(Repair for equipments and various parts, summary of POWER PLANT MAINTENANCE )
1. Shell & tube type HEAT EXCHANGER
General method
Drilling
hydrofracturing
Chemical
circulation
line
Pump
Chemical
Tank
Large CCW (Capacity 30ton) : ST-407S(50% Solution), chemical circulation for shell side takes 48hrs, tube side takes 48hrs.
* The large equipment takes longer time to clean, the actual circulation has little effect.
C.W Exchangers
Plugged tubes.
Physical cleaning(drilling) cause leakage
in tube.
Before: 2.90g
After: completely
dissolved
50, 60min
Before 4.87g
After: completely
dissolved
40, 90min
50, 90min
Before 1.59g
Before 1.59g
Barnacle shell(Ca) is
completely dissolved but
only flesh remain.
After 0.02g
Before cleaning
(Film scale cause of coolant additives)
After cleaning
After cleaning
2) Condenser
This is an equipment to exchange from used steam for turbine operating to water with condensation. It material made from Titanium for
seawater and stainless steel for fresh water. The scale formed on the inner wall of the tube makes decreases heat transfer efficiency,
To maintain the efficiency clean the tubes periodically. But scale removal takes a lot of cost and time because the scale is various ingredients
buildup with high heat. The time of this equipments maintenance takes is affect on the time it takes the entire power plant maintenance. * *
* General size of condenser
Related equipments
Condenser
Evaporator
After cleaning
Before cleaning
Scale diagram
Hydrofracturing : Inserting the high-pressure water spray nozzle to remove the scale.
* Problems 1) Require a lot of time to work.
2) Require expensive equipment and highly skilled worker.
3) It is very difficult to do cleaning work on site, Move the equipment to work place.
4) Impossible to remove the scale perfectly.
Hydrofracturing diagram
[6]
Chemical
inlet
Heater
(steam pipe)
Chemical
tub
Chemical
outlet
** Use a device made of steel or aluminum designed to fit into the condenser can be assembled by bolts, nuts. The device has chemical inlet, outlet
and air vent for emission gas.
ii) Application procedure
a. Attach the save chemical device.(assembly)
b. Input chemical into upper chemical inlet line. (Chemical must be slowly inject due to scale melting gas emission)
c. Use lower drain line discharge chemical into chemical tub.
- Repeat b, c depending on site conditions.(Chemical cleaning 3~5 days, high pressure water jet 3~5 days)
- Increasing the higher chemical temperature can save chemical dosage amount. (Higher temperature increases chemical scale solubility)
- Chemical : ST-407 (5~15%)
- Chemical temperature : 60 ~ 80
Tank
Pump
Chemical circulation each tubes
ii) Application device : Connect chemical circulation hose to each tubes(ST-407, 10%
solution 3 times exchange, chemical temperature 50) high press water jet
[ Front]
[ Rear ]
Pin side
Before
Tube side
** Application examples 1. Listrindo(Indonesia) Gas, coal Power Plant AFC (Air Fan Cooler)
Application method: Spray the chemical (RR-101B, 30%) and prepare vinyl at the bottom of AFC to correct chemical drain for circulation.
Picture of AFC
AFC
AFC cleaning
Before
After
** Application examples 2. PLN(Indonesia) Gas, diesel Power Plant AFC (Air Fan Cooler)
Picture of AFC
Bottom of device
Close up
[General method]
Connecting
pump
Disassemble
Dipping 30 min
into inhibitor
remover
reassembling
Drying and
rubber gasket
reassembling
Rinse
Assembling
Heat exchanger
Chemical bath
PUMP
Test operation
Chemical Bath
After cleaning
Picture of
Cooling water side scale
& Rolling oil side scale
Target
heat
exchanger
Connect
chemical
circulation hose
MSR-100, 50, 5hr
4. Chlorination
: By using electric power with generating chlorine to use cooling water which It will be used to remove sea shell and oyster shells and the
inner side is titanium material.
i) General method : Disassemble each unit and removing the scale at electrode by hand.
ii) Suggest method : ST-407 15% solution, for 8~12hr circulation.
iii) Below pictures chlorination total capacity : The quantity of chemical circulation (water+chemical) : about 7ton(1,850 gallon)
iv) Remarks : It occur much of air bubble in processing the chemical and scale reaction and because of air bubble if the chemical and scale do
not contact fully, the scale may not dissolve easily. So please remove the air bubble by circulation and reverse circulation processing repeatedly.
** Application examples : PLN - Indonesia
Filter bundle
Filter Element
[Methane ]
MSR-100
Picture of reverse cleaning
6. For remove grease from new turbine blade (Boryeong power plant)
** After manufacturing the turbine, it use rust inhibitor(or grease) on the turbine surface and before installation the turbine, the rust inhibitor
would be remove by using incombustible chemical(M.C) but this is poisonous and contained carcinogenic agent. So it can substitute water
soluble chemical as below.
** Suggest method : Mclean-100 30% solution spraying (10~30minute staying) High pressure water washing Drying
Chemical spray
After
Chemical circulation
3) Wide area parts with allowing water wet(No have electric wire)
i) It use the RR-101B 100% by spraying evenly on the surface of parts.
ii) Do high pressure water wash 10~30 minute lately
iii) Dry naturally or with high pressure air wind
4) Wide area parts but not allowed water wet (it have electric wire)
i) Cover with highly hygroscopic fabric on the parts surface.
ii) Do spay the RR-101B 100% on the fabric enough.
** Incase thick rust and scale, if need to remove rapidly with raise up reaction time, you can use high temperature air wind or steam to reduce
the processing time.
iii) Take off the fabric and scour with watered fabric or alcohol.
5) Thin inner diameter pipes inside : chemical circulation (Yeong kwang Nuclear power plant)
i) Chemical : Iron oxide scale : RR-101B 30% Solution
: Seawater based scale, Calcium(Ca) based scale : ST-407 15% Solution
: Silica(SiO2) based scale : ST-205 30% Solution
ii) Temperature : Room temperature ~60
iii) Application : Do connect with flange and chemical circulation for 30 min to 4 hours and then water washing.
Before
After
Reference
Fig excerpt from www.babcock.com
Filter cage
Picture of filter
Reference - Boryeong Thermal Power Plant, Taean Thermal Power Plant, Yeong kwang Nuclear power plant => Korea Power plant.
- PLN, Indonesia Power, PLTD => Indonesia Public Power plant.
- Listrindo : Indonesia Private Power plant.
T. R&I company
Ura, Yunhee Lee
Ura,
Business Organizer
M : +82 10 3630 6042
E : trnisales@gmail.com
Joey Kim
Business Operator
M : +82 10 3890 6338
E : trnichemical@gmail.com
Office: +82 70 4225 0068
Fax: +82 2 400 0068