Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Earthworks
282.0
283
283.1
PM
Slipping / tripping
Lack of concentration
MI
Non-compliance to
procedure
Inadequate risk
assessment
PE
III
PE
III
PE
III
Thorns / broken
branches
284.1
PM
Contact with
Inadequate PPE
MI
Lack of concentration
Inadequate risk
assessment
285.0
Manual handling
285.1
PM
Musculoskeletal
disorders
Lack of training /
experience
Incorrect lifting
techniques
Inadequate supervision
SI
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
(PDPMAN-ST-001)
Medical surveillance (32-282)
Eskom Personal Protective Equipment (240-44175132)
SANS 1200 ALL PARTS
Project specific drawings
286.0
Insects
286.1
PM
Habitat invasion
Inadequate inspection /
supervision
F
SI
MI
PE
II
PE
II
PE
III
PE
III
Inadequate PPE
Lack of concentration /
communication
Inadequate risk
assessment
Wild/stray animals
287.1
PM
Attacks
Inadequate training /
experience
F
SI
MI
Inadequate risk
assessment
Non-compliance to
procedures
288.0
Uneven surfaces /
terrain/ terrain
288.1
PM
Lack of concentration
MI
Inadequate supervision
289.0
Stripping of soil
Motorised equipment
289.1
Operator
All persons present
PM
Contact with
Poor planning
Lack of concentration
Non-compliance to
procedures
SI
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Dust
300.1
Operator
All persons present
PM
Inhalation
Inadequate PPE
MI
Inadequate dust
suppression
Inadequate training /
experience
PE
III
PE
III
PE
III
PE
II
Noise
301.1
Operator
PM
Exposure to noise
levels above 85dB
Lack of signage
MI
Damage to hearing
Inadequate hygiene
surveys
Nuisance to local
residents
Inadequate training /
experience
Inadequate inspection /
maintenance
302.0
302.1
Al persons in work
area
PM
Lack of concentration
MI
Non-compliance to
procedure
Inadequate risk
assessment
Lack of communication
Cut to fill/spoil
Motorised equipment
303.1
Operator
All persons present
PM
Contact with
Poor planning
Lack of attention
F
SI
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
Non-compliance to
procedures
H & S / Fin
Cons
Likelihood
Risk rating
RCE
304.0
Dust
304.1
Operator
All persons present
PM
Inhalation
Inadequate PPE
SI
Inadequate dust
suppression
PE
III
PE
III
PE
III
PE
III
Inadequate training /
experience
Noise
305.1
Operator
All persons present
PM
Exposure to noise
levels above 85dB
Lack of signage
MI
Inadequate hygiene
surveys
Inadequate training /
experience
Inadequate inspection /
maintenance
306.0
306.1
PM
Lack of concentration
MI
Non-compliance to
procedure
Inadequate risk
assessment
Lack of communication
Dust
307.1
Geologist and
anyone present
PM
Dust inhalation
Inadequate PPE
Inadequate dust
suppression
Inadequate training /
experience
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Hand tools
308.1
Geologist and
anyone present
PM
Caught between
Lack of concentration
MI
Non-compliance to
procedures
PE
III
PE
III
PE
II
PE
II
PE
III
309.0
Spoil move to
stockpile area/
shaping, levelling and
spreading
Dust
309.1
PM
Dust inhalation
MI
Inadequate dust
suppression
Inadequate training /
experience
Insufficient medical
monitoring
310.1
PM
Contact with
Inadequate training /
experience
F
SI
MI
Lack of attention
SANS 1200 ALL PARTS
Non-compliance to
procedures
311
Stockpile
311.1
PM
Entrapment
F
SI
MI
Inadequate signage /
barricading
312.0
Hazardous chemical
substances
312.1
PM
Inadequate
communication of risks
Unsuitable
transportation
Hazardous substances
not stored in suitable
containers
SI
MI
Inadequate safety
signage i.e.
Safety signs depicting
No smoking, No
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
313.0
Soil density
verification
313.1
Operators
PM
Exposure to radiation
Non-compliance to
procedures
SI
MI
Co workers
Inadequate training /
experience
Public
PE
III
PE
II
PE
III
PE
III
Inadequate signage /
barricading
Inadequate PPE
Roads (Access roads, Terrace maintenance roads and Terrace ring roads)
314.0
Access road
construction
Road transport,
construction vehicles
314.1
Work force
Public
PM
Members of public or
workmen being
endangered by
machine operation
Inadequate traffic
management systems
F
SI
MI
315.0
315.1
Public
PM
Members of public
being endangered by
open manholes and
trenches
SI
MI
316.0
Noise
316.1
Workforce Public
Everyone in close
proximity of work
area
PM
Exposure to noise
levels above 85dB
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Underground services
317.1
Everyone in close
proximity of work
area
PM
Electrocution
Inadequate assessment
of existing services
F
SI
MI
PE
III
PE
II
PE
III
PE
III
PE
III
318.0
Roadbed preparation
Earthmoving equipment
318.1
Operators
Civil team
PM
Machine overturning
Materials or
equipment falling
from machine
Lack of concentration
Non-compliance to
procedures
F
SI
MI
Inadequate supervision
319.0
Manual operations
creating dust
319.1
Civil team
PM
MI
320.0
320.1
Civil team
PM
Contact with
Bituminous surface
treatment
321.1
Civil team
MI
Lack of concentration
PM
Contact with
Inadequate PPE
Inadequate training /
experience
SI
MI
Non-compliance to
procedures
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Affected persons
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
Inadequate supervision
321.2
Civil team
PM
Smoke Inhalation
Inadequate PPE
H & S / Fin
Cons
Likelihood
Risk rating
RCE
PE
III
PE
III
PE
III
PE
III
Inadequate training /
experience
Poor ventilation
Road marking
Paint
322.1
Civil team
PM
Inhalation of paint
fumes / vapours
Non-compliance to
procedures
MI
Poor ventilation
Medical surveillance (32-282)
PPE not worn
SANS 1200 ALL PARTS
Project specific drawings
322.2
Civil team
PM
Skin contact
Non-compliance to
procedures
MI
324.0
Terrace maintenance
and ring concrete
roads
Compacting in-situ
material
Hand tools
324.1
Civil Team
PM
Contact with
Lack of concentration
MI
Non-compliance to
procedures
Inadequate supervision
Inadequate inspection
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
Civil Team
PM
Musculoskeletal
disorders
Lack of concentration
MI
Compactors
325.1
Civil Team
PM
Body vibration
Likelihood
Risk rating
RCE
PE
III
PE
III
PE
III
PE
III
PE
II
Non-compliance to
procedures
325.0
H & S / Fin
Cons
Inadequate supervision
Inadequate inspection
Inadequate
experience/training
Inadequate training /
experience/supervision
Inadequate PPE
Inadequate inspection/
maintenance
Non-compliance to
procedures
325.2
Civil Team
PM
Exposure to noise
above 85dB
Lack of signage
Inadequate hygiene
surveys
MI
Noise induced
hearing loss
Inadequate training /
experience
Inadequate inspection /
maintenance
326.0
Motorised equipment
e.g. Rollers
326.1
Civil Team
PM
Poor planning
MI
SI
Lack of concentration
Non-compliance to
procedures
Inadequate supervision
Project specific drawings
327.0
Access road /
offloading pad
Excavating equipment
i.e. graders
327.1
Civil team
PM
Poor planning
F
SI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
construction
Lack of attention
MI
Non-compliance to
procedures
H & S / Fin
Cons
Likelihood
Risk rating
RCE
(PDPMAN-ST-001)
Medical surveillance (32-282)
SANS 1200 ALL PARTS
Project specific drawings
327.2
Civil team
PM
Overturning
Poor planning
Lack of attention
F
SI
MI
Non-compliance to
procedures
PE
II
PE
II
PE
II
PE
III
PE
III
Inadequate training /
experience
327.3
Civil team
PM
Poor planning
PD
Lack of attention
Non-compliance to
procedures
Yard Works (Earth mat, Kerbs & Channels and Yard stoning)
328.0
Excavate trenches
Earthmoving equipment
e.g. excavators
328.1
Civil Team/
excavating Team
Operator
PM
Lack of concentration
Awkward body position
F
SI
MI
Non-compliance to
procedures
Inadequate inspection /
maintenance
329.0
Hand tools
329.1
Civil team
PM
Contact with
Inadequate training/
experience/supervision
Lack of concentration
MI
Inadequate supervision
Project specific drawings
330.0
Unidentified,
underground utilities
330.1
PM
Cutting into
underground services
(cables, water mains)
Inadequate inspection /
maintenance
PPE not worn
Lack of concentration
Non-compliance to
procedures
SI
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
331.0
332.0
PM
Dust inhalation
Lack of PPE
Non-compliance to
procedures
MI
Pulmonary
diseases
PE
III
PE
III
PE
III
PE
III
Inadequate training /
experience
333.0
Ergonomics
330.2
Civil/ Foundation
Team
PM
Musculoskeletal
disorders
Non-compliance to
procedures
Inadequate training /
experience
SI
MI
Musculoskeletal
disorders
334.0
Extreme weather
conditions
334.1
PM
Exposure to extreme
weather elements
Lack of PPE
Non-compliance to
procedures
MI
SI
Various diseases
Inadequate training /
experience
Inadequate risk
assessment
Inadequate supervision
335.0
Copper
335.1
Civil Team
PM
Contact with /
absorption
Lack of PPE
Non-compliance to
procedures
Inadequate training /
experience
Inadequate risk
assessment
MI
Heavy metal
poisoning
Skin irritation
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
Inadequate supervision
H & S / Fin
Cons
Likelihood
Risk rating
RCE
336.0
336.1
Civil Team
PM
Caught between
Lack of concentration
MI
PE
III
PE
III
PE
III
PE
III
Inadequate supervision
Inadequate inspection /
maintenance
337.0
337.1
Welder
Civil Team
PM
Eye injury
MI
Non-compliance to
procedures
Inadequate supervision
Inadequate
training/experience
338.1
Welder
PM
Contact with
Lack of concentration
MI
Skin irritation
Non-compliance to
procedures
Inadequate supervision
Inadequate
training/experience
339.0
Thermal reaction
339.1
Welder
PM
Lack of concentration
Non-compliance to
procedures
SI
MI
Inadequate supervision
SANS 1200 ALL PARTS
Inadequate
training/experience
PPE not worn
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
340.0
Welding fumes
340.1
Welder
PM
Inhalation
Lack of concentration
Non-compliance to
procedures
SI
MI
Metal fever
H & S / Fin
Cons
Likelihood
Risk rating
RCE
PE
III
PE
III
PE
II
PE
III
PE
III
Inadequate supervision
Inadequate
training/experience
341.1
Welder
PM
Fire
Lack of concentration
Non-compliance to
procedures
MI
SI
PD
Inadequate supervision
Project specific Emergency preparedness and response
plan
Inadequate
training/experience
341.2
PM
Explosion
Inadequate inspections
and maintenance
Lack of concentration
Non-compliance to
procedures
F
SI
PD
Inadequate supervision
Project specific Emergency preparedness and response
plan
Inadequate
training/experience
Inadequate inspections
and maintenance
341.3
PM
MI
Non-compliance to
procedures
Poor house-keeping
Project specific drawings
342.0
Ergonomics (Manual
handling)
342.1
Civil team
PM
Musculoskeletal
disorders
Incorrectly lifting
techniques
SI
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
Inadequate planning
H & S / Fin
Cons
Likelihood
Risk rating
RCE
2013/Rev 1)
Mandatory SHE Specification to be met by contractors
and suppliers during refurbishment and construction
(PDPMAN-ST-001)
Medical surveillance (32-282)
SANS 1200 ALL PARTS
Project specific drawings
343.0
343.1
Operator
PM
Dust inhalation
Civil team
SI
MI
Inadequate planning
Inadequate training /
experience
PE
III
PE
III
PE
III
Noise
344.1
Operator
PM
Civil team
SI
MI
Inadequate
maintenance and
inspections
Inadequate supervision
Hearing Conservation (32-425)
Mandatory SHE Specification to be met by contractors
and suppliers during refurbishment and construction
(PDPMAN-ST-001)
SANS 1200 ALL PARTS
Project specific drawings
345.0
Yard stoning
345.1
Applicators
Bystanders
PM
Inhalation
SI
MI
Inadequate ventilation
Mandatory SHE Specification to be met by contractors
and suppliers during refurbishment and construction
(PDPMAN-ST-001)
Project specific environmental management plan
SANS 1200 ALL PARTS
Project specific drawings
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
345.2
Applicators
PM
Bystanders
SI
MI
Inadequate training /
experience
H & S / Fin
Cons
Likelihood
Risk rating
RCE
PE
III
PE
III
PE
III
PE
III
Non-compliance with
procedures
Dust
346.1
PM
Dust inhalation
Non-compliance to
procedures
MI
Inadequate dust
suppression
PPE i.e. dust masks not
worn
347.0
Noise
347.1
PM
Noise above 85 dB
Lack of signage
MI
Inadequate hygiene
surveys
Inadequate training /
experience
348.0
348.1
PM
Lack of concentration
PPE not worn
Inadequate risk
assessment
SI
MI
Poor communication
Foundations (Flood Lights, Main Columns, Earth Wire Support, Busbars, Equipment Foundations)
349.0
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
350.0
351.0
Hazardous chemicals i.e. fuels, lubrication See line works (Hazardous Chemical Substances)
Excavations
Hand tools
351.1
Civil Team
PM
Contact with /
Struck by
Lack of concentration
MI
H & S / Fin
Cons
Likelihood
Risk rating
RCE
PE
III
PE
II
PE
III
PE
III
PE
III
Inadequate supervision
Inadequate inspection
352.0
Excavating equipment
e.g. TLB, excavator
352.1
Operator
Civil Team
PM
Contact with
F
SI
MI
Non-compliance to
procedures
352.2
Operator
Civil Team
PM
Equipment failure
Inadequate experience/
training
Inadequate supervision
MI
SI
Latent defects
SANS 1200 ALL PARTS
Inadequate experience/
training
353.0
Noise
353.1
Operator
Civil team
PM
Exposure above 85 dB
Inadequate supervision
Lack of signage
Inadequate hygiene
surveys
MI
SI
Noise induced
hearing loss
Inadequate training /
experience
Blinding
Chemical burns
354.1
Civil team
PM
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
355.0
Reinforcement
Protruding rebar
355.1
Civil team
PM
Lack of signage
SI
MI
Lack of
concentration
PE
III
PE
III
PE
III
PE
III
PE
III
355.2
Civil team
PM
Lack of signage
SI
MI
Lack of
concentration
Pouring of concrete
(into foundation)
Chemical burns
356.1
Civil team
PM
Inadequate training/
experience/supervision
Manual handling
operations i.e. hand
tools such as shovels
357.1
Civil team
PM
Musculoskeletal
disorders
SI
Inadequate training /
experience
Underlying medical
conditions
358.0
Vibrators
358.1
Operators
PM
Inadequate PPE
Excessive body vibration
due to teams not taking
appropriate turn to do
vibrating operations
Inadequate training /
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
experience
359.0
Noise
359.1
Operators
PM
Exposure to noise
levels above 85dB
SI
NIHL
PE
III
PE
III
PE
III
PE
III
PE
II
360.0
361.0
Shuttering
Installation of HD
bolts
PM
Contact with
Inadequate PPE
MI
Inadequate training
/experience
362.0
Clean HD bolts
362.1
Civil team/
Foundation team
PM
Lack of concentration
MI
362.2
Civil team/
Foundation team
PM
Damage of HD bolt by
steel bristles
Lack of concentration
PD
Non-compliance to
procedures
Inadequate supervision
Project specific drawings
Fire Protection (Manholes, Sumps, Piping, Oil holding dams, Transformer/reactor bay firewalls)
363.0
364.0
Restricted excavation
i.e. manholes and
sumps
Confined spaces
364.1
Civil team
PM
Collapse of excavation
Non-compliance to
procedures
Inadequate excavations
supports
F
SI
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
Structural cohesion of
soil
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Adverse weather
conditions
365.0
Elevated position
365.1
Civil team
PM
SI
MI
Inadequate barricading
Lack of communication
Inadequate signage
Lack of training /
experience
PE
III
PE
III
PE
II
PE
III
Dust
367.1
Civil team
PM
Inhalation
MI
Inadequate dust
suppression
Inadequate training /
experience
Inadequate supervision
Micro organisms
368.1
Civil team
PM
Exposure to disease
bearing ground
organisms while
excavating
Inadequate training /
experience
SI
MI
Inadequate PPE
Lack of supervision
369.0
370.0
PM
Non-compliance to
procedures
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Poor supervision
371.0
371.1
Civil team
PM
Slips, trips,
Non-compliance with
procedures
MI
PE
III
PE
III
PE
III
PE
III
PE
II
Lack of attention
Eskom Personal Protective Equipment (240-44175132)
Poor housekeeping
SANS 1200 ALL PARTS
Lack of planning
Project specific drawings
Lack of supervision
371.2
Civil team
PM
Contact with
(abrasions, cuts,
pinching)
MI
Inadequate training /
experience
Lack of supervision
SANS 1200 ALL PARTS
Awkward body position
Project specific drawings
374
Ergonomics
374.1
Civil team
PM
Musculoskeletal
disorders
SI
MI
Non-compliance with
procedures
Repetitive movement
Lack of experience
Underlying medical
conditions
Fire walls
Scaffolding
375.1
Civil team
PM
Structural failure
Lack of attention
PD
Inadequate training
/experience
Under estimation of
load
Overloading
Inadequate
maintenance /
inspection
375.2
PM
Non-compliance with
procedures
Lack of attention
Inadequate training
/experience
F
SI
MI
Inadequate
maintenance /
inspection
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Drainage
376.0
377.0
Excavation
Bedding of pipes
(Filling and bedding
material i.e. stone)
378.0
378.1
Civil team
PM
PM
Contact with
Lack of attention
PPE not worn
Poor housekeeping
Poor communication
Lack of concentration
MI
MI
Inadequate training /
experience
PE
III
PE
III
PE
III
PE
III
379.0
379.1
Civil team
PM
Lack of concentration
Poor housekeeping
MI
Inadequate signage
Medical surveillance (32-282)
380.0
Laying of concrete
pipes
Ergonomics (Manual
handling of material)
380.1
Civil team
PM
Musculoskeletal
disorders
Non-compliance to
procedures
Underlying diseases
SI
Repetitive motions
Lack of experience
Non-compliance to
procedures
Underestimation of load
weight
Inadequate training /
experience
PPE not worn
381.0
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Transformers/Reactor Plinths
382.0
383.0
PM
Lack of concentration
SI
MI
Non-compliance to
procedures
PE
III
C
Inadequate supervision
Inadequate
experience/training
Inadequate risk
assessment
385.0
Place Kerbs
385.1
Civil team
PM
Contact with
Lack of concentration
MI
Non-compliance to
procedures
PE
III
PE
III
PE
III
Ergonomics
386.1
Civil team
PM
Musculoskeletal
disorders
Lack of concentration
Si
Non-compliance to
procedures
Inadequate supervision
Inadequate
experience/training
Underestimation of load
387.0
387.1
Electricians
Assistants
PM
Contact with
Lack of concentration
Non-compliance to
procedures
MI
Inadequate supervision
SANS 1200 ALL PARTS
Inadequate
experience/training
Inadequate risk
assessment
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Installation of
steel structure
Uneven surfaces /
terrain
(Applicable to all
substation work)
388.1
PM
Lack of concentration
MI
Horse play
Inadequate Risk
assessment
PE
II
PE
II
PE
II
PE
III
PE
III
PE
III
PE
Inadequate
communication
390.0
Open trenches
Adverse weather
conditions
389.1
390.1
General workers
General workers
Visitors
PM
PM
Exposure to extreme
elements
Lack of concentration
Horse play
Lack of barricading
Inadequate Risk
assessment
Inadequate
communication
Inadequate planning
MI
F
SI
Inadequate rehydration
Underlying diseases
Poor Nutrition
Dehydration
Frost bite
391.0
391.1
Foundation team
PM
Cuts (Injuries)
Improper PPE
Improper use of
equipment
MI
392.0
392.1
Foundation team
All persons in area
PM
Trips
Fall
Inadequate / Pre-use
Inspections
Protruding metal objects
not capped or
demarcated
MI
Lack of concentration
393.0
393.1
Assemblers
PM
Tool slipping
Over torqueing
MI
SI
Inadequate PPE
394.0
Unsecured steel /
394.1
Assemblers
PM
Improper handling
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
material
Inadequate inspection
MI
SI
H & S / Fin
Cons
Likelihood
Risk rating
RCE
395.0
Manual handling of
heavy objects / material
395.1
Assemblers
PM
Ergonomics
Improper lifting
techniques
MI
SI
PE
III
PE
II
PE
II
PE
II
Underlying medical
condition
Lack of PPE
396.0
Integrity of lifting
equipment for lifting of
equipment and
employees
396.1
Operators
Riggers
Assemblers
PM
Equipment failure
Inadequate training /
experience
Inadequate
maintenance
Hydraulic failure
PD
F
SI
Inadequate
inspections
Falling material
Inadequate Risk
assessment
Incorrect equipment
Incorrect slinging
SANS 1200 ALL PARTS
Latent defects
Project specific drawings
Inadequate training
Inadequate supervision
397.0
398.0
Erection, handling
and lifting of
equipment
Inexperienced
equipment operator(s)
397.1
398.1
Operators
Riggers Erection
team
Bystanders
Operator
Riggers
Bystanders
PM
PM
Falling material
Incorrect slinging
PD
F
SI
Load shifting
Failure of equipment /
tackle
Inadequate inspection
Inadequate training
Lack of supervision
Lose control of
equipment
Falling material
Inadequate training /
experience
SI
PD
F
Lack of supervision
Medical surveillance (32-282)
Underlying medical
condition
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Suspended load
399.1
Erection Team
Bystanders
PM
Exposure to falling
objects
Failure of lifting
equipment
SI
PD
F
PE
II
PE
II
PE
III
PE
PE
II
Inadequate training
SANS 1200 ALL PARTS
Project specific drawings
400.0
Unstable terrace
400.1
Operator
Riggers
Bystanders
PM
Crane overturn
Sinking terrace
Poor compaction
SI
PD
F
Inadequate method
statement or
401.0
Tightening and
torqueing of bolts and
nuts
Incorrect application of
hand tools e.g. torque
wrench
401.1
Erection team
PM
Falling, slipping
Noncompliance to
method statement
Worn out tools
MI
SI
Inadequate pre-use
inspections
402.0
Elevated positions
402.1
Climbers
Bystanders
PM
F
SI
PPE failure
Inadequate training
Underlying medical
conditions
Engineering design
constraints
Non-compliance to
method statement
403.0
Component failure
403.1
Erection team
Bystanders
PM
Collapsing of steel
structure
Worker complacency
Latent defects on bolts
Incorrect size of bolts
PD
F
SI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Inadequate inspections
of bolts
404.0
Inexperienced
employees/
workers
404.1
Co-workers
Bystanders
PM
Collapsing of steel
structure
Inappropriate storage of
bolts (exposure to
elements)
Inadequate training
F
SI
Inadequate supervision
PE
II
PE
II
PE
II
PE
III
PE
III
Incorrect assembly
Non-compliance to
procedure
405.0
Elevated positions
405.1
Climbers
Bystanders
PM
Failure to secure
F
SI
PPE Failure
Inadequate training
Underlying medical
conditions
Engineering design
constraints
Non-compliance to
method statement
406.0
Incorrect application of
hand tools (purpose
made / special tools)
406.1
Assemblers
PM
Equipment failure
Complacency
Inadequate training
Non-compliance to
method statement
F
SI
PD
407.0
Assemble / erect
masts (tubular
steelwork) with light
fittings
Heavy material
407.1
Assemblers
PM
Musculoskeletal
disorders
Incorrect lifting
techniques
SI
MI
Inadequate training /
experience
Underestimation of
weight
407.2
Assemblers
PM
Caught between
SI
MI
Lack of supervision
SANS 1200 ALL PARTS
Incorrect body position
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
408.0
Elevated positions
408.1
Assemblers
PM
Lack of concentration
Non-compliance to
procedures
F
SI
MI
PE
II
PE
III
PE
III
PE
III
PE
III
Inadequate training /
experience
409.0
Lights (Hardware)
409.1
Assemblers
PM
Underlying medical
conditions
Lack of concentration
SI
MI
Lack of supervision
Project specific drawings
PPE not worn
410.0
410.1
Assemblers
PM
Caught between /
struck by
Underestimation of
weight
Lack of concentration
MI
Lack of supervision
Project specific drawings
Inadequate inspection /
maintenance
411.0
412.0
Install cables
Electrical wire /
hardware i.e. copper
wire, electrical boxes.
411.1
Assemblers
PM
Contact with
MI
Incorrect PPE
412.1
Assemblers
PM
Caught between /
struck by
Lack of concentration
Incorrect body position
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
Non-compliance to
procedures
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Lack of supervision
Project specific drawings
Inadequate experience
413.0
Electricity
413.1
Electricians
PM
Electrical contact
F
SI
Incorrect PPE
Non-compliance to
procedures i.e isolation,
test before touch
PE
II
PE
II
PE
III
PE
III
Installation of lights
and cabling
Elevated positions
414.1
Assemblers
PM
Lack of concentration
F
SI
Non-compliance to
procedures
Lack of supervision
Working at Height (32-418)
Lack of fall protection
Eskom Personal Protective Equipment (240-44175132)
Lack of risk assessment
Life saving rules (32-421)
Inadequate inspection /
maintenance
Inadequate training /
experience
415.0
Lights (Hardware)
415.1
Assemblers
PM
Underlying medical
conditions
Lack of concentration
MI
Lack of supervision
Project specific drawings
PPE not worn
416.0
416.1
Assemblers
PM
Caught between /
struck by
Underestimation of
weight
Lack of concentration
Incorrect body position
Non-compliance to
procedures
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
417.0
Install cables
418.0
Electrical wire /
hardware i.e. copper
wire, electrical boxes.
Electricity
417.1
Assemblers
PM
Contact with
MI
Incorrect PPE
418.1
Electricians
PM
Electrical contact
Lack of concentration
Incorrect PPE
PE
III
PE
II
PE
III
PE
III
PE
III
F
SI
MI
Non-compliance to
procedures i.e isolation,
test before touch
419.1
Fence installers
PM
Hand injuries
Lack of concentration
MI
Incorrect PPE
Non-compliance to
procedures
Open excavations
420.1
Fence installers
Lack of concentration
SI
MI
421.0
421.1
Fence Installers
PM
Caught between
Lack of concentration
Lack of risk assessment
Inadequate training/
experience
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Fence Installers
PM
Equipment failure
Lack of concentration
PD
Inadequate training/
experience
PE
III
PE
III
PE
III
Non-compliance to
procedures
422.0
Non-Lethal Electric
Fence
Electricity (pulse)
422.1
Fence installers
PM
Electric Shock
Persons in close
proximity
Non-compliance to
procedures
MI
Inadequate training /
experience
Inadequate signage
423.0
Fence hardware
423.1
Fence installers
Contact with
Persons in close
proximity
Non-compliance to
procedures
MI
Inadequate training /
experience
Boreholes
Drilling (activities)
424.1
Operators
PM
Non-compliance to
procedures
SI
MI
PE
III
PE
II
425.0
425.1
Operators
Bystanders
PM
Equipment failure
F
SI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Lack of concentration
Project specific drawings
Lack of supervision
Inadequate inspection /
maintenance
426.0
Lifting equipment
426.1
Operators
Riggers
PM
Failure
Inadequate training /
experience
F
SI
MI
PE
II
PE
III
PE
II
PE
III
Lack of concentration
Safe use of lifting machine and lifting tackle (39-98)
Inadequate inspection /
maintenance
Non-compliance to
procedures
Under estimation of
load
Lack of supervision
427.0
Dust
427.1
PM
Inhalation
Incorrect lifting
techniques
Inadequate training /
experience
MI
Inadequate
maintenance /
inspections
Non-compliance to
procedures
Live / unidentified
underground utilities
428.1
Drilling team
PM
Electrocution
Spillage (toxic)
Unidentified utilities
Inadequate surveys of
area to be drilled
F
SI
MI
428.2
Drilling team
PM
Damage to
infrastructure
Contact underground
utilities
Utility users
Inadequate surveys of
PD
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
area to be drilled
H & S / Fin
Cons
Likelihood
Risk rating
RCE
429.0
Excavations
429.1
Drilling team
PM
open excavations
SI
MI
PE
III
PE
III
Sewers
430.0
Excavate trenches, backfill, compact and dispose of surplus material See assessment for excavating trenches in Yardwork
Pipes
431.1
Civil Team
PM
Lack of concentration
MI
Non-compliance to
procedures
Inadequate supervision
Eskom Personal Protective Equipment (240-44175132)
Inadequate
experience/training
Inadequate risk
assessment
Poor house-keeping
Superstructure
erection
432.1
Civil team
PM
Contact with
Lack of concentration
SI
MI
Non-compliance to
procedures
PE
III
PE
III
433.0
Roof works
433.1
Civil team
PM
Contact with
Lack of concentration
Non-compliance to
procedures
SI
MI
Inadequate supervision
Eskom Personal Protective Equipment (240-44175132)
PPE not worn
SANS 1200 ALL PARTS
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
Inadequate
experience/training
434.0
Elevated positions
434.1
Civil team
PM
Falling material /
workers
Inadequate fall
protection plan
H & S / Fin
Cons
Likelihood
Risk rating
RCE
PE
II
PE
III
PE
III
PE
II
Inadequate training /
experience
Lack of supervision
SANS 1200 ALL PARTS
Project specific drawings
435.0
435.1
Civil team
PM
Contact with
Lack of concentration
SI
MI
Non-compliance to
procedures
Inadequate supervision
Eskom Personal Protective Equipment (240-44175132)
PPE not worn
SANS 1200 ALL PARTS
Inadequate
experience/training
436.0
437.0
437.1
Civil team
PM
Contact with
Lack of concentration
SI
MI
Non-compliance to
procedures
Inadequate supervision
Eskom Personal Protective Equipment (240-44175132)
PPE not worn
SANS 1200 ALL PARTS
Inadequate
experience/training
438.0
Plastering
Elevated work
438.1
Civil team
PM
Fall from
Lack of concentration
Non-compliance to
procedures
F
SI
MI
Inadequate supervision
Medical surveillance (32-282)
PPE not worn
Eskom Personal Protective Equipment (240-44175132)
Inadequate
experience/training
Inadequate
inspections/maintenanc
e
Inadequate risk
assessment
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Underlying medical
conditions
439.0
440.0
Cement (also see Lines: Hazardous chemical substances hazards and risks
Chase services
Ergonomics
440.1
Civil team
PM
Musculoskeletal
disorders
Inadequate training /
experience
MI
PE
III
PE
III
PE
III
PE
III
PE
III
Inadequate supervision
Occupational Health Risk Assessment (OHRA/PDP2013/Rev 1)
Under estimation of
weight
Underlying diseases
441.0
441.1
Civil team
PM
Contact with
Lack of concentration
MI
Inadequate supervision
Project specific drawings
Inadequate inspection /
maintenance
442.0
442.1
Operators
PM
Contact with
SI
MI
Lack of supervision
Project specific drawings
Inadequate inspection /
maintenance
443.0
Dust
443.1
Civil team
PM
Inhalation of cement
dust
Persons in close
proximity
MI
Non-compliance to
procedures
444.0
Noise
444.1
Civil team
PM
Non-compliance to
SI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
procedures
Persons in close
proximity
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Inadequate
maintenance /
inspection
Inadequate training /
experience
445.0
446.0
Screed placing
Wet cement see Hazardous chemical substance risk assessment Line works
Hand tools i.e. floaters
446.1
PM
Lack of concentration
MI
Inadequate training /
experience
PE
III
PE
III
PE
III
PE
II
447.0
Installation of cooling
and other equipment
447.1
Electricians
Installers
Assistants
PM
Musculoskeletal
disorders
SI
MI
Inadequate training /
experience
Non-compliance to
procedures
447.2
Electricians
Installers
Assistants
PM
Contact with
MI
Inadequate training /
experience
Non-compliance to
procedures
Lack of supervision
Electricity
448.1
Electricians
Installers
PM
Contact with
Lack of concentration
F
SI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
Assistants
MI
Inadequate training /
experience
H & S / Fin
Cons
Likelihood
Risk rating
RCE
(PDPMAN-ST-001)
Medical surveillance (32-282)
Eskom Personal Protective Equipment (240-44175132)
449.0
449.1
Electricians
Installers
Assistants
PM
Non-compliance to
procedures
Lack of supervision
Lack of concentration
PD
Inadequate training /
experience
PE
III
III
Inadequate inspection /
maintenance
450.0
Refilling / gassing
450.1
Artisans
Assistants
PM
Inhalation
Lack of concentration
MI
Lack of training /
experience
Non-compliance to
procedures
PE
451.0
Laying of flooring
Carpeting
451.1
Civil team
PM
Contact with
MI
Lack of training /
experience
PE
III
PE
III
452.0
Glue
452.1
Tilers
Civil team
PM
Inhalation
Non-compliance to
procedures
Lack of supervision
SI
MI
Non-compliance to
procedures
Lack of supervision
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
453.0
Tiles
453.1
Tilers
Civil team
PM
Lack of concentration
MI
Lack of training /
experience
H & S / Fin
Cons
Likelihood
Risk rating
RCE
PE
III
PE
III
PE
III
PE
III
PE
III
Lack of supervision
PPE not worn
454.0
455.0
455.1
Tilers
Civil team
PM
Contact with
Lack of concentration
SI
MI
Lack of supervision
Project specific drawings
Inadequate inspection /
maintenance
455.2
Tilers
Civil team
PM
Caught between
MI
Lack of supervision
Project specific drawings
PPE not worn
456.0
Ceiling installation
Ergonomics
456.1
Civil team
PM
Musculoskeletal
disorders
MI
Non-compliance to
procedures
Inadequate supervision
Inadequate
experience/training
457.0
457.1
Civil team
PM
Dust inhalation
Inadequate risk
assessment
Non-compliance to
procedures
MI
Inadequate supervision
PPE not worn
Inadequate
experience/training
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Inadequate hygiene
surveys
458.0
458.1
Civil team
PM
Fall from
Lack of concentration
SI
Non-compliance to
procedures
PE
III
PE
III
PE
III
Inadequate
inspections/maintenanc
e
Inadequate risk
assessment
459.0
Painting
Lead product
459.1
Painter
PM
Inhalation of paint
fumes and vapour
Underlying medical
conditions
Inadequate risk
assessment e.g. hygiene
surveys
SI
MI
460.0
Excavations
Handling excavated
material
Cast concrete for
carport supports
Structural steel for
parking
Carport roofing
Paint to steel
Laying Paving blocks
467.1
Civil Team
PM
Musculoskeletal
disorders
MI
Project/department: PDP
Scope:
Prepared by:
2. Identify Risks
Hazard identification
Risk No
Affected persons
2014 /09/01
Accountable manager: S Small
3. Analyse Risks
Risk
owner
Associated risk
Abnormal
Y/N
Causes of risk
Consequences
Existing controls
Preventive/Reactive
Inadequate
experience/training
H & S / Fin
Cons
Likelihood
Risk rating
RCE
Cutting, welding of
carport steelwork
468.1
Civil team
PM
Electric shock
Inadequate inspection /
maintenance
Operators
Cutting paving blocks
Non compliance to
procedures
Inadequate training /
experience
PE
II