You are on page 1of 22

CHAPTER 1

EXPERIENCE AFTER GRADUATION


Designation

Temporary Instructor

Organisation

Department of Civil Engineerin, University of Moratuwa

Duration

1991

I obtained the Bachelor of Science degree in Civil Engineering (Second Class Upper Division), from the
University of Moratuwa in 1991. I was also awarded the Rex Croose Memorial Award for the best
undergraduate in construction related subjects.
Soon after passing out from the University, I was invited to work as a Temporary Instructor in the
Structural Division of the Department of Civil Engineering in the University of Moratuwa from June
1991. I consider this as a great honour bestowed on me as a very young Civil Engineer.
During this period, I was given the opportunity to teach the subject of Civil Engineering Construction
(CSC) to Part-1 undergraduates. In addition to this, I conducted lectures on part-time basis on
Reinforced Concrete Designs under the guidance of Prof. Priyan Dias and also Laboratory Practicals in
Structural Engineering for the Civil Engineering students. I also assisted in Geological Mapping
classes during this period.

Designation

Site Engineer

Organisation

Central Engineering Consultancy Bureau (CECB)

Duration

1992 to 1994

I joined the Central Engineering Consultancy Bureau (CECB) in February 1992 and was immediately
posted to the Quay Project at the Naval Dockyard, Trincomalee, as a Site Engineer.
Site experience obtained under the direct guidance of Dr. A.N.S. Kulasinghe, the Chairman of CECB and
Eng. A.K.D.N. Athukorale, the Chief Resident Engineer of CECB, was an important milestone in my
engineering carrier.
I was able to gain very valuable experience in the casting of pre-stressed concrete beams, PSC Caissons,
Off-Shore construction works, etc., associated with the project.
The main responsibility assigned to me was the quality controlling in the Pre-Cast Yard. In addition to
this I was also in charge of the Material Testing Laboratory. Apart from these I also had to participate in
the Monthly Progress Review Meetings along with the Clients and Contractors representatives and the
Chief Resident Engineer.

Designation

Site Engineer

Organisation

Central Engineering Consultancy Bureau (CECB)

Duration

1995

I was assigned as Site Engineer to the Bar Association of Sri Lanka Building Project site, at Hulftsdorp.
During this period, my Project Manager, Eng. M.A.C. Perera and the Chief Resident Engineer,
Ms. Shantha Jayaratne, guided me to gain valuable experience in several other aspects of Civil
Engineering Construction and also to learn on how to become a responsible Civil Engineer.

Designation

Structural Designs Engineer

Organisation

Central Engineering Consultancy Bureau (CECB)

Duration

1996 to 1998

In 1997, I was posted as a Designs Engineer to the Structural Designs Unit of the Central Engineering
Consultancy Bureau, Head Office in Colombo.
I was assigned to carryout structural designs of Low to Medium rise buildings and during which process I
was able to learn the applications of structural engineering principles.
During this period, I was able to complete the designs of an 8-storeyed Ward and Operating Theatre
Complex for the Kalubowila Hospital, 5-storeyed building for the Gampaha Divisional Secretariat at
Miriswatta and the 7-storeyed Head Office building for the CECB at Bauddhaloka Mawatha, Colombo 7.
In addition, I was also involved in the planning and design of several other hospital buildings spread all
over the island.
This was a good opportunity for me to obtain design experience in different types of buildings.
I was also able to learn the Procedures to be followed, Standards to be maintained and about Method
Statements, Specifications, Codes of Practice, etc., to be adopted.
Exposure to the integrated planning of buildings, incorporating Architectural, Structural, Electrical,
Mechanical and Building Services was also extremely useful.
I was able to fulfill all the requirements and obtain the Corporate Membership of the Institution of
Engineers Sri Lanka (IESL) in 1996 (M3428) and become a Chartered Civil Engineer.
I was able to achieve this target within just 4 years after joining the CECB.

Designation

Chief Resident Engineer (Gampaha Office)


and Senior Structural Designs Engineer (Head Office)

Organisation

Central Engineering Consultancy Bureau (CECB)

Duration

1999 to 2002

After completing the construction of the Gampaha Divisional Secretariat building at Miriswatta I
pioneered the forming of the first ever Construction Unit/Base Office of CECB outside Colombo District,
in Gampaha. This Base Office is still functioning as a fully pledged Operational Unit.
After obtaining sufficient experience in structural designs and construction works I was assigned as the
Chief Resident Engineer and was directly involved in the designing and construction of Hospitals,
Hostels, Office Complexes, etc., undertaken by the CECB on Design Build and Turn-Key basis.
During this period, I was involved in all modes of engineering works, detailed designs of buildings, etc.,
and also in checking and scrutinizing the structural designs of Design Build projects carried out by
other agencies.
The timely need to undertake projects on Engineering Procurement Construction (EPC), was heavily felt
by the Management of CECB at this time. As a result, a Colombo based Design Unit was established to
handle EPC works. Initially, 2 brilliant young engineers were trained in building designs and I am proud
to note that they are now serving as Senior Lecturers in two Engineering Faculties. This Unit has grown
up to a fully pledged Design Unit with more than 25 Engineers practicing in the fields of Geo-Technical,
Bridge Construction, Coastal Engineering, etc.
Keppitipola Economic Centre, a fast track construction, to be built in a high wind zone, facing severe
restrictions and to suit local conditions was a memorable project designed by me during this period.
..

CHAPTER 2
EXPERIENCE INVOLVING SUPERIOR RESPONSIBILITIES
Designation

Project Manager

Organization

Central Engineering Consultancy Bureau (CECB)

Duration

2002 to 2005

In January 2002, I was promoted to the post of Project Manager in charge of EPC-Colombo SuburbsUnit,
known as (EPC-CS), which too was formulated by me in the year 2002 to undertake Turnkey works in
Colombo and the Suburbs of Colombo.
Right throughout my career, I have been entrusted with mentoring many Undergraduates, Graduate
Engineers and other Technical Personnel attached to Sites under EPC-CS Unit. The Trainees were given a
good training in technical, administrative and managerial aspects of construction, with hands-on
experience. Special emphasis was given to the practical aspects, based on the principles of theory they
had learned during their respective courses.
Subsequently, I initiated an Equipment Hiring Unit within the Construction Unit for acquiring and
supplying accessories required for building construction, namely, scaffolding sets, screw jacks, GI pipes,
etc. This Unit is still serving all Construction Units of CECB as an independent Cost Centre based Units.
As the Project Manager and Officer in Charge of the Unit I was responsible for overall administration
and management, liaison with Clients and other stakeholders, ensuring that projects were executed to
required Standards and delivered on time and conducting Progress Review Meetings. I was also
responsible for the higher Management to the performance of the Unit and enhancing its turnover.
Following is a list of Projects, for which I was the Project Manage. (See page 7)

ITEM

NAME OF THE PROJECT

ESTIMATED
VALUE Rs.
(Mn)

Design and Construction of Hostel Complex for the University of Sri


Jayawardanapura

160

Design and Construction of an Office Building for the Department of Agrarian


Development Colombo 07

37

Renovation of Building for the Ministry of Transport at Narahenpita

Renovation of the Ministry of Power & Energy premises Colombo 10

18

Design & Construction of a new Building for the Prime Minister's Office
Colombo 7

51

Development of DMT Office Building at Werahera - Stage I

53

Development of DMT Office Building at Werahera - Stage II

12

Development of DMT Office Building at Werahera - Stage III

16

Renovation of the Ministry of Foreign Affairs Building, Colombo

46

10

Refurbishment of the Conference Hall of Prime Minister's Office, Colombo 7

..

Designation

Deputy General Manager (EPC-CS)

Organization

Central Engineering Consultancy Bureau (CECB)

Duration

2006 to 2013

In 2006, I was promoted as the Deputy General Manager in charge of all matters connected with
Engineering, Procurement, Administrative and Financial issues pertaining to the EPC Division of the
Western Province (EPC-CS)
I also had to assist in other connected matters such as for recruitment of Technical Staff and further
aspects of procurement activities for Works, Supplies and Services, to ensure that such activities were
carried out in compliance with Government Procurement Procedure.
I was responsible for the preparation and checking of Consultancy Agreements, preparation of Project
Proposals, checking and approval of Tender Documents, Technical Specifications, Project Estimates,
Scope of Works, etc. During this period I had the opportunity to work as a member in many Technical
Evaluation Committees (TEC) and Procurement Committees (PC).
Following is a list of Projects of which I was in charge as the Deputy General Manager (EPC-CS).
ITEM

NAME OF THE PROJECT

ESTIMATED
VALUE Rs.
(Mn)

Design and Construction of the Parking area of Narahenpita Economic Center

21

Design and Construction of theExtension to Repository Building for Department of


National Archives in Colombo 7

585

Design and Construction of theEconomic Center at Piliyandala - Bokundara

45

Renovation of Existing Bus Stand at Nugegoda

17

Construction of Toilet Block for Kalubowila Hospital

15

Construction of Sewage and Waste Water Treatment Plant for the National Institute of
Education -Maharagama

22

Construction of the Police Station at Biyagama

70

Construction of theSathipola at Pattiwila- Stage I

25

Construction of theSathipola at Mawaramandiya- Stage I

53

10

Construction of the Sports Ministry Building at Colombo 7

403

11

Renovation of the existing Canteen at Department of Motor Traffic -Narahenpita

11

12

Construction of the Sathipola at Pattiwila- Stage II

23

13

Construction of the Sathipola at Mawaramandiya- Stage II

31

Designation

Deputy General Manager (Hospital Works)

Organization

Central Engineering Consultancy Bureau (CECB)

Duration

During the Year 2008

During this period I was assigned to work as the Deputy General Manager (Hospital Works), of Central
Engineering Consultancy Bureau (CECB) for one year, in addition to the other duties assigned to me. The
main task of this unit was to provide Consultancy Services for the construction of new buildings and
renovation of existing buildings of Government Hospitals and other Healthcare Institutions functioning
under the Ministry of Health. For these, funding was done mainly by the Government of Sri Lanka. This
was the period I was exposed much to Operation and Maintenance aspects of Engineering.
I was entrusted by the Senior Management to find out the reasons for the financial losses this Unit was
experiencing to formulate and adopt suitable measures for making the unit profitable.
.

Designation

Deputy General Manager, Research and Development (R&D)

Organization

Central Engineering Consultancy Bureau (CECB)

Duration

2006 onwards

CECB established its Research and Development Unit in January 2006 and I was privileged to be
appointed as its Deputy General Manager.
I had to involve in many research and development works in connection with day- to-day engineering
problems faced by the staff of the EPC Units.
One main area of my research interest is the use of earth as a basic engineering material. We believe that
the application of stabilized earth for housing has by now been developed to a fairly good level over the
past few years with prototype applications.
Following is a list of projects I handled as the Deputy General Manager (R & D).

NO

1
2
3

4
5
6
7

PROJECT/ ITEM
Design and fabrication of an easily dismantled portable
type, Canopy/ Supporting structure, for the Jana
Karaliya mobile theatre, that can accommodate 800
spectators
Design and Construction of Kiosks for the Rasa Kevili
Gammanaya for the SME in the area.
Design and Fabrication of accessories for Toilets for the
Disabled, at a cost of 1/5th of the market price.
Design and Construction of a Mortuary Table to European
Standards, at a cost of 1/5th the market price (RS.205
million)
Design and Fabrication of an electrically operated Sand
Sieving machine and manually operated earth block
making machine.
Design and Fabrication of a space saving (4mx6m) Mobile
Toilet Block, that can serve 18 users simultaneously.
Development of a cost effective stand to support drinking
water tanks, for the Northern and Eastern Provinces.

REMARKS

YEAR

In fabric and steel sections

2003

With rammed earth walls

2003

Locally available stainless


steel sections. Currently
being used in CECB Design
Building Projects

2008

2008
2008
In light weight steel sections

2011

In stabilized earth

2012

Designation

Consultant (EPC-Works)

10

Organization

Central Engineering Consultancy Bureau (CECB)

Duration

2006 to date

Following is a list of projects in which I worked as a Consultant (EPC-Works)


ITEM

NAME OF THE PROJECT

COST (Rs)

YEAR

Construction of an Office Building for the Ministry of


Environment at Battaramulla

1Bn

2011

Extention of the Administration Building for Faculty of


Management at University of Sri Jayawardenapura

50 Mn

2013

Planning of Temporary Housing and Ancillaries for IDP


settlements in Manik Farm

75 Mn

2009

Designation

Technical Auditor

Organization

Central Engineering Consultancy Bureau (CECB)

11

Duration

2011 to date

I have been assisting the Internal Auditor of CECB to clarify various complicated technical issues related
to engineering projects. In a broader sense, Technical Auditing refers to auditing a Project from its
inception up to the O&M stage.

Designation

Additional General Manager (EPC-WP2)

Organization

Central Engineering Consultancy Bureau (CECB)

12

Duration

January 2013 to date

I was appointed as the Additional General Manager in charge of the EPC Western Province in 2013.
During this period I have been involved in many projects, some of which are listed below,

ITE
M

NAME OF THE PROECT

ESTIMAT
ED
VALU
E
Rs. (MN)

Design and Construction of Cat Area at the National Zoological


Gardens, Dehiwala

60

Construction of Walk-in-Aviary for Exotic Birds, for National


Zoological Gardens, Dehiwala

22

Design and Construction of the Radio Therapy Department - National


Cancer Institute, Maharagama

274

Design & Construction of Environmental Secretariat Building at


Battaramulla

Development of S De S Jayasinghe Play Ground in Dehiwala

50

Construction of a Driving Testing Lane and Parking facilities for the


Department of Motor Traffic at Werahera

93

Design & Build Contract to Convert Gym Area of Sri Lanka Institute
of Tourism & Hotel Management (SLITHM) into Class Rooms &
other facilities

13

Developments to the Beddagana Bio- Diversity Park

181

Design and Construction of Sports Ministry Building at Colombo 7

432

10

Balance works for the completion of Police Station - Borella

29

11

Balance works for the completion of newly constructed Police


Complex, at Narahenpita.

95

12

Construction of Accommodation building for Police and Paramedics


(OCH-Southern Section) in Kotalawala.

39

13

Outer Circular Highway to the city of Colombo Project (Southern


Section) Toll Plazas - Kothalawala Interchange

162

14

Design and Construction of Sewage and Waste Water Treatment Plant


- National Institute of Education, Maharagama

20

15

Storm Water Drainage & Treatment Plant for Economic Centre at


Bokundara

12

13

1,126

16

Design and Construction of Warehouse Complex for Colombo


Commercial Fertilizer Limited in Wattala

54

17

Construction of the District Labour Office - Negombo (Stage I)

35

18
19

Improvements to Car Park and adjoining buildings of Prime


Minister's Office in Colombo 7
Renovation of Ministry of Economic Development Deputy Minister's
Office Building, Colombo 10

40
43

20

Design and Construction of Steel Trusses for Bridges at Samurdhi


Mawatha & Makola, Udupila Road

11

21

Design and Construction of Office and Laboratory Complex, at


Battaramulla for Government Analysts Department

1,214

22

Design and Construction of a Lecture Hall Building for the Faculty of


Management Studies and Commerce, at University of Sri
Jayawardenapura

123

23

Removing and Reloading the Skeleton of Blue Whale in the National


Museum

01

14

CHAPTER 3
CONTINUING PROFESSIONAL DEVELOPMENT (CPD)
1. Professional Qualification and Memberships

Fellow of the Institution of Engineers, Sri Lanka (F 997)


Member of the Society of Structural Engineers, Sri Lanka (CM 094)
Member of the Association of Consulting Engineers, Sri Lanka
Member of the Geotechnical Engineering Society

2. Training and Seminars participated in for CPD

CPD TRAINING DESCRIPTION

Facade Design & Engineering in Colombo

Emotional Balancing for Higher Productivity in


Bangalore, India
Environmental rules & regulations in
construction Industry, by ICTAD

YEAR

NO OF
HOURS

2015

2015

40

2015

OHSAS 18001 Occupational Health & Safety


Management Systems, by SLSI

2015

16

Workshop on Building Strong Interpersonal


Skills, at CECB

2015

Interactive Workshop on Working with


Happiness, by Ceylon Chamber of Commerce

2014

Structural strengthening workshop

2014

Seminar on glass facades to high rises in


Colombo
4th Annual sustainable Building
Materials & Technologies Seminar in
Dubai

2013

2013

16

2012

2012

60

Knowledge and experience sharing seminar on


Disaster and Management conducted by
M.O.D.M
Insurance Foundation Certificate, conducted by
SLII
15

TOTAL
NO.OF
HOURS
FOR THE
YEAR

80

24

Research Methodology, conducted by UOC

2012

60

Human Settlement, conducted by ICTAD

2010

Design Built/EPC/Turn Key Contracts, by


ACESL

2010

Training as an Investment, by SLF

2010

Advances in Tall Buildings and Green Building


Technology, by University of Peradeniya

2009

16

Nano Technology

2009

Enhancing Awareness of Taxes and Taxation

2009

Termite Control and Painting

2008

Importance of Transport Infrastructure for


National Development

2008

Code of Ethics, by IESL

2008

Strategic Leadership in the 21st


Century

2008

Low cost housing and Technology in Nepal

2007

16

Performance Management for Better Result

2007

Compressed Stabilized Earth Blocks in Auroril,


India
12th ERU Symposium, by University of
Moratuwa

2006

40

2006

48

128

24

24

24

24

Tsunami Housing Support Projects in India

2005

24

24

National Conference on Construction &


Technology, Fair India

2003

24

24

Conference of Ground Improvement


Techniques, organized by SLGS
Seminar on Managing Projects-Issues &
Challenges

2002

2002

16

2001

08

Symposium on Research for Industry


University of Moratuwa
16

Seminar on Concrete for Y2K-Singapore

2000

16

Accounting for Engineers by IESL

1997

40

Advanced Concrete Technology for tall


buildings, by University of Moratuwa

1997

16

Advanced Concrete Technology for tall


buildings, by University of Moratuwa

1996

16

Structural Design of High Rise buildings, by


University of Moratuwa

1996

16

SLGS Seminar on Site Investigations

1996

Seminar on Piling & Ground Improvement, by


SLGS
Micro Computer Workshop-Computer Aided
Drafting

1995

1995

40

48

1994

120

120

Management Development for Engineers, by


IESL

17

16

56

40

CHAPTER 4
OTHER PROFESSIONAL SERVICES
MENTORING AND TRAINING OF YOUNG ENGINEERS/ SUBORDINATES
4.1. Undergraduates
During my professional career I have trained many Civil Engineering and Earth Resources Engineering
undergraduates. I have guided them on goining sufficient knowledge on application of theory to site
conditions. I have also guided them in Report Writing and maintaining their Daily Diaries properly. I have
explained to them the importance of site safety, quality assurance of works, environmental impact
assessment, labour control, etc. I insist on them to prepare sketches, rates for special works, etc. On many
occasions I have advised them to refer the Drawings and Specifications prior to commencement of the
work at site. This would help to avoid unnecessary delays. I have encouraged them to use the CECB
Library and to refer the drawings of completed projects, to get an idea on detailing. I have explained to
them the importance of attending Technical Sessions of IESL in order to improve and enhance their
knowledge of engineering and to get to know the senior engineers in the industry.
4.1.1. Presentations Made

Undergraduate to Chartered Engineer for undergraduate trainees of Moratuwa and Peradeniya.

4.2. Graduate Engineers


Providing training for Graduate Engineers has been a high priority during my professional life. I
encourage them to maintain an interest on improvement of engineering knowledge and help them,
educating them on the application of theoretical knowledge in actual site conditions under various
constraints. Not only engineering, but also the ethics and art of working with subordinates at site and in
the Office in order to achieve the project objectives within a peaceful environment; have been my main
areas of advice for juniors.
I give them the opportunity to be trained for Professional Review Examinations. I have arranged site
visits for them to gain experience on special works. I am of the view that when they are given
responsibility by working independently, they can develop self-confidence to discharge their duties.
Young engineers and subordinates are always welcome to attend the Progress Review Meetings and
Project Discussion Meetings in order to familiarize them in conducting such meetings. Apart from that, I
make available opportunities for those who are not in the permanent cadre to sit for Professional Review
Examinations. I also impress upon them the importance of keeping a note book for recording day-to-day
works.

18

4.2.1 Presentations Made


I have made the following Presentations.

Graduate to Professional Engineer - A carrier guide for graduate engineers.


60,000 houses in 100 days A Proposal for Manik Farm temporary housing.
Janakaraliya Mobile Theater with 800 seating capacity
The Role of Site Engineer, Resident Engineer and Project Manager, with respect to a
building site
Types of Buildings
Personality & productivity improvement through understanding self

4.3. Middle Level Technical Personnel


I have given training for Diploma level technical personnel too. I have guided them to gain sufficient
knowledge on application of theory to site conditions. I have guided them in Report Writing and
maintaining their Daily Diaries properly. I have explained to them the importance of site safety, quality
assurance of works, material testing at site, labour control, etc. On many occasions I have advised them to
refer the Drawings and Specifications prior to commencement of work at site. They were trained for the
certification of Contractors claims, Extra work orders, etc. I have guided them to visit other sites
whenever special works are being carried out in order to gain experience.
4.3.1. Presentations Made

Low rise buildings Options available


Construction using Stabilized Earth
Insurance for Engineering works

4.4. Subordinates
In my professional career I have contributed towards the training of many Engineering Assistants,
Technical Officers and Work Supervisors. My main concern has been to improve their technical
knowledge on site. I have explained to them the importance of the quality of work. Whenever possible I
help them to interpret Specifications and Guidelines. I have arranged Workshops to improve their
technical skills and to resolve problems encountered during work at Sites. I also have helped them to
improve their language skills which is of utmost importance in communication, report writing and
maintaining daily records at Sites. I encourage them to follow related courses conducted by recognized
Institutions to improve their skills and knowledge. I give them the opportunity to attend these classes even
during office time with the approval of the higher management. I have explained to them to maintain
safety measures to maximum level at Site and within the Laboratory in order to ensure the safety of men,
machinery and Works.

19

CHAPTER 5
Involvement with IESL Activities
5.1 I have been a regular, consistent participator in evening lectures organized by the IESL from 1994
to date. This has helped me to appreciate other Engineering disciplines while enhancing
knowledge in my own field.
5.2 I was a member of the Civil Engineering Sectional Committee, for Session 2012/2013 and
2013/2014.
5.3 The concept of The Building Clinic, the much popular event of IESL annual Techno
Exhibition, was a brain child of mine.
5.4 Served as a panel member in Building Clinics held in 2015 in Galle and Maharagama.
5.5 Presentations were made in the Seminar Room at Techno 2013/2014 & 2015.
5.6 Served as a panel member of Building Clinic at Techno 2013/2014 & 2015.
5.7 A presentation on Cost Effective Construction Methods, Materials & Technologies was made
on 9th Oct 2013, at the Dr. Kulasinghe Auditorium, at IESL.
5.8 Participated in 2 Workshops in 2013 to finalize the Corporate Plan of IESL in 2013.
5.9 A presentation was made on the theme Sustainable Infrastructure Construction in Developing
Countries at the seminar organized as a part of IESL Annual Sessions in 2015.
5.10

Visiting Lecturer at IESL College of Engineering in the years 2014 & 2015.

20

CHAPTER 6
Corporate Social Responsiblitlities Activities
6.1 Flood affected areas in the year 2003 Ratnapura, Kalawana
Designed and Constructed low cost, fast track steel sheds for the displaced. Involved in distributing
dry rations and drinking water to the affected people.
6.2 Drought affected area in the year 2004 Embilipitiya
Involved in distributing drinking water to the affected people.
6.3 Tsunami Rehabilitation Works
CECB organized many projects to help people who were affected due to the Tsunami of December
2004. CECB organized a road clearing program in Moratuwa area. I was directly involved in this
task for organizing and coordination of works. We also distributed essential items for several people
in the Moratuwa area.
Voluntarily assisted in number of Tsunami housing schemes in the Southern area in 2005/2007
6.4 Post war Settlement of Refugees
Volunteered to work in Manik Farm during February March 2009. I was involved in developing
a cost effective temporary housing system for the resettlement of people affected by war.
6.5 Member of the Buddhist Association
a) Responsible for starting the annual Wesak Dansela in the year 2003 which we have continued
up to date
b) Responsible for starting the Annual Sila Samadanaya in the year 2013
c) Responsible for starting Annual Blood Donation Campaign in 2009
d) Directly involved in the Design & Construction of a disabled access to Ruwanwelisaya, as the
annual CSR project by CECB, in 2012
e) I played a lead role in constructing 3 Chitya at 3 Senasanas, including a Bana Salawa for
Sambuddhathwa Jayanthi, in 2011

21

6.6 Trade Union Activities


I have been an executive committee member of the Engineers Association of CECB since 1998.
During this period I functioned as the President for 2 years (2000-2001). I have also been the Editor
of its monthly newsletter The Consultant during the years 2007 and 2008.
6.7 Motivator

Organized monthly Music Programmes to enhance the soft skills of subordinate staff.

Organized Monthly Presentations on different themes to enhance the presentation skills of


subordinate staff.

6.8 Visiting Lecturer

IESL

University of Vocational Technology Ratmalana (Univotec)

- College of Engineering

..

Eng. U.S.KARUNARATNA
B.Sc, Eng. (Hons),CEng, FIE. (SL), MConsE (SL), MSSE (SL)