Professional Documents
Culture Documents
Requirements
Potential
Cause (s) /
Mechanism(s)
of Failure
e
Wrong Raw
material
received from
Al. alloy- supplier .
50016 Receipt
& Storage
Failure during
(01)
v
**
---
> Improper
Verification
To
receipt & store
the Raw
Material as per
identification &
procedure.
Improper
storage of raw
material.
Wrong raw
material issue
**
*** - - -
Current
Process
Control
Prevention
Current
Process
Control
Detection
c
l
verification
***
--*>> Casting Defect
** Failure
*** Poor
Performance
s-
--
Lack of Identification
Mark(colour code &
batch no.) on raw
material.
Mixed up
different alloy.
1 Specification /
requirement
clearly
mentioned in /
c with Purchase Order
and
Indent.
Supplier Invoice.
Supplier T.C.
Raw Material
Verification.
(Batch wise)
Indent.
2 Separate rack or
Stock Register for
for different
Al. alloy
r location
raw material with tag &
colour mark.
D R Recomm- Responsended
ibility
Action(s)
& Target
Completion
e P
Date
4 32
Action Results
Action
Taken
4 32
4 64
P
t
N
e
S O D R
s
FORMAT NO. PE-F-QS-FMEA/PROC. - 021 *
REV-01
(SIGNATURE)
* EFFECT ON NEXT OPERATION
** EFFECT ON ASSEMBLY
Process
Function /
Potential
Failure
Mode
Potential
Effect(s)
of Failure
S C
Requirements
Potential
Cause (s) /
Mechanism(s)
of Failure
l
(02)
Shell
Core Making
> Improper
cleaning of
parting line.
To manufacture
the shell core to
enable as per given > Parting line
Mismatch
shape.
Current
Process
Control
Prevention
Current
Process
Control
Detection
* Unwanted Projection 5
or Groove "V" form in
parting line
** Leakage
*** ---
* Roughness or Groove 5
"V" form in parting line.
**
Leakage
*** -----
2 > Training
e P
> Visual
Inspection
70
t N
c
* Rough surface
& Blow hole
> Visual
Inspection
70
32
> Visual
Inspection
PCS (F-10)
> Visual
56
> Visual
Inspection
56
3 > Training
> Visual
Inspection
63
> Visual
Inspection
70
time.
** ---> Excess
baking of core
* Core Break
** --*** ----
* Blow hole
** ---*** ----
> Improper
coating
* Sand inclusion
** ---*** ---
(SIGNATURE)
* EFFECT ON NEXT OPERATION
** EFFECT ON ASSEMBLY
BS ,BKR, PK
Process
Function /
Potential Failure
Mode
Potential
Effect(s)
of Failure
S C
Requirements
Potential
Cause (s) /
Mechanism(s)
of Failure
O
c
Current
Process
Control
Prevention
R
P
e l
t
(03)
> Low/ High molten
Melting of Al.alloy metal temp.
To achieve
molten aluminium
metal free from
dross & within
required temp.
> Improper
Purification (dross)
>Temp. indicator
& Controller
64
N
-
v-
> Visual
Inspection
64
-c -
64
> Training
(SIGNATURE)
* EFFECT ON NEXT OPERATION
** EFFECT ON ASSEMBLY
N-
R, PK
PAGE : 03
Process
Function /
Potential
Failure
Mode
Potential
Effect(s)
of Failure
S C
Requirements
Potential
Cause (s) /
Mechanism(s)
of Failure
Current
Process Control
Prevention
c
Current
Process
Control
Detection
e l
(04)
> Low molten
Preparation of metal temp.
Al.alloy
To achieve molten
aluminium metal
free from dross &
within specified
temp.
> High molten
metal temp.
* > In-complete
>> Porous grain
>> Metal jointing
** Poor Appearance
*** ----
* >> Porosity
>> Crack
>> Blow hole
**
Leakage
*** Leakage
> Improper
degassing
8 -
> Improper
Verification
D R
e
t
e P
c
4
N
64
e P
64
> Visual
Inspection
64
> Physical
Property Log
Book.
32
v c
t N
c
-
(SIGNATURE)
* EFFECT ON NEXT OPERATION
** EFFECT ON ASSEMBLY
Process
Function /
Potential
Failure
Mode
Potential
Effect(s)
of Failure
S C
Requirements
Potential
Cause (s) /
Mechanism(s)
of Failure
Current
Process
Control
Prevention
Current
Process
Control
Detection
c
(05)
> Blow hole in
Gravity die
casting
casting
To achieve
casting as
desired shape.
* --** Failure /
Leakage
*** Poor
Performance
e l
8
Action Results
D R RecommResponse
ended ibility
Action S O D R
t
Action(s)
& Target Taken
e
Completion
c P
Date
e P
64
e-
c-
96
> Training
> Visual
c t N
Inspection
> Improper grain
structure
64
96
24
63
63
> Training
7 63
* ---** Failure
*** ----
> Shrinkage /
crack in casting
3 -
(SIGNATURE)
* EFFECT ON NEXT OPERATION
** EFFECT ON ASSEMBLY
BKR, PK
Process
Function /
Potential
Failure
Mode
Potential
Effect(s) of
Failure
S C
Requirements
Potential
Cause (s) /
Mechanism(s)
of Failure
e l
(06)
Cutting of
Runner/Riser
To achieve cast
component free
from runner & riser.
> Excess
cutting
*Scrapped
** --*** ---
Current
Process
Control
Prevention
c
> Improper blade
setting.
Current Process D R
Control
e
Detection
t
e P
c
2 >Work Instruction
> Viaual Inspection
for Bandsaw cutting
70
c e
N
c
t
(07)
Fettling
To achieve cast
component free
from burrs, sharp
edge & unwanted
material.
(Parting line)
> Improper
fettling
* Damage
Rubber hose
** Damage Subparts
*** Leakage
70
(08)
> Improper
porosity
sealing.
* Leakage
**
Leakage
24
Vacuum
Impregnation
To get porosity
sealed cast
component.
*** Leakage
(SIGNATURE)
* EFFECT ON NEXT OPERATION
** EFFECT ON ASSEMBLY
BS ,BKR, PK
Process Function /
Requirements
Potential
Failure
Mode
Potential Effect(s) S
of
Failure
Potential
Cause (s) /
Mechanism(s)
of Failure
l
Current
Process
Control
Prevention
c
e
(09)
Leak Proof Testing
> Machining
Machining (CNC) dimn. not as per
specification
To achieve the
Machining dimension as
per specification.
>Rough surface
(11)
48
c-
>Tool blunt
>Tool Change
Frequency
>CNC Programme
Locking
> Visual
Inspection
56
> Visual
Inspection
56
> Unskilled
Operator
24
(SIGNATURE)
* EFFECT ON NEXT OPERATION
>Loose clamping
>CNC
Programme error
>
Tool blunt
Appearance
*** ----
> CNC
Programme error
(RPM, FEED)
* ---
** Poor
Completio
n Date
* ---
* Leakage
** Leakage
***
Leakage
**
Fitment Problem
*** ---
D R
e
t
e P
c
** EFFECT ON ASSEMBLY
KR, PK
Process Function /
Requirements
(12)
> Improper
High Pressure Cleaning
Cleaning
To achieve the
cast component free from
dust, burrs, oil particle
* Failure during
Millipore test
** ---
(13)
> Improper
Inspection
***
Damage equipment
Potential
Cause (s) /
Mechanism(s)
of Failure
O
c
> Un-calibrated
Instrument
> Untrained & Un-known
Inspector
Current
Process
Control
Prevention
D
e
t
>Calibration of
Instrument
> Training &
Display
c-
t
c
48
> Log
Book for F.I
(SIGNATURE)
* EFFECT ON NEXT OPERATION
** EFFECT ON ASSEMBLY
BKR, PK
Process
Function /
Potential
Failure
Mode
Potential
Effect(s)
of Failure
C
e
Requirements
Potential
Cause (s) /
Mechanism(s)
of Failure
l
(14)
Packaging
To get cast
component
packed as per
packaging
standard.
(15)
Storage
> Ignorance of
packaging pattern
>Negligence of
packaging operator
> Ignorance of
packaging standard.
Such as
>Absence of partition &
Layer sheets
> improper
sealing
> Improper
Tagging
* Wrong material
storage
** Reject
*** ----
> Wrong
Quantity
* Wrong Quantity in
stock.
**
Quantity short
*** ---
> Improper
storage
* Damage
** Reject
*** ---
To
store the finish
component with
proper
> Improper
identification tag
Identification
& quantity in
proper place
* Wrong despatch
** Reject
*** ----
(16)
> Wrong
* Will pass though
Dispatch
material supply receiving inspection
The component
to be dispatch as
** ---per invoice
***
---
O Current
Process
Control
Prevention
c
2
Current
Process
Control
Detection
Action Results
Recomm- Responsended
ibility
Action S O D R
Action(s)
& Target Taken
Completion
P
Date
e
e
c
N
v
> Packaging
pattern of
component
> On job
Training
2 > Packaging
Standard of
component
> Visual
Inspection
7 56
> Visual
Inspection
48
1 > Training
> Packaging
Standard of
component
> Visual
Inspection
42
1 > Training
> Packaging
Standard of
component
> Visual
Inspection
42
1 >W.I. # 3.18
> Visual
(for storage
Inspection
and preservation)
> PreDispatch
Inspection
36
1 > Separate
location for
different
components.
> Visual
Inspection
> PreDispatch
Inspection
36
> Visual
Inspection
48
c
-
t
-
(SIGNATURE)
* EFFECT ON NEXT OPERATION
** EFFECT ON ASSEMBLY