Professional Documents
Culture Documents
Page 1 / 7
CONTENTS
1.0 INTRODUCTION..........................................................3
2.0 DEFINITION AND ABBREVIATION.................................3
3.0 THE REFERENCE STANDARD........................................3
4.0 MODEL SETUP............................................................4
5.0 CALCULATION PROCESS..............................................6
5.1 CALCULATION FOR THE PRESSURE LOAD:........................................6
5.2 CALCULATION FOR MEMBER BARS BEARING CAPACITY AND STABILITY.....6
5.3 BEARING CAPACITY OF CONCRETE SLAB:.........................................7
Page 2 / 7
1.0
Introduction
Based on Item 1.1.3.5 testing Appendix A of the contract, following is the specific calculation for
initial water pressure testing.
2.0
3.0
Page 3 / 7
4.0
Model Setup
As per our site arrangement, on both sides of pipe testing section the supporting system consist
of several components including blank flange, anchor bolts, 80 nos. lifting jacks,5 nos. 1.8*1.8m
steel plate and concrete slab 2.4*2.2*0.1m against to undisturbed soil.
Please refer to following Model and photos.
Model:
AURVALVE
STEEL PLATE
1.8m*1.8m
WATER SUPPLY
FROM WATER PUMP
PIPE SECTION
VENT PIPE
FILLING PIPE
PRESSURE GAUGE
PIPE FOR PRESSURE GAUGE
CONCRETE SLAB
2.4M*2.2m
LIFTING JACK
MEMBER BAR
UNDISTURBED SOIL
PIPE FLANGE
Photos:
Page 4 / 7
Page 5 / 7
5.0
5.1
Calculation Process
Calculation for the pressure load:
Basic parameter:
p (test pressure)=16.5bar
5.2
5.3
Page 7 / 7