The Specialist For trading Contracting and
Engineering services
our primary objective is to grow and
achieve recognition and status for our
commitment to deliver an unparalleled
service, unequalled quality and always
within
ithi time
ti & budget
b d t philosophy
hil h for
f both
b th
ourselves and our clients, whilst remaining
dedicated towards the task, mission & core
values.
values
The Specialist For trading Contracting and Engineering services was initially
established to support the reconstruction of Iraq’s infrastructure in 2004 providing a
range of expertise within various sectors and in particular Oil and gas, Power
Distribution networks and Main Water and Waste Water networks within all of the
South East provinces.
The specialist for Trading, Contracting, and Engineering Services: have worked
with Reyam International since 2005 till 2007 on the Installation and Commissioning of
Complex Oil field control systems, Power Projects and Telecommunications systems.
ORGANISATION CHART
SENIOR
ENGINEER
DIRECTOR
DIRECTORS
3 Construction two classroom, computer room, Al Hajir, wilayat Ibri
CDO room, server room in two school
CDO room, server room in two school
4 Construction two classroom, computer room, Wadi Al Ain, wilayat Ibri
CDO room, server room in two school
5 Construction of three classroom, CDO room, and Sulaif, wilayat Ibri
server room in two school
6 Construction of five classroom, 14 toilet, Physics AL Iraqi, wilayat Ibri
L b t
Laboratory, and server room
d
1 A Seeb waste water project Phase 4 Al Muabella
1 A Seeb waste water project Phase B5 Al khod
Commissioning
Pre-Construction Logic Linked
Procedures &
Design Programme
Method
Assessment Development
Statements
P C
Pre-Construction
t ti and d Design
D i Period
P i d
Punch List
FAT’s BMS O&M
Coordination
SAT’s Logic Manual
& System
Witnessing Witnessing Coordination
Turnover
Project
Post
End User Start – Up Review
Handover
Training & Operations & Lessons
M it i
Monitoring
Identified
140
117
117
120 114
NUMBER of SYSTEMS
95
100
81
77
80 73
707069
66
60 50
40 3938
40 35
31
N
20 19
1614 17 17171616
20 12 13121111 1412
98
64 7 8
4 53 54
10 10 21 1 1 00 20 0 0 0 0
0 A32 A 33 A 37 Reagent A40 Ut ilit ies A 50 Solvent A 51 Tank A 52 WwTW A 53 A54 WW A 60 Pipe A 61 Roads A62 Drainage A63 Fire A70 M ain Sub A90 Sit e
Drumst ore & Warehouse Store Recov Farm Incinerat or St ripper Racks Wat er Wide
Eng
AREA
700
600
500
A c t iv it i e s C o m p le t e
400
300
200
100
0
10- 17- 24- 31- 14- 21- 28- 12- 19- 26- 2- 9- 16- 23- 30- 13- 20- 27- 11- 18- 25- 1- 8- 15- 22- 29- 6- 13- 20- 27- 10- 17- 24- 31- 14- 21- 28- 7- 14- 21- 28- 4- 11-
7-Jun- 5-Jul - 6-Sep- 4-Oct - 3-Jan- 7-Feb-
May- M ay- M ay- May- Jun- Jun- Jun- Jul - Jul - Jul - A ug- Aug- Aug- A ug- Aug- Sep- Sep- Sep- Oct - Oct- Oct - Nov- Nov- Nov- Nov- Nov- Dec- Dec- Dec- Dec- Jan- Jan- Jan- Jan- Feb- Feb- Feb- M ar - Mar - M ar - M ar - Apr - Apr -
02 02 02 02 03 03
02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 03 03 03 03 03 03 03 03 03 03 03 03 03
W1 Cumul ati ve 18 18 18 18 18 18 28 30 36 37 44 46 74 78 83 86 94 106 110 113 134 154 168 182 201 222 247 280 314 345 361 370 383 383 452 453 455 464 466 482 511 522 546 549 558 572 574 582 588
Sub W2 Cumul ati ve 17 17 17 17 17 17 17 17 17 19 20 24 27 28 46 60 67 75 79 84 89 99 129 147 162 187 217 240 291 318 331 352 369 369 371 376 380 384 398 403 413 424 436 456 461 469 480 499 511
W2 Cumul ati ve 17 17 17 17 17 17 17 17 17 18 18 20 20 20 24 39 45 48 60 74 82 84 95 111 131 143 157 193 238 270 287 313 339 342 344 365 371 377 379 384 387 403 415 421 433 444 463 472 485
Sub SM CCCumul at i ve 28 28 28 28 28 28 28 28 28 29 30 32 32 33 40 45 49 51 56 57 59 59 61 62 70 71 84 93 107 126 137 160 173 173 174 187 189 201 217 222 236 248 279 295 305 320 354 380 401
SMCC Cumul at i ve 18 18 18 18 18 18 18 18 18 19 19 19 19 20 21 29 32 35 37 40 47 47 50 51 60 61 69 78 97 116 125 150 162 162 162 174 176 179 195 207 217 225 241 246 268 280 312 336 376
Week Ending
SAFETY
QUALITY
PLANNING
Construction,
C i D
Design
i &
Management Regulations
SAFETY MANAGEMENT
As with the most reputable companies on the International stage The Specialist For
trading Contracting and Engineering services regards the safety and health of all
its employees and that of its clients and subcontractors as one of its highest priorities,
and in order to maintain this focus we have set ourselves an objective of “Zero
Accidents” in everything we do
Accidents do.
The Specialist For trading Contracting and Engineering services operate under
CDM Regulations throughout our contracts with the Military and Main Contractor
clients and observe Safety Management in all contracts we undertake.
• We recognize that we are obliged to take cognizance of the established local laws
and regulations within the different arena’s where we operate and ensure the
protection of the local people and the local Environment.
• We carry out our operations in a manner which will ensure the health, safety and
security of all our employees and the public at large.
QUALITY MANAGEMENT
The The Specialist For trading Contracting and Engineering services Board of
Directors are committed to a “Policy” of providing it’s clients with an “Total Quality
Management Service”. To this end the Company has adopted a “Quality System” in
accordance with “ISO-9001” and CDM Regulations.
As a Company we realise the need for not only a Quality Operating System but for a
Qualityy Control mentalityy through
g all levels of the business. Quality
y training
g is essential,,
from design, through Procurement and Construction, through to final Commissioning
and Handover.
All personnel employed by the company are inducted in the Companies Quality Policy
and we aim to ensure that all assigned personnel give the highest levels of Quality
Assurance within their works.
Quality Audits measure the Companies Quality Standards and the results of these
audits are used as a tool for future training.
The Specialist For trading Contracting and Engineering services consider planning as a
integral part of any project. The planning stage prior to commencement of the works is
critical in the transition from design to procurement, from procurement to Construction,
and finally through to Commissioning and final close out.
We take an extreme interest in the overall project programme to identify the needs for
critical systems to be brought on line as early as possible within the construction cycle.
By doing this we can make sure that the ‘live’ status of early utility systems will benefit
progressive system handover and commissioning of the remaining systems.
We ensure that the planning programme remains a ‘live’ tool throughout the project
lifetime where we offer assistance with progress input and automatically run metric
lifetime,
calculations that can be measured against the ‘timeline’ to identify where differentials in
the schedule could impact on the overall time frame for completion.
Individual priority systems are segregated from the overall programme schedule and
tracked independently as ‘milestone’ line items in order to assure dependency for
follow on systems.
The completion of all systems are reliant on the best information available for smooth
transition through to completion