheless, the project
LICENCE
Chairman, is a Aconstruction
REAS was successfully
Corporate Mining completed in October 2009 and
Consultant with 36 the first concentrate was produced
years’ experience in in November 2009. At the time of
the mining sector. this writing, commissioning was
For the past 20 progressing according to plan.
years, he has served
as a senior participant in dealmaking, Neal Rigby: nrigby@srk.com
supporting the rationalisation,
merger, disposal and acquisition of
international mining companies and
mining finance institutions: his role to
define the fundamental value, risks
and opportunities of mining projects.
Neal has undertaken conceptual
through feasibility studies in over 50
SRK recently completed a
comprehensive Due Diligence (DD)
countries worldwide, for a wide range
study on a complex mining operation
of projects.
in Southern Africa. The copper mining
Neal Rigby: nrigby@srk.com operation consists of a complex
array of surface and underground ore
production operations together with
primary and secondary beneficiation
facilities. SRK’s approach to DD
studies is to involve professional
staff in an integrated multi-discipline
approach. The presence of water
affects the geotechnical design,
both surface and underground,
and further complexity is added
if several end products require
different process routes and different
markets. Smelting and refining add
more environmental requirements.
Particularly on the African continent,
the continuous supply of electrical
power and the need for emergency
power are important for continuous
operations.
SAG and ball mill building at Santa Rita
SRK put together a multi-disciplined
team of 18 engineers and scientists

2
Due diligence study on a complex
mining operation in Southern Africa

Roger dixon

Roger Dixon
is a Corporate
Consultant and
Chairman of SRK’s
Johannesburg
office. He has 37
years’ experience
Typical Southern African open pit in the early stages of development in mining
engineering, with
projects relating to
to complete the DD in time; the team and Performance Standards. Once, engineering studies, mineral reserve
would have few parallels in mining converting Mineral Resources estimation, due diligence studies
consultancies worldwide. to Mineral Reserves was settled on platinum, gold and copper and
between the Geologist and the Mining feasibility studies on open-pit and
As part of the DD a multi-discipline Engineer but today, compliance
risk assessment workshop was underground operations.
with environmental and social
held, with client participation to requirements is paramount. Roger helped formulate the Mine
identify key obstacles in reaching Health and Safety Act of 1996. He
planned production commitments. The Logistics and communication proved was involved in preparing the South
geologist and process engineer, the to be a challenge. However, the African Code for reporting resources
rock engineer and geohydrologist and technical team met each evening to and mineral reserves (SAMREC Code)
the tailings and waste disposal engineer discuss issues; this interaction proved in 2000, and mineral asset valuation
were amongst the diverse disciplines invaluable in understanding the (SAMVAL Code) in 2008. He currently
represented. interdependencies involved. chairs the Committee for Mineral
The workshop, a marathon session, Translating the technical issues into a Reserve International Reporting
covered the operations from exploration financial model is key. The SRK team Standards (CRIRSCO), which has
through mine design and development put together an interactive model that representatives from the major mining
to production and transportation of reflected two business cases – one countries around the world.
the finished metal products. The including Inferred Resources and one Roger Dixon: rdixon@srk.co.za
client, taking on the residual risks, put excluding them. The model showed
together a program for mitigation to be how changes at any stage of any of
managed on an ongoing basis to reduce the interlinked processes affect net
the operation’s risks. present value (NPV) and cost per unit
of production.
The size of the Environment and Social
team (5) reflects the importance of Roger Dixon: rdixon@srk.co.za
compliance with the Equator Principles

3
g i e l s o n c outinho Mining Project Evaluation in Brazil
Gielson Coutinho,
Principal Mining
Engineer, has 14
years’ experience
in the Brazilian
Mining Industry.
He works with
mining companies
to improve their
operations.

In 1998, Gielson helped found


Gemcom’s office in Belo Horizonte;
in 2005, he was appointed director of
SRK Brazil. With experience in project
management, mine planning, feasibility
studies and due diligence, his projects
involve open pit mining in iron ore.

Gielson Coutinho:
gcoutinho@srk.com.br
Iron ore in Granhães, Minas Gerais, Brazil, showing the contact of an itabirite ore body with the country rocks

antonio girodo In Brazil mining is energised by a copper, nickel sulfides and laterites, zinc,
supportive economic and political asbestos, and limestone for cement.
Antonio Carlos environment. As South America’s
SRK is participating in several studies
Girodo, Mining leading economy, Brazil is rich in history
including geological prospecting,
Engineer and and culture, with a combination of
exploration, feasibility studies, mine
Metallurgist, has 40 geography, population and economy
planning and design, modelling and
years’ experience that only a few countries such as the
resource estimating, and mining
working in gold, USA and China share. Brazil ranks
infrastructure, including issues
iron, nickel, copper, among the world’s top-five producers
concerning power and water supply and
cobalt, potash, of agricultural goods and mineral
the environment.
bauxite and commodities. Having controlled
phosphate mining. inflation, the country has a stable Mining in Brazil is steadily growing
He teaches part-time at the Mining political system, high employment and more complex. For example, in the iron
Engineering School of the Federal falling risk ratings. Foreign investments ore industry, Brazil produced only high-
University of Minas Gerais. His industry are welcomed and mining will reach grade, direct-shipping hematitic ore until
knowledge is vast; his particular US$25 billion in 2010. the beginning of the ‘70s. As hematites
interests are mathematical modelling, are frequently accompanied by soft
SRK established an office in Brazil
geological modelling, geostatistics and and rich itabirite orebodies, companies
in 2005 and presently employs 20
resource estimating. Girodo is an SRK started mining this ore based on
professionals and 10 associates with
Brazil associate. hydrogravitic methods (mainly spiral
experience in geology, mining and
concentrators), magnetic concentrators
Antonio Carlos Girodo: process engineering, and metallurgy. The
and reverse flotation, because those
girodo@srk.com.br fast-growing team of mathematicians
methods work where all others fail.
and computer scientists, economists,
When demand for iron ore outran
financial analysts, and environmental
supply in 2003, the price rose 71%; and
specialists deals with world-class mining
in 2004, 21%. This high value made
enterprises and with complex, integrated
mining the low-grade ores economic.
projects involved with iron ore, gold,

4
Environment and closure due diligence
Over the last 15 years, the importance Closure and rehabilitation costs are
of environmental, social and closure the largest environmental costs
issues in the evaluation of mineral associated with mining projects but
properties (MPE) has significantly are often overlooked because they
changed. While once these issues were generally occur decades into the future.
generally considered insignificant, they When discounted as part of the Net
have evolved into an integral component Present Value calculation, they may be
of most MPEs. Many investors have insignificant compared to development
specific environmental, social and costs. Nonetheless, the mining industry
closure standards that are as important has advanced the practice of mine
as the resources, mine design and closure considerably over the past
technical feasibility, due to their potential two decades to control future costs
to increase the predevelopment costs and minimise the risks of developing a
and slow the return on investment. mine requiring perpetual care. Although
the cost of perpetual care would
With the advent of environmental and be insignificant in NPV calculations,
social benchmarks, such as World corporate business practices, and
Bank and IFC standards, and the political and social pressures over the
Equator Principles, most new mining long-term management of closed mines
developments today are subject to a is changing the way mining companies
level of scrutiny previously unheard evaluate the business risks associated
of. Extended permitting and approval with closure.
processes are commonplace, often
lengthening the predevelopment Jeff Parshley: jparshley@srk.com
phase of a project by years. Post-
approval delays in project development
are occurring more frequently due
J e f f p a rs h l e y
However, the concentration of low to lawsuits and protests by citizens
grade (CPI) ore involves extensive and special interest groups. Several
milling that demands great amounts projects have even been stopped due J eff Parshley, P.G.,
of energy – a significant problem in to environmental or social concerns. C.E.M., Principal
Brazil. Another problem is the low Although rare, global political and with SRK Reno, has
product yield of the ore and the huge environmental trends suggest more over 29 years of
amounts of tailings CPI ores generate. frequent occurrences in the future. project experience
This presents a difficult environmental throughout North
problem since mine sites lack sufficient America, Latin
places to store these residues. America, and Europe.
He holds a degree
Many businesses are involved in in geology from Dartmouth College,
acquisitions and mergers today, and Hanover, New Hampshire. Jeff’s
SRK Brazil is participating in project expertise includes mine closure and
evaluations and studies that require remediation, mine environmental
highly specialised skills in sensitive studies, mine permitting, and
areas. As this trend continues, environmental geochemistry.
bringing more complex problems, SRK
professionals will be well prepared to Jeff Parshley: jparshley@srk.com
face these challenges.

Gielson Coutinho: gcoutinho@srk.com.br

Mine permitting and approval processes can lengthen the predevelopment phase of a project by years

5
Palladon’s Iron Mountain project, Utah

T he Iron Mountain project is located In the 1950s and 1960s, former


near Cedar City, Utah. The District owners drilled on site, but the core
was discovered in 1849 by Mormon samples are no longer available. SRK
Pioneers, and the iron deposits were worked with Palladon to design a
mined almost continuously from 1851 drill program for Comstock-Mountain
to 1995, producing an estimated Lion deposit and adjacent stockpiles
88.2Mt. The new board of Palladon to verify the historic database and
Ventures Ltd, the current owner, estimate a resource for a Preliminary
commissioned SRK to review the Economic Assessment; the resource
project and comment on its merits. includes 40.35Mt at an average grade
of 45% Fe. SRK concluded the high
costs of off-mine freight and shipping
leah mach clearly favored producing higher
value products. The iron mineralogy
of the orebodies is predominantly
L eah Mach is based magnetite, which has certain value in
in SRK’s Denver downstream steelmaking. In addition,
office and is a the project infrastructure is good.
Principal Resource
Geologist with 23 SRK commissioned an assessment
years’ experience in to examine both the US and export
Greenfield polymetallic project site
geological studies, market potential. Currently, the US
including resource imports over 95% of its alternative
estimation. She is iron units, while China’s demand SRK was commissioned by a
a Qualified Person continues to be strong. SRK Chinese company to review a copper
with regard to National Instrument concluded that the Iron Mountain project located in East Africa. The
43-101 and JORC requirements. Leah project had merit and that there were objectives of the review were to use
has international experience in resource opportunities for project optimisation. the data provided to analyse and
estimation, project management, and Meanwhile, Palladon is using SRK’s provide summaries of the results
assay protocols and quality control and work in discussions with prospective for the client, and comment on any
has been involved in feasibility studies, investors and off-take partners. material flaws detected in the project.
due diligence and resource estimation in
Leah Mach: lmach@srk.com The SRK team visited the project site in
precious metals, base metals, and iron
Joanna Poeck: jpoeck@srk.com 2009, reviewed the materials and held
ore projects.
discussions with the current owner.
Leah Mach: lmach@srk.com
The property holds licences within a
substantial mining agreement area.
The mineralisation on site is typical of
a volcanic massive sulphide deposit
comprising a precious metal-rich
oxide zone overlying massive sulphide
lenses containing copper and zinc.
The East African nation has shown
strong support for the project, and will
participate in a net smelter royalty of
5.0% on precious metals and 3.5% on
other metals.

A NI43-101 technical report on the


project’s feasibility was completed and a
South African engineering firm updated
the process plant design and estimates
for capital and operating costs.
Mining at Palladon’s Comstock-Mountain Lion pit

6
Technical review of a polymetallic
yonglian sun
project in East Africa
D r Yonglian Sun is a
Principal Consultant
with over 20 years’
experience in
rock mechanics,
geotechnical
and mining
engineering across
four continents.
His international
experience includes site investigation,
analysis and geotechnical modelling in
open pits, underground mines and tunnels,
and evaluating mining projects. Recently,
he coordinated and led large due diligence
projects, for successful listing on the Stock
Exchange of Hong Kong Limited. Yonglian
established the SRK China Beijing office in
2005 and opened a second office in 2009;
SRK China now has 32 full-time employees
providing due diligence and technical
reviews, exploration management and
The deposit has been subdivided Diesel generators will be rented for
audits; mine design, scoping, and feasibility
and regrouped into 3 zones as oxide, two years to supply power; then,
studies.
supergene and primary. A three- heavy fuel oil generators will be
dimensional geological model was purchased. Water will be supplied by Yonglian Sun: ysun@srk.cn
prepared to outline the mineralised fresh water wells. Concentrates will
domains. SRK recalculated the be trucked to the nearest port.
resource and confirmed the
Overall, the project complies with
j o a nn a p o e c k
company’s estimates.
local/national environmental legislative
SRK investigated the mining requirements and conforms with Joanna Poeck is a
methods, mining phases, processing World Bank/International Finance Mining Engineer in
for three ore types by cyanidation Corporation environmental standards. SRK’s Denver office
and by flotation, the design of the with 6 years of
waste dumps and the disposition of Yonglian Sun: ysun@srk.cn
project experience
acid-generating rocks to build the throughout USA,
interception dyke, and the non-acid Canada, Europe
generating rocks to build the tailings and Australia. Her
dam and mine. expertise includes
open pit design,
SRK concluded preliminarily that
mine scheduling, pit optimisation and
additional geological exploration is
truck productivity analysis. She completes
recommended to upgrade resources
pre-feasibility studies, life of mine designs,
to higher categories and to define
and optimised schedules for iron ore, gold,
more resources at depth so as to
coal and diamond deposits using Vulcan
possibly expand mine life. In terms
software. Before joining SRK, Joanna
of the processing aspects, SRK
worked at Maptek, managing the Vulcan
recommends further metallurgical
technical services team in consulting,
test work be conducted in order
training and technical support.
to determine feasible grinding
size, reagent scheme and related Joanna Poeck: jpoeck@srk.com
operational parameters.

7
A geological risk approach to valuing
early-stage exploration projects

d e b o r a h l o rd

W ith 18 years’
experience,
Deborah Lord, BSc,
MAIG specialises
in valuing
exploration assets
and independent
expert reporting
to standard for
the Australian
Securities Exchange. Her expertise
with SRK reaches across a range
of commodities through a variety of
geological environments. Deborah
recognises the broader application of The valuation of exploration projects has to be understood before the project
risk and value to the exploration industry that do not contain defined resources can be sold or developed. The technical
and applies valuation principles to asset is complex, as consideration must be understanding is then tempered against
management in supporting corporate made of both technical and market market factors.
decision-making. factors. Technical factors include the
SRK has developed a probability (risk)
level of geological understanding of the
Deborah Lord: dlord@srk.com.au based approach to exploration valuation
project area, the targeted mineralisation
– the Geological Risk Method (“GRM”;
style, and the distribution and magnitude
Lord et al., 2001; Morley, 2007). This
of mineralisation indicators defined by
Alison Morley relies on identifying likely target value (TV)
previous exploration (e.g. geochemistry
outcomes from successful development
or geophysics). Market factors may
A lison Morley, MSc, BSc, Grad. include recent comparable transactions,
of a resource of particular target size
(TS), and discounting this figure by the
DipAppFin, MAusIMM, has over 12 geography, infrastructure costs and
cost and probability of success through
years’ experience commodity prices.
the five stages of the exploration and
as an Underground
SRK’s valuation approach considers both development cycle, to arrive at an
Mine Geologist and
technical and market factors. Analysis of the expected value (EV). The TS is based on
Superintendent,
technical aspects of the project form the core the geological understanding of the area,
gaining hands-on
of the valuation method as the probability and uses data from previous exploration
experience at
of the realisation of mineralisation potential and nearby operations.
Broken Hill and
Mount Isa. She has
managed a large Exploration Stages
team of geologists. EV = P x TV - C A B C D E $
In 2004, Alison joined EV = Expected Value of Detailed Expected value to be
Project Reconnai- Drill Feasibility
SRK where she participated in valuing Discovery at Stage Generation PA ssance PB Testing PC
Resource
Definition PD Study PE
delivered to the mining
division
exploration prospects and mines. She
P = Probability of success CA = $ CB = $ CC = $ CD = $ CE = $ Expected NPV of
has completed numerous Independent EVA = $ EVB = $ EVC = $ EVD = $ EVE = $ target deposit style
Geologist’s Reports and due diligence C = Cost of each stage
and fatal flaw studies of mining company TV = Target Value Risk Risk Risk Risk Risk
assets. (NPV of deposit style)
Geological Investigation Stages Economic Evaluation Stages

Alison Morley: amorley@srk.com.au Schematic diagram of the geological risk method (after Lord et al., 2001)

Lord D., Etheridge M. A., Willson M, Hall G and Uttley P (2001) ‘Measuring Exploration
Success: An alternate to the discovery-cost-per-ounce method of quantifying
exploration effectiveness’ Society of Economic Geologists Newsletter, No 45, April.
8
Trekkopje
T rekkopje is the site of a green fields of global consultants over a 20-month
project, consisting of a very large, low- period to develop the Definitive Feasibility
grade, shallow uranium resource hosted Study (DFS) that was issued in 2008. While
Grass-roots iron ore exploration, central Western in calcium carbonate cemented (calcrete) South African consultants worked on the
Australia, courtesy: Giralia Resources conglomerates. It rests in the arid desert process, infrastructure, environmental
region of western Namibia, in southwestern and permitting aspects of the project,
Africa, situated in gently sloping terrain. SRK worked closely with the client team
to review the exploration program to
Trekkopje will be an open pit operation,
ensure that all work was 43-101 compliant.
primarily using large hydraulic excavators
SRK developed Resource and Reserve
loading haul trucks. With a planned
statements and mine plans; provided
production rate of 100,000t/d of crushed
metallurgical, site geochemistry and
ore and an average stripping ratio of 0.23:1
hydrogeology assessments; performed site
(waste to ore), the mine life is expected to
geotechnical evaluation and engineering
last approximately 13 years, based on the
design, including pit slope and heap leach
current resources. The crushing plant will be
pad design, and performed economic
designed to crush ore at a rate of 7,000t/h
modelling. Late in the DFS program,
to a product size of 100% passing 38mm.
UraMin was acquired by the world energy
It will consist of two Primary Crushers and
expert AREVA, as part of their global
two Secondary Crushers running parallel,
uranium supply strategy.
each with a throughput of 3,500t/h. The ore
will then be agglomerated and conveyed to Terry Mandziak: tmandziak@srk.com
an on-off heap leach pad, sized to contain Neal Rigby: nrigby@srk.com
The geological risk of each project is 300 days of ore. Uranium will be recovered
quantified by assessing geological features from the heap leach pad using a carbonate/
indicative of four key success factors bicarbonate solution and ion-exchange.
for deposit formation (source, pathway, Based on the current mine plan, the majority
fluid and trap). Market parameters of the spent ore and waste will be placed T e rr y M a nd z i a k
are considered in the GRM through back into the shallow open pits, allowing
comparable market transactions for for an overall reduced mining footprint and Terry Mandziak,
deposits and exploration plays with similar concurrent reclamation. a University of
commodities and target sizes, and the Saskatchewan
Beginning in mid-2006, UraMin Inc. (the
expected exploration and infrastructure graduate, has over 16
owner at the time), commissioned SRK to
costs to define a resource at the specified years of diversified
coordinate and lead a multidisciplinary team
TS. The market data is used in the professional experience
GRM as a dollar value per tonne of in project coordination
metal as determined by the market at a and project design,
given time – equivalent to the yardstick including tailings and
method of valuation – and as cost heap leach projects in North America,
discounts for exploring and developing South America, Turkey, China and Africa.
the project from one stage to the next.
The final EV is then benchmarked Since joining SRK’s Denver office in 2004,
against traditional valuation approaches. Terry has managed a multidisciplinary
team of consultants for several projects,
The GRM represents a science- and including the Trekkopje Feasibility Study,
market transaction-based valuation in addition to performing due diligence on
approach, which is easily auditable, and tailings and heap leach projects across
accounts for the collective technical the globe.
knowledge of the project being valued, in
concert with market conditions preceding Prior to joining SRK, Terry spent five years
and at the time of the valuation. managing heap leach pad construction
Mining ore at Trekkopje
projects and seven years designing
Louis Bucci: lbucci@srk.com.au tailings and heap leach pad projects from
Deb Lord: dlord@srk.com.au concept through final development.
Alison Morley: amorley@srk.com.au
Peter Williams: pwilliams@srk.com.au Terry Mandziak: tmandziak@srk.com

9
Partnering with Polymetal: from IPOs to
Compliance Audits for ongoing reporting
I e st y n H u mp hr ey s

D r Iestyn Humphreys
is Managing Director
of SRK (UK) Limited
and a Director of the
SRK Group. With 20
years’ experience in
the metals and mining
sector, he manages
due diligence projects
for exploration
companies and financial institutions
seeking access to capital markets.
Our teams have authored Independent
Engineer’s and Qualified Persons’ Reports
on discoveries in Europe, the Americas,
Australasia, Asia and Africa. For SRK he
helps secure regulatory approvals for Dukat Mine (Polymetal) in Far Eastern Federal District, Russian Federation
IPOs, GDRs, and ADRs on international
exchanges. Historically, he has helped
write mineral valuation and reporting S ince 2003 to the present, SRK has processed 3.2Mt of ore to produce
partnered with JSC Polymetal in its 12.8Moz of silver and 0.2Moz of gold.
codes and contributes to the CESR Listing
annual declarations of Mineral Resources By January 2009, the company reported
Requirements initiative.
and Ore Reserves. The declarations total Ore Reserves of 390Moz silver and
Iestyn Humphreys: meet the terms and definitions in the 5.2Moz gold contained within 65.5Mt of
ihumphreys@srk.co.uk 2004 Australasian Code for Reporting of ore grading 185.5g/t silver and 2.5g/t gold.
Exploration Results, Mineral Resources
On an annual basis, a significant
and Ore reserves – the JORC Code, an
(2009: 80%) portion of the Ore Reserve
internationally recognised reporting code
declaration in Polymetal’s Annual report
as defined by the Combined Reserves
supported by the Compliance Audits
International Reporting Standards
were completed by SRK from consulting
Committee (CRIRSCO).
practices in Europe and the Russian
Today, Polymetal is a public holding Federation. The process SRK follows
company listed on the London Stock combines annual desktop studies and
Exchange (SRK Mineral Expert’s Report sample site visits completed on a three-
2006), the Russian Trading System Stock year rolling basis. To ensure material
Exchange and MICEX. The company and transparent disclosure, SRK reviews
operates and manages extensive mineral the entire discipline spectrum from
properties located in the Urals, Siberian exploration through geology, resource
and Far Eastern Federal Districts of estimation, mining, metallurgy and
the Russian Federation. These mineral environmental to mineral economics.
properties comprise 30+ separate This process is greatly aided by the
licences with a total area exceeding company’s established twin reporting
7,100km2 covering the development system, specifically developed for
spectrum from advanced staged computerised estimation and modern
exploration, to developing and mature pit optimisation techniques, as well as
operating mines. In the 9-month period manual techniques that comply with
ending 30 September, the company local regulatory reporting requirements.

10
Project evaluation course
Mike Warren and Paul Hodkiewicz, papers. The attendees indicated they
Principals at SRK Australia, presented appreciated being provided with such
a training course on Project Evaluation a comprehensive set of notes and
in Singapore in May 2009. The course, reference material.
entitled “Valuation and Financial
Paul and Mike have been asked to
Assessment of Mining Projects - a
present the course twice in 2010.
complete guide to due diligence in
Singapore is the likely venue but there
mining,” attracted 18 attendees who
was also some interest in running the
came from mining and exploration
course in Jakarta and/or Bali.
companies, as well as accounting and
finance firms. Mike Warren: mwarren@srk.com.au
As a result of contacts made at the
course, SRK is now providing geological
consulting to one of the mining
m i k e w a rr e n
companies, and supplying Leapfrog™
software training to assist the mining
company to visualise their deposits in 3D. M ike Warren is
a Principal Mining
In December 2009, Mike and Paul ran Engineer with 30
the course again in Singapore, with an years’ experience,
attendance increase to 31. The attendees including on-site
came from a range of companies based and head office
in Asia, with the majority from mining roles. He leads the
companies; however, the attendees were project evaluation
mainly non-technical staff who worked team within SRK
in roles such as accounting, business Australia and has
SRK recognises that organic
analysis, business management and managed due diligence and valuations on
development and acquisition continues
business development. a range of mining projects.  Mike provides
to fuel the growth of companies
operating in the Russian Federation The course attendees receive a thick technical skills to underground and open
and the broader Commonwealth of volume of documentation from the cut mines. He has added technical-
Independent States (CIS). This growth course, which includes copies of the economic modelling and evaluation skills
coupled with the widespread geographic presentations and a large collection to his strong technical background. He
location of mining and exploration of reference articles and technical has prepared Independent Reports for
properties within these companies IPOs on exchanges in Toronto, Hong Kong
and the continued need for access to and New York. 
global debt and equity capital markets,
Mike Warren: mwarren@srk.com.au
places increasing demands on in-
house technical resources and external
consultants. To meet this demand
SRK continues to draw on its global
resources and local expertise to:

• Establish further CIS regional practices


• Develop Mineral Resource and Ore
Reserve management systems/
protocols tailored to the needs of local
and international regulatory requirements
• Play a direct role in the various
international initiatives to align state
approved reserve reporting systems
with the CRIRSCO template
Iestyn Humphreys:
ihumphreys@srk.co.uk SRK Project Evaluation Class

11
Due diligence in coal – do SRK clients
get good value for their money?

T he short answer to this important the most senior technical specialists,


question is Yes – SRK brings value to managers and board members.
clients, licence holders and advisers
SRK teams can advise on a spectrum
during the due diligence process,
of issues, covering not only mining and
whether it involves an IPO, purchase,
geology/reserves, but also geotechnical,
sale, or borrowing. We are able to do this
hydrogeology, environmental, processing,
because of the experience, breadth of
infrastructure and financial issues. The
knowledge, and communication skills of
team is able to carry out associated
our multidisciplined coal teams.
detailed assessments if they are needed,
SRK has staff located in all the major from scoping to feasibility studies and
coal producing areas of the world and software modelling using numerous
most have worked for many years proprietary software packages.
“at the sharp end” of the industry, as
Our due diligence and independent
technical specialists and managers, before
reporting skills have been employed over
entering the consultancy business. Team
the past 5 years by major clients, including
members are able to communicate with
SUEK, the largest steam coal producer
the “workforce at the face” as well as
in Russia and a world top-ten producer.
The company has over 40 open pits,
K e i t h ph il pott underground mines, washing plants and
associated infrastructure located between
western Siberia and Vladivostok. SRK has
Keith has worked in mobilised up to six multidisciplined teams,
Oxidised volcanic clearing

the coal industry for including specialist Russian technical


35 years, spending translators, to visit the assets. SRK has SRK has been evaluating minerals
the first 17 years with prepared updated reserve statements projects in southern West Kalimantan
the state-owned coal and IPO documentation (not yet used!), Indonesia for the past four years. This
industry in the UK working closely with SUEK in preparing work has been focussed primarily on
before becoming a LoMps and financial budgets for these advising various clients on exploration
consultant. He joined tasks and, in 2010, is continuing to work and development programs for iron ore.
SRK in 1996 and is with the client.
a Principal Geologist and Corporate Iron mineralisation in this region is
Consultant. Keith is responsible for the Keith Philpott: kphilpott@srk.co.uk hosted predominantly within shales
coal group in the UK office and has which have been hydrothermally
extensive experience managing due altered and selectively replaced by
diligence commissions across the world. massive hematite. SRK established
He has been responsible for many reports a spatial association between iron
and resource/reserve assessments to mineralisation and porphyritic plutonic
international standards. rocks early on, and proposed a
magmatic-hydrothermal model of
Keith Philpott: kphilpott@srk.co.uk formation. This model formed the
basis of future exploration programs
designed by SRK for the district.

Drilling programs that SRK


implemented have confirmed a
magmatic-hydrothermal origin for iron
formation. However, in addition to
intersecting hematite mineralisation,

Coal stocks at Tygnuisky

12
Re-evaluation of the base and precious
metal potential south of the Kalimantan Arc

Louis bucci

Dr Louis Bucci is an
Economic Geologist
with over 13 years’
international
experience
investigating
mineralised
hydrothermal
systems. He has
worked on gold, base metals, nickel,
iron ore, manganese and molybdenum
across four continents. Louis interprets
technical datasets in assisting clients to
focus their exploration resources and
efforts. He has extensive experience in
geological due diligence, fatal flaw and
project analysis for Competent Person’s
SRK also identified geological and Through this project evaluation work in Reports for global financial institutions
alteration features consistent with West Kalimantan, SRK has identified and security exchanges globally, and
porphyry- or epithermal-style base a potentially new base and precious for feasibility study projects.
and precious metal systems in the metals district, in an area historically
drill core. Such features include the targeted solely for iron ore. Most Louis Bucci: lbucci@srk.com.au
extensive development of volcanic recent exploration results indicate that
and deformation breccia, and the the iron mineralisation may represent
alteration of sulphide – quartz – one phase of an overall evolving k a t e b a ss a n o
chlorite – epidote – carbonate. These multi-element magmatic-hydrothermal
results were somewhat unexpected,
as the projects of interest occur
system. As such, base and precious Dr Kate Bassano
metal deposit styles within the (PhD, BSc, MAIG) is
significantly south of the currently Kalimantan Arc should be considered a Geology Consultant
accepted limits for the Kalimantan Arc in exploration models for the southern with over five years of
– a geological district characterised by West Kalimantan, and should consider experience in mineral
gold and precious metals mines with a a re-evaluation of the southern margin exploration geology
porphyry or epithermal affinity. of the Kalimantan Arc. and geochemistry,
The project’s owners recognised the SRK thanks the International with exposure to
significance of SRK’s interpretation Commerce Corporation Pte Ltd for numerous deposit
and the recent exploration findings, their permission to publish this article. styles. Kate’s expertise is in ore deposit
and are working closely with us to geochemistry and geochronology, and
develop sophisticated exploration Louis Bucci: lbucci@srk.com.au the mapping of regionally deformed
programs to simultaneously target Kate Bassano: kbassano@srk.com.au metamorphic terrains, with a specific
iron ore and base and precious metals interest in base and precious metals,
systems within the district. and iron ore.

Kate Bassano: kbassano@srk.com.au

13
K e n rei pa s

K en Reipas, P.Eng.,
Red Mountain gold project located in
is a Principal
Mining Engineer
with over 28 years’
British Columbia, Canada
experience in mine
engineering, mine
production and
consulting. Prior
to joining SRK, he
worked at several
Canadian open pit and underground
mining operations, involved in the bulk
mining of iron, coal, gold and base
metals. His positions included Chief
Engineer and Mine Superintendent.
Since 1997, Ken’s consulting projects
have included technical studies and
reports, mine planning and reserves,
project economics, and due diligence
reviews, involving northern projects,
mine rehabilitation, mine reopening and
care and maintenance.

Ken Reipas: kreipas@srk.com

K e l ly s e xsm ith T he Red Mountain Project near tramway, and tunnel and shaft. Road
Stewart, British Columbia has been the access was selected
subject of extensive exploration and
Kelly is a Principal development activities since 1989.
• Power supply. Overland BC Hydro
Geochemist in power line was selected over on-site
SRK’s Vancouver Seabridge Gold Inc. (“Seabridge”) diesel generation.
office with over 17 acquired the Red Mountain Project in • Operating schedule, considering
years’ experience. February 2002 to provide exceptional the mountain location and
She holds a B.Sc. returns to shareholders by maximising avalanche hazards. Seasonal
in Geological leverage to the gold price that was operation from May to October was
Sciences from expected to rise. Seabridge’s business selected over year-round operations
the University of plan was to find, evaluate, acquire, for safety and reliability
British Columbia explore and develop gold deposits. • Mill location and basic process. An
and a M.Sc. from the Colorado School Management decided that Seabridge on-site mill using a grinding and
of Mines. Kelly specialises in the would not build or operate mines, but cyanidation leaching (CIP) circuit
geochemical characterisation of mine would look to partner or sell assets was selected over the alternative of
wastes. Her experience includes that were ready for production. using flotation to produce a sulphide
design and supervision of geochemical concentrate for offshore marketing
In 2003 Seabridge commissioned SRK
test programs, geochemical modelling,
Toronto to prepare an Independent • A conventional type of mill was
development of conceptual waste
Engineering Study on the Project. selected over a portable type, due to
management plans, and prediction
the tonnage required (1000tpd) and
and monitoring of water quality from SRK evaluated previous studies and
the very fine grind needed
tailings, waste rock and pit walls. recommended the best development
alternatives for various aspects of the • The full use of backfill was selected
Kelly Sexsmith: ksexsmith@srk.com to maximise the mining recovery of
project, including:
the resources. Minimising backfill was
• Method of access to the site location considered to reduce costs, but the
in challenging mountainous terrain. potential savings did not justify a lower
Options included road access, aerial recovery of the mineral resource

14
El Chanate gold project, Mexico

With the significant increase in the gold SRK has also been involved in providing
price over the last several years, some technical analysis for potential mergers
smaller mines have had the opportunity and acquisitions that Capital Gold may or
to become bigger mines. Capital Gold may not execute. Using a combination
Corporation’s El Chanate heap leach gold of public domain and/or site specific
mine, located in the Sonoran desert of data, SRK has acted as technical advisor
Mexico is one such operation. and independent engineer to evaluate
potential orebodies, mine plans and
Subsequent to completion of SRK’s economic models.
Independent Engineer role for the
lending banks, SRK was retained by SRK will continue to provide Capital
and worked closely with Capital Gold Gold Corporation with the technical
personnel to help define potential expertise needed to make informed
corporate and operational strategies investment and operational decisions in
to maximise shareholder value and order to meet the company’s corporate
the growth of the company. Specific strategy in the years ahead.
work has included revised geologic
Bret Swanson: bswanson@srk.com
modelling and resource estimation, pit
optimisation, preparation of phased
mine plans and production schedules,
mine equipment fleet modelling
Br e t S w a ns o n
and estimation, development of a
disturbance schedule, compilation
of an NI 43-101 technical report B ret C Swanson
View of former exploration camp from portal area
and scoping and targeting of in-fill/ (BE Mining)
exploration drilling programs. MAusIMM is a
Principal Mining
The culmination of a series of “what-
Having selected the optimum Engineer with 15
if” scenarios and recommended
development plan for the project, SRK years of global
work plans has given management
prepared a life-of-mine production mining experience.
and site personnel a much better
plan and cash flow model. His recent work
understanding of the true potential at
has involved
In late 2007, Seabridge commissioned El Chanate and what work is required
contributions to
SRK to update the costs and to realise its potential.
numerous feasibility, pre-feasibility,
economics of our 2003 Technical preliminary assessment, independent
Report. Results were reported in engineer, Competent Person’s Reports
an updated Preliminary Economic and mine site support while employed
Assessment in January 2008. with SRK Denver.
Throughout this period, SRK Bret Swanson: bswanson@srk.com
Vancouver provided ongoing
environmental management services
to Seabridge, including annual site
inspections, water quality monitoring,
annual regulatory reporting, and
closure planning to ensure the site
is in compliance and no outstanding
regulatory concerns could delay future
development activities.

Seabridge is now seeking a joint


venture partner or acquirer for the
Red Mountain Project.

Ken Reipas: kreipas@srk.com


Kelly Sexsmith: ksexsmith@srk.com The El Chanate Mine, Sonora Desert, Mexico

15
Independent review of world-
wide exploration portfolio

In connection with the acquisition The challenge of this unique assignment


of Falconbridge Ltd., the integration was to mobilise an experienced and
planning team of Xstrata plc credible team capable of reviewing a
commissioned SRK to provide worldwide portfolio containing early- to
technical guidance for the evaluation of development-stage exploration assets
Falconbridge’s exploration assets. and prepare a timely technical overview.

SRK’s assignment was to complete SRK’s unique worldwide presence was


a desktop review of Falconbridge’s instrumental in mobilising five teams
greenfield exploration assets with to visit six regional exploration offices
a view towards summarising the in five countries on three continents.
characteristics of the portfolio, providing Within six weeks, a team of 14 SRK
an independent assessment of their geologists had reviewed over 60 active
realisable value and commenting on the exploration projects in 14 countries to
capabilities of the exploration team. assess their merit, rank the portfolio
on the basis of qualitative metrics –
essentially the perceived potential
J e a n - Fr a n Ç o i s of yielding a positive discovery – and
Couture provide a “fair market value” opinion,
based on a market approach and
comparative transaction analysis.
D r. Jean-François
Couture, P. Geo, is a Although subjective, the ranking
Surface Miner in continuous mode
Principal Geologist proposed by SRK based on a very limited
based in Toronto review, aimed at providing a first-order
and Director of SRK independent overview of the portfolio, to PT Indo Rak Resources (RAK),
North America. guide Xstrata in realising the value of the a subsidiary of Middle East Coal
He is a Qualified exploration assets as part of integrating and a joint owner of the Marwa
Person within the Falconbridge into Xstrata. Critical to Wahau deposit along with PT TOP,
definition of several this assignment was SRK’s capacity to commissioned SRK to undertake a
international mobilise quickly a credible review team feasibility study of the property. The
regulatory requirements (National and deliver a timely technical review. thermal coal greenfield project, sitting
Instrument 43-101, JORC). His over a large resource, is poised to be
Jean-François Couture:
expertise lies in geological and one of the biggest open-cast projects
jfcouture@srk.com
structural modelling, ore deposit in Kalimantan.
modelling, digital data integration,
exploration project review, due It is located in the District of Marwa
diligence and resource evaluation. Wahau, Kutai Timur, East Kalimantan,
He has authored and co-authored Indonesia. Of the two blocks,
independent technical reports for North and South, the North block is
precious and base metals, uranium thoroughly explored. The workable S2
exploration and mining projects in seam has a reported JORC resource
Canada, Argentina, Burkina Faso, of around 500Mt; the coal is known to
Chile, China, Finland, Guyana, Ghana, extend into the South Block.
Kazakhstan, Mexico, Niger, Sweden, Beginning in 2008, SRK assisted
South Africa and the United States. RAK in evaluating the deposit with an
Jean-François Couture: jfcouture@srk.com independent audit of its exploration data
and reported resources. Following that
study, SRK joined SMGC, a geological
consultant from Jakarta, in advising RAK.

In March 2009, SRK started a scoping


study of the North block using the
14 SRK geologists reviewed over 60 active exploration projects in 14 countries geological models and resources

16
Marwa Wahau coal project–
preliminary feasibility study
marajul haque

M arajul Haque is
a Mining Engineer,
specialising in mine
planning, equipment
selection, optimising
production
sequencing and
economic modelling.
He has worked with
international mining
equipment manufacturers, planning
and implementing coal mining projects.
Marajul recently developed an application
based on MS-Excel that helps determine
equipment requirements, mining fleet
composition and size, and cost estimates.
He is presently involved with a coal project
in South Kalimantan, Indonesia, while he
completes his MBA degree in finance.
prepared by SMGC. The study used This method is most apt for areas
comparative methods of scope with flat terrain and low dipping coal Marajul Haque: mhaque@srk.co.in
definition and cost estimating. seams with long strike length. It
facilitates early backfilling, reduces the
The current 2009 report estimates the need for external dumps, improves kousik bose
total geological resource to be 937Mt environmental outcomes and promotes
within the North block. Only measured progressive rehabilitation.
and indicated resource categories were Kousik is a Mining
applied to estimate potentially mineable The mine is planned for 21Mt per annum Engineer working
coal, forming the basis of mine planning with a project life of 19 years. The in open-cast coal
and economic evaluation. An early quantity of open-pit mineable coal from mines, with mining
interpretation of slope stability and a the North block is estimated at 388Mt companies and
basic understanding of groundwater at a life-of-mine stripping ratio of 1.42:1. mining consulting
conditions was completed by others. No inferred category resources were firms. With projects
included in the calculation. SRK evaluated in mine operations,
The pre-feasibility study defines different mining technologies and planning, and
an open-cut strip mining operation selected the preferred option. SRK has consulting, he uses
utilising conventional truck and also planned for the mine and support software, such as Whittle Optimisers,
shovel equipment for overburden infrastructure for the target capacity. extensively. His special interest is in
removal, Continuous Surface Miner
mine modelling, optimisation studies and
for coal mining and waste backfilling Based on this work, SRK recommended
design. Kousik started with SRK’s UK
to maximise in-pit dumping thereby that the project proceed to a definitive
office in Cardiff, with coal his specialty.
ensuring minimal environmental feasibility study.
He is presently working on the
disturbance. The method divides the
Marajul Haque: mhaque@srk.co.in feasibility study for a major coal project
coal block into longitudinal strips of
Arunabha Duari: aduari@srk.co.in in South Kalimantan, Indonesia.
similar width from one end of the block
Kousik Bose: kbose@srk.co.in
to the other. Once coal is removed from Kousik Bose: kbose@srk.co.in
Barendra Nath Paul: bpaul@srk.co.in
one strip, it is backfilled with the waste
rock generated from the next strip.

17
d av id patti ns on

Dr David Talvivaara
Pattinson, Principal
Metallurgical
Engineer, joined
SRK in 2005 and
specialises in
metallurgy and
mineral processing
aspects of
technical studies,
due diligence and project execution.
David has over 28 years of experience
in the non-ferrous mining industry.
During his career he has been
involved in plant design, construction
and commissioning with an
international engineering company
and has experience in consultancy for
reimbursable, EPCM and lump-sum
contract work. David is SRK’s Project
Manager for the Talvivaara project.

David Pattinson: dpattinson@srk.co.uk

T alvivaara is a Greenfield mine hydrometallurgical pilot plant. The


J am e s G i lbe rt son development, located in eastern project follows Equator Principles and
Finland. It is the first application of received its Environmental Permit in
James Gilbertson the bio-heap leaching process for 2008. At present throughput is being
is a Senior the economic exploitation of low- ramped up and full scale production
Exploration grade, nickel-zinc sulphide ore bodies. should be achieved during 2010.
Geologist with Although not yet in full production,
There are a number of interesting
SRK Exploration Talvivaara already stands out for using
aspects of the Talvivaara project due
Services. He has 10 new, innovative technology and for
to the application of bio-heap leaching.
year’s experience the speed at which the project has
Non selective bulk open pit mining
in the mining been implemented.
will be used to develop the two ore
and exploration Pekka Pera, the CEO of Talvivaara bodies and ore blending will not be
industry, including Mining Company Plc, initiated the required. In pilot testing, relatively
three as a Resource Geologist with project after acquiring the mining high metal extractions were achieved
SRK (UK). James conducts exploration rights and historical research from by crushing the ore to only minus
logistics, planning and reviews, Outokumpu in 2004. A handpicked 8mm. The crushed ore is stacked 8 to
resource estimates and audits, and team of specialists completed a 10 metres high on large HDPE-lined
QA/QC management. He reviewed Pre-Feasibility Study in 2005 and leach pads, and bacterial leaching
the geology and resource estimation a Bankable Feasibility Study in takes place in two stages over four
for the Talvivaara project and helped December 2006. A 17,000 tonne bio- years. The bacteria used were found
compile JORC-compliant Mineral heap leach was built in mid-2005 to naturally within the surrounding
Resource and Ore Reserve statements. demonstrate that the leaching process environment and the temperature
James Gilbertson: could operate effectively during the within the heap can reach 80°C.
jgilbertson@srkexploration.com cold Finnish winters at temperatures Metals precipitated from the pregnant
below -20°C. Metals were recovered solution include NiCoS, ZnS and CuS.
as precipitated sulphides in a

18
SRK involvement
SRK has been involved with SRK’s role as Independent Engineer
the Talvivaara project since 2006. will gradually change to operational
SRK was appointed by Talvivaara monitoring and it is likely that this
to prepare a Mineral Experts will continue until the end of 2010.
Report for listing on the London
Stock Exchange, and subsequently
by Standard Bank Plc to prepare
a Technical Audit Report for S a b i n e a nd e rs o n
debt finance. Additionally SRK
has prepared a revised JORC
compliant resource estimate and
Sabine, Senior
Mining Engineer,
has provided assistance during
joined SRK in 2005,
additional financing. For project
performing technical
implementation, SRK was appointed
assessment of
to undertake the role of Independent
exploration and
Engineer on behalf of the banks and
mining projects,
report quarterly on all aspects of the
in support of
development.
acquisitions, debt
and equity finance.
Her experience includes project
evaluation and valuation, economic
analysis, multi-disciplinary due
diligence, project managing numerous
commissions, and preparing scoping
Talvivaara site
and pre-feasibility studies. Sabine
is responsible for SRK’s Financial
The development includes all on-site Evaluation of the Talvivaara project.
reagent systems and infrastructure,
Sabine Anderson: sanderson@srk.co.uk
including a fresh water supply
system, a new power line, a rail spur
and large lined waste storage ponds.
It is recognised that the Talvivaara
operation may well have set the
standard for a new generation of low
grade open pit mining operations.

The mine should produce 15 million


tonnes of ore a year, over a 22-year
mine life. Annual metal production
is estimated at 33,000 tonnes Ni,
61,000 tonnes Zn, 10,000 tonnes
Cu and 1,300 tonnes Co. To date,
approximately €700 million has been
invested in the project.

David Pattinson: dpattinson@srk.co.uk

Sabine Anderson: sanderson@srk.co.uk


Stacker – bio heap leach
James Gilbertson:
jgilbertson@srkexploration.com

19
Capstone Mining Corp’s Minto Mine

SRK began its relationship with and, with funding in place, Minto was
Minto Exploration Ltd. (a 100%-owned constructed and commissioned within a
subsidiary of Capstone Mining Corp.) in very aggressive timeline and budget.
2006, when it conducted a due diligence
Upon startup, SRK assisted the mine with
review of the Minto copper-gold-silver
operational support and has continued
mine project for a major bank. At that
to provide on-going technical assistance
time, the company had just completed
ever since. SRK performs geochemistry,
a feasibility study and was fast-tracking
rock mechanics, hydrogeology and
construction at the mine. SRK’s
resource/reserve estimation for the
favorable review assisted the bank in
operation and has provided mine
making a decision to invest in the project
planning services on an as-needed basis.
Exploration success at Minto has led to
SRK’s involvement in estimating new
G o rdo n D oe rks en mineral resources and reserves and
providing 43-101 compliant technical
reports and preliminary feasibility studies
G ordon Doerksen, for new resource areas.
P.Eng., PE, is a
Principal Consultant, Minto’s aggressive “can-do” attitude
Mining, in SRK’s has led to significant improvements in
Vancouver office. copper production since start-up, and
His technical more opportunities are still available. SRK
strengths are is currently reviewing the underground
built on 20 years’ mining potential of the deeper and high-
Contamination from illegal discharges
experience at grade zones, where extraction using open
operating mines pits is not economical.
in production, management and As the Yukon’s only copper mine D uring 2009, SRK took on several
engineering roles. He has worked with continues to expand and evolve, SRK compliance audits for project funders.
coal, trona, aggregates, gold, copper is fully committed to provide technical Through this work, SRK witnessed
and poly-metallic, in both underground and operational support to help mine mines move from merely aiming for
and open-pit mines. Gordon’s expertise personnel make informed decisions and compliance with in-country environmental
is in mine design, scheduling, equipment continue to exceed expectations. legislation to adopting good practice as
selection, costing, project management outlined in the Equator Principles and
and practical solutions to operational Gordon Doerksen: gdoersken@srk.com other guidelines. Mining companies
problems. He manages due diligence and financial organisations are working
audits, technical reports, economic to achieve international best practices.
assessments, and feasibility studies. Several projects have focussed on
refurbishing mining and processing
Gordon Doerksen: gdoerksen@srk.com
activities in Zambia and the DRC,
where new players address complex
environmental and social legacy issues.

Financial and legislative drivers are


advocating environmental and social
management over the life of an
operation. However, while many mines
are simultaneously in the development,
operations and closure stages, attention
is largely focussed on new development
projects. Attention to legislative
compliance is imperative, but the
development stage cannot be considered
in isolation from other stages. The
Minto main pit operations
ramifications of this neglect include:

20
briony liber

B riony Liber is a
Senior Environmental
Taking a holistic view in mining Scientist in SRK’s

reviews and audits Johannesburg office.


Briony has over 11
years’ experience
in environmental
impact assessment,
public involvement,
environmental management and
implementation of management plans.
In the last year, Briony has developed
knowledge of the Equator Principles
and IFC guidelines, having worked on
an ESIA for a mine in the Democratic
Republic of Congo and on several
environmental auditing projects at
Zambian and South African mines.

Briony Liber: bliber@srk.co.za

H e nr i e t ta S a lt e r
Successful rehabilitation of a tailings dam
D r. Henrietta
Salter is a Principal
• Limited attention to existing liabilities. community relations and difficulty in Scientist in SRK’s
By focussing resources only on new obtaining funding Johannesburg office.
developments, existing liabilities • Turnover of difficult assets. As assets She has over 17
often increase and opportunities for become less financially viable to one years’ experience
progressive rehabilitation and clean up company, others may see an opportunity in environmental
are missed, even though they would to invest. Affected communities can be impact assessment,
reduce the final costs at closure. exposed to several mining companies water and waste
Particularly for refurbishment projects, over a few years that should manage the management and environmental
neglect or poor practice can significantly assets, but the turnover often results in auditing and due diligences. She
degrade the environment delayed or incomplete implementation of managed the preparation of an
• Management systems focus on commitments. Unrealistic commitments Equator Principles-compliant ESIA/
new developments. When existing made in the past can result in strained ESMP for a project in the Democratic
operations at a site are not included, community relationships and a difficult Republic of Congo, as well as auditing
serious pollution incidents can result in operational environment compliance with the Principles and
significant non-compliance, jeopardising due diligence work on copper, coal,
In many of these reviews, SRK has the
project funding and licence to operate zinc, gold, platinum group metals and
opportunity to consider the operations
uranium mines.
• Social uncertainties around possible in their entirety. SRK concludes that
closure. In one case several operations operations simultaneously meet Henrietta Salter: hsalter@srk.co.za
were geographically dispersed and at legislative requirements in some areas
different stages in the life of mine. With of the operations yet are non-compliant
the focus on new development, limited in other areas. The former areas of
closure planning was evident at the compliance tend to correspond with new
site of the possible closure resulting developments. Briony Liber: bliber@srk.co.za
in socio-economic uncertainty which Dr Henrietta Salter: hsalter@srk.co.za
The holistic review allows SRK to assist
manifested in community threats, James Lake: jlake@srk.co.za
clients in identifying areas that need
action, and dissatisfaction. Lack of
attention, to bring the full spectrum
attention to these issues can damage
of the operations to compliance level,
reputations and perpetuate poor
minimising or avoiding risks.

21
jAY P e nn i n g t o n
Growing up with a gold mine – SRK’s
multi-level project support at Hycroft
J ay Pennington
is a Certified
Professional
Geologist and
Principal Mining
Geologist in SRK’s
Elko, Nevada office.
He is a Qualified
Person for NI43-101
reporting under CIM
regulatory guidelines. He has over 24
years of international experience in
precious and base metals exploration,
resource geology, mine feasibility
and due diligence. His expertise is
interpreting mineralising systems,
integrating digital data and resource
evaluation. With 12 years’ industry
experience in Australia and Southeast
Asia, he was Chief Geologist at the Cutaway view of modelled gold mineralisation through the Cut 4 Pit at Hycroft
Grasberg Deposit in Indonesia. Jay’s
recent consulting work consists of
domestic and international mine Allied Nevada Gold Corp. was formed oxide and sulfide ores. Following a
development and due diligence for in 2006 after purchasing a portfolio of favorable outcome, they approached
mine financing. over 100 precious metal prospects in SRK to prepare permitting documents
Nevada (NV). Their flagship property, and engineering designs to expand the
Jay Pennington: jpennington@srk.com Hycroft, located 60 miles west of historic leach pad. In less than 18 months
Winnemucca, NV, was reactivated after the company was mining and leaching
a 10-year dormancy period to establish oxide ore and pouring gold offsite. The
cash flow to fund on-site exploration and company, however, had set its sights on
to develop advanced projects in other a much larger sulfide resource beneath
parts of the State. Since 2006, as the the mined-out oxide pits.
price of gold has risen from US$700 to
During the production ramp-up period,
US$1,100 per ounce, interest in historic
SRK teamed with Allied and independent
Nevada mines has been rekindled and
specialists to build the geologic base
some sites are coming back on line with
from which a 2.0Moz gold equivalent
new development strategies. Though
mineral resource was generated. Initial
the Carlin Trend is Nevada’s “headliner”
work included digitising and verifying
mining district, the state’s “supporting
data from nearly 4,000 historic drill
cast” of gold producers over the last
holes. SRK then took responsibility for
two decades have been shallow, open-
storing and managing the drill database.
pit oxide operations receptive to bulk
Geologic support involved probabilistic
mining and low-cost heap leaching.
modelling of lithology, alteration and
The underlying sulfide zones of these
merging interpretations of logged oxide
deposits that are not heap-leachable have
and cyanide soluble gold to produce a
been largely ignored and often undrilled.
“leachable ore” horizon. The scale of the
In 2007, Allied, who subcontracts most property would have made the cost/time
of their technical work, selected SRK investment prohibitive, for this type of
for due diligence of a Hycroft restart modelling, using a conventional sectional
that would involve production of both approach. Next, the team produced a

22
Mountain Winnemucca
Site visit could be critical for
identifying the potential fatal flaws
View Getchell Independence
Hycroft Trend Group
Wildcat Elko

Maverick
Reno

T
Carlin Springs
Trend he picturesque Serra da Canastra Although the stream running through
Kimberlite Province in southwest Minas the kimberlite at the bottom of the
Hasbrouck/
Battle Gerais is one of several diamondiferous steep valley was identified as a
Mtn/Eureka
Three Hills
Trend locations in Brazil. The kimberlite bodies potential problem during the desktop
are mostly buried along the extensive study, only the site visit revealed the
Producing
N E VA D A valley floors and beneath scree magnitude of the problem. In the early
Advanced
Exploration deposits. The region has produced morning hours, fifty minutes of hard
Exploration
Gold Trends approximately 2 million carats of tropical rain produced a flash flood
Las Vegas
diamonds since the mid-1930s. that converted a peaceful crystal-clear
stream into a raging current with flows
SRK and Mineral Services jointly estimated at 20-50m3 per second.
completed a technical audit of the
Canastra 1 kimberlite pipe. A small This event would certainly materially
team of diamond mining specialists affect the mining approach and the
flew in to value the Canastra project in capital to be spent upfront to manage
preparation for a possible bid. surface water. Without the site visit,
this flaw could not have been identified
With both time and cost constraints
from the data provided.
for this assessment, it was critical to
concentrate on “big picture” issues Jarek Jakubec: jjakubec@srk.com
material to the outcome.

Auditing diamond properties is one


of the most challenging due diligence Jarek Jakubec
assignments, because the resource
cannot be re-sampled or the grade/value J arek Jakubec,
comprehensive structural framework verified within the audit time frame. C. Eng has over 25
to serve as domain boundaries for the However, identifying other issues and years of operating
ensuing round of resource estimation. potential fatal flaws could provide critical and consulting
In parallel, Allied/SRK prepared an information for the project acquisition. experience in
intensive infill-drilling program that, mining, geology and
The Canastra 1 pipe is located near
once completed, added 6.1Moz gold rock mechanics,
the beautiful Casca d’Anta waterfall,
equivalent to the company’s resource including technical
on the steep valley floor, where
base, upgraded many of these resources and managerial
regional rainfall is estimated between
to reserves, and more than doubled positions in operating mines in Canada,
1,300 – 1,700mm per year.
Allied’s share price. Geologic modelling Botswana and the Czech Republic. As
is currently being refined, and as new an SRK Engineer based in Vancouver,
drilling data arrives, SRK is shifting from Jarek has worked on 70 projects on
probabilistic to deterministic modelling all continents, completing technical or
using an extensive 3D toolkit. operational audits, and due diligence
studies, publishing technical papers
SRK has leveraged the relationship at
and speaking at conferences. Jarek is a
Hycroft to support Allied in promoting
Qualified Person for 43-101 reporting.
its other properties. SRK’s capability for
rapid assessment and 3D manipulation Jarek Jakubec: jjakubec@srk.com
of exploration data has allowed it to
host project demonstrations, gaining
valuable exposure to prospective new
clients and showcasing SRK software
and talent, while advancing Allied’s
marketing objectives.

Jay Pennington: jpennington@srk.com

General view of Serra da Canastra kimberlite

23
Evaluating CIS projects

d av id p ea r ce

David is the
Managing Director When evaluating projects in Russia, than comparable international projects
of SRK Russia Kazakhstan and other CIS countries, a key at the time, with data spacing guided by
and is based in challenge is that their data and technical the assessment of deposit complexity.
Moscow. He has studies have been developed following Where the assessment was appropriate,
over 20 years’ resource reporting guidelines that differ the data spacing often matched
experience, 11 of from the standards many international that required to meet geostatistical
which were on mine investors or consultants use. SRK has been requirements. Also, while the drill core
sites. With SRK he involved in CIS projects for many years and is often no longer available, the drillhole
has led several large has developed approaches to help clients “passports” are stored in either corporate
multi-disciplinary audits for financing evaluate and optimise projects. or state archives
and stock exchange listings including SRK has made these key observations: • Resource estimates are typically derived
the listing of ENRC (2007) and Vedanta using standardised polygonal methods,
(2003) on the London Stock Exchange. • While the quality assurance and control which generally produce comparable
systems often did not involve duplicates global results to more sophisticated
David Pearce: dpearce@srk.ru.com or standards, independent laboratory methods but which can in some cases
checks involving 5-10% of all samples produce less reliable local estimates
provide sufficient insight into the
• There are often multiple technical
accuracy of the samples. However, a
studies available, though data required
key challenge can come when the core
internationally (e.g. the Bond Work Index)
recovery is poor, due to the extensive
may not be available. It is important
use of single-tube core barrels
to understand what studies exist to
• Often, far more geological data, including help plan future work and to explain
underground exploration, is available differences if new studies give different
with CIS projects than with international results.
projects, providing a greater appreciation
• As the technical studies are rarely based
of the geology
on computerised models, the effort
• Soviet exploration programs were involved in updating life-of-mine plans or
typically better controlled and guided evaluating alternative cut-off grades can
result in mines operating sub-optimally
24
Sino Gold

In 2006, Sino Gold Limited commissioned The SRK report was tailored to meet the
SRK to provide an Independent Expert Listing Rule requirements of HKEx and was
Report on the mines and exploration assets included by Sino Gold in their prospectus.
of the company, with the report intended The listing was successful and Sino Gold
to be submitted to the Stock Exchange became the first mining company jointly
of Hong Kong Limited (HKEx). Sino Gold listed in Australia and Hong Kong. The
was already listed on the Australian Stock White Mountain mine was successfully
Exchange but wanted to have a dual listing commissioned in late 2008.
in Hong Kong. The SRK team inspected
Peter Smith is an Environmental
and reported on the Jinfeng gold mine and
Scientist who previously worked for
exploration tenements in China, which
Sino Gold and SRK China was happy
were owned by the company or were in
to attract Peter to work for SRK in our
Joint Venture (JV) with Chinese partners.
Beijing office. Two SRK staff joined Sino
The Jinfeng gold mine is located in Gold in their Sydney office and were
Guizhou Province, as shown in the map part of the exciting period of exploration
below. Jinfeng had a reserve grade and operation of both Jinfeng and
averaging 5.4g/t gold and was to be mined White Mountain. In 2009, Eldorado Gold
by both open-pit and underground mining of Canada completed a merger and
methods. The metallurgy of the Jinfeng took over management of Sino Gold
ore was not straightforward, requiring to create a company with almost 19
processing by the bio-oxidation method to million ounces of gold in measured and
achieve good recovery of gold. indicated resources.

The exploration assets included the Mike Warren: mwarren@srk.com.au


Reviewing drill core at a Russian project White Mountain project in Jilin Province,
three JVs in Shandong Province and four
JVs in the “Golden Triangle,” which is
SRK’s approach aims to:
located in the border area of Guizhou
• Use existing data as much as possible and Guangxi Provinces.
• Advise and supervise verification drilling
to check historic data and infill studies CHINA
to collect missing data Jinfeng
• Computerise the data to evaluate SICHUAN
alternatives quickly PROVINCE

• Develop international style scoping,


prefeasibility and feasibility studies in HUNAN
conjunction with Russian studies YUNNAN PROVINCE

• Benchmark the projects against PROVINCE


GUIZHOU
comparable international projects PROVINCE
• Help the client implement the
changes needed to realise the planned Guiyang
performance targets
• Help CIS clients raise international debt Anshun

and equity finance through advising on


0 N 200Km
how the studies can meet the levels of Zhenfeng
confidence and accuracy required Kunming Jinfeng
Railway
By combining SRK’s local knowledge with Ceheng Township, Highway
international experience, SRK has been
GUANGXI
able to help clients optimise projects and PROVINCE
Luizhou
Location map for Jinfeng gold mine
meet local regulatory requirements in the
most efficient way.

David Pearce: dpearce@srk.ru.com

25
Geology beyond the resource

A fundamental part of SRK’s approach risks are often associated with other
to project evaluation is the recognition aspects, such as geo-metallurgy and
that many of the risk areas associated environmental impact. In these specific
with mining projects are driven by lack examples, key assumptions are dependent
of understanding of the geology of the on mineralogy and the representivity of
deposit in question. Typically, there is sampling campaigns, which are often
significant focus on the impact of geology limited in scope and breadth. Assessing
on the resource. This is justifiable, since the geological representivity of the data,
the resource is the key asset of a mining which underpin downstream assumptions
project and a long list of project failures for other disciplines, is therefore a key
can be attributed to poor resource part of the geologist’s role in any project
estimates. However, from a number evaluation.
of project reviews over recent years,
Recognising these factors, the geologist
it is apparent that the key geological
has a responsibility to communicate with
other team members, especially those
with an engineering rather than geological
R i c h a rd C l a y t o n background, to assess the key geological
assumptions impacting these other
disciplines. The geologist can then assess
Richard Clayton is a the level of geological understanding
Resource Geologist supporting these assumptions and help
whose primary identify any risk areas and/or opportunities
expertise is in the for improvement.
production and
critical evaluation In summary, the geologist must look
of mineral resource beyond the resource and assess the
impact of geology on the project as a
estimates and
management of whole. Recognising this fact is a key A nvil Mining Limited, a public company
strength for SRK’s holistic approach listed on the Toronto and Australian
multi-disciplinary,
to project evaluation and assessing Stock Exchanges, is engaged in
due-diligence projects. He is a
geological risk in particular. exploring and developing base metals
member of SRK Australia’s project
mineral properties in Southern Africa.
evaluation team based in Sydney,
Richard Clayton: rclayton@srk.com.au Anvil’s principal development asset, the
and his experience covers a broad
Kinsevere Copper Project, is located in
range of commodities and geographic
the Democratic Republic of Congo and
locations.  Richard’s involvement with
is managed via its 95% interest in a
multi-disciplinary teams provides
local joint venture. Relying on input from
the background and experience to
various technical teams located on three
assess the impact of geology on other
continents, the company completed
disciplines –metallurgy, mining and
a Feasibility Study in 2007. Additional
environment, in particular.
exploration drilling and technical updates
Richard Clayton: rclayton@srk.com.au led to a further update following which,
the company sought access to the debt
capital markets to fund construction and
commissioning of an SX-EW plant with
rated capacity of 60ktpa of LME grade A
quality electrolytic copper cathode.

In 2008, as the independent engineer,


SRK completed a full technical due
diligence of the project and authored an
Independent Engineer’s Report (IER).

Copper oxide mineralisation – Peru

26
Kinsevere Copper Project: due diligence in the DRC

Kinsevere Mine (Anvil) in Haut-Katanga Province, Democratic Republic of Congo

Since local knowledge and specialist In 2009, SRK again worked with Iestyn Humphreys:
input for review of milling-in-raffinate Anvil, maintaining the original team of ihumphreys@srk.co.uk
technology was key, SRK established consultants. Following the development
a multi-disciplinary team from its of updated mining plans and construction/
European and Southern African practices commissioning schedules, Anvil
supplemented by expert associate announced that it had reached an
metallurgists. The process did not agreement for US$200m of debt and
identify any fatal flaws but presented equity financing with Trafigura Beheer
specific recommendations, which were B.V., the second largest independent
incorporated in a detailed action plan. commodity trader in the global non-
ferrous market. The updated IER was
During the second half of 2008, as turmoil
made available to all parties.
mounted in the financial markets and
copper prices declined, the company Following recent (December 2009)
was unable to secure funding and in shareholder approvals, syndication of
November 2008 all construction activities the Trafigura project finance remains a
were placed on hold. At this stage the possibility. The intellectual capital vested
plant construction was 35% complete in the process to date is significant, and
with detailed engineering 77% complete. the updated action plans and the IER
In the ensuing six months, sustaining remain the principal independent technical
dry conditions in the open-pits while due diligence reference documents. The
completing technical optimisation studies ability to retain a core team of consultants
and the detailed action plan were critical with local and specific experience,
to maintain the momentum and identify through a global network of practices, to
alternative sources of funding should support access to the international debt
market conditions change. capital markets is crucial.

27
Every type of mining project in all environments everywhere in the world.

To learn more about SRK and how we might help you with your next
mining challenge, please visit:

www.srk.com

Printed in Canada on:

28

You might also like