THE SHELL PETROLEUM DEVELOPMENT COMPANY OF

NIGERIA LIMITED

Stolt Offshore Services SA


Combines Stolt Comex Seaway and ETPM

Subcontractor (if applicable)

Project:

Offshore Gas Gathering System Project


L-01398
Project No.:

Document title:

6262 5020

PRE-CROSSING WORKS:
DSV POSITIONING AND SURVEY
PROCEDURES

Document Number:

OG-AA-K-2984

0
A
Rev.

14/05/02
15/04/02

Date

REVISION

Issue for Companys Comments


Issue for IDC
Designation

DESCRIPTION AND AFFECTED SECTIONS

Page 1/34

JNL
JNL
Orig
STOLT

JVA
JVA
Chk
STOLT

EK
EK
Appr
STOLT

AUTHORISED BY

Appr
SPDC

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
A
Date of Issue:
28/03/02
PAGE 2

/ 28

OG-AA-K-2984

ISSUE FOR I.D.C.

N. KOMAJDA

ISSUE FOR COMPANYS COMMENTS

N. KOMAJDA

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 3

/ 34

OG-AA-K-2984

TABLE OF CONTENTS
1

INTRODUCTION

1.1

Objectives......................................................................................................................................................

1.2

Responsibilities..............................................................................................................................................

1.3

Definitions......................................................................................................................................................

1.4

References......................................................................................................................................................

GEODETIC PARAMETERS AND CO-ORDINATES

2.1

Local Geodesy...............................................................................................................................................

2.2

Datum Shift Parameters...............................................................................................................................

2.3

32 Pipeline Route Co-ordinates...............................................................................................................

2.4

32 Crossing Locations...............................................................................................................................

2.5

24 Pipeline Route Co-ordinates...............................................................................................................

2.6

24 Crossing Locations...............................................................................................................................

2.7

Positional Information................................................................................................................................

PERSONNEL

15

EQUIPMENT

16

4.1

Surface Positioning.....................................................................................................................................

4.2

Sub-surface Positioning..............................................................................................................................

4.3

Gyrocompass...............................................................................................................................................

4.4

Navigation and Data Acquisition System.................................................................................................

4.5

CTDS Sensor...............................................................................................................................................

MOBILISATION AND CALIBRATIONS

18

5.1

DGPS Verification.......................................................................................................................................

5.2

Gyrocompass Calibration...........................................................................................................................

5.3

USBL Calibration.......................................................................................................................................

5.4

Velocity of Sound in Seawater...................................................................................................................

OPERATIONS
6.1

20

Positioning...................................................................................................................................................

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 4

/ 34

OG-AA-K-2984

6.2

As-built Survey............................................................................................................................................

6.3

Field Reporting...........................................................................................................................................

EQUIPMENT LIST

22

APPENDICES

23

8.1

Equipment Mobilisation Check List.........................................................................................................

8.2

As-found 10.75 Texaco Pipeline...............................................................................................................

8.3

As-found 12.75 Texaco Pipeline...............................................................................................................

8.4

As-found 18 Texaco Pipeline....................................................................................................................

8.5

As-found 36 Agip Pipeline........................................................................................................................

8.6

As-found 12 Agip Pipeline........................................................................................................................

8.7

Post-lay SYMP to DP-B Umbilical............................................................................................................

8.8

Post-lay 16 SYMP to DP-A......................................................................................................................

8.9

Post-lay 18 SYMP to DP-A......................................................................................................................

8.10

Post-lay 12 SYMP to DP-A......................................................................................................................

8.11

NITEL FOC.................................................................................................................................................

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 5

/ 34

OG-AA-K-2984

INTRODUCTION
1.1

Objectives

The purpose of this document is to gather for all concerned personnel, the necessary
information and references for the positioning and survey operations onboard the
diving support vessel Stephaniturm for the diving operations on the proposed 32
OGGS RP-A to Bonny NLNG Trunkline and the proposed 24 Forcados/Yokri to
OGGS RP-A Spurline. The diving operations are to prepare the crossings of the
proposed pipelines with existing pipelines and cables. The crossed lines are to be
protected by grout mattresses installed by divers.
1.2

Responsibilities

The Survey department is responsible for the implementation and maintenance of


these procedures.
The Lead Installation Engineer is responsible for checking that this document
complies with the requirements for this project.
The Project Manager is responsible for approving this document.
The Offshore Operations Manager is responsible for all operations involving the DSV.
1.3

Definitions

Company
Contractor
CM
CTDS

DCC
DGPS
DP
DSV
HHWS
km
KP

The Shell Petroleum Development Company of Nigeria Limited


(SPDC)
Stolt Offshore Services SA (Stolt)
Central Meridian
(or CTD, or TDS) Conductivity, Temperature, Depth and Salinity
measurements performed to calculate the velocity of the acoustic
waves throughout the water column.
Distance Cross Course
Differential Global Positioning System
Dynamic Positioning
Dive Support Vessel
Highest High Water Springs
kilometre
Kilometre Post

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 6

/ 34

OG-AA-K-2984

LAT
Lowest Astronomical Tide
LLWS
Lowest Low Water Spring
MSL
Mean Sea Level
NLNG
Nigeria Liquified Natural Gas Ltd
nm
Nautical Mile
OGGS
Offshore Gas Gathering System
QC
Quality Control
RP-A
Riser Platform A
SYMP
(Shell EA) Soft Yoke Mooring Platform
USBL
Ultra Short Base Line underwater acoustic positioning system.
All co-ordinates within this document are expressed in terms of the projection and
datum defined in Section 2.

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

1.4

Revision:
0
Date of Issue:
14/05/02
PAGE 7

/ 34

OG-AA-K-2984

References

Reference is made to the following documents:


Title

Source

Document No

32 Pre-crossing Installation Procedure

Stolt Offshore
Services
Stolt Offshore
Services
Stolt Offshore
Services
Stolt Offshore
Services
Stolt Offshore
Services
Racal Survey
(Malaysia) SDN
BHD (supplied by
Customer)
Racal Survey
(Malaysia) SDN
BHD (supplied by
Customer)
Racal Survey
(Malaysia) SDN
BHD
Racal Survey
(Malaysia) SDN
BHD
SPDC

OG-AA-K-2925

24 Pre-crossing Installation Procedure


Survey equipment Calibration Procedures
Pre-engineering and Pre-lay (32) Survey
Report
Shell EA Pipelines/Umbilicals Post-lay Report
32" OGGS Trunkline (OGGSRP-A - OGGS
Receiving Facilities Bonny) Pipeline Route
Survey. Survey Report Volume 1 of 2
32" OGGS Trunkline (OGGSRP-A - OGGS
Receiving Facilities Bonny) Alignment Sheets
29 sheets at 1:10 000
24 Forcados / Yokri Spurline
(Forcados/Yokri OGGSRP-A) Pipeline
Route Survey. Survey Report Volume 1 of 2.
24 Forcados / Yokri Spurline
(Forcados/Yokri OGGSRP-A) Alignment
Sheets 10 sheets at 1:10 000
Proposed OGGS and BTIP Pipeline Route
Plan
NITEL FOC as-laid co-ordinates Brass Beach
to Bonny East Beach
NITEL FOC as-laid co-ordinates Escravos to
Forcados

Date

OG-AA-K-2934
OG-AA-K-2902

09/10/01

OG-RP-K-2980

21/01/02

D-IS-03-997

March
2002
14/08/00

9043-0, INT-073
Rev.2
1999/030A/90430
/INT073/001 to
029, Rev 1

28/02/00

9043-0, INT-074
Rev.1

18/04/00

1999/030A/90430
/INT074/001 to
010, Rev 1
p9904005

18/04/00

HAM via BODC

SPDC

February
1997
February
1997

10/99

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 8

/ 34

OG-AA-K-2984

GEODETIC PARAMETERS AND CO-ORDINATES


2.1

Local Geodesy

The following geodetic datum, spheroid and mapping projection parameters will be
used:
Datum:
Datum
Spheroid
Semi-major axis
Inverse flattening

:
:
:
:

Minna (Nigeria)
Clarke 1880 (modified)
6 378 249.145 m
293.465

:
:
:
:
:
:

Nigerian West Belt


Transverse Mercator
4 30' 0.00"E
4 00' 0.00"N
230 738.266 m
0.00 m

Projection definition:
Grid name
Projection type
Central meridian
Latitude of origin
False Easting at CM
False Northing at
latitude of origin
Scale Factor at CM
2.2

: 0.99975

Datum Shift Parameters

WGS 84 Definition:
Datum
Spheroid
Semi-major
axis
Semi-minor
axis
Inverse
flattening
Eccentricity
squared

: WGS 84
: WGS 84
: 6 378 137.0 m
: 6
356
752.3142 m
: 298.257 223
563
: 0.006 694 380

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

OG-AA-K-2984

Revision:
0
Date of Issue:
14/05/02
PAGE 9

/ 34

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 10

/ 34

OG-AA-K-2984

Transformations from WGS 84 to Minna Datum:


To convert positional data from WGS 84 to the Minna Datum, the following
parameters were applied:
DX
DY
DZ
Rot X
Rot Y
Rot Z
Scalin
g

:
:
:
:
:
:
:

+111.916 metres
+87.852 metres
-114.499 metres
-1.87527 seconds
-0.20214 seconds
-0.21935 seconds
-0.03245 ppm

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

2.3

PAGE 11 /

34

OG-AA-K-2984

32 Pipeline Route Co-ordinates

Easting
325792.0
332764.2
334018.2
335955.9
345754.9
351682.1
360566.8
386986.1
391869.0
397617.3
425770.7
426526.4
427247.5
427247.5
427968.6
428724.3
429324.3
430080.1
430802.9
430802.9
431525.7
432281.4
509347.4
517379.6
521806.1
531554.0
532089.2
531950.0
HHWS 531062.1
Last
531054.9
First
TP1
IP1
TP2
TP3
IP2
TP4
TP5
IP3
TP6
TP7
IP4
TP8
TP9
IP5
TP10
TP11
IP6
TP12
TP13
IP7
TP14
TP15
IP8
TP16
TP17
IP9
TP18

2.4

Revision:
0
Date of Issue:
14/05/02

Northing
84083.0
66396.0
63214.8
60397.5
46150.3
37532.3
32012.8
15600.3
12566.9
12589.1
12697.8
12700.7
12926.8
12926.8
13153.0
13155.9
13158.2
13161.1
12940.6
12940.6
12720.0
12722.9
13020.5
13051.5
19754.0
34513.7
35324.0
36285.0
42416.5
42465.9

Bearing Radius Length


158.486
158.486
19011.62
30000
145.481
6809.38
145.481
17291.71
50000
121.850
20621.72
121.850
31102.24
20000
89.779
11195.00
89.779
28153.61
5000
72.589
1500.00
72.589
0.00
5000
89.779
1500.600
89.779
600.00
5000
106.968
1499.70
106.968
0.00
5000
89.779
1500.30
89.779
77066.57
15000
33.442
14748.88
33.442
17688.14
2551
351.760
1855.68
351.760
6195.42
351.760
50.00

Cum Length
0.00
19011.62
19011.62
25821.00
43112.70
43112.70
63734.42
94836.66
94836.66
106031.66
134185.27
134185.27
135685.27
135685.27
135685.27
137185.87
137785.87
137785.87
139285.57
139285.57
139285.57
140785.87
217852.45
217852.45
232601.33
250289.47
250289.47
252145.15
258340.56
258390.56

KP
0.000
19.012
19.012
25.821
43.113
43.113
63.734
94.837
94.837
106.032
134.185
134.185
135.685
135.685
135.685
137.186
137.786
137.786
139.286
139.286
139.286
140.786
217.852
217.852
232.601
250.289
250.289
252.145
258.341
258.391

32 Crossing Locations

Crossing
10.75 Texaco*

Easting
351715

Northing
39011

KP
52.43

Water Depth
22

Comment
OGGS RP-A

HHWS, Bonny
Interface

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

12.75 Texaco*
18 Texaco
NITEL Cable*
36 Agip
12 Agip
Crossing
10.75 Texaco*
12.75 Texaco*
18 Texaco
NITEL Cable*
36 Agip
12 Agip

Revision:
0
Date of Issue:
14/05/02
PAGE 12

/ 34

OG-AA-K-2984

361199
364309
384775
428928
429104

31620
29688
16974
13156
13156

Existing Pipeline /
Cable Bearing
177/357
053/233
064/244
090/270
358/178
000/180

* in burial at the crossing location

64.48
68.14
92.23
137.39
137.57
Proposed 32
Bearing
135/225
122/302
122/302
122/302
090/270
090/270

20
20
21
23
23
Crossing
Angle
42
69
58
32
88
90

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

2.5
First
TP1
IP1
TP2
TP3
IP2
TP4
TP5
IP3
TP6
TP7
IP4
TP8
TP9
IP5
TP10
Last

Revision:
0
Date of Issue:
14/05/02
PAGE 13

/ 34

OG-AA-K-2984

24 Pipeline Route Co-ordinates


Easting
315424.9
315079.5
314828.2
314213.7
310555.0
303020.1
301158.1
298696.2
298594.9
298392.7
298392.1
293547.2
303588.2
303587.5
304365.6
304770.3
325749.0

Northing
158224.5
157392.9
156787.8
156560.9
155210.4
152429.0
144615.9
134285.8
133860.6
133473.3
133473.3
124223.0
121356.2
121356.4
121134.3
120433.6
84114.0

Bearing Radius
202.550
202.550
1500
249.740
249.740
15000
193.405
193.405
3499
207.643
207.643
8500
105.934
105.934
2000
149.989
149.989

Length Cum Length


0.00
900.48
900.48
900.48
1235.40
2135.88
3899.99
6035.87
6035.87
14748.30
20784.17
10619.40
31403.57
31403.57
869.60
32273.17
0.00
32273.17
32273.17
15088.80
47361.97
0.00
47361.97
47361.97
1537.80
48899.77
41943.05
90842.82

KP Comment
0.000 Forcados/Yokri
0.900
0.900
2.136
6.036
6.036
20.784
31.404
31.404
32.273
32.273
32.273
47.362
47.362
47.362
48.900
90.843 OGGS RP-A

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

2.6

Revision:
0
Date of Issue:
14/05/02
PAGE 14

/ 34

OG-AA-K-2984

24 Crossing Locations

Crossing
NITEL Cable*
NITEL Cable*
SYMP to DP-B Umbilical
16 SYMP to DP-A
18 SYMP to DP-A
12 SYMP to DP-A
Crossing
NITEL Cable*
NITEL Cable*
SYMP to DP-B Umbilical
16 SYMP to DP-A
18 SYMP to DP-A
12 SYMP to DP-A

Easting
301128
318229
322923
322930
322954
322967

Northing
144489
97133
89007
88995
88953
88931

Existing Pipeline /
Cable Bearing
115/295
158/338
079/259
079/259
080/260
082/262

* in burial at the crossing location

KP
20.91
75.81
85.192
85.206
85.254
85.280
Proposed 24
Bearing
193/013
150/330
150/330
150/330
150/330
150/330

Water Depth
18m
26m
22m
22m
22m
22m
Crossing
Angle
78
8
71
71
70
68

Department:
Stolt Offshore Services SA

Revision:
0
Date of Issue:
14/05/02

Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

2.7

PAGE 15

/ 34

OG-AA-K-2984

Positional Information

The following table lists the platforms that may be used for DGPS and compass
verifications or calibrations:
Name
DP-A

WGS84
Latitude
Longitude
448 08.53N 52147. 14E

Nigerian West Belt


Northing
Easting
88691.7
326539.0

DP-B

448 22.54N

52050. 14E

89119.7

324782.1

DP-J

450 51.62N

51648. 71E

93689.7

317338.8

RP-A

44538. 998N 52122. 667E 84098.2

325790.6

Comment
Platform Centre
(Heading = 46.49T)
Platform Centre
(Heading = 44.7T)
Platform Centre
(Heading = 44.92T)
Platform Centre
(Heading = 315.6T)

See Appendices 8.2 to 8.11 for as-found positions of existing pipelines and cables at
the crossings.

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 16

/ 34

OG-AA-K-2984

PERSONNEL
For the provision of positioning services for 24 hours per day, the following personnel
will be mobilised:
1 x Surveyor
1 x Survey technician

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 17

/ 34

OG-AA-K-2984

EQUIPMENT
This section details the positioning and survey equipment onboard the DSV.
The following equipment will be mobilised:
Surface positioning
Sub-surface positioning
Gyrocompass
Navigation and data
software
CTDS sensor

4.1

Thales GeoSolutions SkyFix Premier


DGPS + MultiFix3
Kongsberg Simrad HiPAP
SG Brown 1000 gyrocompass
acquisition Eiva Navipac
Valeport CTDS Meter Series 600

Surface Positioning

Differential GPS will provide the primary surface positioning onboard the DSV. The
differential delivery will be provided by Thales-GeoSolutions SkyFix Spot system.
The following SkyFix Reference Stations may be used.
Station Name
Port Gentil
Port Harcourt 1
Pointe Noire
Luanda
Abidjan

Station ID
900
910
940
945
955

Latitude
00 41' S
04 50' N
04 47' S
08 49' S
05 19' N

Longitude
008 46' E
007 00' E
011 52' E
013 14' E
004 01' W

Distance from RP-A


712km, 384nm
183km, 99nm
1,280km, 691nm
1,737km, 937nm
1,041km, 562nm

Real-time differential GPS makes it possible to correct the readings of GPS receivers
operating in a given area with values corresponding to the errors actually observed at
a reference station.
The system is provided with the latest Thales QC and multi-reference software
package MultiFix3. The SkyFix/MultiFix3 system is interfaced to both the DP
systems of the DSV and to the survey navigation computer.
4.2

Sub-surface Positioning

An Ultra Short Base Line (USBL) Kongsberg Simrad HiPAP will be used to provide
sub-sea positioning. This system is permanently installed on the vessel. The
transponder may be hand-held by a diver.

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

4.3

Revision:
0
Date of Issue:
14/05/02
PAGE 18

/ 34

OG-AA-K-2984

Gyrocompass

The heading of the vessel will be provided by a SG Brown gyrocompass, which will
be interfaced to the navigation system.
4.4

Navigation and Data Acquisition System

The proposed integrated navigation package Eiva Navipac will be interfaced to the
surface positioning equipment, the gyrocompass and to the USBL acoustic surface
unit to provide real time position of the vessel.
This system is based on a Pentium II computer, a data storage unit with hard disk and
3.5 floppy disk , a printer, and a colour monitor for the helmsmans display (with full
back up).
All navigation data are stored on disk (HD and CD-ROM) for post processing
purposes if required.
The following will be displayed graphically:
the theoretical pipeline route;
positions of relevant existing structures: pipelines, cables and seabed
obstructions, etc.
The following items will be displayed numerically:
the actual position and heading of the vessel;
the Distance Off Line of the vessel reference point relative to the
proposed pipeline route;
the Distance Along Line of the vessel reference point relative to the
proposed pipeline route;
positions of all offsets (i.e. bell location).
The positioning information and graphical display from the integrated navigation
system will be displayed on remote screens (i.e. for helmsman) as required.
4.5

CTDS Sensor

A CTDS Valeport Series 600 (conductivity/temperature/depth/salinity) meter will be


used to measure the necessary parameters in order to compute the velocity of sound
profile through the seawater column (using the Medwin or Wilson formula).
The sound velocity results are entered into the HiPAP USBL surface unit.

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 19

/ 34

OG-AA-K-2984

MOBILISATION AND CALIBRATIONS


Any calibrations performed prior to the Project will be sent to Customer before the
commencement of operations.
The DSV will have already been mobilised for another Project.
The following operations may be performed:
project briefing;
measurement check of all horizontal and vertical offsets;
gyrocompass calibration;
DGPS verification;
USBL calibration;
check operation of CTDS sensor;
input of the work parameters into the navigation package (geodetic
parameters);
input of the database information into the navigation package (existing
pipeline and cable positions);
input of the proposed pipeline routes;
complete mobilisation check list and documentation.
5.1

DGPS Verification

One of the following methods will be used to verify the DGPS positioning system:
a total station set up on and referenced to co-ordinated points on the
shore will be used to observe the range and bearing to a reflector mounted onto
the GPS antenna on the vessel. The reflector position will be calculated and this
will be compared to the antenna position observed at the vessel. The shore and
vessel parties will ensure that they are using the same geodetic and projection
parameters;
the vessel will perform transit fixes around a platform (see Section 2.7
for positions of platforms near the work areas). The derived platform position
will be compared to the known position. The calibration method is outlined in
OG-AA-K-2902.

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

5.2

Revision:
0
Date of Issue:
14/05/02
PAGE 20

/ 34

OG-AA-K-2984

Gyrocompass Calibration

The calibration of the gyrocompass will be performed by one of the following


methods:
by total station observation from a co-ordinated point on the shore to
reflectors mounted on the vessel;
azimuth survey using theodolite observation from the vessel to known
and co-ordinated onshore or offshore positions (existing platforms or flares);
determination of the vessel heading based on two DGPS/RTK antennae
located on points along the vessel lubber line;
transit or sextant observations to a co-ordinated structure whilst the
vessel is en-route to the work area;
by taped offsets from a quay of known azimuth to the vessels lubber
line.
See Section 2.7 for positions of platforms near the work areas.
In all of the above methods, the calculated heading will be compared to the observed
gyrocompass reading and any error applied as a correction in the navigation software.
5.3

USBL Calibration

A calibration will be performed as outlined in OG-AA-K-2902.


5.4

Velocity of Sound in Seawater

On arrival on site and prior to starting the operations, a sound velocity profile will be
observed with the CTDS probe. Medwin's or Wilson's formula will be used to
determine the speed of sound for the USBL system. Velocity profiles will be observed
at the commencement of operations and again when the vessel re-locates to the next
crossing.

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 21

/ 34

OG-AA-K-2984

OPERATIONS
Refer to the Pre-crossing Installation Procedures for details of the proposed dive
operations and tasks. The following sections outline the requirements of the survey
personnel onboard the DSV.
6.1

Positioning

The vessel is a dynamically positioned Class II multi-purpose diving support vessel.


The proposed, diving location, will be selected by the dive superintendent in
conjunction with the master. Once selected, the surveyor will enter the required dive
location into the navigation system to provide a target for the DSVs bell offset during
movement on DP.
During grout bag installation, the divers laying the bags will initially be positioned on
the seabed (as requested by the dive superintendent) by USBL interrogation of handheld mini-transponders. The subsequent positioning at each site may be performed by
divers taped measurements from the initial bag installation.
6.2

As-built Survey

The purpose of this survey is to acquire data to determine the position and alignment
of the grout bags for use in the final as-built alignment sheets and report.
Upon completion of the installation at each crossing, the diver will take the hand-held
transponder to the extremities of the grout bag arrays to confirm their position and
orientation.

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

6.3

Revision:
0
Date of Issue:
14/05/02
PAGE 22

/ 34

OG-AA-K-2984

Field Reporting

A preliminary field report will be submitted onboard the survey vessel after
completion of the survey operations. The preliminary report will be inclusive of the
main results of the survey, and in particular those that could create the need for
remedial actions. It should contain the following:
1. Introduction;
2. Scope of Work;
3. Description of operations;
4. Summary of preliminary survey results;
5. Surface positioning and sub-surface positioning;
6. Note on equipment performance including positioning QC;
7. Sequence of Significant Events;
8. Mobilisation, trials and calibration results including the following:
Velocity sensor calibration certificates;
Statement of Readiness;
DGPS verification results;
Offset measurements and diagram;
Gyrocompass calibration and check results;
Surface and USBL system set-up parameters;
Personnel and equipment lists;
9. Health, Safety and Environment Report;
10. Chart and Drawing Index;
11. Completed Check Lists;
12. Conclusions and recommendations.

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 23

/ 34

OG-AA-K-2984

EQUIPMENT LIST
The equipment listed below will be installed and interfaced onboard the DSV:
Item
Thales GeoSolutions SkyFix Premier DGPS including:
Dual frequency GPS receivers (Trimble MS750)
Inmarsat Demodulators
MultiFix computers and MultiFix software version 3
Navigation equipment c/w computers with Eiva Navipac
software, printer and peripherals
USBL Simrad Acoustic Positioning System
Mini-transponders c/w charger
SG Brown Gyrocompass
Valeport CTDS probe Series 600

Online
1

2
1
6
3
1

Spare
1

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 24

/ 34

OG-AA-K-2984

APPENDICES
8.1

Equipment Mobilisation Check List

The following are to be checked and signed off during mobilisation on completion of
each item.
Item N
1

Item

Completed
()

Time/Date

DGPS
functional test
differential received
verification
USBL system
functional test
offsets measured
calibration
Gyrocompass
functional test
latitude and speed settings
calibration
On-line Navigation System:
Interfacing
Offsets measured
Field database input
Datum conversion test completed
CTD Probe
wet test
valid certificate

P.C./Surveyor
Customer Acceptance

___________________
___________________

Date ___________
Date ___________

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

8.2

Revision:
0
Date of Issue:
14/05/02
PAGE 25

/ 34

OG-AA-K-2984

As-found 10.75 Texaco Pipeline

The Niari determined the following co-ordinates for the 10.75 Texaco pipeline
during the pre-engineering and pre-lay survey undertaken on 28 October 2001:
#
1*
2
3
4
5
6
7
8
9
10
11
12
13*

Easting
352698
351912
351883
351841
351800
351760
351715
351645
351627
351610
351599
351580
349359

Northing
25734
38225
38315
38460
38567
38712
39011
39477
39600
39700
39800
39900
52537

* taken from Customer chart p9904005.

Comment
Oloibiri Tank

Crossing

Middleton

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

8.3

Revision:
0
Date of Issue:
14/05/02
PAGE 26

/ 34

OG-AA-K-2984

As-found 12.75 Texaco Pipeline

The Niari determined the following co-ordinates for the 12.75 Texaco pipeline
during the pre-engineering and pre-lay survey undertaken on 28 October 2001:
#
1*
2
3
4
5*

Easting
352698
361039
361199
361231
371404

Northing
25734
31500
31620
31644
40068

* taken from Customer chart p9904005.

Comment
Oloibiri Tank
Crossing
North Apoi

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

8.4

Revision:
0
Date of Issue:
14/05/02
PAGE 27

/ 34

OG-AA-K-2984

As-found 18 Texaco Pipeline

The Niari determined the following co-ordinates for the 18 Texaco pipeline during
the pre-engineering and pre-lay survey undertaken on 28 October 2001:
#
1*
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21*

Easting
352698
363540
363600
363700
363800
363900
364000
364100
364200
364300
364309
364400
364500
364600
364700
364800
364900
365000
365100
365150
375823

Northing
25734
29420
29455
29480
29510
29543
29570
29600
29637
29683
29688
29732
29761
29791
29831
29879
29920
29948
29980
30000
35895

* taken from Customer chart p9904005.

Comment
Oloibiri Tank

Crossing

Funiwa

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

8.5

Revision:
0
Date of Issue:
14/05/02
PAGE 28

/ 34

OG-AA-K-2984

As-found 36 Agip Pipeline

The following co-ordinates for the 36 Agip pipeline were determined by the Niari
during the pre-engineering and pre-lay survey undertaken on 29 October 2001:
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Easting
428956
428959
428959
428962
428970
428976
428970
428955
428945
428940
428937
428934
428930
428928
428925
428920
428916
428931
428966
428980
429005
429026
429044
429046

Northing
11792
12000
12100
12200
12300
12400
12500
12600
12700
12800
12900
13000
13100
13156
13200
13300
13400
13500
13600
13700
13800
13900
14000
14100

Comment

Crossing

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

8.6

Revision:
0
Date of Issue:
14/05/02
PAGE 29

/ 34

OG-AA-K-2984

As-found 12 Agip Pipeline

The following co-ordinates for the 12 Agip pipeline were determined by the Niari
during the pre-engineering and pre-lay survey undertaken on 29 October 2001:
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Easting
429105
429106
429106
429107
429106
429105
429105
429106
429102
429104
429108
429110
429113
429119
429125
429125
429123
429122
429120
429115
429115
429111
429108
429103

Northing
12300
12400
12500
12600
12700
12800
12900
13000
13100
13156
13200
13300
13400
13500
13600
13700
13800
13900
14000
14100
14200
14300
14400
14500

Comment

Crossing

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

8.7

Revision:
0
Date of Issue:
14/05/02
PAGE 30

/ 34

OG-AA-K-2984

Post-lay SYMP to DP-B Umbilical

The following co-ordinates for the SYMP to DP-B Umbilical were determined by the
Niari during the post-lay survey undertaken 26 and 27 February 2002:
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Easting
320902
320968
321018
321084
321113
321166
321251
321333
321427
321517
321609
321760
321832
321880
321939
322032
322115
322210
322290
322345
322439
322497
322598
322672

Northing
88710
88717
88724
88731
88733
88744
88751
88764
88771
88786
88797
88820
88828
88832
88841
88854
88861
88875
88887
88893
88917
88924
88942
88958

#
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47

Easting
322730
322858
322925
322984
323060
323143
323244
323285
323340
323413
323500
323609
323674
323781
323869
323981
324122
324240
324318
324394
324485
324591
324707

Northing
88976
88993
89008
89018
89030
89049
89068
89075
89088
89101
89117
89140
89146
89169
89190
89208
89217
89217
89206
89195
89175
89151
89116

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

8.8

Revision:
0
Date of Issue:
14/05/02
PAGE 31

/ 34

OG-AA-K-2984

Post-lay 16 SYMP to DP-A

The following co-ordinates for the 16 SYMP to DP-A pipeline were determined by
the Niari during the post-lay survey undertaken 26 and 27 February 2002:
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Easting
321398.1
321475.0
321573.7
321658.5
321748.6
321818.8
321911.4
321960.2
322002.7
322045.4
322101.0
322169.3
322238.8
322309.2
322395.4
322477.8
322532.5
322602.8
322681.8
322775.9

Northing
88761.1
88771.9
88785.7
88792.9
88807.5
88814.9
88826.9
88829.2
88839.0
88845.4
88850.0
88857.4
88867.7
88877.3
88891.3
88909.0
88918.3
88931.0
88947.2
88964.2

#
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Easting
322868.4
322932.5
323035.2
323163.6
323266.6
323310.4
323398.2
323438.4
323500.6
323566.3
323667.9
323718.3
323771.1
323826.5
323939.1
324051.3
324146.2
324248.5
324344.6
324402.2

Northing
88980.9
88995.5
89014.7
89036.6
89058.1
89063.6
89082.3
89092.1
89100.3
89112.6
89129.7
89143.7
89150.8
89164.3
89185.5
89193.0
89195.0
89191.6
89179.0
89168.4

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

8.9

Revision:
0
Date of Issue:
14/05/02
PAGE 32

/ 34

OG-AA-K-2984

Post-lay 18 SYMP to DP-A

The following co-ordinates for the 18 SYMP to DP-A pipeline were determined by
the Niari during the post-lay survey undertaken 26 and 27 February 2002:
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Easting
320868.7
321124.5
321172.9
321374.6
321445.5
321487.2
321550.0
321650.8
321717.1
321822.6
321903.8
321968.8
322032.0
322133.5
322251.7
322345.3
322394.9
322426.7
322485.0
322529.3
322629.8

Northing
88689.3
88721.4
88725.6
88749.2
88760.2
88766.5
88772.6
88780.9
88791.6
88803.5
88812.5
88822.4
88828.8
88842.4
88857.9
88866.5
88875.9
88880.3
88885.9
88890.8
88903.8

#
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

Easting
322704.9
322765.6
322860.1
322991.7
323174.0
323323.5
323484.1
323558.6
323647.3
323774.1
323923.1
324036.6
324176.0
324270.2
324338.5
324415.2
324552.8
324647.1
324761.0
324877.7

Northing
88916.5
88919.4
88935.5
88960.1
88988.9
89011.8
89038.8
89057.1
89065.8
89091.4
89113.8
89131.5
89144.2
89153.4
89148.6
89142.2
89121.8
89105.5
89085.6
89068.5

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 33

/ 34

OG-AA-K-2984

8.10 Post-lay 12 SYMP to DP-A


The following co-ordinates for the 12 SYMP to DP-A pipeline were determined by
the Niari during the post-lay survey undertaken 26 and 27 February 2002:
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

Easting
320864.0
321156.5
321361.2
321432.0
321525.3
321636.7
321773.4
321903.2
322026.9
322123.0
322180.6
322281.1
322373.2
322446.7
322539.3
322650.6
322718.1
322799.2
322949.5
323128.0
323254.0
323358.4
323432.4

Northing
88684.1
88719.2
88740.3
88749.5
88763.5
88770.1
88791.7
88805.0
88819.7
88830.6
88837.9
88849.5
88860.0
88872.1
88882.6
88895.2
88904.7
88909.6
88929.3
88949.1
88961.4
88973.4
88983.4

#
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

Easting
323560.7
323641.7
323773.9
323925.8
324028.9
324106.4
324224.0
324314.0
324521.6
324637.9
324768.9
324878.9
325042.5
325153.4
325332.0
325497.5
325572.0
325701.1
325828.7
325951.6
326039.8
326296.6

Northing
89001.3
89006.7
89021.3
89042.5
89051.1
89063.3
89084.0
89087.5
89104.8
89096.2
89076.7
89057.2
89042.1
89034.0
89016.9
88991.6
88970.5
88930.1
88886.8
88847.8
88817.8
88736.0

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

Revision:
0
Date of Issue:
14/05/02
PAGE 34

/ 34

OG-AA-K-2984

8.11 NITEL FOC


The cables are laid as a pair, each 12.8mm outside diameter. They are reported to be
laid side-by-side and buried at a depth of 1 metre below the seabed.
Following a meeting between Customer, Contractor and NITEL, a decision was taken
to use the NITEL-supplied cable positions on which to base the pipeline crossings and
therefore there is no requirement to positively locate the cables prior to intervention
work.
NITEL cable as-laid co-ordinates at first crossing of 24 (KP20.91)
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Easting
298823
298921
299011
299102
299191
299281
299377
299481
299586
299678
299769
299860
299950
300043
300133
300225
300316
300405
300495
300586
300676
300767
300857
300950
301040

Northing
145559
145513
145470
145430
145386
145345
145299
145248
145202
145158
145117
145075
145031
144992
144954
144911
144869
144827
144781
144742
144700
144656
144615
144573
144531

#
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

Easting
301128
301131
301220
301310
301404
301493
301584
301676
301767
301859
301946
302038
302129
302219
302312
302400
302500
302565
302656
302744
302837
302927
303018
303108

Northing
144489
144490
144446
144404
144363
144319
144281
144237
144194
144156
144110
144069
144027
143985
143944
143900
143852
143828
143784
143744
143702
143659
143615
143575

NITEL cable as-laid co-ordinates at second crossing of 24 (KP75.81)


#

Easting

Northing

Easting

Northing

Department:
Stolt Offshore Services SA
Combines Stolt Comex Seaway and ETPM

SURVEY

Document Title:

Stolt Document
Number

DSV POSITIONING AND SURVEY


PROCEDURES

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

317260
317297
317334
317373
317407
317444
317481
317518
317555
317590
317629
317664
317703
317740
317777
317811
317852
317887
317922
317963
317998
318037
318072
318109
318148
318182
318220
318229
318256
318293

PAGE 35

/ 34

OG-AA-K-2984

99573
99481
99389
99297
99203
99109
99015
98923
98829
98737
98643
98551
98458
98366
98272
98179
98086
97992
97899
97808
97714
97622
97528
97436
97342
97248
97156
97133
97062
96970

END OF DOCUMENT

Revision:
0
Date of Issue:
14/05/02

31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

318332
318367
318404
318443
318480
318513
318552
318589
318623
318662
318699
318738
318775
318810
318849
318882
318921
318956
318995
319031
319398
319768
320134
320503
320872
321240
321535
321610
321978
322346

96878
96784
96692
96600
96506
96412
96318
96226
96132
96040
95948
95854
95762
95668
95578
95482
95390
95296
95204
95110
94182
93251
92321
91391
90463
89719
88788
88602
87674
86742