Prepared by:
ERP PM Team
R&D Building, NTPC-EOC Complex
Sector-24, NOIDA
Press ENTER.
Put Description of
DIR.
Take Lab/Office
corresponding to plant
name and press ENTER.
Press "Create
Original" icon.
Enter description
of Original to be
attached.
Attach the
original.
Press Continue
(Enter).
Give Document No by
selecting from
dropdown.
Give Document
Type.
Press ENTER.
Select from
dropdown
Document Status
as Reviewed.
Press SAVE.
Message as shown in screen shot given below will be displayed.
Message is
displayed.
Tcode: CV02N
Give Document No by
selecting from
dropdown.
Give Document
Type.
Press ENTER.
10
Select from
dropdown
Document Status
as Approved.
Press SAVE.
Message as shown in screen shot given below will be displayed.
11
Message is
displayed.
MaintenanceMaintenance
Tcode: IW21
12
ProcessingNotificationCreate
Press ENTER.
Fill in Notification
short text.
13
Fill in unit
synchronization
date & time.
Defect Location and Defect can be selected from relevant dropdown by clicking on
Defect Location Tab under the Items Tab of the notification as shown in screen shot
given below:
14
Defect to be
selected from
drop down.
Defect location to be
selected from drop
down.
Click on
Defect
location Tab.
Defect Location
can be described
in detail in short
text.
Created document (as explained in section 2.1) is to be linked to the notification as shown
in screen shot given below:
15
After linking the document to the notification, press SAVE button as shown in screen
shot given below:
16
17
Message is
displayed.
18
19
Give
Recipient
name.
Press
SEND.
20
Notification is to be also sent to representative of NETRA through SAP mail. Screen shot
explaining the same is given below:
21
Print out of notification along with physical sample of boiler tube will also be sent to
NETRA for analysis.
22
Mechanism and Root Cause of boiler tube failure can be specified by clicking on
Mechanism/Root Cause Tab under Items Tab. For Mechanism, relevant Tcode can
be selected from the dropdown. Root Cause can be mentioned in short text as well as
long text.
Action Plan can be mentioned by clicking on Action Plan Tab under Items Tab.
Short text as well as long text has been provided for this purpose.
More than 1 item under above mentioned heads can be entered.
Screen shot showing the procedure to enter Mechanism and Root Cause is given below:
23
Click on
Mechanism/Root
Cause Tab.
Relevant Mechanism
code can be selected
from drop down.
Screen shot showing the procedure to enter Action plan is given below:
24
25
26
Mechanism of failure, Root Cause of failure and Action Plan can be specified by
Corporate OS under Items Tab. Procedure to enter above is same as given in section
2.4 (Page nos. 23, 24 & 25). More than 1 item under above mentioned heads can be
entered.
After mentioning all the details, notification is to be COMPLETED by Corporate OS.
Screen shot showing the completion of notification is given below:
27
If analysis of boiler tube sample is not required to be done by NETRA, Corporate OS can
COMPLETE the notification without RELEASE to NETRA. Before completing the
notification, Corporate OS can enter their observations in the form of Mechanism of
failure, Root Cause of failure and Action Plan.
After completion of notification, notification can be viewed only in Display mode as
shown in screen shot below:
28
Message is
displayed.
The notification can be sent to site BMD representative through SAP mail as shown in
screen shot below: