Sand production
At higher draw down-pressure, sand production is a common problem especially the
production from unconsolidated and fire grained sand. Sand erodes and plugs the
equipment and restricting the flow rates. Screens and gravel placing limit sand entry
into the well bore and in some cases reduce productions rates, less pressure draw
down eliminates the need for screen and gravel placing and allows higher production
rates from drainhole or horizontal well.
1202/644
1202/644
sweep patterns,
1202/644
It is important to note that the third requirement listed above limits the tools that can
be used in the horizontal part of the hole even through the curvature there is
negligible. These requirements place limitations on what can be achieved by mediumradius drilling. The requirement for drill string flexibility means drill strings must be
smaller in diameter for higher curvatures. At the limit, it is necessary, e.g., articulated
strings, coiled tubing type strings stressed beyond the elastic limit, and strings made of
exotic higher-strength the materials such as titanium, carbon fiber or steel-reinforced
hoses. Charges of this sort move the technique beyond the boundary of normal
medium-radius drilling.
The trend to using smaller diameter drill pipe goes along with the drilling of smaller
diameter holes. Another driving force moving the technology towards small diameters
is the incentive to drill horizontal drains starting with existing vertical wells. To do this,
1202/644
1202/644
1202/644
1202/644
1) Vertical section:
It is drilled from seabed (mud line) until kick-off point (KOP).
3) Horizontal section:
It is drilled from the end of second build arc (EOC) to the end of proposed
distance to be drilled horizontally in the pay zone, in accordance with the type of
horizontal well to be drilled.